Scaffold for building furnace wall of combustion chamber of coke oven
By designing a scaffolding including wooden frame plates, column cross-branch structures, cross bars, T-shaped top support and steel frame plates, the problem of difficulty in ensuring the stability and safety of the scaffolding during the masonry of the coke oven combustion chamber is solved, and the effects of construction safety, material protection and shortening of construction period are achieved.
Patent Information
- Application Number
- CN202420950426.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-05-06
- Publication Date
- 2025-04-18
- Estimated Expiration
- 2034-05-06
AI Technical Summary
During the masonry of the coke oven combustion chamber, due to the narrow width and large height of the carbonization chamber, the stability and safety of the existing scaffolding are difficult to guarantee, and the construction of the installation is cumbersome, which affects the progress of the construction period.
A scaffolding consisting of wooden frame plates, column cross-branch structures, cross-branch bars, T-shaped top support and steel frame plates is designed. Through the connection between column cross-branch structures and cross-branches, the stability of the pole is ensured at each step, and the retardant material is protected through the T-shaped top support and flexible rubber pads.
The safety and reliability of the scaffolding and rapid disassembly are achieved, the construction safety of furnace construction personnel and the quality of refractory masonry are ensured, and the construction period is shortened.
Smart Images

Figure CN222771838U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of building construction, and in particular relates to a scaffold used for building the furnace wall of a combustion chamber of a coke oven, and is suitable for building the furnace wall of the combustion chamber of various types of coke ovens. Background Art
[0002] At present, the refining of coke mainly uses coke ovens, which adopt ramming coking process and top-loading coal coking process. The coke oven is mainly composed of a basic platform, a small flue, a regenerator, a ramp, a combustion chamber, and a furnace roof. Among them, the refractory masonry of the combustion chamber occupies an important position in the construction task of the coke oven. The quality of the refractory masonry of the combustion chamber determines the success or failure of the construction of the entire coke oven. Nowadays, with the development of science and technology, the height of the combustion chamber of the coke oven is getting higher and higher, and even has reached 8 meters. When the combustion chamber of the coke oven is built, because the width of the carbonization chamber is very narrow (usually 0.45m~0.6m) and the height is large (usually 6m~8m), the stability and safety of the scaffolding of the standing platform of the furnace builders are difficult to guarantee, which seriously affects the construction safety of the furnace builders and the quality of refractory masonry. The scaffolding commonly used for masonry of the furnace wall of the combustion chamber of the coke oven is cumbersome to erect and dismantle, which increases labor and affects the construction period of the coke oven. Therefore, it is necessary to propose improvements. Utility Model Content
[0003] The technical problem solved by the utility model is to provide a scaffold for building the furnace wall of the combustion chamber of a coke oven. The utility model aims to design a scaffold which is simple in structure, safe and reliable, convenient and practical, and can be safely and quickly erected and dismantled, and is specially used for building the furnace wall of the combustion chamber of a coke oven.
[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:
[0005] The scaffolding used for building the furnace wall of the combustion chamber of a coke oven comprises a wooden frame plate, which is arranged along the entire length of the floor of the carbonization chamber. A plurality of vertical column cross-bracing structures are evenly distributed along the entire length of the carbonization chamber on the upper portion of the wooden frame plate. The plurality of column cross-bracing structures are connected together at the same level by a cross bar that runs through the length of the carbonization chamber. A T-shaped jack support is provided on the top of each of the column cross-bracing structures, and the upper portions of the plurality of T-shaped jack supports are supported by steel frame plates.
[0006] Wherein, each of the column cross-bracing structures is composed of one, two or more than two column cross-bracing components spliced together according to the construction height.
[0007] Furthermore, each of the column cross-brace assemblies includes a flexible rubber pad, a cross-brace and an upright pole. The upright pole is vertically erected, the cross-brace is cross-staggered with the upright pole and fixedly connected by right-angle fasteners, the two ends of the cross-brace are used to support the furnace walls on both sides of the width of the combustion chamber, and flexible rubber pads are provided at both ends of the cross-brace; multiple upright poles at the same level are connected together by a cross-brace, and the cross-brace is connected to the upright pole by a right-angle fastener.
