PE pipe production traction device

By designing motor-driven conveying components, automated traction and stable conveying of PE pipes of different sizes are achieved, which solves the problem that existing devices cannot automatically adjust the spacing and thread wear, and improves the stability of traction work and the service life of the equipment.

CN222794362UActive Publication Date: 2025-04-25KUNSHAN XITAI AUTOMATION TECHNOLOGY CO LTD
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202421624153.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-10
Publication Date
2025-04-25
Estimated Expiration
2034-07-10

AI Technical Summary

Technical Problem

When the existing PE pipe production traction devices adjust the spacing between the upper and lower conveyor belts, they cannot automatically adjust according to the size of the PE pipe, resulting in multiple manual adjustments. The long service time of the threaded pipe will cause thread wear and affect the traction work.

Method used

A PE tube production traction device is designed, and a motor-driven conveying assembly is adopted, including a fixing plate, an adjustment plate and a conveying plate. The fixed plate is driven by the motor and the reverse thrust is provided by the first spring to achieve fixed clamping of PE tubes of different sizes. The clamping position of the conveying plate is changed through the adjustment plate to correct the conveying offset of the PE tube.

Benefits of technology

Automatic traction and stable transport of PE pipes of different sizes is achieved, which avoids the need for manual adjustment, extends the service life of the device, and improves the stability of PE pipe transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222794362U_ABST
    Figure CN222794362U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pipe production, and discloses a PE pipe production traction device which is characterized in that motors on the two sides are installed on the front sides of installation plates on the two sides, rotating shafts are connected to the two sides of the interiors of the installation plates on the two sides, conveying belts are arranged on the outer walls of the rotating shafts on the two sides, connecting plates are evenly connected to the interiors of the conveying belts, and the connecting plates are connected to the outer walls of the conveying belts. According to the PE pipe production traction device, the motors on the two sides are started to enable the conveying belts on the two sides to work, when PE pipes of different sizes are dragged, the motors on the two sides are started, the motors on the two sides are started, the motors on the two sides are started, the motors on the two sides are started, and the motors on the two sides are started to drive the conveying belts to work. The fixing plates on the two sides can displace due to the PE pipes of different sizes, and the first springs on the two sides can provide reverse thrust for the fixing plates on the two sides, so that the fixing plates can stably fix and clamp the PE pipes of different sizes, and traction and conveying of the PE pipes are facilitated.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of pipe production, in particular to a PE pipe production traction device. Background Art

[0002] At present, when PE pipes of different sizes are produced and pulled, it is necessary to adjust the distance between the upper and lower conveyor belts. Most of the ways to adjust the distance between the upper and lower conveyor belts are often in the form of manually rotating the threaded pipe to adjust the spacing between the two. The fixed structure cannot be automatically adjusted according to the size of the PE pipe. When adjusting the spacing through the threaded pipe, the staff needs to rotate it repeatedly many times. When the threaded pipe is used for too long, the threads on its surface are easily worn, resulting in the threaded pipe being unable to work normally, which will have a certain impact on the production and pulling work of the PE pipe. Therefore, in view of the current situation, it is necessary to improve it. Utility Model Content

[0003] In view of the above situation, in order to overcome the defects of the prior art, the utility model provides a PE pipe production traction device, which effectively solves the problem that when PE pipes of different sizes are currently produced and pulled, it is necessary to adjust the distance between the upper and lower conveyor belts. Most of the ways to adjust the distance between the upper and lower conveyor belts are often in the form of manually rotating the threaded pipe to adjust the spacing between the two. The fixed structure cannot be automatically adjusted according to the size of the PE pipe. When adjusting the spacing by the threaded pipe, the staff needs to repeatedly rotate it many times. When the threaded pipe is used for too long, the threads on its surface are easily worn, resulting in the threaded pipe being unable to work normally, thereby causing a certain impact on the production traction work of the PE pipe.

