Construction hanging basket structure

By designing a construction hanging basket structure including brackets, suspension platforms and installation components, the problems of high site requirements and cumbersome installation of conventional hanging baskets are solved, and a more flexible and efficient construction hanging basket installation is achieved.

CN222782370UActive Publication Date: 2025-04-22CHINA CONSTR SCI & IND CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421425217.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-20
Publication Date
2025-04-22
Estimated Expiration
2034-06-20

AI Technical Summary

Technical Problem

Conventional hanging baskets in the prior art have high requirements for the site, and the installation and disassembly process is cumbersome, which affects the construction progress.

Method used

A construction hanging basket structure is provided, including two sets of brackets, a suspension platform, a first fixing assembly and a second mounting assembly. The bracket is fixed to the structural beam or concrete beam by a first mounting assembly, the suspension platform is suspended on the front side of the beam by a first cable assembly, and the second mounting assembly is connected to the building body through an embedded member and a second cable assembly, thereby increasing the traction force on the rear side of the beam.

Benefits of technology

It overcomes the strict requirements that conventional hanging baskets can only be installed on good panel structures, realizes flexible installation of brackets, simplifies the installation and disassembly process, and improves construction progress.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222782370U_ABST
    Figure CN222782370U_ABST
Patent Text Reader

Abstract

The utility model provides a construction hanging basket structure. The construction hanging basket structure comprises two sets of supports, a hanging platform, a first fixing assembly and a second mounting assembly. The support comprises a stand column and a cross beam, the cross beam is fixedly arranged on the stand column, the bottom of the stand column is installed on a structural beam or a concrete beam through a first fixing assembly, and the first installing assembly comprises a first installing plate, a second installing plate and a first fixing piece. The structural beam or the concrete beam is located between the first mounting plate and the second mounting plate, and the first fixing piece is suitable for locking the first mounting plate and the second mounting plate. The two ends of the suspension platform are suspended on the front side of the beam through first steel cable assemblies. The second installation assembly comprises a second steel cable assembly, an embedded part and a second fixing part, the embedded part is fixed to the building body through the second fixing part, one end of the second steel cable assembly is connected to the rear side of the cross beam, and the other end is connected to the embedded part.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction equipment, in particular to a construction hanging basket structure. Background Art

[0002] With the rapid development of prefabricated curtain walls, their application in architectural design has become more and more common. In order to pursue the square beauty of the facade, many factory projects often use prefabricated curtain walls to build factory facades. The finished surface height of the facade is designed to be higher than the finished surface height of the roof panel. From the perspective of the main structure, overhead independent beams higher than the roof panel are often added as the basis for the facade decoration. The construction working surface of the exterior wall decoration of this type of building is higher than the roof panel, and high-altitude exterior wall operations higher than the roof panel are required.

[0003] As a commonly used construction tool for building curtain wall decoration construction, the hanging basket has the characteristics of easy installation and flexible construction. However, the conventional hanging basket can only be installed on a good board structure, and a counterweight block is added at the tail end. The conventional hanging basket has high requirements on the site, and the installation and disassembly process is cumbersome, which affects the construction progress. Utility Model Content

[0004] Therefore, the technical problem to be solved by the utility model is to overcome the defects of the conventional hanging basket in the prior art that the site requirements are high, the installation and disassembly process is cumbersome, and the construction progress is affected, thereby providing a construction hanging basket structure.

[0005] In order to solve the above problems, the utility model provides a construction hanging basket structure, comprising:

[0006] Two groups of brackets, the brackets include a column and a crossbeam, the crossbeam is fixedly arranged on the column, the bottom of the column is installed on the structural beam or concrete beam through a first fixing assembly, the first mounting assembly includes a first mounting plate, a second mounting plate and a first fixing member, the first mounting plate is fixedly arranged at the bottom of the column, the structural beam or concrete beam is located between the first mounting plate and the second mounting plate, and the first fixing member is suitable for locking the first mounting plate and the second mounting plate;

[0007] A suspension platform, both ends of which are respectively suspended on the front side of the crossbeam through a first steel cable assembly;

[0008] The second installation component includes a second steel cable component, an embedded component and a second fixing component. The embedded component is fixed to the building body through the second fixing component. One end of the second steel cable component is connected to the rear side of the beam, and the other end is connected to the embedded component.

