Back pressure type bottom-supported pile sinking guide frame

By designing a reverse pressure bottom sinking pile guide, the coordinated structure of foundation piles, auxiliary piles and guide frame body is used to solve the problem of difficulty in adjusting the level of pile sinking guide frame, improving the accuracy and installation efficiency of pile sinking, and achieving cost savings and production efficiency improvements.

CN222810019UActive Publication Date: 2025-04-29CCCC THIRD HARBOR ENGINEERING CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421826945.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-30
Publication Date
2025-04-29
Estimated Expiration
2034-07-30

AI Technical Summary

Technical Problem

The existing pile sinking guides have difficulties in adjusting the level, especially in deep water areas and multiple lifting and falling adjustments, which affect the pile sinking accuracy and installation efficiency.

Method used

A reverse pressure type bottom sinking pile guide is designed. By setting up the coordination between the foundation pile, auxiliary pile and the guide frame body, the reinforcement rod, steel mesh plate and rigging platform are used to improve the horizontal adjustment speed and stability of the guide frame.

Benefits of technology

The horizontal adjustment time of the pile sinking guide frame is greatly improved, ensuring the pile sinking accuracy of steel pipe piles and the installation of the pipe frame is smooth, shortening the operating time of offshore ships, reducing costs, and improving work efficiency and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222810019U_ABST
    Figure CN222810019U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pile sinking guide frames, and discloses a back pressure type bottom-supported pile sinking guide frame which comprises four foundation piles and further comprises engineering piles arranged on the inner sides of the foundation piles, auxiliary piles for improving the stability of the foundation piles are arranged on the inner walls of the foundation piles, and the auxiliary piles are arranged on the inner walls of the foundation piles. A guide frame body used for improving the stability of the foundation piles is arranged among the four foundation piles, crossed reinforcing rods are fixed to the inner side of the guide frame body, and a steel mesh plate and a rigging platform are arranged on the inner side of the guide frame body. The foundation piles, the auxiliary piles and the guide frame body are used in cooperation, the levelness adjusting time of the pile sinking guide frame can be greatly shortened, a good foundation is provided for steel pipe pile sinking precision and smooth guide pipe frame installation, meanwhile, the marine ship operation time can be shortened, the cost of ship machines, equipment and personnel is reduced, and the working efficiency is improved. The working efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of pile sinking guide frames, in particular to a counter-pressure bottom-seating pile sinking guide frame. Background Art

[0002] The jacket foundation is a major form of offshore wind turbine foundation, mainly composed of four foundation piles and a jacket. The four legs of the jacket are inserted underwater into four steel pipe piles, and finally grouting is performed in the annular space formed between the inner wall of the steel pipe pile and the jacket legs to connect and fix them, forming a four-pile jacket wind turbine foundation structure. In order to ensure that the jacket tip can be smoothly inserted into the steel pipe pile, the steel pipe pile sinking accuracy needs to be strictly controlled. One of the main measures to control the verticality of the steel pipe pile is to control the horizontality of the pile sinking guide frame.

[0003] Traditional pile guide frames mainly include reverse-pull pile guide frames, auxiliary piles, anti-sinking plate combined bearing pile guide frames, and suction bucket pile guide frames. The reverse-pull pile guide frame has the characteristics of high leveling accuracy, but the platform erection and leveling time is long, and it is not suitable for deep water areas; the auxiliary pile, anti-sinking plate combined bearing pile guide frame has the characteristics of fast platform erection and mature technology, but its platform level control is more difficult, usually requiring multiple lifting and lowering to adjust the level; the suction bucket pile guide frame has the characteristics of high leveling accuracy, but its sinking process is more cumbersome and takes a long time. Compared with other centralized pile guide frames, the reverse pressure pile guide frame has the characteristics of high leveling accuracy and short leveling time. Utility Model Content

[0004] The utility model aims to provide a counter-pressure bottom-sinking pile guide frame to solve the problems raised in the above-mentioned background technology.