[0004] To achieve the above object, the utility model provides the following technical solution: a PE pipe production traction device, comprising a workbench, a mounting plate, the mounting plates on both sides are connected to the upper and lower sides of the front of the workbench, and the interiors of the mounting plates on both sides are provided with conveying components;

[0005] Wherein, the conveying assembly includes a motor, and the motors on both sides are installed on the front sides of the mounting plates on both sides, the mounting plates on both sides are connected with rotating shafts on both sides, the outer walls of the rotating shafts on both sides are provided with conveying belts, the interior of the conveying belts is evenly connected with connecting plates, the interior of the connecting plates is connected with a bracket, the bottom of the bracket is connected with a fixing plate, the interior of the fixing plate is connected with a first spring, the first spring is connected to the bottom end of the bracket, the outer walls of the bracket are connected with adjusting plates on both sides, the adjusting plates on both sides are connected with mounting rods, the mounting rods on both sides are connected to the two sides inside the fixing plate, the outer walls of the mounting rods on both sides are connected with conveying plates, and a disassembly assembly is provided inside the bracket.

[0006] Preferably, the outer walls of the conveying plates on both sides are connected with anti-slip layers, and the outer walls of the conveying plates on both sides are arc-shaped and fit with the outer walls of the PE pipes to be conveyed.

[0007] Preferably, the left and right sides of the front part of the workbench are connected to mounting frames, the two sides inside the mounting frames are connected to mounting shafts, the outer walls of the mounting shafts on both sides are connected to mounting blocks, the facing ends of the mounting blocks on both sides are connected to rotating drums, and the outer walls of the mounting shafts on both sides are provided with second springs.

[0008] Preferably, one side of the installation blocks on both sides is connected with auxiliary wheels, and the auxiliary wheels on both sides are in contact with the inner walls of the installation frames on both sides.

[0009] Preferably, the disassembly assembly includes a card slot, and the card slots on both sides are arranged on both sides of the inner cavity of the connecting plate, and third springs are connected to both sides of the outer wall of the bracket, and one end of the third springs on both sides is connected to a card block, and the card blocks on both sides match the card slots on both sides, and the insides of the card slots on both sides are connected to push plates, and the bottoms of the push plates on both sides are connected to anti-sliding blocks.

[0010] Preferably, both sides of the inner cavity of the card slot on both sides are connected with limiting rods, and the limiting rods on both sides pass through the bodies of the push plates on both sides.

[0011] Preferably, a placement groove is provided on the front side of the workbench, and a box door is hinged on the front side of the placement groove.

[0012] Compared with the prior art, the beneficial effects of the utility model are:

[0013] 1. By starting the motors on both sides to make the conveyor belts on both sides work, the fixed plate inside the mounting plate moves. When traction is performed on PE pipes of different sizes, the fixed plates on both sides will be displaced due to the different sizes of PE pipes. The first springs on both sides can provide reverse thrust for the fixed plates on both sides, so that they can stably fix and clamp PE pipes of different sizes, which is convenient for traction and transportation. When the fixed plate moves up and down, it will drive the adjustment plates on both sides to slide inside the fixed plate, thereby changing the clamping position of the conveying plate on the PE pipe on the same arc, realizing the correction of the offset conveying position of the PE pipe during the conveying process, and improving the stability of the PE pipe conveying;

[0014] 2. When traction of PE pipes, part of the PE pipes can be placed inside the rotating drums on both sides, and the rotating drums on both sides are concave, so that when transporting PE pipes of different sizes, the PE pipes can be transported stably, preventing the PE pipes from shaking back and forth during transportation and avoiding bending when traction of the PE pipes;

[0015] 3. When the PE pipe is too large or too small or damaged, you can push the push plates on both sides to move the blocks on both sides toward the inside of the bracket. At this time, you can easily remove the bracket to directly replace the fixed plates of different sizes, so as to achieve the purpose of clamping the PE pipe stably during traction. When the fixed plate needs to be installed, you only need to push the blocks on both sides and place them inside the connecting plate to make them enter the inside of the card slots on both sides, so as to complete the fixed installation of the fixed plate, which is convenient for the staff to install and disassemble the fixed plate. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. They are used together with the embodiments of the present invention to explain the present invention and do not constitute a limitation to the present invention.

