Mounting and supporting structure of sludge precast pile

By designing an installation support structure of silt prefabricated piles including main mechanism and auxiliary mechanism, the problem of inconvenient installation and protection of traditional structures is solved, and convenient installation and stability enhancement of the structure is achieved.

CN222771476UActive Publication Date: 2025-04-18ZHEJIANG HUIJING CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421670201.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2025-04-18
Estimated Expiration
2034-07-15

AI Technical Summary

Technical Problem

The installation support structure of traditional sludge prefabricated piles has problems such as inconvenient installation and protection.

Method used

An installation support structure of sludge prefabricated piles including main body mechanism and auxiliary mechanism is designed, and the protective bollard and fixing ring are fixed in the connecting shell through threaded holes and fixing bolts, structural stability is enhanced by adhesive layer and filling layer, and the square mounting frame and concrete reinforcement cage are fixed in position through I-shaped fixing base and threaded holes.

Benefits of technology

It realizes the easy installation and protection of prefabricated silt piles, and enhances the stability and protective effect of the structure.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222771476U_ABST
    Figure CN222771476U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of supporting structures, in particular to an installation supporting structure of a sludge precast pile, which comprises a main mechanism and an auxiliary mechanism, the auxiliary mechanism is fixedly arranged at the bottom of the main mechanism, and the main mechanism comprises a circular fixed column body, a first T-shaped connecting shell and a second T-shaped connecting shell. A first T-shaped connecting shell is fixedly arranged at the top of the circular fixing column body, and a first protection column, a second protection column, a third protection column and a fourth protection column are fixed to the middle of the first T-shaped connecting shell and the middle of the second T-shaped connecting shell through a first set of threaded holes. The first fixing ring and the second fixing ring are fixed in the first protective column, the second protective column, the third protective column and the fourth protective column through the first group of fixing bolts and the second group of fixing bolts; and through the design that the first bonding layer fixes the damp-proof filling layer and the concrete reinforcement filling layer in the circular fixing column body, the purpose that the installation supporting structure of the sludge precast pile is convenient to install and protect is achieved through the design that the first bonding layer fixes the damp-proof filling layer and the concrete reinforcement filling layer in the circular fixing column body.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of supporting structures, in particular to an installation supporting structure for a silt prefabricated pile. Background Art

[0002] Soft soil is a saturated clay soil with low shear strength, high compressibility, low permeability and high natural water content. Silt and silty soil are the main types of soft soil. Silt soil refers to clay soil with a natural water content greater than the liquid limit and a natural porosity ratio between 1.0 and 1.5. This type of soil is mainly distributed in my country's southeastern coastal areas and inland areas along and around large rivers, lakes and lakes. Due to its high compressibility and low strength, the foundation settlement is large and mostly uneven, which can easily cause cracks in building walls and overturning of buildings. In engineering construction, it must be given enough attention.

[0003] The traditional installation support structure of silt prefabricated piles does not solve the problem of inconvenient installation and protection. Therefore, we propose an installation support structure of silt prefabricated piles. Utility Model Content

[0004] The purpose of the utility model is to provide an installation support structure for a silt prefabricated pile to solve the problems raised in the above background technology.

[0005] In order to achieve the above purpose, the utility model provides the following technical solutions:

[0006] A mounting support structure for a silt precast pile comprises a main mechanism and an auxiliary mechanism, wherein the auxiliary mechanism is fixedly arranged at the bottom of the main mechanism, the main mechanism comprises a circular fixed column, a first T-shaped connecting shell, and a second T-shaped connecting shell, and the first T-shaped connecting shell is fixedly arranged at the top of the circular fixed column.

[0007] Preferably, a second T-shaped connecting shell is fixedly arranged at the bottom of the first T-shaped connecting shell, a first group of threaded holes are opened on the surfaces of the first T-shaped connecting shell and the second T-shaped connecting shell, a first protective column is fixedly arranged inside the first group of threaded holes, a second protective column is fixedly arranged on one side of the first protective column, and a third protective column is fixedly arranged on one side of the second protective column, which is conducive to better fixing the first protective column, the second protective column, the third protective column and the fourth protective column in the middle of the first T-shaped connecting shell and the second T-shaped connecting shell through the first group of threaded holes.