[0009] Optionally, the first mounting plate is provided with a first slot hole at a corner, and the second mounting plate is provided with a second slot hole corresponding to the number and position of the first slot hole; the first fixing member includes a stud bolt, a first nut and a second nut, the stud bolt passes through the first slot hole and the second slot hole, and the first nut and the second nut are respectively locked at opposite ends of the stud bolt.

[0010] Optionally, the first slot hole and the second slot hole are bar-shaped holes.

[0011] Optionally, the embedded part is a plate-like structure, including a hanging ear arranged on the surface of the embedded part, and a third slot hole arranged at the corner of the embedded part, and the second steel cable assembly is connected to the hanging ear; the second fixing part is a chemical anchor bolt, and the chemical anchor bolt fixes the embedded part to the building body through the third slot hole.

[0012] Optionally, the three hanging ears are arranged on the surface of the embedded part, and the three second steel cable assemblies are respectively connected to the corresponding hanging ears.

[0013] Optionally, the second steel cable assembly is connected to the hanging ear via a horseshoe buckle.

[0014] Optionally, the first steel cable assembly includes a first steel cable and a limiting member arranged on the first steel cable.

[0015] Optionally, the second steel cable structure includes a second steel cable and rope clamps arranged at both ends of the second steel cable.

[0016] Optionally, the second steel cable is connected to the rear side of the crossbeam via a connecting sleeve.

[0017] Optionally, the top of the column extends beyond the top of the cross beam, and the top of the column is respectively connected to the front side and the rear side of the cross beam through reinforcing steel cables.

[0018] The utility model has the following advantages:

[0019] The construction hanging basket structure provided by the utility model includes: two groups of brackets, a hanging platform, a first fixing assembly and a second mounting assembly. The bracket includes a column and a crossbeam, the crossbeam is fixedly arranged on the column, the bottom of the column is mounted on a structural beam or a concrete beam through a first fixing assembly, the first mounting assembly includes a first mounting plate, a second mounting plate and a first fixing member, the first mounting plate is fixedly arranged at the bottom of the column, the structural beam or the concrete beam is located between the first mounting plate and the second mounting plate, and the first fixing member is suitable for locking the first mounting plate and the second mounting plate. The two ends of the hanging platform are respectively suspended on the front side of the crossbeam through a first steel cable assembly. The second mounting assembly includes a second steel cable assembly, an embedded part and a second fixing part, the embedded part is fixed to the main body of the building through the second fixing part, one end of the second steel cable assembly is connected to the rear side of the crossbeam, and the other end is connected to the embedded part.

[0020] During construction, the distance between the two groups of brackets can be determined according to the size of the hanging platform. The two groups of brackets can be fixed on the structural beam or concrete beam through the corresponding first mounting components respectively. Compared with the prior art, there is no strict requirement to set them on the board structure. Specifically, taking one group of brackets as an example, it can be positioned by the first mounting plate at the bottom of the column, and the second mounting plate can be placed at the position corresponding to the first mounting plate at the bottom of the structural beam or concrete beam. Then, the first mounting plate and the second mounting plate are fixed by the first fixing member to complete the installation of the column.