[0008] Furthermore, the lower ends of the uprights in each group of the lower column and cross-brace assemblies are fixedly connected to the wooden frame board, the uprights in the two upper and lower adjacent groups of the column and cross-brace assemblies are connected together by docking fasteners, and the top ends of the uprights in the uppermost column and cross-brace assemblies are connected to T-shaped top supports.
[0009] Furthermore, the T-shaped top support is a T structure welded by channel steel and steel pipe, the steel pipe is vertically welded to the middle lower part of the channel steel, the steel pipe is used for socket connection with the upper end of the vertical pole, and flexible rubber pads are also connected to both ends of the channel steel.
[0010] Furthermore, the flexible rubber pad is made of rubber skin cut according to required sizes, and the flexible rubber pad is fixed to both ends of the cross brace and both ends of the channel steel of the T-shaped top support by rivets.
[0011] The advantages of this utility model compared with the prior art:
[0012] 1. The scaffolding structure of this scheme is safe and reliable. A horizontal brace is set at the bottom of each step of the scaffolding pole, and the two ends of the horizontal brace are against the furnace wall of the combustion chamber. There is an integral T-shaped top support on the upper part of the pole, and the two ends of the T-shaped top support are against the furnace wall of the combustion chamber. Each step of the pole is connected with a horizontal bar, which can be connected to the outer frame on both sides of the machine coke through the horizontal bar, ensuring that the scaffolding is stable, reliable and safe;
[0013] 2. The scaffolding frame of this scheme is conducive to the protection of finished refractory materials: flexible rubber pads are installed at both ends of the horizontal support and the two ends of the T-shaped top support to avoid damage to the refractory materials of the combustion chamber furnace body and ensure the quality of the refractory masonry of the combustion chamber;
[0014] 3. The standing platform of the scaffolding in this scheme is supported by a T-shaped top support. The T-shaped top support is a self-made integral T-shaped top support, which is connected to the top of the vertical pole by a socket. It is convenient, fast, reliable, and reusable, which saves labor and materials and shortens the construction period of the scaffolding. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the side elevation structure of the first step scaffolding in the utility model;
[0016] Figure 2 This is a schematic diagram of the front elevation structure of the first step scaffolding in the utility model;
[0017] Figure 3This is a schematic diagram of the side elevation structure of the second step scaffolding in the utility model;
[0018] Figure 4 This is a schematic diagram of the front elevation structure of the second step scaffolding in the utility model;
[0019] Figure 5 This is a schematic diagram of the side elevation structure of the third step scaffolding in the utility model;
[0020] Figure 6 This is a schematic diagram of the front elevation structure of the third step scaffold in the utility model;
[0021] Figure 7 It is a schematic diagram of the scaffolding erection structure of the utility model. DETAILED DESCRIPTION
[0022] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0023] It should be noted that, in this article, the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also includes other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, an element defined by the sentence "includes a ..." does not exclude the presence of other identical elements in the process, method, article or device including the element.
[0024] See also Figure 1-7 , describe the embodiments of the present utility model in detail.
[0025] Example: Scaffolding for building the wall of the combustion chamber of a coke oven, see Figure 1 As shown, it includes a wooden frame board 1, which is arranged along the length of the carbonization chamber floor, and a plurality of vertical column cross-bracing structures are evenly distributed on the upper part of the wooden frame board 1 along the length of the carbonization chamber, and a plurality of the column cross-bracing structures are connected together at the same level by a cross bar 4 that runs through the length of the carbonization chamber, and a T-shaped top support 6 is provided on the top of each of the column cross-bracing structures, and a plurality of the T-shaped top supports 6 are supported on the upper parts of steel frame boards 7.
[0026] In this embodiment, the wooden frame board 1 is a wooden frame board used in construction projects, which is placed just below the column cross-bracing structure and arranged along the length of the carbonization chamber, which can effectively avoid damage to the refractory material on the top surface of the ramp and is beneficial to the protection of the finished product.
[0027] In a specific embodiment, see Figure 1-6 As shown, each of the column cross-bracing structures is composed of one, two or more than two column cross-bracing components spliced together according to the construction height.