[0008] Preferably, a fourth protective column is fixedly provided on one side of the third protective column, a second group of threaded holes are provided on the surfaces of the first protective column, the second protective column, the third protective column and the fourth protective column, a first fixing ring is fixedly provided inside the first protective column, the second protective column, the third protective column and the fourth protective column, a first group of fixing bolts is fixedly provided on the surface of the first fixing ring, which is conducive to better fixing the first fixing ring and the second fixing ring inside the first protective column, the second protective column, the third protective column and the fourth protective column through the first group of fixing bolts and the second group of fixing bolts.

[0009] Preferably, a second fixing ring is fixedly provided at the bottom of the first fixing ring, a second group of fixing bolts is fixedly provided on the surface of the second fixing ring, a first adhesive layer is fixedly provided inside the circular fixing column, a moisture-proof filling layer is fixedly provided inside the first adhesive layer, a second adhesive layer is fixedly provided inside the moisture-proof filling layer, and a concrete steel filling layer is fixedly provided inside the second adhesive layer, which is conducive to better fixing the moisture-proof filling layer and the concrete steel filling layer inside the circular fixing column through the first adhesive layer and the first adhesive layer.

[0010] Preferably, the auxiliary mechanism includes an I-shaped fixing base, a square mounting frame, and a third group of threaded holes. The square mounting frame is fixedly arranged on the top of the I-shaped fixing base, and the third group of threaded holes is opened on the top of the square mounting frame, which is conducive to better fixing the square mounting frame to the top of the I-shaped fixing base through the third group of threaded holes.

[0011] Preferably, a third group of fixing bolts are fixedly arranged inside the third group of threaded holes, a fourth group of threaded holes are opened at the bottom of the I-shaped fixing base, a fourth group of fixing bolts are fixedly arranged inside the fourth group of threaded holes, and a concrete steel cage is fixedly arranged at the bottom of the fourth group of fixing bolts, which is conducive to better fixing the concrete steel cage to the I-shaped fixing base through the fourth group of fixing bolts.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. The installation support structure of the sludge precast piles is designed to fix the first protective column, the second protective column, the third protective column and the fourth protective column to the first T-shaped connecting shell and the middle part of the second T-shaped connecting shell through a first group of threaded holes, and to fix the first fixing ring and the second fixing ring to the inside of the first protective column, the second protective column, the third protective column and the fourth protective column through a first group of fixing bolts and a second group of fixing bolts. The moisture-proof filling layer and the concrete steel filling layer are fixed to the inside of the circular fixed column through a first adhesive layer and a first adhesive layer, so as to achieve the purpose of facilitating the installation and protection of the installation support structure of the sludge precast piles.

[0014] 2. The installation support structure of the silt precast pile achieves the stability of the installation support structure of the silt precast pile by fixing the square installation frame to the top of the I-shaped fixed base through the third group of threaded holes and fixing the concrete steel cage to the I-shaped fixed base through the fourth group of fixing bolts. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the three-dimensional structure of the circular fixing column, the first T-shaped connecting shell, the second T-shaped connecting shell, the first set of threaded holes, the first fixing ring, and the second fixing ring of the utility model;

[0016] Figure 2 This is a schematic diagram of the internal structure of the installation support structure of the prefabricated silt pile of the utility model;

[0017] Figure 3 It is a schematic diagram of the three-dimensional structure of the second T-shaped connecting shell, the first protective column, the second protective column, the third protective column, the fourth protective column, the first group of threaded holes, and the second group of threaded holes of the utility model;

[0018] Figure 4 It is a schematic diagram of the three-dimensional structure of the auxiliary mechanism of the utility model.

