Remote monitoring device for dry quenching dust removal system

By installing sensors at key parts of the dry coke quenching dust removal system and connecting the PLC controller, remote monitoring and control of various system data is achieved, solving the problem of the lack of remote monitoring capabilities of the existing system, ensuring the stable operation and efficient dust removal of the system.

CN222801036UActive Publication Date: 2025-04-25LUBAN TECH (SHANXI) CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202421822879.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2025-04-25
Estimated Expiration
2034-07-30

AI Technical Summary

Technical Problem

The existing dry coke quenching and dust removal systems lack remote monitoring capabilities and cannot achieve remote display and control of various system data.

Method used

A remote monitoring device is designed. By installing pressure sensors, material level sensors and temperature sensors in key parts such as dry-extinguishing furnaces, dust removal equipment, boilers, ash buckets, etc., and connecting these sensors to the PLC controller. The controller is connected to the centralized control center and the remote control end through the operator station to realize real-time data monitoring and remote control.

Benefits of technology

Remote monitoring and control of various data of the dry coke quenching dust removal system is realized, ensuring the effective operation and stable dust removal of the system, providing a redundant data transmission path, and ensuring the stability and reliability of the control system.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222801036U_ABST
    Figure CN222801036U_ABST
Patent Text Reader

Abstract

A remote monitoring device for a dry quenching dust removal system belongs to the technical field of dry quenching control systems and comprises a pressure sensor, a material level sensor and a temperature sensor, the sensors acquire data and transmit the data to a controller through an interface module, and the controller is connected with an operator station. The operator station receives pressure, material level and temperature data and then sends the data to the centralized control center and the remote control end for communication, so that on-site and remote monitoring of the dry quenching dust removal system is realized; each data is transmitted through an independent thread to ensure the redundancy of the control system, and the stable operation of the dry quenching system is ensured by remotely monitoring the data of the dry quenching dust removal system.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of dry coke quenching control systems, and in particular relates to a remote monitoring device for a dry coke quenching dust removal system. Background Art

[0002] The dry coke quenching dust removal system is an important energy-saving and environmentally friendly process in the dry coke quenching production process. Its main purpose is to replace the traditional wet coke quenching, cool the red coke in the dry coke quenching furnace with inert gas, and recover the sensible heat of the red coke to generate steam, so as to achieve energy saving and reduce environmental pollution. Therefore, it is very necessary to monitor the various parts of the dry coke quenching dust removal system. At present, the monitoring of the dry coke quenching dust removal system is mainly to collect data through sensors and display and analyze it through operators standing in the centralized control center, but it does not have remote monitoring capabilities.

[0003] In the prior art, there is a device for measuring the material level of a hopper of a CDQ primary dust collector, which is disclosed in publication number CN101354280A. The device has a temperature measuring element on the side wall of the dust collector hopper, and the temperature measuring software is connected to a PLC controller via a cable and automatically displays and controls the measured data. However, the device only monitors the material level of the hopper and cannot remotely display and control various data of the CDQ dust removal system. Utility Model Content

[0004] The technical problem solved by the utility model is: to overcome the problems existing in the above-mentioned prior art and to provide a remote monitoring device for a dry coke quenching dust removal system.

[0005] The technical solution adopted by the utility model is as follows:

[0006] The remote monitoring device for a dry coke quenching dust removal system described in the utility model comprises a dry quenching furnace, a primary dust removal device, an ash hopper I, a boiler, a secondary dust removal device, an ash hopper II, a circulating fan and a heat exchanger, wherein pressure sensors are installed on the inlet and outlet pipes of the primary dust removal device and the secondary dust removal device; material level sensors are installed on the side walls of the ash hopper I and the ash hopper II; temperature sensors are installed on the inlet pipe of the boiler and the outlet pipe of the heat exchanger; the pressure sensor, the material level sensor and the temperature sensor are all connected to a controller, the controller is connected to an operator station, and the operator station is also connected to a centralized control center end and a remote control end.

[0007] The dry quenching furnace, the primary dust removal equipment, the boiler, the secondary dust removal equipment, the circulating fan and the heat exchanger are connected in sequence through pipelines, and the heat exchanger is connected to the dry quenching furnace through the pipeline.