[0028] For details, see Figure 1 As shown, each of the column cross brace assemblies includes a flexible rubber pad 2, a cross brace 3 and a vertical pole 5. The vertical pole 5 is vertically erected, the cross brace 3 is cross-staggered with the vertical pole 5 and fixedly connected by right-angle fasteners, and the two ends of the cross brace 3 are used to support the furnace wall on both sides of the width of the combustion chamber. Flexible rubber pads 2 are provided at both ends of the cross brace 3. Multiple vertical poles 5 at the same level are connected together by a cross bar 4, and the cross bar 4 is connected to the vertical pole 5 by a right-angle fastener.
[0029] In this embodiment, preferably, the cross brace 3 is preferably made of φ48.3×3.6mm steel frame pipe for construction engineering, the length of which is determined according to the width of the carbonization chamber, the thickness of the flexible rubber pad, and the construction margin for easy assembly and disassembly, and is connected with the vertical poles using right-angle fasteners.
[0030] In this embodiment, the crossbar 4 is preferably made of φ48.3×3.6mm steel frame pipe for construction engineering, arranged throughout the length, one for each step of the scaffolding, connected to the vertical poles using right-angle fasteners, and the two ends are connected to the external frames on both sides of the machine core into one.
[0031] In this embodiment, the vertical pole 5 is made of φ48.3×3.6mm steel frame pipe for construction engineering, with a height of about 1.2m, which is convenient for furnace builders to lay refractory materials. It is connected to the T-shaped top support by a socket-type connection and to the upper vertical pole by a right-angle fastener.
[0032] In this embodiment, refer to Figure 3-6 As shown, the lower end of the upright pole 5 in each lower group of the upright column and cross brace assembly is fixedly connected to the wooden frame board 1, and the upright poles 5 in the two upper and lower adjacent groups of the upright column and cross brace assembly are connected together by a butt fastener 8, and the top of the upright pole 5 in the uppermost upright column and cross brace assembly is connected to a T-shaped top bracket 6. The butt fastener 8 is a butt fastener used in construction engineering, and is used to connect the upper and lower layers of upright poles.
[0033] In this embodiment, refer to Figure 1 As shown, the T-shaped top support 6 is made of 10 # The T structure is made of channel steel and 0.2mφ60mm steel pipe, and the φ60mm steel pipe is welded with 10 #The welding position of the channel steel is located at the longitudinal and transverse center of the channel steel; the steel pipe is used for socket connection with the upper end of the vertical pole 5, and the two ends of the channel steel are also connected with flexible rubber pads 2. The length of the channel steel is determined according to the width of the carbonization chamber, the thickness of the flexible rubber pad, and the construction margin for easy assembly and disassembly.
[0034] Preferably, the flexible rubber pad 2 is made of rubber skin cut according to the required size, and the flexible rubber pad 2 is fixed to the two ends of the cross brace 3 and the two ends of the channel steel of the T-shaped top support 6 by rivets to prevent the cross brace and the channel steel from damaging the refractory material of the combustion chamber furnace wall.
[0035] In this embodiment, the steel frame plate 7 is a steel frame plate for construction engineering, which is 2m long and has a width determined according to the width of the carbonization chamber, the width required for furnace builders to stand, and the width required for construction.
[0036] The advantages of the scaffolding for laying the furnace wall of the combustion chamber of the coke oven in the utility model are as follows: ① The scaffolding frame structure is safe and reliable. A horizontal brace is arranged at the bottom of each step of the scaffolding pole, and the two ends of the horizontal brace are against the furnace wall of the combustion chamber. An integral T-shaped top support is arranged on the upper part of the pole, and the two ends of the T-shaped top support are against the furnace wall of the combustion chamber. Each step of the pole is connected with a horizontal bar, and the horizontal bar can be connected with the outer frame on both sides of the machine coke to ensure that the scaffolding is stable, reliable and safe; ② The scaffolding frame is conducive to the protection of the finished refractory materials. Flexible rubber pads are installed at both ends of the horizontal brace and the two ends of the T-shaped top support to avoid damage to the refractory materials of the combustion chamber furnace body and ensure the quality of the refractory masonry of the combustion chamber. A wooden frame board is arranged at the bottom of the pole to avoid damage to the refractory materials on the top surface of the ramp, which is conducive to the protection of the finished product; ③ The scaffolding frame structure is simple, easy to assemble and disassemble, and can be reused. The scaffolding standing platform is supported by a T-shaped top support, which is a self-made integral T-shaped top support and is connected to the top of the vertical pole by a socket. It is convenient, fast, reliable and reusable, which saves labor and materials and shortens the scaffolding erection period.