[0019] In the figure: 1. Main mechanism; 101. Circular fixed column; 102. First T-shaped connecting shell; 103. Second T-shaped connecting shell; 104. First group of threaded holes; 105. First protective column; 106. Second protective column; 107. Third protective column; 108. Fourth protective column; 109. Second group of threaded holes; 110. First fixing ring; 111. First group of fixing bolts; 112. Second fixing ring; 113. Second group of fixing bolts; 114. First adhesive layer; 115. Moisture-proof filling layer; 116. Second adhesive layer; 117. Concrete steel filling layer; 2. Auxiliary mechanism; 201. I-shaped fixing base; 202. Square mounting frame; 203. Third group of threaded holes; 204. Third group of fixing bolts; 205. Fourth group of threaded holes; 206. Fourth group of fixing bolts; 207. Concrete steel cage. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-Figure 4 As shown, the utility model provides a technical solution for the installation support structure of a silt prefabricated pile:

[0022] A mounting support structure for a silt precast pile comprises a main mechanism 1 and an auxiliary mechanism 2. The auxiliary mechanism 2 is fixedly arranged at the bottom of the main mechanism. The main mechanism 1 comprises a circular fixed column 101, a first T-shaped connecting shell 102, and a second T-shaped connecting shell 103. The first T-shaped connecting shell 102 is fixedly arranged at the top of the circular fixed column 101.

[0023] In this embodiment, preferably, a second T-shaped connecting shell 103 is fixedly provided at the bottom of the first T-shaped connecting shell 102, and a first group of threaded holes 104 are provided on the surfaces of the first T-shaped connecting shell 102 and the second T-shaped connecting shell 103, a first protective column 105 is fixedly provided inside the first group of threaded holes 104, a second protective column 106 is fixedly provided on one side of the first protective column 105, and a third protective column 107 is fixedly provided on one side of the second protective column 106, which is conducive to better fixing the first protective column 105, the second protective column 106, the third protective column 107, and the fourth protective column 108 in the middle of the first T-shaped connecting shell 102 and the second T-shaped connecting shell 103 through the first group of threaded holes 104.

[0024] In this embodiment, preferably, a fourth protective column 108 is fixedly provided on one side of the third protective column 107, and a second group of threaded holes 109 are provided on the surfaces of the first protective column 105, the second protective column 106, the third protective column 107 and the fourth protective column, and a first fixing ring 110 is fixedly provided inside the first protective column 105, the second protective column 106, the third protective column 107 and the fourth protective column, and a first group of fixing bolts 111 are fixedly provided on the surface of the first fixing ring 110, which is conducive to better fixing the first fixing ring 110 and the second fixing ring 112 inside the first protective column 105, the second protective column 106, the third protective column 107 and the fourth protective column 108 through the first group of fixing bolts 111 and the second group of fixing bolts 113.

[0025] In this embodiment, preferably, a second fixing ring 112 is fixedly provided at the bottom of the first fixing ring 110, a second group of fixing bolts 113 are fixedly provided on the surface of the second fixing ring 112, a first adhesive layer 114 is fixedly provided inside the circular fixed column 101, a moisture-proof filling layer 115 is fixedly provided inside the first adhesive layer 114, a second adhesive layer 116 is fixedly provided inside the moisture-proof filling layer 115, and a concrete steel filling layer 117 is fixedly provided inside the second adhesive layer 116, which is conducive to better fixing the moisture-proof filling layer 115 and the concrete steel filling layer 117 inside the circular fixed column 101 through the first adhesive layer 114 and the first adhesive layer 114.

[0026] In this embodiment, preferably, the auxiliary mechanism 2 includes an I-shaped fixed base 201, a square mounting frame 202, and a third group of threaded holes 203. The square mounting frame 202 is fixedly provided on the top of the I-shaped fixed base 201, and the third group of threaded holes 203 is opened on the top of the square mounting frame 202, which is conducive to better fixing the square mounting frame 202 on the top of the I-shaped fixed base 201 through the third group of threaded holes 203.

[0027] In this embodiment, preferably, a third group of fixing bolts 204 are fixedly arranged inside the third group of threaded holes 203, a fourth group of threaded holes 205 is opened at the bottom of the I-shaped fixing base 201, a fourth group of fixing bolts 206 are fixedly arranged inside the fourth group of threaded holes 205, and a concrete steel cage 207 is fixedly arranged at the bottom of the fourth group of fixing bolts 206, which is conducive to better fixing the concrete steel cage 207 to the bottom of the I-shaped fixing base 201 through the fourth group of fixing bolts 206.

