Cement stabilized macadam base maintenance device

By using a blanket with good water permeability instead of plastic film in the cement-stabilized gravel base maintenance device, the lack of water permeability and non-recyclability in the prior art is solved, and the convenience of sprinkler operation and environmentally friendly maintenance effect is achieved.

CN222809837UActive Publication Date: 2025-04-29河南省光大路桥工程有限公司
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202421793715.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-29
Publication Date
2025-04-29
Estimated Expiration
2034-07-29

AI Technical Summary

Technical Problem

The existing cement-stabilized gravel base maintenance device is covered with plastic film, which lacks water permeability, affects the sprinkler operation, and is frequently operated, affects the construction progress, and causes pollution to the environment to the unrecyclable items.

Method used

A blanket with good water permeability is used instead of plastic film. The length direction of the blanket is set perpendicular to the width direction of the cement-stabilized gravel base layer. A fixed seat is set at one end of the blanket and a fixed rod is set at the other end. Several blankets are set in sequence along the length direction of the cement-stabilized gravel base layer.

Benefits of technology

During the maintenance period, the sprinkler operation is not affected and it is easy to fix. By installing recycling components in the fixing seat, the blanket can be easily stored and recycled, reducing environmental pollution.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222809837U_ABST
    Figure CN222809837U_ABST
Patent Text Reader

Abstract

The utility model discloses a cement stabilized macadam base maintenance device which comprises a plurality of covering parts arranged in the width direction of a cement stabilized macadam base, the covering parts are connected end to end and sequentially arranged in the length direction of the cement stabilized macadam base, and each covering part comprises a blanket. The length direction of the blanket is perpendicular to the width direction of the cement stabilized macadam base, a fixing base is arranged at one end of the blanket in the width direction of the blanket, and a fixing rod is arranged at the other end of the blanket in the width direction of the blanket. The blankets are arranged, the length directions of the blankets are perpendicular to the width direction of the cement stabilized macadam base, the fixing seats are arranged at one ends of the blankets, the fixing rods are arranged at the other ends of the blankets, and the blankets are sequentially arranged in the length direction of the cement stabilized macadam base. The blanket with good water permeability is adopted to replace an existing plastic film, the watering operation is not affected in the maintenance period, and the blanket is easy to fix.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the technical field of water-stabilized maintenance, and in particular relates to a cement-stabilized crushed stone base maintenance device. Background Art

[0002] Maintenance regulations for cement stabilized gravel base: 1. After a section of the working surface is rolled and passed the compaction test, it is immediately covered with a blanket and pressed with cement blocks to prevent it from being blown away by the wind. After the cement of the water-stabilizing layer is finally set (2-3 hours after rolling), it is then exposed to water and moistened. At the same time, all traffic is closed. 2. During the curing period, people are often sent to check the watering and blanket coverage. For places that are not covered in place, the surface of the mixture should be immediately sprinkled with water and then covered again. Avoid long-term water loss or alternating dryness and wetness on the surface of the water-stabilizing base to ensure the strength of the structural layer and reduce the possibility of shrinkage cracks. The curing period is not less than 7 days. 3. After the construction is completed every day, the front-field construction worker of the water-stabilizing will give instructions to the person in charge of the maintenance team. The instructions include specific construction sections and construction dates. 4. The maintenance period after the completion of the water-stabilizing construction is 7 days. The sprinkler truck will sprinkle water at least 7 times a day in the first 3 days of maintenance, and the water will be exposed to water at least 4 times a day in the last three days. The water must be thoroughly watered by the water truck.

[0003] In the existing cement-stabilized gravel base maintenance devices, such as the cement-stabilized gravel base maintenance device disclosed in Publication No. CN211472081U and the cement-stabilized gravel base maintenance device disclosed in Publication No. CN216891890U, plastic film is used instead of blanket covering in their technical solutions. The disadvantage is that the plastic film is not water-permeable and water-infiltrative, and the cement-stabilized gravel base needs to be maintained for seven days, and watering is required many times during the period. The use of plastic film seriously affects the watering operation. The plastic film needs to be uncovered each time for the watering operation, and then the plastic film needs to be re-laid. The operation is frequent, which affects the construction progress. In addition, the plastic film is a non-recyclable item, which also has a certain impact on environmental protection.