[0021] The crossbeam is arranged on the column. The front side refers to the side facing the working surface. The two ends of the hoisting platform are respectively suspended on the front side of the crossbeam through the first steel cable assembly. That is, one end of the hoisting platform is suspended on the front side of the crossbeam of one group of brackets through the first steel cable assembly, and the other end is also suspended on the front side of the crossbeam of another group of brackets through the first steel cable assembly. A lifting structure can be arranged on the hoisting platform, and the cooperation of the lifting mechanism and the first steel cable assembly drives the hoisting platform to rise or fall on one side of the working surface. The rear side refers to the side away from the working surface. The rear side of the crossbeam is connected to the main body of the building through the second steel cable assembly, the embedded parts and the second fixing parts. Fixing the embedded parts to the main body of the building through the second fixing parts is conducive to improving the traction force of the second steel cable assembly on the rear side of the crossbeam, thereby improving the load-bearing capacity of the front side of the crossbeam, so that the column can be stably supported on the structural beam or concrete beam.

[0022] Through the above-mentioned first installation component and second installation component, the bracket can be flexibly installed on the structural beam or concrete beam, overcoming the strict requirement that the conventional hanging basket can only be installed on a good board structure, with less impact on other professional construction, and more convenient and quick installation and disassembly, which is conducive to the rapid installation of the construction hanging basket structure and the acceleration of construction progress. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the specific implementation methods of the utility model or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 This is a structural schematic diagram of the construction hanging basket structure installed on the structural beam in this embodiment;

[0025] Figure 2 This is a structural schematic diagram of the construction hanging basket structure installed on the concrete beam in this embodiment;

[0026] Figure 3Schematic diagram of the front view structure of the column in this embodiment;

[0027] Figure 4 Schematic diagram of the side view structure of the column in this embodiment;

[0028] Figure 5 Schematic diagram of the top view of the first mounting plate in this embodiment;

[0029] Figure 6 This is a schematic diagram of the structure of the first installation component cooperating with the structural beam in this embodiment;

[0030] Figure 7 for Figure 6 A schematic diagram of the structure of the first installation component from another angle;

[0031] Figure 8 This is a schematic diagram of the structure of the first installation assembly cooperating with the concrete beam in this embodiment;

[0032] Fig. 9 for Figure 8 A schematic diagram of the structure of the first installation component from another angle;

[0033] Fig.10 Schematic diagram of the front view of the embedded parts in this embodiment;

[0034] Fig.11 Schematic diagram of the side view structure of the embedded part in this embodiment;

[0035] Fig.12 Schematic diagram of the top view of the embedded parts in this embodiment.

[0036] Description of reference numerals:

[0037] 11. Column; 111. Support column; 112. Reinforced steel cable; 12. Crossbeam; 121. Large connecting sleeve; 122. Middle connecting sleeve; 123. Connector; 124. Upper connecting sleeve; 125. Third steel cable; 13. First mounting plate; 131. First slot; 14. Second mounting plate; 15. First fixing member; 151. Stud bolt; 152. First nut; 153. Second nut; 2. Suspension platform; 31. Embedded parts; 311. Hanging ear; 312. Third slot; 32. Second fixing member; 33. Horseshoe buckle; 4. Structural beam; 5. Building main body; 61. First steel cable; 62. Limiting member; 7. Concrete beam; 71. Second steel cable; 72. Rope clamp; 73. Lower connecting sleeve. DETAILED DESCRIPTION

[0038] The technical solution of the utility model will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0039] In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.

[0040] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0041] In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.

[0042] like Figure 1 and Figure 2 As shown, in this embodiment, a construction hanging basket structure is provided, including: two groups of brackets, a hanging platform 2, a first fixing component and a second installation component.

[0043] The bracket includes a column 11 and a crossbeam 12. The crossbeam 12 is fixedly arranged on the column 11. The extension direction of the column 11 is perpendicular to the extension direction of the crossbeam 12. The bottom of the column 11 is installed on the structural beam 4 or the concrete beam 7 through the first fixing component. After the column 11 is installed, it extends in the height direction to support the crossbeam 12 to a certain height from the structural beam 4 or the concrete beam 7. The crossbeam 12 extends in the horizontal direction. The front side of the crossbeam 12 extends to the top of the working surface, and the rear side of the crossbeam extends to the side away from the working surface. The two groups of brackets are installed respectively through independent first fixing components, and the distance between the two groups of brackets can be flexibly adjusted to adapt to suspension platforms 2 of different sizes.

