Earthwork conveying device for deep foundation pit excavation
By using technical means such as positioning guides, sealing baffles and closed structures in the deep foundation pit excavation earth conveying device, the problem of earth spilling out of the hopper during movement is solved, and the conveying efficiency and safety are improved.
Patent Information
- Application Number
- CN202422145008.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-03
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-09-03
AI Technical Summary
During the excavation of deep foundation pits, the hopper is susceptible to wind or vibration during movement, causing earth to spill out, affecting the conveying efficiency and safety.
A deep foundation pit excavation earth conveying device is designed, using technical means such as positioning guides, sealing baffles and closed structures to ensure that the conveying hopper is sealed during movement and preventing earth from spilling out.
It effectively avoids the spilling of earth during the transportation process, improves the conveying efficiency and safety, and reduces the wear of the conveyor and the safety risks of construction personnel.
Smart Images

Figure CN222794527U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of conveying devices, and more specifically, particularly relates to a conveying device for earthwork excavation in a deep foundation pit. Background Art
[0002] When excavating a deep foundation pit, it is necessary to first use an excavator to excavate the foundation pit, and then manually handle the details of the foundation pit and clear the pit. When clearing the pit, it is necessary to use a conveyor to transport the earth out of the foundation pit. When transporting the earth, it is necessary to first pile the earth in the hopper, and then use the motor to retract and release the traction rope to drive the hopper to slide to achieve the transportation of the earth.
[0003] For example, Chinese patent publication No. CN207553192U discloses a deep foundation pit earthwork excavation conversion platform; the deep foundation pit earthwork excavation conversion platform includes a support platform; a drum, the drum is arranged on the top of the support platform, and the drum is rotatably connected to a driving motor; a lifting mechanism, the lifting mechanism includes a conveying plate, a slide groove and a rotating shaft; an earth-moving mechanism, the earth-moving mechanism includes a box body, a hanging ring, a first slider and a second slider; the outer wall of the first slider is provided with an elastic clamp, and the elastic clamp is connected to the limiting hole in cooperation with each other; a traction rope; an electric push rod, the electric push rod is arranged opposite to the limiting hole; a workbench, the workbench is installed on the top of the support platform, and the bottom surface of the workbench is provided with the support platform; the deep foundation pit earthwork excavation conversion platform provided by the utility model can quickly transport the earth in the foundation pit to the foundation pit, and the labor workload of workers is small.
[0004] Based on the above, the upper part of the hopper is usually an open structure. When the hopper is subjected to wind or vibration during movement, some soil may easily spill out of the hopper, affecting the transportation efficiency of the soil and the use effect of the conveyor. At the same time, the spilled soil may easily float into the eyes of the construction workers, affecting the safety of the conveyor. Utility Model Content
[0005] In order to solve the above technical problems, the utility model provides a deep foundation pit excavation earthwork conveying device to solve the problem that when the hopper is subjected to wind or vibration during movement, part of the earthwork is easily spilled from the hopper, affecting the earthwork conveying efficiency and the use effect of the conveyor. At the same time, the spilled earth is easy to float into the eyes of the construction workers, affecting the safety of the use of the conveyor.
[0006] The purpose and effect of the deep foundation pit excavation earthwork conveying device of the utility model are achieved by the following specific technical means:
[0007] A deep foundation pit excavation earthwork conveying device comprises a positioning guide frame, a positioning guide groove, a positioning mounting frame, a conveying hopper, a guide mounting plate, a sealing baffle, a closing structure, a blocking structure and a limiting blocking rod; two positioning guide grooves are provided, and the two positioning guide grooves are respectively opened on the left and right sides of the positioning guide frame; the positioning mounting frame is slidably connected to the inner sides of the two positioning guide grooves; the conveying hopper is bolted to the outer side of the positioning mounting frame; two guide mounting plates are provided, and the two guide mounting plates are respectively fixedly connected to the left and right sides of the conveying hopper; two sealing baffles are provided, and the two sealing baffles are respectively slidably connected to the upper parts of the two guide mounting plates left and right; the closing structure is provided on the upper part of the conveying hopper; the blocking structure is provided on the lower part of the positioning guide frame; the limiting blocking rod is rotatably connected to the lower part of the positioning guide frame.
[0008] Furthermore, the blocking structure includes a positioning connecting shaft and a limiting transmission gear; the positioning connecting shaft is rotatably connected to the lower part of the positioning guide frame; and the limiting transmission gear is fixedly connected to the middle part of the positioning connecting shaft.