[0017] In the attached picture:

[0018] Figure 1 It is a schematic diagram of the structure of the utility model;

[0019] Figure 2 This is a schematic diagram of the installation frame structure of the utility model;

[0020] Figure 3 This is a schematic diagram of the structure of the fixed plate of the utility model;

[0021] Figure 4 This is a schematic diagram of the structure of the conveying plate of the utility model;

[0022] Figure 5 This is a schematic diagram of the rotary drum structure of the utility model.

[0023] In the figure: 100, workbench; 200, mounting plate; 201, motor; 202, rotating shaft; 203, conveyor belt; 204, connecting plate; 205, bracket; 206, fixing plate; 207, first spring; 208, adjusting plate; 209, mounting rod; 210, conveyor plate; 300, mounting frame; 301, mounting shaft; 302, mounting block; 303, rotating drum; 304, second spring; 305, auxiliary wheel; 400, slot; 401, third spring; 402, block; 403, push plate; 404, anti-sliding block; 405, limit rod; 406, placement slot. DETAILED DESCRIPTION

[0024] The technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all of the embodiments; based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the utility model.

[0025] See also Figure 1-5 A PE pipe production traction device includes a workbench 100 and a mounting plate 200. The mounting plates 200 on both sides are fixedly connected to the upper and lower sides of the front part of the workbench 100, and conveying components are arranged inside the mounting plates 200 on both sides.

[0026] Wherein, the conveying assembly includes a motor 201, and the motors 201 on both sides are fixedly installed on the front sides of the mounting plates 200 on both sides. The mounting plates 200 on both sides are rotatably connected to the rotating shafts 202 on both sides. The outer walls of the rotating shafts 202 on both sides are sleeved with conveyor belts 203. The interior of the conveyor belt 203 is evenly and fixedly connected to the connecting plate 204, and the interior of the connecting plate 204 is movably connected to the bracket 205. The bottom of the bracket 205 is movably connected to the fixed plate 206, and the interior of the fixed plate 206 is fixedly connected to the first spring 207, and the first spring 207 is fixedly connected to the bottom end of the bracket 205. The outer walls of the bracket 205 are rotatably connected to the adjusting plates 208 on both sides, and the interiors of the adjusting plates 208 on both sides are rotatably connected to the mounting rods 209. The mounting rods 209 on both sides are movably connected to the two sides inside the fixed plate 206. The outer walls of the mounting rods 209 on both sides are fixedly connected to the conveying plates 210. The interior of the bracket 205 The part is provided with a disassembly component, and the conveyor belts 203 on both sides are operated by starting the motors 201 on both sides, so that the fixed plate 206 inside the mounting plate 200 is moved. When PE pipes of different sizes are towed, the fixed plates 206 on both sides will be displaced due to the PE pipes of different sizes, wherein the first springs 207 on both sides can provide reverse thrust for the fixed plates 206 on both sides, so that the PE pipes of different sizes can be stably fixed and clamped, and it is convenient to tow and convey them, and the PE pipes of different sizes can be fixed, clamped and towed without the staff manually rotating the threaded pipe. When the fixed plate 206 moves up and down, it will drive the adjusting plates 208 on both sides to slide inside the fixed plate 206, thereby changing the clamping position of the conveying plate 210 on the PE pipe on the same arc, realizing the correction of the offset conveying position of the PE pipe during the conveying process, and improving the stability of the PE pipe conveying.

[0027] The outer walls of the conveying plates 210 on both sides are fixedly connected with anti-skid layers. The outer walls of the conveying plates 210 on both sides are arc-shaped and fit with the outer walls of the PE pipes to be conveyed, so that the PE pipes can be fixed and clamped more firmly.