[0044] The first mounting assembly includes a first mounting plate 13, a second mounting plate 14 and a first fixing member 15. The first mounting plate 13 is fixedly arranged at the bottom of the column 11. The structural beam 4 or the concrete beam 7 is located between the first mounting plate 13 and the second mounting plate 14. The first fixing member 15 is suitable for locking the first mounting plate 13 and the second mounting plate 14. There is an interaction force between the first mounting plate 13 and the second mounting plate 14 and the structural beam 4 or the concrete beam 7, thereby firmly fixing the first mounting plate 13 to the top of the structural beam 4 or the concrete beam 7, ensuring that the column 11 provides stable support to the beam 12 to prevent the beam 12 from tilting.

[0045] Both ends of the suspension platform 2 are respectively suspended on the front side of the cross beam 12 through the first steel cable assembly, that is, the opposite ends of the suspension platform 2 are respectively suspended on the front side of the two groups of cross beams 12 through the first steel cable assembly, so that the suspension platform 2 can maintain balance. A lifting mechanism that cooperates with the first steel cable assembly can be provided on the suspension platform 2, and the lifting mechanism is used to control the suspension platform 2 to rise or fall to reach different height positions.

[0046] The second installation component includes a second steel cable component, an embedded component 31 and a second fixing component 32. The embedded component 31 is fixed to the building body 5 by the second fixing component 32. The building body 5 can be a reinforced concrete roof parapet, a structural beam, a roof structural plate, etc. One end of the second steel cable component is connected to the rear side of the beam 12, and the other end is connected to the embedded component 31. The embedded component 31 and the second steel cable component are arranged in this way to provide traction to the rear side of the beam 12. When the front side of the beam 12 is subjected to the pulling force from the first steel cable component, the second steel cable component can ensure that the beam 12 does not tilt. Fixing the embedded component 31 to the building body 5 can facilitate installation without adding a hanging basket counterweight. On the other hand, the structural strength of the building body 5 is greater, which can prevent the second steel cable component from loosening.

[0047] During construction, the distance between the two groups of brackets can be determined according to the size of the hanging platform 2. The two groups of brackets can be fixed on the structural beam 4 or the concrete beam 7 respectively through the corresponding first mounting components. Compared with the prior art, there is no strict requirement to set them on the board structure. Specifically, taking one group of brackets as an example, it can be positioned by the first mounting plate 13 at the bottom of the column 11, and the second mounting plate 14 can be placed at the bottom of the structural beam 4 or the concrete beam 7 at a position corresponding to the first mounting plate 13. Then, the first mounting plate 13 and the second mounting plate 14 are fixed by the first fixing member 15, thereby completing the installation of the column 11.

[0048] The crossbeam 12 is arranged on the column 11. The front side refers to the side facing the working surface. The two ends of the suspension platform 2 are respectively suspended on the front side of the crossbeam through the first steel cable assembly. That is, one end of the suspension platform 2 is suspended on the front side of the crossbeam 12 of one group of brackets through the first steel cable assembly, and the other end is also suspended on the front side of the crossbeam 12 of another group of brackets through the first steel cable assembly. A lifting structure can be arranged on the suspension platform 2, and the suspension platform 2 is driven to rise or fall on one side of the working surface through the cooperation of the lifting mechanism and the first steel cable assembly. The rear side refers to the side away from the working surface. The rear side of the crossbeam 12 is connected to the building body 5 through the second steel cable assembly, the embedded part 31 and the second fixing part 32. Fixing the embedded part 31 to the building body 5 through the second fixing part 32 is conducive to improving the traction force of the second steel cable assembly on the rear side of the crossbeam, thereby improving the load-bearing capacity of the front side of the crossbeam 12, so that the column 11 can be stably supported on the structural beam 4 or the concrete beam 7.