[0008] Ash hopper I is connected below the primary dust removal equipment, and ash hopper II is connected below the secondary dust removal equipment.

[0009] The pressure sensor, material level sensor and temperature sensor are all connected to the controller via an interface module.

[0010] The controller adopts a PLC controller, and the interface module adopts an IM153 module used in conjunction with the PLC controller.

[0011] The centralized control center is connected to the operator station via an HDMI cable, and the remote control terminal is connected and communicated with the operator station via the Internet.

[0012] The utility model has the following beneficial effects:

[0013] The utility model can not only monitor various data of the dry coke quenching and dust removal system on site, but also remotely monitor and analyze the current data status of the dry coke quenching and dust removal system, effectively ensuring the effective operation and stable dust removal of the dry coke quenching and dust removal system; various data collection and transmission are sent to the operator station through independent threads, providing redundancy for the control system and ensuring smooth lines of the control system. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a schematic diagram of the utility model;

[0015] Figure 2 This is the electrical connection diagram of the utility model;

[0016] Figure 3 This is the schematic diagram of the temperature sensor interface circuit;

[0017] Figure 4 This is the schematic diagram of the pressure sensor interface circuit;

[0018] Figure 5 This is the schematic diagram of the level sensor interface circuit.

[0019] Among them: 1. CDQ furnace; 2. Primary dust removal equipment; 3. Ash hopper I; 4. Boiler; 5. Secondary dust removal equipment; 6. Ash hopper II; 7. Circulating fan; 8. Heat exchanger; 9. Pressure sensor; 10. Material level sensor; 11. Temperature sensor; 12. Controller; 13. Operator station. DETAILED DESCRIPTION

[0020] like Figure 1 to Figure 2As shown, the remote monitoring device for the dry quenching dust removal system described in the utility model includes a dry quenching furnace 1, a primary dust removal device 2, an ash hopper I3, a boiler 4, a secondary dust removal device 5, an ash hopper II6, a circulating fan 7 and a heat exchanger 8, and pressure sensors 9 are installed on the inlet and outlet pipes of the primary dust removal device 2 and the secondary dust removal device 5; a material level sensor 10 is installed on the side wall of the ash hopper I3 and the ash hopper II6; a temperature sensor 11 is installed on the inlet pipe of the boiler 4 and the outlet pipe of the heat exchanger 8; the pressure sensor 9, the material level sensor 10 and the temperature sensor 11 are all connected to the controller 12, the controller 12 is connected to the operator station 13, and the operator station 13 is also connected to the centralized control center end and the remote control end.

[0021] The dry quenching furnace 1, the primary dust removal device 2, the boiler 4, the secondary dust removal device 5, the circulating fan 7 and the heat exchanger 8 are connected in sequence through pipelines, and the heat exchanger 8 is connected to the dry quenching furnace 1 through a pipeline.

[0022] The ash hopper I3 is connected below the primary dust removal equipment 2, and the ash hopper II6 is connected below the secondary dust removal equipment 5.

[0023] The pressure sensor 9 , the material level sensor 10 and the temperature sensor 11 are all connected to the controller 12 via an interface module.

[0024] The controller 12 adopts a PLC controller, and the interface module adopts an IM153 module used in conjunction with the PLC controller.

[0025] The centralized control center is connected to the operator station 13 via an HDMI cable, and the remote control terminal is connected and communicated with the operator station 13 via the Internet.

[0026] Specifically, Figure 1 to Figure 2As shown, the dry quenching and dust removal system includes a dry quenching furnace 1, a primary dust removal device 2, a boiler 4, a secondary dust removal device 5, a circulating fan 7 and a heat exchanger 8. These components are connected in sequence through pipelines to form the basic structure of the dry quenching and dust removal system. A pressure sensor 9 is installed on the inlet and outlet pipelines of the primary dust removal device 2 and the secondary dust removal device 5 to monitor and control the pressure of the pipeline and prevent the backflow of coke powder; a temperature sensor 11 is installed on the inlet pipeline of the boiler 4 and the outlet pipeline of the heat exchanger 8 to monitor the heat exchange efficiency; a material level sensor 10 is installed on the side wall of the ash hopper I3 and the ash hopper II6 to detect the material accumulation in the ash hopper in real time. A PLC controller is used as the main control unit, and the IM153 interface module is used to realize data interaction with each sensor. The PLC controller is electrically connected to the operator station 13, and the operator station 13 is connected to the remote control end and the centralized control center end through independent threads. The operator station 13 realizes remote display and control with the remote control end through the Internet, and the operator station 13 is connected to the centralized control center end through an HDMI cable to realize on-site display and control. To ensure the stability of the control system, various sensors are operated through independent threads, providing redundancy for the control system and ensuring that the system can still operate stably when a single link fails.

