Concrete surface layer elevation control support

By setting height adjustment components, such as nuts and screws, on the concrete surface elevation control bracket, the construction difficulties caused by the lack of height adjustment components in the prior art are solved, and high-quality and efficient concrete surface elevation control is achieved.

CN222797080UActive Publication Date: 2025-04-25SHANDONG CCCC HARBOR ENG CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421393874.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-06-18
Publication Date
2025-04-25
Estimated Expiration
2034-06-18

AI Technical Summary

Technical Problem

The existing concrete surface construction molds lack height adjustment components, which makes it difficult to adjust the height of the review channel steel during construction, which can easily affect the height of adjacent channel steel and affect the construction quality.

Method used

A concrete surface elevation control bracket is designed, including positioning rods and channel steel. The channel steel is equipped with height adjustment components, such as nuts and screws, through which the height of the channel steel can be adjusted to ensure the stability and consistency of the elevation.

Benefits of technology

By setting up a height adjustment component, the height of the review channel steel can be adjusted in time during the construction process, avoiding knocking and removing the wedge-shaped fixed pins to affect the height of the adjacent channel steel, and ensuring construction quality and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222797080U_ABST
    Figure CN222797080U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of concrete surface layer elevation control devices, and particularly discloses a concrete surface layer elevation control support which comprises a positioning rod and channel steel, and at least one installation base is arranged on the channel steel. The positioning rod penetrates through the mounting seat and then is vertically fixed on a site base layer; connecting assemblies are arranged on wing plates at the two ends of the channel steel; the connecting assembly is used for connecting channel steel of two adjacent concrete surface layer elevation control brackets; and at least one height adjusting assembly is further arranged on a wing plate on the bottom surface of the channel steel. Compared with the prior art, by arranging the height adjusting assembly, the height of the channel steel can be adjusted and rechecked in time in the construction process, and high construction quality is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of concrete surface layer elevation control devices, and specifically discloses a concrete surface layer elevation control bracket. Background Art

[0002] During the construction of the concrete surface layer, the channel steel used as the formwork has problems such as weak support, large errors in adjusting the elevation and flatness, and loose joints in the steel formwork, which can easily lead to problems in the elevation and flatness control of the concrete construction.

[0003] To solve the above problems, the patent with announcement number CN213867245U discloses a road surface concrete construction mold, in which the assembled channel steel is formed by the left and right butt joint of the channel steel through a socket-type component, and the inner and outer sides of the channel steel are respectively evenly distributed with reserved plug holes for the separation seam template and longitudinal locking parts, and the assembled channel steel is fixed to the vertical positioning rod with adjustable height through the longitudinal locking part, and the vertical positioning rod is vertically fixed to the road base. By using a socket-type component to horizontally butt the two channel steels together, the left and right channel steels slide up and down along the vertical positioning rod through the U-shaped steel plate and are fixed to the vertical positioning rod with adjustable height through the wedge-shaped fixing pin that passes through the U-shaped steel plate to limit the position, thereby realizing the vertical fixation and elevation of the left and right channel steels.

[0004] In the above scheme, the positioning rods set on the cylindrical steel columns and the friction fixation between the positioning rods and the longitudinal locking parts will inevitably sink during the machine vibration during the construction process, affecting the elevation of the channel steel, which requires timely adjustment and verification. However, due to the lack of height adjustment components, it is difficult to adjust and verify the height of the channel steel during construction, and the wedge-shaped fixing pins need to be knocked out, which is easy to affect the height of the adjacent channel steels and affect the construction quality. Utility Model Content

[0005] In view of the above-mentioned deficiencies in the prior art, the utility model provides a concrete surface elevation control bracket to solve the problem of lack of height adjustment components, difficulty in adjusting and verifying the height of channel steels during construction, and the need to knock out the wedge-shaped fixing pins, which easily affects the height of adjacent channel steels and affects the construction quality.

[0006] To achieve the above purpose, the technical solution of the utility model is:

[0007] A concrete surface layer elevation control bracket includes a positioning rod and a channel steel, wherein at least one mounting seat is arranged on the channel steel; after the positioning rod passes through the mounting seat, it is vertically fixed on the base of the site; connecting components are arranged on the wing plates at both ends of the channel steel; the connecting components are used to connect the channel steels of two adjacent concrete surface layer elevation control brackets; at least one height adjustment component is also arranged on the bottom wing plates of the channel steel. By arranging the height adjustment component, the height of the channel steel can be adjusted and checked in time during the construction process, avoiding knocking out the wedge-shaped fixing pin to affect the height of the adjacent channel steel, and ensuring high quality of construction.