[0009] Furthermore, the blocking structure also includes a limit transmission rack and a first reset elastic member; the limit transmission rack is slidably connected to the lower part of the positioning guide frame, and the limit transmission rack is meshed with the limit transmission gear; the limit transmission rack is elastically connected to the positioning guide frame through the first reset elastic member.
[0010] Furthermore, the blocking structure also includes a rubber dust cover and a limiting pressure plate; the lower part of the rubber dust cover is fixedly connected to the lower part of the positioning guide frame, and the upper part of the rubber dust cover is fixedly connected to the upper part of the limiting transmission rack; the limiting pressure plate is fixedly connected to the lower part of the conveying hopper.
[0011] Furthermore, the blocking structure also includes a guide roller and a reset volute spring; two guide rollers are provided, and the two guide rollers are rotatably connected to the left and right sides of the positioning mounting frame respectively; two reset volute springs are provided, and the limit lever is elastically connected to the positioning guide frame through the two reset volute springs.
[0012] Furthermore, the closed structure includes a limiting mounting baffle and a positioning metal block; two limiting mounting baffles are provided, and the two limiting mounting baffles are respectively fixedly connected to the outer sides of the two sealing baffles; two positioning metal blocks are provided, and the two positioning metal blocks are respectively fixedly connected to the inner sides of the two limiting mounting baffles.
[0013] Furthermore, the closed structure also includes a positioning electromagnet and a second reset elastic member; two positioning electromagnets are provided, and the two positioning electromagnets are respectively fixedly connected to the left and right sides of the conveying hopper; four second reset elastic members are provided, and the two limit mounting baffles are elastically connected to the conveying hopper through the four second reset elastic members.
[0014] Compared with the prior art, the utility model has the following beneficial effects:
[0015] The utility model discloses sealing the conveying hopper through the sealing baffle plate during the movement of the conveying hopper, thus preventing the earth from being spilled out of the conveying hopper due to wind or vibration, improving the conveying efficiency of the conveyor for earth, and improving the use effect of the conveyor; the guide roller can reduce the friction resistance encountered by the conveying hopper during the movement, thus ensuring the movement stability of the conveying hopper, and also can reduce the wear of the positioning guide groove, thus improving the service life of the conveyor; the limit stopper can prevent construction personnel from approaching during the operation of the conveyor, thus preventing the earth adhered to the outside of the conveying hopper from falling into the eyes of the construction personnel, and also preventing the conveying hopper from colliding with the construction personnel when moving, thus improving the use safety of the conveyor. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model.
[0017] Figure 2 It is a structural schematic diagram of a positioning guide frame of the utility model.
[0018] Figure 3 It is a schematic diagram of the installation position of the positioning metal block of the utility model.
[0019] Figure 4 It is a schematic diagram of the installation position of the positioning electromagnet of the utility model.
[0020] Figure 5 It is a schematic diagram of the matching relationship between the limit transmission gear and the limit transmission rack of the utility model.
[0021] Figure 6 This utility model Figure 5 Schematic diagram of the local enlarged structure at point A in the middle.
[0022] In the figure, the corresponding relationship between the component names and the figure numbers is as follows:
[0023] 1. Positioning guide frame; 101. Positioning connecting shaft; 102. Limit transmission gear; 103. Limit transmission rack; 104. First reset elastic member; 105. Rubber dust cover; 2. Positioning guide groove; 3. Positioning mounting frame; 301. Guide roller; 4. Conveying hopper; 401. Limit pressure plate; 402. Positioning electromagnet; 5. Guide mounting plate; 6. Sealing baffle; 601. Limit mounting baffle; 602. Positioning metal block; 603. Second reset elastic member; 7. Limit stop rod; 701. Reset scroll spring. DETAILED DESCRIPTION
[0024] The implementation of the utility model is further described in detail below in conjunction with the drawings and examples.
[0025] Embodiment 1:
[0026] As attached Figure 1 To Attachment Figure 4 As shown:
[0027] The utility model provides a deep foundation pit excavation earthwork conveying device, comprising a positioning guide frame 1, a positioning guide groove 2, a positioning mounting frame 3, a conveying hopper 4, a guide mounting plate 5, a sealing baffle 6 and a closed structure; two positioning guide grooves 2 are provided, and the two positioning guide grooves 2 are respectively opened on the left and right sides of the positioning guide frame 1; the positioning mounting frame 3 is slidably connected to the inner sides of the two positioning guide grooves 2; the conveying hopper 4 is bolted to the outer side of the positioning mounting frame 3; two guide mounting plates 5 are provided, and the two guide mounting plates 5 are respectively fixedly connected to the left and right sides of the conveying hopper 4; two sealing baffles 6 are provided, and the two sealing baffles 6 are respectively slidably connected to the upper parts of the two guide mounting plates 5; the closed structure is provided on the upper part of the conveying hopper 4.