[0028] The left and right sides of the front part of the workbench 100 are fixedly connected with mounting frames 300, and the two sides of the inside of the mounting frames 300 are fixedly connected with mounting shafts 301, and the outer walls of the mounting shafts 301 on both sides are movably connected with mounting blocks 302, and the facing ends of the mounting blocks 302 on both sides are rotatably connected with rotating drums 303, and the outer walls of the mounting shafts 301 on both sides are sleeved with second springs 304. When the PE pipe is towed, a part of the PE pipe can be placed inside the rotating drums 303 on both sides, and the rotating drums 303 on both sides are concave, so that when transporting PE pipes of different sizes, the PE pipe can be transported stably, and the PE pipe can be prevented from shaking back and forth during transportation, and the PE pipe can be avoided from bending when it is towed.

[0029] One side of the mounting blocks 302 on both sides is fixedly connected with auxiliary wheels 305 , and the auxiliary wheels 305 on both sides are in contact with the inner walls of the mounting frames 300 on both sides, so that the movement of the rotating drums 303 on both sides is more stable.

[0030] The disassembly assembly includes a card slot 400, and the card slots 400 on both sides are arranged on both sides of the inner cavity of the connecting plate 204. The outer walls of the bracket 205 are fixedly connected with third springs 401 on both sides, and one end of the third springs 401 on both sides is fixedly connected with a card block 402. The card blocks 402 on both sides match the card slots 400 on both sides. The insides of the card slots 400 on both sides are movably connected with push plates 403, and the bottoms of the push plates 403 on both sides are fixedly connected with anti-sliding blocks 404. When the PE pipe is too large or too small or damaged, it can be pushed by pushing the push plates on both sides. The plate 403 allows the blocks 402 on both sides to move toward the inside of the bracket 205. At this time, the bracket 205 can be easily removed to directly replace the fixing plates 206 of different sizes, so as to achieve the purpose of stably clamping the PE pipe during traction. When the fixing plate 206 needs to be installed, it is only necessary to push the blocks 402 on both sides and place them inside the connecting plate 204 so that they can enter the inside of the card grooves 400 on both sides, and the fixed installation of the fixing plate 206 can be completed, thereby facilitating the installation and removal of the fixing plate 206 by the staff.

[0031] The two sides of the inner cavity of the two side slots 400 are fixedly connected with limit rods 405, and the two side limit rods 405 penetrate the bodies of the two side push plates 403, so that the movement of the two side push plates 403 is more stable.

[0032] A placement slot 406 is provided at the front side of the workbench 100 , and a box door is hinged at the front side of the placement slot 406 , so that spare or different-sized fixing plates 206 can be placed therein and can be directly taken out when replacement is needed.

[0033] Working principle: by starting the motors 201 on both sides to make the conveyor belts 203 on both sides work, the fixed plate 206 inside the mounting plate 200 moves, and when PE pipes of different sizes are towed, the fixed plates 206 on both sides will be displaced due to the PE pipes of different sizes, wherein the first springs 207 on both sides can provide reverse thrust for the fixed plates 206 on both sides, so that they can stably fix and clamp PE pipes of different sizes, and facilitate their towing and transportation, and the staff does not need to manually rotate the threaded pipe to fix, clamp and pull PE pipes of different sizes, wherein the fixed plate 206 will drive the adjusting plates 208 on both sides to slide inside the fixed plate 206 when moving up and down, thereby changing the clamping position of the conveying plate 210 on the PE pipe on the same arc, realizing the correction of the conveying position of the deviated PE pipe during the conveying process, improving the stability of the PE pipe conveying, and ensuring the smooth operation of the PE pipe. During traction, a part of the PE tube can be placed inside the rotating drums 303 on both sides, and the rotating drums 303 on both sides are concave, so that when transporting PE tubes of different sizes, the PE tube can be transported stably, and the PE tube can be prevented from shaking back and forth during transportation, and bending when the PE tube is towed can be avoided. When the PE tube is too large or too small or damaged, the push plates 403 on both sides can be pushed to move the clamping blocks 402 on both sides toward the inside of the bracket 205. At this time, the bracket 205 can be easily removed to directly replace the fixed plates 206 of different sizes, so as to achieve the purpose of stably clamping the PE tube during traction. When the fixed plate 206 needs to be installed, it only needs to push the clamping blocks 402 on both sides and place them inside the connecting plate 204 to make them enter the inside of the clamping grooves 400 on both sides, so as to complete the fixed installation of the fixed plate 206, thereby facilitating the installation and removal of the fixed plate 206 by the staff.