[0004] Based on the deficiencies in the prior art, the utility model discloses a cement-stabilized gravel base maintenance device, by arranging a blanket, the length direction of the blanket is arranged perpendicular to the width direction of the cement-stabilized gravel base, and a fixing seat is arranged at one end of the blanket, and a fixing rod is arranged at the other end of the blanket. Several blankets are arranged in sequence along the length direction of the cement-stabilized gravel base, and a blanket with good water permeability is used to replace the existing plastic film, which does not affect the watering operation during maintenance. Utility Model Content

[0005] In view of the shortcomings of the prior art, the purpose of the utility model is to provide a cement-stabilized gravel base maintenance device to solve the technical problems raised in the background technology.

[0006] The utility model provides the following technical solutions:

[0007] A cement-stabilized gravel base maintenance device comprises a covering member arranged along the width direction of the cement-stabilized gravel base, wherein a plurality of the covering members are provided, and the plurality of the covering members are connected end to end and arranged in sequence along the length direction of the cement-stabilized gravel base. The covering member comprises a felt, and the length direction of the felt is arranged perpendicular to the width direction of the cement-stabilized gravel base. A fixing seat is arranged at one end of the felt along the width direction thereof, and a fixing rod is arranged at the other end of the felt along the width direction thereof.

[0008] Preferably, the blanket is a cement curing blanket with good water permeability.

[0009] Preferably, the fixing seat is in a rectangular parallelepiped shape, a recovery cavity is provided inside the fixing seat along its length direction, and a recovery component for storing the blanket is provided inside the recovery cavity along its length direction.

[0010] Preferably, the recovery component includes a recovery column, the axial direction of the recovery column is arranged along the length direction of the recovery chamber, the end of the blanket away from the fixed rod is connected to the recovery column, and the two ends of the recovery column are coaxially provided with rotating shafts, and the other ends of the two rotating shafts are respectively connected to the front and rear side surfaces of the fixed seat through bearings.

[0011] Preferably, the two ends of the recovery column are coaxially provided with limit plates, and the edges of the side surfaces of the two limit plates close to each other are circumferentially provided with a plurality of shifting rods.

[0012] Preferably, the axial direction of each of the shifting rods is arranged perpendicular to the side surface of the limiting plate.

[0013] Preferably, a recovery port for allowing the blanket to pass through is further provided at the lower end of a side surface of the fixing seat close to the fixing rod, and the length direction of the recovery port is arranged along the length direction of the recovery cavity.

[0014] Preferably, binding belts for fixing the fixing rod are respectively provided at both ends of the recovery port on a side surface of the fixing seat close to the fixing rod.

[0015] Preferably, a rectangular opening communicating with the recovery chamber is further provided on a side surface of the fixing seat away from the fixing rod, and the length direction of the rectangular opening is arranged along the length direction of the recovery chamber.

[0016] Preferably, a plurality of fixing plates are provided on a side surface of the fixing seat away from the fixing rod, and the plurality of fixing plates are sequentially arranged below the rectangular opening along the length direction of the fixing seat, and a through hole is provided on the fixing plate extending upward and downward, and a first fixing rod is fitted in the through hole.

[0017] Preferably, the fixing rod is provided with a plurality of circular holes along its length direction, and the second fixing rod is fitted into the circular holes.

[0018] Preferably, the blanket is provided with a plurality of straps at the left and right ends along its length direction, respectively. The plurality of straps are sequentially arranged along the length direction of the blanket.

[0019] Compared with the prior art, the utility model has the following beneficial effects:

[0020] (1) The utility model discloses a cement stabilized gravel base maintenance device, which is provided with a blanket, the length direction of which is perpendicular to the width direction of the cement stabilized gravel base, and a fixing seat is provided at one end of the blanket, and a fixing rod is provided at the other end of the blanket. A plurality of blankets are arranged in sequence along the length direction of the cement stabilized gravel base, and a blanket with good water permeability is used to replace the existing plastic film, which does not affect the watering operation during maintenance and is easy to fix.