[0008] Preferably, the height adjustment assembly includes a nut fixedly arranged on the bottom wing plate of the channel steel; a screw is arranged inside the nut; and a disc is fixedly arranged after the end of the screw passes through the bottom wing plate of the channel steel. The arrangement of the screw and the nut facilitates the adjustment of the height of the channel steel. The arrangement of the disc increases the contact area with the base surface of the site and ensures the stability of the height setting of the channel steel.

[0009] Preferably, the mounting seat is hingedly arranged on the channel steel wing plate. The hingedly arranged mounting seat facilitates the storage of the concrete surface elevation control bracket when not in use.

[0010] Preferably, the mounting seat is arranged on the channel steel through two round tubes 1; the mounting seat includes round tube 2; two L-shaped rods are fixedly arranged on the outer wall of round tube 2; the two L-shaped rods are symmetrically arranged; the ends of the L-shaped rods are hinged in round tube 1; the two round tubes 1 are respectively fixedly arranged on the two wing plates of the channel steel; the positioning rod is arranged in round tube 2. The hinged arrangement of the mounting seat is completed.

[0011] Preferably, the length of the second round tube is less than the distance between the two wing plates of the channel steel. After the second round tube rotates around the hinge of the L-shaped rod and the first round tube, it can be placed between the two wing plates of the channel steel, reducing the volume occupied and facilitating storage.

[0012] Preferably, the connection assembly includes two round tubes three; the round tubes three are fixedly arranged on the wing plates of the channel steel. The channel steels of two adjacent concrete surface elevation control brackets can be connected by threaded steel bars inserted into the round tubes three.

[0013] The beneficial effect of the utility model is that by setting the height adjustment component, the height of the channel steel can be adjusted and checked in time during the construction process, avoiding the impact of knocking out the wedge-shaped fixing pin on the height of the adjacent channel steel, thereby ensuring high construction quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] In order to more clearly illustrate the technical solutions in the embodiments of the utility model or the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.

[0015] Figure 1 This is a schematic diagram of the structure of Embodiment 1 of the present utility model;

[0016] Figure 2 This is a schematic diagram of the structure of the mounting base of Example 1 of the utility model;

[0017] Figure 3 This is a schematic diagram of the use state of Example 1 of the utility model;

[0018] Figure 4 This is a schematic diagram of the structure of Example 2 of the utility model.

[0019] Description of reference numerals:

[0020] 1-positioning rod, 2-channel steel, 3-mounting seat, 4-nut, 5-screw, 6-disc, 7-round tube one, 8-round tube three, 9-threaded steel; 301-round tube two, 302-L-shaped rod. DETAILED DESCRIPTION

[0021] In order to enable those skilled in the art to better understand the technical solutions in the present invention, the following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0022] Example 1

[0023] like Figure 1-2 As shown, a concrete surface layer elevation control bracket includes a positioning rod 1 and a channel steel 2, and a mounting seat 3 is arranged in the middle of the channel steel 2; after the positioning rod 1 passes through the mounting seat 3, it is vertically fixed on the base of the site; connecting components are arranged on the wing plates at both ends of the channel steel 2; the connecting components are used to connect the channel steels 2 of two adjacent concrete surface layer elevation control brackets; a height adjustment component is also arranged on the bottom wing plate of the channel steel 2.

[0024] In the above arrangement, the mounting seat 3 is hingedly arranged on the middle wing plate of the channel steel 2. The hinged mounting seat 3 facilitates the storage of the concrete surface elevation control bracket when not in use. The mounting seat 3 is arranged on the channel steel 2 through two circular tubes 17; the mounting seat 3 includes a circular tube 2 301; two L-shaped rods 302 are fixedly arranged on the outer wall of the circular tube 2 301; the two L-shaped rods 302 are symmetrically arranged; the ends of the L-shaped rods 302 are hinged in the circular tube 1 7; the two circular tubes 17 are respectively fixedly arranged on the two wing plates of the channel steel 2; the positioning rod 1 is arranged in the circular tube 2 301. The hinged arrangement of the mounting seat 3 is completed. The length of the circular tube 2 301 is less than the distance between the two wing plates of the channel steel 2. After the circular tube 2 301 rotates around the hinge of the L-shaped rod 302 and the circular tube 1 7, it can be placed between the two wing plates of the channel steel 2, which reduces the volume occupied and is convenient for storage.