[0049] Through the above-mentioned first installation component and second installation component, the bracket can be flexibly installed on the structural beam 4 or the concrete beam 7, overcoming the strict requirement that the conventional hanging basket can only be installed on a good board structure, with little impact on other professional construction, and more convenient and quick installation and disassembly, which is conducive to the rapid installation of the construction hanging basket structure and the acceleration of construction progress.

[0050] like Figure 3 , Figure 4 and Figure 5 As shown, the first mounting plate 13 is provided with first slots 131 at the corners, and the second mounting plate 14 is provided with second slots corresponding to the number and position of the first slots 131 at the corners. For example, the first mounting plate 13 is provided with four first slots 131, and the four first slots 131 are respectively located at the four corners of the first mounting plate 13. Similarly, the second mounting plate 14 is also provided with four second slots. The first fixing member 15 includes a stud bolt 151, a first nut 152 and a second nut 153. The stud bolt 151 passes through the first slot hole 131 and the second slot hole. The first nut 152 and the second nut 153 are respectively locked at the opposite ends of the stud bolt 151, thereby firmly fixing the first mounting plate 13 and the second mounting plate 14 on the structural beam 4 or the concrete beam 7.

[0051] For example Figure 6 and Figure 7As shown, the first mounting plate 13 is placed on the structural beam 4, and the first slotted hole 131 at the corner of the first mounting plate 13 exceeds the flange of the structural beam 4. After the second mounting plate 14 is aligned with the first mounting plate 13, the first mounting plate 13 and the second mounting plate 14 are firmly fixed on the structural beam 4 through the cooperation of the stud bolts 151, the first nut 152 and the second nut 153. With such an arrangement, the bracket can be erected without damaging the structural beam 4. At the same time, the corners of the first mounting plate 13 and the second mounting plate 14 exceeding the flange of the structural beam 4 can further improve the stability of the installation of the column 11.

[0052] For example Figure 8 and Fig. 9 As shown, the first mounting plate 13 is placed on the concrete beam 7, and the first slotted hole 131 at the corner of the first mounting plate 13 exceeds the top edge of the concrete beam 7. After the second mounting plate 14 is aligned with the first mounting plate 13, the first mounting plate 13 and the second mounting plate 14 are firmly fixed on the concrete beam 7 through the cooperation of the stud bolts 151, the first nut 152 and the second nut 153. With such an arrangement, the bracket can be erected without damaging the concrete beam 7. At the same time, the corners of the first mounting plate 13 and the second mounting plate 14 exceed the top edge and the bottom edge of the concrete beam 7, which can further improve the stability of the installation of the column 11.

[0053] In addition, fixing the first mounting plate 13 and the second mounting plate 14 by means of the stud bolts 151 , the first nuts 152 and the second nuts 153 is also conducive to flexible installation and disassembly, thus speeding up the construction process.

[0054] like Figure 5 As shown, in the present embodiment, the first slot hole 131 and the second slot hole are strip holes, and such a setting is conducive to adjusting the setting position of the stud bolt 151 according to the structural dimensions of the structural beam 4 or the concrete beam 7, so as to adapt to structural beams 4 or concrete beams 7 of different sizes. Within the allowable range of the adjustment size, there is no need to customize the first mounting plate 13 according to the size of the structural beam 4 or the concrete beam 7, thereby improving the applicability of the first mounting plate 13 and the second mounting plate 14.

[0055] like Fig.10 , Fig.11 and Fig.12 As shown, in this embodiment, the embedded part 31 is a plate-like structure, which is beneficial to increasing the tensile strength of the embedded part 31. The embedded part 31 includes a hanging ear 311 arranged on the surface of the embedded part 31, and a third slot 312 arranged at the corner of the embedded part 31. The second steel cable assembly is connected to the hanging ear 311, and the setting of the hanging ear 311 is beneficial to connecting the second steel cable assembly.