[0021] (2) The utility model is a cement-stabilized gravel base maintenance device, in which a recovery component for recovering a felt is arranged inside a fixed seat. The felt can be rolled up and stored by rotating a recovery column, so as to be convenient for next use. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] In order to more clearly illustrate the technical solution of the implementation mode of the utility model, the drawings required for use in the implementation mode are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.

[0023] Figure 1 It is a schematic diagram of the laying of the utility model.

[0024] Figure 2 This is a schematic diagram of the cover structure of the utility model.

[0025] Figure 3 This is a schematic diagram of the structure of the recycling component of the utility model.

[0026] Figure 4 This is a schematic diagram of the fixing rod structure of the utility model.

[0027] Figure 5 It is a rear view schematic diagram of the fixing seat structure of the utility model.

[0028] Figure 6 It is a schematic diagram of the lever structure of the utility model. DETAILED DESCRIPTION

[0029] In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is only a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0030] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0031] See also Figure 1-6 As shown, a cement stabilized gravel base maintenance device includes a covering member arranged along the width direction of the cement stabilized gravel base, and the covering member is provided in plurality. The covering members are connected end to end and arranged in sequence along the length direction of the cement stabilized gravel base. The covering member includes a blanket 1, and the length direction of the blanket 1 is arranged perpendicular to the width direction of the cement stabilized gravel base 2. A fixing seat 3 is arranged at one end of the blanket 1 along its width direction, and a fixing rod 4 is arranged at the other end of the blanket 1 along its width direction. The blanket 1 is a cement maintenance blanket with good water permeability. Several blankets are arranged in sequence along the length direction of the cement stabilized gravel base, and the blankets with good water permeability are used to replace the existing plastic film, which does not affect the watering operation during maintenance and is easy to fix.

[0032] The fixing seat 3 is in a rectangular parallelepiped shape, and a recovery chamber 5 is provided inside the fixing seat 3 along its length direction. A recovery component 6 for storing the blanket 1 is provided inside the recovery chamber 5 along its length direction.

[0033] The recovery component 6 includes a recovery column 61, the axial direction of which is arranged along the length direction of the recovery chamber 5, the end of the blanket 1 away from the fixing rod 4 is connected to the recovery column 61, the two ends of the recovery column 61 are respectively coaxially provided with a rotating shaft 63, and the other ends of the two rotating shafts 63 are respectively connected to the front and rear side surfaces of the fixing seat 3 through bearings 64. By arranging a recovery component for recovering the blanket inside the fixing seat, the blanket can be rolled up and stored by rotating the recovery column, so as to be convenient for next use.

[0034] A recovery port 7 for allowing the blanket 1 to pass through is further provided at the lower end of a side surface of the fixing seat 3 close to the fixing rod 4 , and the length direction of the recovery port 7 is arranged along the length direction of the recovery chamber 5 .

[0035] The fixing base 3 is provided with binding belts for fixing the fixing rod 4 at both ends of the recycling port 7 on one side surface close to the fixing rod 4. After the blanket is recycled, the two ends of the fixing rod can be bound by the binding belt, and the fixing rod is bound to the upper side of the fixing base for easy transportation and handling.

[0036] The two ends of the recovery column 61 are also coaxially provided with limit plates 62, and the edges of the sides of the two limit plates 62 close to each other are also circumferentially provided with a plurality of levers 65. The axial direction of each lever 65 is perpendicular to the side of the limit plate 62. A rectangular opening 8 connected to the recovery chamber 5 is also provided on the side surface of the fixed seat 3 away from the fixed rod 4, and the length direction of the rectangular opening 8 is arranged along the length direction of the recovery chamber 5. Through the rectangular opening 8, people can use their hands to move the lever, so that the limit plate and the recovery column are rotated, and the recovery operation of the blanket is realized.

[0037] A plurality of fixing plates 9 are further provided on one side of the fixing seat 3 away from the fixing rod 4. The fixing plates 9 are sequentially arranged below the rectangular opening 8 along the length direction of the fixing seat 3. A through hole is provided on the fixing plate extending vertically, and a first fixing rod 10 is fitted in the through hole. The first fixing rod 10 is connected to the edge soil layer on one side of the cement stabilized gravel base layer to improve the stability of the fixing seat 3 when it is placed.