[0027] Specifically, Figures 3 to 5 As shown, the temperature sensor 11 is connected to the PLC controller via the interface modules shown by P1 and P2, the pressure sensor 9 is connected to the PLC controller via the interface modules shown by P3 to P6, and the material level sensor 10 is connected to the PLC controller via the interface modules shown by P7 to P11.

[0028] Specifically, the inlet and outlet pipes of the primary dust removal equipment 2 and the secondary dust removal equipment 5 are key points for detecting changes in internal pressure of the system. Monitoring the pressure at these locations can prevent pipe blockage and equipment damage, ensure smooth gas flow, and adjust system parameters to optimize dust removal effect and improve efficiency. The ash hopper is a place for collecting dust and impurities generated during the dust removal process. Monitoring the ash hopper material level is very important for preventing overflow and keeping the system clean. The material level sensor 10 can monitor the material accumulation in the ash hopper I3 and the ash hopper II6. When the material level reaches a certain height, it can cooperate with the discharge mechanism to avoid dust overflow and ensure the normal operation of the dust removal equipment. The temperature on the inlet pipe of the boiler 4 and the outlet pipe of the heat exchanger 8 directly affects the thermal energy conversion efficiency and the thermal balance of the system. By monitoring the temperature at these locations, it is ensured that the boiler 4 and the heat exchanger 8 operate at the optimal temperature, improve the thermal energy utilization efficiency, and prevent equipment damage or reduced efficiency due to excessively high or low temperatures.

Claims

1. A remote monitoring device for a dry coke quenching dust removal system, comprising a dry quenching furnace (1), a primary dust removal device (2), an ash hopper I (3), a boiler (4), a secondary dust removal device (5), an ash hopper II (6), a circulating fan (7) and a heat exchanger (8), characterized in that: Pressure sensors (9) are installed on the inlet and outlet pipes of the primary dust removal device (2) and the secondary dust removal device (5); level sensors (10) are installed on the side walls of the ash hopper I (3) and the ash hopper II (6); temperature sensors (11) are installed on the inlet pipe of the boiler (4) and the outlet pipe of the heat exchanger (8); the pressure sensor (9), the level sensor (10) and the temperature sensor (11) are all connected to a controller (12), the controller (12) is connected to an operator station (13), and the operator station (13) is also connected to a centralized control center and a remote control terminal.

2. The remote monitoring device for a dry coke quenching dust removal system according to claim 1, characterized in that: The dry quenching furnace (1), the primary dust removal device (2), the boiler (4), the secondary dust removal device (5), the circulating fan (7) and the heat exchanger (8) are connected in sequence via pipelines, and the heat exchanger (8) is connected to the dry quenching furnace (1) via a pipeline.

3. The remote monitoring device for a dry coke quenching dust removal system according to claim 1, characterized in that: The ash hopper I (3) is connected below the primary dust removal equipment (2), and the ash hopper II (6) is connected below the secondary dust removal equipment (5).

4. The remote monitoring device for a dry coke quenching dust removal system according to claim 1, characterized in that: The pressure sensor (9), material level sensor (10) and temperature sensor (11) are all connected to the controller (12) via an interface module.

5. The remote monitoring device for a dry coke quenching dust removal system according to claim 4, characterized in that: The controller (12) is a PLC controller, and the interface module is an IM153 module used in conjunction with the PLC controller.

6. The remote monitoring device for a dry coke quenching dust removal system according to claim 1, characterized in that: The centralized control center end is connected to the operator station (13) via an HDMI connection line, and the remote control end is connected and communicated with the operator station (13) via the Internet.