[0037] The process of using this scaffold to build the furnace wall of the coke oven combustion chamber is shown in Figure 7 As shown:
[0038] (1) Safety briefings and technical plan briefings shall be provided to all relevant workers, and special workers shall be required to hold a certificate before taking up their posts;
[0039] (2) Prepare scaffolding materials for building the furnace wall of the coke oven combustion chamber according to the technical plan. The specifications, models, quantity and types of the materials must meet the construction requirements;
[0040] (3) Arrange construction personnel to make integral T-shaped top supports and cross braces according to the requirements of the technical plan;
[0041] (4) After the refractory materials of the coke oven combustion chamber wall are built to a height of 1.2m, the scaffolding dedicated to building the coke oven combustion chamber wall is erected.
[0042] (5) After each step of the erection of the scaffolding used for building the furnace wall of the combustion chamber of the coke oven is completed, the scaffolding must be inspected and accepted by the relevant construction parties and can only be put into use after passing the inspection.
[0043] (6) Every time the refractory material of the combustion chamber wall is built to a height of 1.2m, the next step of scaffolding erection and acceptance is carried out until the construction of the combustion chamber wall of the coke oven is completed.
[0044] After the coke oven combustion chamber wall is built, the scaffolding specially used for building the coke oven combustion chamber wall is dismantled, transported out and cleaned.
[0045] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.
[0046] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A scaffold used for building the furnace wall of a coke oven combustion chamber, characterized in that: The invention comprises a wooden frame plate (1), wherein the wooden frame plate (1) is arranged along the entire length of the floor of the carbonization chamber, and a plurality of vertically erected column cross-bracing structures are evenly distributed along the entire length of the carbonization chamber on the upper part of the wooden frame plate (1). The plurality of column cross-bracing structures are connected together at the same level by a cross bar (4) that runs through the length of the carbonization chamber, and a T-shaped top support (6) is provided on the top of each of the column cross-bracing structures, and a steel frame plate (7) is supported on the upper parts of the plurality of T-shaped top supports (6).
2. The scaffold for building the furnace wall of the combustion chamber of a coke oven according to claim 1, characterized in that: Each of the column cross-bracing structures is formed by splicing one, two or more than two column cross-bracing components according to the construction height.
3. The scaffold for building the furnace wall of the combustion chamber of a coke oven according to claim 2, characterized in that: Each of the upright column cross brace assemblies comprises a flexible rubber pad (2), a cross brace (3) and an upright pole (5); the upright pole (5) is vertically erected; the cross brace (3) and the upright pole (5) are cross-staggered and fixedly connected by right-angle fasteners; the two ends of the cross brace (3) are used to abut against the furnace walls on both sides of the width of the combustion chamber; the two ends of the cross brace (3) are provided with a flexible rubber pad (2); a plurality of upright poles (5) at the same level are connected together by a cross bar (4); the cross bar (4) is connected to the upright pole (5) by a right-angle fastener.
4. The scaffold for building the furnace wall of the combustion chamber of a coke oven according to claim 3, characterized in that: The lower ends of the uprights (5) in each group of lower upright and horizontal bracing assemblies are fixedly connected to the wooden frame board (1), the uprights (5) in two upper and lower adjacent groups of upright and horizontal bracing assemblies are connected together via a butt fastener (8), and the top ends of the uprights (5) in the uppermost upright and horizontal bracing assemblies are connected to a T-shaped top support (6).
5. The scaffold for building the furnace wall of the combustion chamber of a coke oven according to claim 4, characterized in that: The T-shaped top support (6) is a T structure formed by welding channel steel and steel pipe. The steel pipe is vertically welded to the middle lower part of the channel steel. The steel pipe is used for socket connection with the upper end of the vertical pole (5). Flexible rubber pads (2) are also connected to both ends of the channel steel.
6. The scaffold for building the furnace wall of the combustion chamber of a coke oven according to claim 5, characterized in that: The flexible rubber pad (2) is made of rubber skin cut according to the required size, and the flexible rubber pad (2) is fixed to the two ends of the cross brace (3) and the two ends of the channel steel of the T-shaped top support (6) by using rivets.