[0038] The fixing rod 4 is provided with a plurality of circular holes 11 along its length direction, and the circular holes are fitted with a second fixing rod 12. The second fixing rod 12 is connected to the edge soil layer on the other side of the cement stabilized gravel base to improve the stability of the fixing rod 4 when placed.

[0039] The blanket 1 is also provided with a plurality of straps 13 at the left and right ends along the length direction thereof, and the plurality of straps 13 are sequentially arranged along the length direction of the blanket 1. The plurality of blankets are sequentially arranged along the length direction of the cement stabilized gravel base, and adjacent blankets are connected by the straps 13, so as to improve the covering stability between the plurality of blankets and reduce the possibility of wind blowing.

[0040] The above is only a preferred implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed by the present invention according to the technical solution and inventive concept of the present invention, which should be covered by the protection scope of the present invention.

Claims

1. A cement stabilized gravel base maintenance device, characterized in that: The invention comprises a covering member arranged along the width direction of a cement-stabilized gravel base layer, wherein a plurality of the covering members are arranged, and the plurality of covering members are connected end to end and arranged in sequence along the length direction of the cement-stabilized gravel base layer. The covering member comprises a blanket (1), wherein the length direction of the blanket (1) is perpendicular to the width direction of the cement-stabilized gravel base layer (2), a fixing seat (3) is arranged at one end of the blanket (1) along the width direction thereof, and a fixing rod (4) is arranged at the other end of the blanket (1) along the width direction thereof.

2. A cement-stabilized crushed stone base maintenance device according to claim 1, characterized in that: The fixing seat (3) is in the shape of a rectangular parallelepiped, a recovery chamber (5) is provided inside the fixing seat (3) along its length direction, and a recovery component (6) for storing the blanket (1) is provided inside the recovery chamber (5) along its length direction.

3. A cement-stabilized crushed stone base maintenance device according to claim 2, characterized in that: The recovery component (6) comprises a recovery column (61), the axial direction of the recovery column (61) being arranged along the length direction of the recovery chamber (5), the end of the blanket (1) away from the fixing rod (4) being connected to the recovery column (61), the two ends of the recovery column (61) being coaxially provided with rotating shafts (63), the other ends of the two rotating shafts (63) being connected to the front and rear side surfaces of the fixing seat (3) via bearings (64) respectively.

4. A cement-stabilized crushed stone base maintenance device according to claim 3, characterized in that: Limiting plates (62) are coaxially arranged at both ends of the recovery column (61), and a plurality of shifting rods (65) are circumferentially arranged on the edges of the side surfaces of the two limiting plates (62) that are close to each other.

5. A cement-stabilized crushed stone base maintenance device according to claim 4, characterized in that: A recovery port (7) for allowing the blanket (1) to pass through is also provided at the lower end of a side surface of the fixing seat (3) close to the fixing rod (4), and the length direction of the recovery port (7) is arranged along the length direction of the recovery chamber (5).

6. A cement-stabilized crushed stone base maintenance device according to claim 5, characterized in that: A rectangular opening (8) communicating with the recovery chamber (5) is also provided on a side surface of the fixing seat (3) away from the fixing rod (4), and the rectangular opening (8) is arranged along the length direction of the recovery chamber (5).

7. A cement-stabilized crushed stone base maintenance device according to claim 6, characterized in that: A plurality of fixing plates (9) are also provided on a side surface of the fixing seat (3) away from the fixing rod (4). The plurality of fixing plates (9) are sequentially arranged below the rectangular opening (8) along the length direction of the fixing seat (3). A through hole is provided on the fixing plate extending vertically therethrough, and a first fixing rod (10) is fitted into the through hole.

8. A cement-stabilized crushed stone base maintenance device according to claim 7, characterized in that: The fixing rod (4) is provided with a plurality of circular holes (11) along its length direction, and the second fixing rod (12) is fitted into the circular hole.

Citation Information

Patent Citations

  • Cement stabilized macadam base maintenance device

    CN211472081U

  • Cement stabilized macadam base maintenance device

    CN216891890U