[0028] Among them, the closed structure includes a limited mounting baffle 601 and a positioning metal block 602; two limited mounting baffles 601 are provided, and the two limited mounting baffles 601 are respectively fixedly connected to the outer sides of the two sealing baffles 6; two positioning metal blocks 602 are provided, and the two positioning metal blocks 602 are respectively fixedly connected to the inner sides of the two limited mounting baffles 601.
[0029] Among them, the closed structure also includes a positioning electromagnet 402 and a second reset elastic member 603; two positioning electromagnets 402 are provided, and the two positioning electromagnets 402 are respectively fixedly connected to the left and right sides of the conveying hopper 4; four second reset elastic members 603 are provided, and two limit installation baffles 601 are elastically connected to the conveying hopper 4 through four second reset elastic members 603.
[0030] The specific usage and function of this embodiment are as follows: fix the positioning guide frame 1 at a suitable position of the foundation pit, and then transfer the earth to the conveying hopper 4. At this time, the positioning electromagnet 402 is energized to generate magnetic force to attract the positioning metal block 602, so that the positioning metal block 602 drives the limiting mounting baffle 601 and the sealing baffle 6 to slide along the guide mounting plate 5, so that the sealing baffle 6 is blocked above the conveying hopper 4. When the motor reels in the traction rope, the traction rope pulls the conveying hopper 4 and the positioning mounting frame 3 to slide along the positioning guide groove 2. After the conveying hopper 4 moves to the destination, the positioning electromagnet 402 is de-energized, and the second reset elastic member 603 pushes the sealing baffle 6 to reset, so that the conveying hopper 4 is opened, which is convenient for taking out the earth.
[0031] Embodiment 2:
[0032] As attached Figure 2 To Attachment Figure 6 As shown:
[0033] On the basis of the first embodiment, it further includes a blocking structure and a limiting blocking rod 7 ; the blocking structure is arranged at the lower part of the positioning guide frame 1 ; the limiting blocking rod 7 is rotatably connected to the lower part of the positioning guide frame 1 .
[0034] The blocking structure includes a positioning connection shaft 101 and a limit transmission gear 102 ; the positioning connection shaft 101 is rotatably connected to the lower part of the positioning guide frame 1 ; and the limit transmission gear 102 is fixedly connected to the middle part of the positioning connection shaft 101 .
[0035] Among them, the blocking structure also includes a limited transmission rack 103 and a first reset elastic member 104; the limited transmission rack 103 is slidably connected to the lower part of the positioning guide frame 1, and the limited transmission rack 103 is meshed with the limited transmission gear 102; the limited transmission rack 103 is elastically connected to the positioning guide frame 1 through the first reset elastic member 104.
[0036] Among them, the blocking structure also includes a rubber dust cover 105 and a limiting pressure plate 401; the lower part of the rubber dust cover 105 is fixedly connected to the lower part of the positioning guide frame 1, and the upper part of the rubber dust cover 105 is fixedly connected to the upper part of the limiting transmission rack 103; the limiting pressure plate 401 is fixedly connected to the lower part of the conveying hopper 4.
[0037] Among them, the blocking structure also includes a guide roller 301 and a reset volute spring 701; there are two guide rollers 301, and the two guide rollers 301 are rotatably connected to the left and right sides of the positioning mounting frame 3 respectively; there are two reset volute springs 701, and the limit lever 7 is elastically connected to the positioning guide frame 1 through the two reset volute springs 701.
[0038] The specific usage and function of this embodiment: during the movement of the conveying hopper 4, the guide roller 301 will roll in the positioning guide groove 2. When the conveying hopper 4 moves from a high position to a low position, the limit pressing plate 401 will contact the rubber dust cover 105 and gradually press the rubber dust cover 105 and the limit transmission rack 103 downward, so that the limit transmission rack 103 pushes the limit transmission gear 102 and the positioning connecting shaft 101 to rotate. When the positioning connecting shaft 101 rotates, it will drive the limit stop rod 7 to rotate, so that the limit stop rod 7 is retracted. At this time, the construction Personnel can approach the conveyor to conveniently transfer earthwork to the conveying hopper 4. When the conveying hopper 4 moves from a low place to a high place, the pressure on the limit transmission rack 103 gradually decreases, and the first reset elastic member 104 will push the limit transmission rack 103 to reset, so that the limit transmission gear 102 reverses. At this time, the limit stop rod 7 will be unfolded, so that construction personnel cannot approach the conveyor. The reset volute spring 701 and the first reset elastic member 104 can limit the position of the limit stop rod 7 to prevent the limit stop rod 7 from being retracted under the action of its own gravity.
