Over-pouring leveling device for cast-in-place pile

By designing the over-filling leveling device of the cast-injected pile, using the leveling mechanism and the over-filling height detection mechanism, the problem of uneven pile tops is solved, the pile top area is leveled, and the structural integrity and load-bearing capacity of the cast-injected pile are improved.

CN222771482UActive Publication Date: 2025-04-18BEIJING MODERN JINYU GEOTECHN ENG
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421605701.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2025-04-18
Estimated Expiration
2034-07-08

AI Technical Summary

Technical Problem

During the over-loading construction of existing cast-injected piles, unevenness is prone to occur in the top area of ​​the pile, resulting in concentrated stress on the concrete surface, affecting the structural integrity and bearing capacity of the cast-injected piles.

Method used

A cast-injected pile super-filling leveling device is designed, including immersed pipes, connecting pipes, leveling mechanisms and super-filling height detection mechanisms. The leveling mechanism realizes the leveling of the pile top concrete through scraping plates and driving components, and the overfilling height detection mechanism uses a laser ranging sensor to automatically detect the overfilling height.

Benefits of technology

By automatically detecting the over-filling height and adjusting the working height of the scraping plate in time, we ensure the flatness of the pile top area, avoid stress concentration, improve the structural integrity and load-bearing capacity of the cast-injected pile, and avoid material waste and increased construction costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222771482U_ABST
    Figure CN222771482U_ABST
Patent Text Reader

Abstract

The utility model discloses a cast-in-place pile over-pouring leveling device, which relates to the technical field of cast-in-place pile over-pouring construction, and comprises an immersed tube arranged in a pile hole and a connecting tube arranged at the top of the immersed tube, and a leveling mechanism and an over-pouring height detection mechanism are sequentially arranged on the connecting tube. The leveling mechanism comprises a supporting frame fixedly connected to the outer wall of the top of the connecting pipe, a rotating cylinder connected with the inner wall of the center of the supporting frame in a penetrating mode through a bearing, a lifting rod connected into the rotating cylinder in a sliding mode, a scraping plate fixedly connected to the bottom end of the lifting rod, a driving assembly and a height adjusting assembly. The leveling mechanism is arranged, the working height of the leveling plate is adjusted to a proper height through the height adjusting assembly, and then the leveling plate is driven to rotate at a high speed through the driving assembly, so that the flatness of a pile top area can be ensured by leveling concrete after the over-pouring construction is completed; and stress concentration caused by uneven concrete surface is avoided, so that the integral structural integrity and the bearing capacity of the cast-in-place pile are ensured.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of cast-in-place pile super-pouring construction, in particular to a cast-in-place pile super-pouring leveling device. Background Art

[0002] Over-pouring of cast-in-place piles refers to the intentional pouring of additional concrete beyond the designed elevation during the concrete pouring process in order to ensure the quality of the concrete at the pile top. This practice is usually to compensate for errors that may occur during the construction process, ensure the accuracy of the pile top elevation, and avoid quality problems caused by under-pouring.

[0003] However, during the existing over-casting construction of bored piles, the top area of ​​the bored piles may become uneven, which may easily lead to stress concentration problems caused by the uneven concrete surface, thereby affecting the overall structural integrity and bearing capacity of the bored piles. Utility Model Content

[0004] The utility model aims to solve the shortcomings in the prior art and proposes a cast-in-place pile over-pouring and leveling device.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A cast-in-place pile over-filling leveling device, comprising a sinking pipe arranged in a pile hole and a connecting pipe arranged on the top of the sinking pipe, wherein a leveling mechanism and an over-filling height detection mechanism are sequentially arranged on the connecting pipe;

[0007] The leveling mechanism includes a support frame fixedly connected to the top outer wall of the connecting pipe, a rotating drum connected to the central inner wall of the support frame through a bearing, a lifting rod slidably connected to the rotating drum, a scraper plate fixedly connected to the bottom end of the lifting rod, a driving assembly and a height adjustment assembly.

[0008] As a preferred technical solution, the driving assembly includes a driving motor fixedly mounted on the outer wall of the bottom of the support frame, a driving gear fixedly mounted on the output shaft of the driving motor, and a transmission gear fixedly mounted on the rotating drum.

[0009] As a preferred technical solution, the driving gear and the transmission gear are meshed with each other, and the output shaft of the driving motor passes through the support frame.

[0010] As a preferred technical solution, the height adjustment assembly includes an adjusting screw threadedly connected to the top of the rotating drum, a turning handle welded to the outer wall of the top end of the adjusting screw, and a bearing seat fixedly connected to the outer wall of the top of the lifting rod, and the bottom end of the adjusting screw is connected to the inner wall of the bearing seat through a bearing, so that the lifting rod can be driven to move up and down by controlling the forward and reverse rotation of the adjusting screw through the turning handle, and then the working height of the scraper plate can be flexibly adjusted according to different concrete over-pouring heights.