[0025] like Figure 3 As shown, the connection assembly includes two round tubes 3 8; the round tubes 3 8 are fixedly arranged on the wing plates of the channel steel 2. The channel steels 2 of two adjacent concrete surface elevation control brackets can be connected by threaded steel bars 9 inserted into the round tubes 3 8. In other alternative embodiments, the threaded steel bars 9 are replaced by round steel bars.

[0026] The height adjustment assembly includes a nut 4 fixedly set on the bottom wing plate of the channel steel 2; a screw 5 is set in the nut 4; and a disc 6 is fixedly set after the end of the screw 5 passes through the bottom wing plate of the channel steel 2. The setting of the screw 5 and the nut 4 facilitates the adjustment of the height of the channel steel 2. The setting of the disc 6 increases the contact area with the base surface of the site and ensures the stability of the height setting of the channel steel 2. By setting the height adjustment assembly, the height of the channel steel 2 can be adjusted and checked in time during the construction process, avoiding the impact of knocking out the wedge-shaped fixing pin on the height of the adjacent channel steel 2, and ensuring high-quality construction.

[0027] In other alternative embodiments, the height adjustment assembly includes a screw rod 5, the upper end of the screw rod 5 is fixedly set on the wing plate at the bottom of the channel steel 2, the lower end of the screw rod 5 is threadedly set in a threaded tube, and the lower end of the threaded tube is fixedly set on a disc 6; the threaded tube is arranged in a circular tube shape as a whole, and an internal thread is arranged on the inner wall.

[0028] Example 2

[0029] The difference from Example 1 is that two height adjustment components and three mounting seats 3 are provided on the channel steel 2. The two height adjustment components are respectively provided at 1 / 3 and 2 / 3 of the length of the channel steel 2; the round tubes 1 7 for installing the two mounting seats 3 are respectively provided between the round tube 3 8 and the height adjustment components; the remaining mounting seat 3 is provided in the middle of the two height adjustment components, that is, the round tube 1 7 for installing the mounting seat 3 is provided in the middle of the two height adjustment components.

[0030] Although the utility model is described in detail by referring to the accompanying drawings and in combination with the preferred embodiments, the utility model is not limited thereto. Without departing from the spirit and essence of the utility model, a person of ordinary skill in the art may make various equivalent modifications or substitutions to the embodiments of the utility model, and these modifications or substitutions shall be within the scope of the utility model / any person of ordinary skill in the art who is familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the utility model, and they shall be within the scope of protection of the utility model. Therefore, the scope of protection of the utility model shall be based on the scope of protection of the claims.

Claims

1. A concrete surface elevation control bracket, comprising a positioning rod (1) and a channel steel (2), characterized in that: At least one mounting seat (3) is provided on the channel steel (2); after the positioning rod (1) passes through the mounting seat (3), it is vertically fixed on the base of the site; connecting components are provided on the wing plates at both ends of the channel steel (2); the connecting components are used to connect the channel steels (2) of two adjacent concrete surface layer elevation control brackets; at least one height adjustment component is also provided on the bottom wing plate of the channel steel (2); The height adjustment assembly comprises a nut (4) fixedly arranged on the bottom wing plate of the channel steel (2); a screw rod (5) is arranged inside the nut (4); and a disc (6) is fixedly arranged after the end of the screw rod (5) passes through the bottom wing plate of the channel steel (2).

2. The concrete surface elevation control bracket according to claim 1 is characterized in that: The mounting seat (3) is hingedly arranged on the wing plate of the channel steel (2).

3. The concrete surface elevation control bracket according to claim 2 is characterized in that: The mounting seat (3) is arranged on the channel steel (2) through two circular tubes (7); the mounting seat (3) comprises a circular tube (301); two L-shaped rods (302) are fixedly arranged on the outer wall of the circular tube (301); the two L-shaped rods (302) are symmetrically arranged; the ends of the L-shaped rods (302) are hinged in the circular tube (7); the two circular tubes (7) are respectively fixedly arranged on the two wing plates of the channel steel (2); and the positioning rod (1) is arranged in the circular tube (301).

4. The concrete surface elevation control bracket according to claim 3 is characterized in that: The length of the second round tube (301) is less than the distance between the two wing plates of the channel steel (2).

5. The concrete surface elevation control bracket according to claim 1, characterized in that: The connection assembly comprises two round tubes three (8); the round tubes three (8) are fixedly arranged on the wing plates of the channel steel (2).

Citation Information

Patent Citations

  • Road surface layer concrete construction mold

    CN213867245U