[0039] In this article, there are a few points to note:
[0040] 1. The drawings of the embodiments of the present disclosure only involve structures related to the embodiments of the present disclosure, and other structures may refer to general designs.
[0041] 2. In the absence of conflict, the embodiments of the present disclosure and the features therein may be combined with each other to obtain new embodiments.
[0042] The above are only specific embodiments of the present disclosure, but the protection scope of the present disclosure is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the present disclosure, which should be included in the protection scope of the present disclosure. Therefore, the protection scope of the present disclosure should be based on the protection scope of the claims.
Claims
1. A deep foundation pit excavation earthwork conveying device, comprising a positioning guide frame (1), a positioning guide groove (2), a positioning mounting frame (3), a conveying hopper (4), a guide mounting plate (5), a sealing baffle (6), a closing structure, a blocking structure and a limit stop rod (7); the positioning guide groove (2) is provided with two, and the two positioning guide grooves (2) are respectively opened on the left and right sides of the positioning guide frame (1); characterized in that: The positioning mounting frame (3) is slidably connected to the inner side of the two positioning guide grooves (2); the conveying hopper (4) is bolted to the outer side of the positioning mounting frame (3); two guide mounting plates (5) are provided, and the two guide mounting plates (5) are respectively fixedly connected to the left and right sides of the conveying hopper (4); two sealing baffles (6) are provided, and the two sealing baffles (6) are respectively slidably connected to the upper parts of the two guide mounting plates (5); the closing structure is provided at the upper part of the conveying hopper (4); the blocking structure is provided at the lower part of the positioning guide frame (1); and the limit stop rod (7) is rotatably connected to the lower part of the positioning guide frame (1).
2. A deep foundation pit excavation earthwork conveying device as claimed in claim 1, characterized in that: The closed structure comprises a limit installation baffle (601) and a positioning metal block (602); two limit installation baffles (601) are provided, and the two limit installation baffles (601) are respectively fixedly connected to the outer sides of the two sealing baffles (6); two positioning metal blocks (602) are provided, and the two positioning metal blocks (602) are respectively fixedly connected to the inner sides of the two limit installation baffles (601).
3. A deep foundation pit excavation earthwork conveying device as claimed in claim 2, characterized in that: The closed structure also includes a positioning electromagnet (402) and a second reset elastic member (603); two positioning electromagnets (402) are provided, and the two positioning electromagnets (402) are respectively fixedly connected to the left and right sides of the conveying hopper (4); four second reset elastic members (603) are provided, and the two limit installation baffles (601) are elastically connected to the conveying hopper (4) through the four second reset elastic members (603).
4. The deep foundation pit excavation earthwork conveying device according to claim 1, characterized in that: The blocking structure comprises a positioning connection shaft (101) and a limit transmission gear (102); the positioning connection shaft (101) is rotatably connected to the lower part of the positioning guide frame (1); and the limit transmission gear (102) is fixedly connected to the middle part of the positioning connection shaft (101).
5. A deep foundation pit excavation earthwork conveying device as claimed in claim 4, characterized in that: The blocking structure also includes a limited transmission rack (103) and a first reset elastic member (104); the limited transmission rack (103) is slidably connected to the lower part of the positioning guide frame (1) up and down, and the limited transmission rack (103) and the limited transmission gear (102) are meshed with each other; the limited transmission rack (103) is elastically connected to the positioning guide frame (1) via the first reset elastic member (104).
6. A deep foundation pit excavation earthwork conveying device as claimed in claim 5, characterized in that: The blocking structure also includes a rubber dust cover (105) and a limiting pressure plate (401); the lower part of the rubber dust cover (105) is fixedly connected to the lower part of the positioning guide frame (1), and the upper part of the rubber dust cover (105) is fixedly connected to the upper part of the limiting transmission rack (103); the limiting pressure plate (401) is fixedly connected to the lower part of the conveying hopper (4).
7. A deep foundation pit excavation earthwork conveying device as claimed in claim 6, characterized in that: The blocking structure also includes a guide roller (301) and a return volute spring (701); two guide rollers (301) are provided, and the two guide rollers (301) are rotatably connected to the left and right sides of the positioning mounting frame (3) respectively; two return volute springs (701) are provided, and the limit blocking rod (7) is elastically connected to the positioning guide frame (1) through the two return volute springs (701).