[0011] As a preferred technical solution, the overfilling height detection mechanism includes a laser ranging sensor fixed through the top of the support frame, a mounting plate welded to the circumferential outer wall of the connecting pipe, and a rangefinder fixedly mounted on the top outer wall of the mounting plate.

[0012] As a preferred technical solution, the rangefinder is provided with a display screen, and the rangefinder is electrically connected to the laser ranging sensor via a signal line.

[0013] As a preferred technical solution, sealing flanges are fixedly installed on opposite ends of the immersed tube and the connecting tube, and the two sealing flanges are fixedly connected by bolts, which facilitates the dismantling of the device after use.

[0014] The beneficial effects of the utility model are:

[0015] 1. An overfilling height detection mechanism is provided. The overfilling height can be automatically detected by a laser distance sensor, and the detected data is transmitted to the display screen on the distance meter. At this time, the on-site construction personnel can accurately judge from the display screen whether the overfilling height meets the construction requirements, which effectively solves the problem of unnecessary material waste and increased construction costs caused by the overfilling height exceeding the expected height;

[0016] 2. A leveling mechanism is provided to adjust the working height of the scraper plate to an appropriate height through the height adjustment component, and then the scraper plate is driven to rotate at high speed through the driving component. In this way, after the over-pouring construction is completed, the flatness of the pile top area can be ensured by leveling the concrete, avoiding stress concentration caused by the uneven concrete surface, thereby ensuring the overall structural integrity and bearing capacity of the cast-in-place pile. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a schematic diagram of the overall three-dimensional structure of the utility model;

[0018] Figure 2 It is a partial cross-sectional structural schematic diagram of the utility model after being connected with the immersed tube;

[0019] Figure 3 It is a three-dimensional structural schematic diagram of the internal parts of the connecting pipe in the utility model;

[0020] Figure 4 It is a three-dimensional enlarged structural schematic diagram of the driving component in the utility model;

[0021] Figure 5 It is a three-dimensional enlarged structural schematic diagram of the height adjustment component in the utility model.

[0022] In the figure: 1. immersed tube; 2. connecting tube; 3. support frame; 4. rotating drum; 5. lifting rod; 6. scraper plate; 7. driving motor; 8. driving gear; 9. transmission gear; 10. adjusting screw; 11. turning handle; 12. bearing seat; 13. laser ranging sensor; 14. mounting plate; 15. distance meter; 16. sealing flange. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0024] Example 1, reference Figure 1-5 A cast-in-place pile over-filling leveling device comprises a sinking pipe 1 arranged in a pile hole and a connecting pipe 2 arranged on the top of the sinking pipe 1, a leveling mechanism is arranged on the connecting pipe 2, and the leveling mechanism comprises:

[0025] Support frame 3, rotating drum 4, the support frame 3 is fixedly connected to the top outer wall of the connecting pipe 2, and the rotating drum 4 is connected to the central inner wall of the support frame 3 through a bearing;

[0026] A lifting rod 5 and a scraping plate 6, wherein the lifting rod 5 is slidably connected to the rotating drum 4, and the scraping plate 6 is fixedly connected to the bottom end of the lifting rod 5;

[0027] A driving assembly, which includes a driving motor 7 fixedly mounted on the outer wall of the bottom of the support frame 3, a driving gear 8 fixedly sleeved on the output shaft of the driving motor 7, and a transmission gear 9 fixedly sleeved on the drum 4 and meshing with the driving gear 8, and the output shaft of the driving motor 7 passes through the support frame 3;

[0028] The height adjustment assembly includes an adjusting screw 10 threadedly connected to the top of the rotating drum 4, a rotating handle 11 welded to the outer wall of the top end of the adjusting screw 10, and a bearing seat 12 fixedly connected to the outer wall of the top of the lifting rod 5. The bottom end of the adjusting screw 10 is connected to the inner wall of the bearing seat 12 through a bearing;

[0029] Furthermore, a sealing flange 16 is fixedly mounted on the opposite end of the immersed tube 1 and the connecting tube 2, and the two sealing flanges 16 are fixedly connected by bolts, which facilitates the dismantling of the device after use;

[0030] In the specific implementation of this embodiment: after the over-tank is completed, the working height of the scraper plate 6 is adjusted to an appropriate height through the height adjustment component, and then the scraper plate 6 is driven to rotate at a high speed through the driving component, so that after the over-tank construction is completed, the flatness of the pile top area can be ensured by scraping the concrete, avoiding stress concentration caused by the uneven concrete surface, thereby ensuring the overall structural integrity and bearing capacity of the bored pile.