[0005] To achieve the above object, the utility model provides the following technical solution: a counter-pressure bottom-sinking pile guide frame, including foundation piles, and also including:

[0006] The engineering piles are arranged on the inner side of the foundation piles, and the inner wall of the foundation piles is provided with auxiliary piles for improving the stability of the foundation piles. The foundation piles are arranged in four, and a guide frame body for improving the stability of the foundation piles is arranged between the four foundation piles, and crossed reinforcement rods are fixed on the inner side of the guide frame body, and steel mesh plates and rigging platforms are respectively arranged on the inner side of the guide frame body.

[0007] Preferably, an oblique support rod is fixed to the outer side of the auxiliary pile, and a connecting rod is fixed between the oblique support rod and the auxiliary pile.

[0008] Preferably, a mounting seat is fixed to the outer side of the auxiliary pile, a first cross bar is provided on one side of the mounting seat, and a first connecting member for improving connection stability is provided between the first cross bar and the diagonal support rod.

[0009] Preferably, a second cross bar is fixed to the outer side of the auxiliary pile, and a second connecting member for improving connection stability is provided between the second cross bar and the diagonal bracing rod.

[0010] Preferably, a positioning rod is fixed on the outer side of the auxiliary pile, a limiting rod is fixed on the inner side of the positioning rod, and a third connecting member for improving connection stability is provided between the positioning rod and the limiting rod.

[0011] Preferably, two symmetrical mounting frames are fixed to the outer side of the guide frame body, and a positioning instrument is fixed to the outer side of the mounting frame.

[0012] Compared with the prior art, the beneficial effects of the utility model are as follows:

[0013] The utility model can greatly improve the time for adjusting the horizontality of the pile sinking guide frame by setting the coordinated use of the foundation piles, the auxiliary piles and the guide frame body, and provide a good foundation for the pile sinking accuracy of the steel pipe piles and the smooth installation of the conductor frame. At the same time, it can shorten the operation time of offshore ships, reduce the cost of ship machinery, equipment and personnel, improve work efficiency, save labor costs, and thus improve production benefits. By setting the first connecting piece, the second connecting piece and the third connecting piece, the connection between the auxiliary piles and the guide frame body and the multiple reinforcement rods can be made more stable. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 A structural schematic diagram of a preferred embodiment of a counter-pressure bottom-sinking pile guide frame provided by the utility model;

[0015] Figure 2 A schematic diagram of the structure of the connection between the auxiliary pile and the diagonal brace provided by the utility model;

[0016] Figure 3 A schematic diagram of the structure of the connection between the auxiliary pile and the positioning rod provided by the utility model;

[0017] Figure 4 A schematic diagram of the structure of the connection between the guide frame body and the positioning instrument provided by the utility model;

[0018] Figure 5 This is a top view of the engineering pile and auxiliary pile provided by the utility model.

[0019] In the figure: 1. foundation pile; 2. engineering pile; 3. auxiliary pile; 4. guide frame body; 5. reinforcement rod; 6. steel mesh plate; 7. rigging platform; 8. diagonal support rod; 9. connecting rod; 10. mounting seat; 11. first cross bar; 12. first connecting piece; 13. second cross bar; 14. second connecting piece; 15. positioning rod; 16. limit rod; 17. third connecting piece; 18. mounting frame; 19. positioning instrument. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0021] See also Figure 1-5 As shown, a counter-pressure bottom-sinking pile guide frame includes a foundation pile 1, which can be installed underwater by setting the foundation pile 1; it also includes an engineering pile 2 arranged on the inner side of the foundation pile 1, and the engineering pile 2 can be used to fix the foundation pile 1 to the bottom of the water; the inner wall of the foundation pile 1 is provided with an auxiliary pile 3 for improving the stability of the foundation pile 1, and the stability of the structure of the foundation pile 1 can be improved by setting the auxiliary pile 3; four foundation piles 1 are provided, and a guide frame body 4 for improving the stability of the foundation pile 1 is provided between the four foundation piles 1, and the four foundation piles 1 can be connected by setting the guide frame body 4; crossed reinforcement rods 5 are fixed on the inner side of the guide frame body 4, and the stability of the structure of the guide frame body 4 can be improved by setting the reinforcement rods 5; steel mesh plates 6 and rigging platforms 7 are respectively provided on the inner side of the guide frame body 4, and the equipment can be easily installed by setting the steel mesh plates 6 and the rigging platform 7.