[0056] The second fixing part 32 is a chemical anchor bolt, which fixes the embedded part 31 on the building body 5 through the third slot hole 312. For example, four third slot holes 312 are arranged on the embedded part 31, and the four third slot holes 312 are respectively located at the four corners of the embedded part 31. The four chemical anchor bolts respectively pass through the corresponding third slot holes 312 and the openings on the building body 5, so as to fix the embedded part 31 on the building body 5. The chemical anchor bolt has a strong anchoring force, can achieve the pre-embedded installation strength, is quick to install, and can save construction time.

[0057] like Fig.10 , Fig.11 and Fig.12 As shown, in the present embodiment, three hooks 311 are arranged on the surface of the embedded part 31, and the three second steel cable assemblies are respectively connected to the corresponding hooks 311. Such arrangement can further improve the traction force on the rear side of the beam 12. For example, the distance between two adjacent hooks 311 among the three hooks 311 is the same, and the arrangement positions of the three hooks 311 form a triangle, which can improve the compactness of the second steel cable assembly.

[0058] like Figure 1 As shown, in the present embodiment, the second steel cable assembly is connected to the lug 311 through a horseshoe buckle 33. An equal number of lugs 311 can be added on the basis of the above three lugs 311. There are two parallel lugs 311 at each setting position. One end of the horseshoe buckle 33 is connected to the two parallel lugs 311, and the other end of the horseshoe buckle 33 is connected to the second steel cable assembly. This can effectively disperse and transfer the load, reduce uneven structural force and stress concentration, and reduce the wear on the second steel cable assembly.

[0059] like Figure 1 As shown, in this embodiment, the first steel cable assembly includes a first steel cable 61 and a limit member 62 arranged on the first steel cable 61. The lifting mechanism can control the lifting and lowering of the suspension platform 2 by winding or releasing the first steel cable 61, and the limit member 62 can control the maximum height of the suspension platform 2.

[0060] like Figure 1 As shown, in this embodiment, the second steel cable structure includes a second steel cable 71 and rope clamps 72 arranged at both ends of the second steel cable 71. The rope clamps 72 can fix the second steel cable 71. The rope clamps 72 can be U-shaped clamps, hook clamps, rotating clamps, circular clamps or piston clamps, etc.

[0061] like Figure 1 As shown, in this embodiment, the second steel cable 71 is connected to the rear side of the cross beam 12 through a lower connecting sleeve 73 . The lower connecting sleeve 73 can be fixed on the rear side of the cross beam 12 , and the lower connecting sleeve 73 is connected to the second steel cable 71 .

[0062] like Figure 1As shown, in this embodiment, the top of the column 11 extends beyond the top of the beam 12, and the top of the column 11 forms a support column 111. The top of the column 11 is respectively connected to the front and rear sides of the beam 12 through a reinforcing steel cable 112, thereby further improving the stability of the bracket.

[0063] like Figure 1 As shown, in this embodiment, a large connecting sleeve 121 is provided on the front side of the cross beam 12 , the large connecting sleeve 121 is fixed on the front side of the cross beam 12 , and the first steel cable 61 and the reinforcing steel cable 112 are respectively connected to the large connecting sleeve 121 .

[0064] like Figure 1 As shown, in this embodiment, an upper connecting sleeve 124 is provided on the rear side of the cross beam 12 , and the reinforcing steel cable 112 is connected to the upper connecting sleeve 124 .

[0065] like Figure 1 As shown, in this embodiment, a middle connecting sleeve 122 and a connecting member 123 are provided on the cross beam 12 near the rear side. The middle connecting sleeve 122 is fixedly provided on the cross beam 12, and the connecting member 123 is connected to the middle connecting sleeve 122. The connecting member 123 is connected to the upper connecting sleeve 124 through a third steel cable 125, and the connecting member 123 can be a rigging turn buckle.