[0031] Example 2, reference Figure 1 and Figure 3 , this embodiment is optimized on the basis of embodiment 1, specifically: a bored pile over-filling leveling device, further comprising an over-filling height detection mechanism provided on the connecting pipe 2;

[0032] In this embodiment, the overfilling height detection mechanism includes a laser distance sensor 13 that penetrates and is fixed to the top of the support frame 3, a mounting plate 14 that is welded to the circumferential outer wall of the connecting pipe 2, and a distance meter 15 that is fixedly mounted on the top outer wall of the mounting plate 14;

[0033] Furthermore, a display screen is provided on the rangefinder 15, and the rangefinder 15 is electrically connected to the laser ranging sensor 13 via a signal line;

[0034] In the specific implementation of this embodiment: the laser ranging sensor 13 can automatically detect the over-filling height, and transmit the detected data to the display screen on the rangefinder 15. At this time, the on-site construction personnel can accurately judge from the display screen whether the over-filling height meets the construction requirements, which effectively solves the problem of unnecessary material waste and increased construction costs caused by the over-filling height exceeding the expected height.

[0035] The working principle of the utility model is as follows: first, the connecting pipe 2 to be used is sealed and connected with the immersed pipe 1 in the pile hole through two sealing flanges 16, and then the concrete is poured into the immersed pipe 1 by a pouring machine. When the poured concrete passes over the top of the immersed pipe 1 and enters the connecting pipe 2, the over-pouring construction is carried out;

[0036] Secondly, during the over-filling construction process, the laser distance sensor 13 can automatically detect the over-filling height and transmit the detected data to the display screen on the distance meter 15. Then, the on-site construction personnel can accurately judge from the display screen whether the over-filling height meets the construction requirements. When the required over-filling height is displayed on the display screen, the construction personnel will inform other construction personnel to stop the concrete pouring work;

[0037] Finally, after the super-filling construction is completed, the adjusting screw 10 is controlled to rotate by the turning handle 11, and then the adjusting screw 10, which is threadedly connected to the rotating drum 4 and whose bottom end is connected to the bearing seat 12 through a bearing, controls the scraper plate 6 connected to the bottom end of the lifting rod 5 to move downward, and adjusts the working height of the scraper plate 6 to a suitable height;

[0038] Finally, the driving motor 7 controls the driving gear 8 to rotate, and then the transmission gear 9 meshing with the driving gear 8 drives the rotating drum 4 to rotate, and then the scraper plate 6 rotates at high speed to scrape the uneven concrete in the pile top area. In this way, by scraping the concrete, the flatness of the pile top area can be ensured, and the stress concentration caused by the uneven concrete surface can be avoided, thereby ensuring the overall structural integrity and bearing capacity of the cast-in-place pile.

[0039] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A bored pile over-pouring and leveling device, comprising a sinking pipe (1) arranged in a pile hole and a connecting pipe (2) arranged at the top of the sinking pipe (1), characterized in that: The connecting pipe (2) is provided with a leveling mechanism and an overfilling height detection mechanism in sequence; The leveling mechanism comprises a support frame (3) fixedly connected to the top outer wall of the connecting pipe (2), a rotating drum (4) connected to the central inner wall of the support frame (3) through a bearing, a lifting rod (5) slidably connected to the inside of the rotating drum (4), a scraping plate (6) fixedly connected to the bottom end of the lifting rod (5), a driving assembly and a height adjustment assembly.

2. The over-filling and leveling device for bored piles according to claim 1, characterized in that: The driving assembly comprises a driving motor (7) fixedly mounted on the outer wall of the bottom of the support frame (3), a driving gear (8) fixedly sleeved on the output shaft of the driving motor (7), and a transmission gear (9) fixedly sleeved on the rotating drum (4).

3. A bored pile over-pouring and leveling device according to claim 2, characterized in that: The driving gear (8) and the transmission gear (9) are meshed with each other, and the output shaft of the driving motor (7) passes through the support frame (3).

4. The over-filling and leveling device for bored piles according to claim 1, characterized in that: The height adjustment assembly comprises an adjusting screw (10) threadedly connected to the top of the rotating drum (4), a rotating handle (11) welded to the outer wall of the top end of the adjusting screw (10), and a bearing seat (12) fixedly connected to the outer wall of the top of the lifting rod (5).

5. The over-filling and leveling device for bored piles according to claim 4, characterized in that: The bottom end of the adjusting screw (10) is connected to the inner wall of the bearing seat (12) via a bearing.

6. The bored pile over-pouring and leveling device according to claim 1, characterized in that: The overfilling height detection mechanism comprises a laser distance measuring sensor (13) penetrating and fixed to the top of a support frame (3), a mounting plate (14) welded to the circumferential outer wall of the connecting pipe (2), and a distance measuring instrument (15) fixedly mounted on the top outer wall of the mounting plate (14).

7. The over-casting and leveling device for bored piles according to claim 6, characterized in that: The distance meter (15) is provided with a display screen, and the distance meter (15) is electrically connected to the laser distance measuring sensor (13) via a signal line.

8. The over-casting and leveling device for bored piles according to claim 1, characterized in that: A sealing flange (16) is fixedly mounted on the opposite end of the immersed tube (1) and the connecting tube (2), and the two sealing flanges (16) are fixedly connected by bolts.