[0028] When the installation support structure of a sludge precast pile of the present embodiment is in use, the first protective column 105, the second protective column 106, the third protective column 107, and the fourth protective column 108 are fixed to the middle of the first T-shaped connecting shell 102 and the second T-shaped connecting shell 103 through the first group of threaded holes 104, the first fixing ring 110 and the second fixing ring 112 are fixed to the inside of the first protective column 105, the second protective column 106, the third protective column 107, and the fourth protective column 108 through the first group of fixing bolts 111 and the second group of fixing bolts 113, the moisture-proof filling layer 115 and the concrete steel filling layer 117 are fixed to the inside of the circular fixed column 101 through the first adhesive layer 114 and the first adhesive layer 114, the square installation frame 202 is fixed to the top of the I-shaped fixed base 201 through the third group of threaded holes 203, and the concrete steel cage 207 is fixed to the bottom of the I-shaped fixed base 201 through the fourth group of fixing bolts 206.

[0029] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only preferred examples of the utility model and are not used to limit the utility model. Without departing from the spirit and scope of the utility model, the utility model will also have various changes and improvements in the installation support structure of the silt precast piles, and these changes and improvements fall within the scope of the utility model to be protected. The scope of protection claimed by the present utility model is defined by the attached claims and their equivalents.

Claims

1. A silt precast pile installation support structure, comprising a main mechanism (1) and an auxiliary mechanism (2), characterized in that: The auxiliary mechanism (2) is fixedly arranged at the bottom of the mechanism, and the main mechanism (1) comprises a circular fixed column (101), a first T-shaped connecting shell (102), and a second T-shaped connecting shell (103), and the first T-shaped connecting shell (102) is fixedly arranged at the top of the circular fixed column (101).

2. The installation support structure of a silt prefabricated pile according to claim 1 is characterized in that: A second T-shaped connecting shell (103) is fixedly arranged at the bottom of the first T-shaped connecting shell (102); a first group of threaded holes (104) are provided on the surfaces of the first T-shaped connecting shell (102) and the second T-shaped connecting shell (103); a first protective column (105) is fixedly arranged inside the first group of threaded holes (104); a second protective column (106) is fixedly arranged on one side of the first protective column (105); and a third protective column (107) is fixedly arranged on one side of the second protective column (106).

3. The installation support structure of a silt prefabricated pile according to claim 2 is characterized in that: A fourth protective column (108) is fixedly arranged on one side of the third protective column (107); a second group of threaded holes (109) are opened on the surfaces of the first protective column (105), the second protective column (106), the third protective column (107) and the fourth protective column; a first fixing ring (110) is fixedly arranged inside the first protective column (105), the second protective column (106), the third protective column (107) and the fourth protective column; a first group of fixing bolts (111) is fixedly arranged on the surface of the first fixing ring (110).

4. The installation support structure of a silt prefabricated pile according to claim 3 is characterized by: A second fixing ring (112) is fixedly arranged at the bottom of the first fixing ring (110), a second group of fixing bolts (113) is fixedly arranged on the surface of the second fixing ring (112), a first adhesive layer (114) is fixedly arranged inside the circular fixing column (101), a moisture-proof filling layer (115) is fixedly arranged inside the first adhesive layer (114), a second adhesive layer (116) is fixedly arranged inside the moisture-proof filling layer (115), and a concrete steel bar filling layer (117) is fixedly arranged inside the second adhesive layer (116).

5. The installation support structure of a silt prefabricated pile according to claim 1 is characterized by: The auxiliary mechanism (2) comprises an I-shaped fixed base (201), a square mounting frame (202), and a third group of threaded holes (203); the top of the I-shaped fixed base (201) is fixedly provided with a square mounting frame (202), and the top of the square mounting frame (202) is provided with the third group of threaded holes (203).

6. The installation support structure of a silt prefabricated pile according to claim 5, characterized in that: A third group of fixing bolts (204) are fixedly arranged inside the third group of threaded holes (203), a fourth group of threaded holes (205) is opened at the bottom of the I-shaped fixing base (201), a fourth group of fixing bolts (206) are fixedly arranged inside the fourth group of threaded holes (205), and a concrete steel cage (207) is fixedly arranged at the bottom of the fourth group of fixing bolts (206).