[0034] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

[0035] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A PE pipe production pulling device, comprising a workbench (100) and a mounting plate (200), characterized in that: The mounting plates (200) on both sides are connected to the upper and lower sides of the front part of the workbench (100), and conveying components are arranged inside the mounting plates (200) on both sides; The conveying assembly comprises a motor (201), the motors (201) on both sides are mounted on the front sides of the mounting plates (200) on both sides, the mounting plates (200) on both sides are connected to rotating shafts (202) on both sides, the outer walls of the rotating shafts (202) on both sides are provided with conveying belts (203), the interior of the conveying belts (203) are evenly connected to connecting plates (204), the interior of the connecting plates (204) are connected to brackets (205), the bottom of the brackets (205) are connected to fixing plates (206), and the fixing plates (206) are connected to the fixing plates (206). A first spring (207) is connected to the inside of the plate (206), and the first spring (207) is connected to the bottom end of the bracket (205). Adjustment plates (208) are connected to both sides of the outer wall of the bracket (205). The insides of the adjustment plates (208) on both sides are connected to mounting rods (209). The mounting rods (209) on both sides are connected to both sides of the inside of the fixed plate (206). The outer walls of the mounting rods (209) on both sides are connected to conveying plates (210). A disassembly component is provided inside the bracket (205).

2. A PE pipe production traction device according to claim 1, characterized in that: The outer walls of the conveying plates (210) on both sides are connected with anti-slip layers, and the outer walls of the conveying plates (210) on both sides are arc-shaped and fit with the outer walls of the PE pipes to be conveyed.

3. A PE pipe production traction device according to claim 1, characterized in that: The left and right sides of the front of the workbench (100) are connected to mounting frames (300), the inside of the mounting frames (300) are connected to mounting shafts (301) on both sides, the outer walls of the mounting shafts (301) on both sides are connected to mounting blocks (302), the facing ends of the mounting blocks (302) on both sides are connected to rotating drums (303), and the outer walls of the mounting shafts (301) on both sides are provided with second springs (304).

4. A PE pipe production traction device according to claim 3, characterized in that: One side of the installation blocks (302) on both sides is connected to an auxiliary wheel (305), and the auxiliary wheels (305) on both sides are in contact with the inner walls of the installation frames (300) on both sides.

5. A PE pipe production traction device according to claim 1, characterized in that: The disassembly assembly comprises a card slot (400), the card slots (400) on both sides are arranged on both sides of the inner cavity of the connecting plate (204), the outer walls of the bracket (205) are connected to third springs (401) on both sides, one end of the third springs (401) on both sides is connected to a card block (402), the card blocks (402) on both sides are matched with the card slots (400) on both sides, the insides of the card slots (400) on both sides are connected to push plates (403), and the bottoms of the push plates (403) on both sides are connected to anti-sliding blocks (404).

6. A PE pipe production traction device according to claim 5, characterized in that: Both sides of the inner cavity of the clamping slot (400) are connected to limiting rods (405), and the limiting rods (405) on both sides penetrate the bodies of the push plates (403) on both sides.

7. A PE pipe production traction device according to claim 1, characterized in that: The front side of the workbench (100) is provided with a placement groove (406), and the front side of the placement groove (406) is hinged with a box door.

Citation Information

Cited By

  • A PE pipe production traction device

    CN224689576U