[0066] Obviously, the above embodiments are merely examples for the purpose of clear explanation, and are not intended to limit the implementation methods. For those skilled in the art, other different forms of changes or modifications can be made based on the above description. It is not necessary and impossible to list all the implementation methods here. The obvious changes or modifications derived therefrom are still within the scope of protection of the invention.

Claims

1. A construction hanging basket structure, characterized in that: include: Two groups of brackets, the brackets comprising a column (11) and a crossbeam (12), the crossbeam (12) being fixedly arranged on the column (11), the bottom of the column (11) being installed on a structural beam (4) or a concrete beam (7) through a first installation assembly, the first installation assembly comprising a first installation plate (13), a second installation plate (14) and a first fixing member (15), the first installation plate (13) being fixedly arranged on the bottom of the column (11), the structural beam (4) or the concrete beam (7) being located between the first installation plate (13) and the second installation plate (14), and the first fixing member (15) being suitable for locking the first installation plate (13) and the second installation plate (14); A suspension platform (2), both ends of which are respectively suspended on the front side of the crossbeam (12) through a first steel cable (61) assembly; The second installation assembly comprises a second steel cable (71) assembly, an embedded component (31) and a second fixing component (32); the embedded component (31) is fixed to the building body (5) via the second fixing component (32); one end of the second steel cable (71) assembly is connected to the rear side of the cross beam (12), and the other end is connected to the embedded component (31).

2. The construction hanging basket structure according to claim 1, characterized in that: The first mounting plate (13) is provided with a first slotted hole (131) at a corner, and the second mounting plate (14) is provided with a second slotted hole corresponding in number and position to the first slotted hole (131); the first fixing member (15) comprises a stud bolt (151), a first nut (152) and a second nut (153); the stud bolt (151) passes through the first slotted hole (131) and the second slotted hole, and the first nut (152) and the second nut (153) are respectively locked at opposite ends of the stud bolt (151).

3. The construction hanging basket structure according to claim 2, characterized in that: The first slot hole (131) and the second slot hole are strip-shaped holes.

4. The construction hanging basket structure according to claim 1, characterized in that: The embedded part (31) is a plate-like structure, comprising a hanging ear (311) arranged on the surface of the embedded part (31), and a third slot hole (312) arranged at the corner of the embedded part (31), and the second steel cable (71) component is connected to the hanging ear (311); the second fixing part (32) is a chemical anchor bolt, and the chemical anchor bolt fixes the embedded part (31) to the building body (5) through the third slot hole (312).

5. The construction hanging basket structure according to claim 4, characterized in that: The three hanging ears (311) are arranged on the surface of the embedded part (31), and the three second steel cable (71) components are respectively connected to the corresponding hanging ears (311).

6. The construction hanging basket structure according to claim 5, characterized in that: The second steel cable (71) assembly is connected to the hanging ear (311) via a horseshoe buckle (33).

7. The construction hanging basket structure according to any one of claims 1 to 6, characterized in that: The first steel cable (61) assembly comprises a first steel cable (61) and a limiting member (62) arranged on the first steel cable (61).

8. The construction hanging basket structure according to any one of claims 1 to 6, characterized in that: The second steel cable (71) structure comprises a second steel cable (71) and rope clamps (72) arranged at both ends of the second steel cable (71).

9. The construction hanging basket structure according to claim 8, characterized in that: The second steel cable (71) is connected to the rear side of the crossbeam (12) via a lower connecting sleeve (73).

10. The construction hanging basket structure according to any one of claims 1 to 6, characterized in that: The top of the column (11) extends beyond the top of the cross beam (12), and the top of the column (11) is respectively connected to the front side and the rear side of the cross beam (12) through a reinforcing steel cable (112).