[0022] See also Figure 1 and Figure 2As shown, an oblique support rod 8 is fixed to the outer side of the auxiliary pile 3, and the stability of the auxiliary pile 3 structure can be improved by setting the oblique support rod 8; a connecting rod 9 is fixed between the oblique support rod 8 and the auxiliary pile 3, and the oblique support rod 8 and the auxiliary pile 3 can be connected by setting the connecting rod 9; a mounting seat 10 is fixed to the outer side of the auxiliary pile 3, and the auxiliary pile 3 can be connected by setting the mounting seat 10; a first cross bar 11 is provided on one side of the mounting seat 10, and the mounting seat 10 can be connected by setting the first cross bar 11; a first connecting member 12 for improving the connection stability is provided between the first cross bar 11 and the oblique support rod 8, and the stability of the connection between the first cross bar 11 and the oblique support rod 8 can be improved by setting the first connecting member 12; a second cross bar 13 is fixed to the outer side of the auxiliary pile 3, and the auxiliary pile 3 can be connected by setting the second cross bar 13; a A second connecting member 14 for improving the connection stability is provided, and the stability of the connection between the second cross bar 13 and the diagonal support bar 8 can be improved by setting the second connecting member 14; a positioning rod 15 is fixed to the outer side of the auxiliary pile 3, and the auxiliary pile 3 can be connected by setting the positioning rod 15; a limiting rod 16 is fixed to the inner side of the positioning rod 15, and the positioning rod 15 can be connected by setting the limiting rod 16; a third connecting member 17 for improving the connection stability is provided between the positioning rod 15 and the limiting rod 16, and the stability of the connection between the positioning rod 15 and the limiting rod 16 can be improved by setting the third connecting member 17; two symmetrical mounting frames 18 are fixed to the outer side of the guide frame body 4, and a positioning instrument 19 can be installed by setting the mounting frame 18; a positioning instrument 19 is fixed to the outer side of the mounting frame 18, and the guide frame body 4 can be positioned by setting the positioning instrument 19.

[0023] Working principle: The crane ship lifts the counter-pressure bottom-sinking pile guide frame to the machine position. According to the measurement and positioning system, the center position and torsion angle of the platform are observed in real time. The surveyor directs the ship to shift to ensure that the deviation between the center of the platform and the center of the designed machine position is less than one meter. After the platform anti-sinking plate is placed on the mud surface and the hook is not under force, the surveyor hooks up to the guide frame body 4 through the rigging to measure the horizontality of the platform; if the horizontality is less than 3 / 1000, it will start to unhook. If the horizontality is greater than 3 / 1000, it is necessary to weld a stopper on the auxiliary pile 3 on the higher side of the guide frame body 4, and press the high point downward through the stopper and the jack to complete the horizontal adjustment. Lift the vibrating hammer to clamp the auxiliary pile 3. After the hook is lifted about 30 cm, pull out the pin of the auxiliary pile 3, lower the auxiliary pile 3, and start sinking the pile with minimum energy. After the diagonal sinking of the auxiliary pile 3 is completed, measure the horizontality of the platform. After the crane lifts the foundation pile 1 and turns over the foundation pile 1, the foundation pile 1 is placed in the dragon mouth of the guide frame body 4, and the foundation pile 1 is slowly lowered. The foundation pile 1 is inserted into the sleeve using the dragon mouth of the top platform and the inclined surface of the sleeve top for guidance; the posture of the foundation pile 1 needs to be measured during the lowering process, and it can be adjusted by the jack; repeat the above operation to complete the insertion of four foundation piles 1. After the insertion of the piles is completed, the pile driver and the hydraulic hammer are lifted to start the first hammering and sinking of the piles. When the pile top is about two meters above the sea level, the hammering is stopped, and the hydraulic hammer is lifted to start the first pile sinking of the second foundation pile 1. After all four foundation piles 1 have completed the first pile sinking, the big arm is adjusted to insert the pile driver, and the four foundation piles 1 are sunk to the designed elevation in turn. After the foundation pile 1 is sunk, the vibrating hammer is lifted to pull out the four auxiliary piles 3 in turn and fix them on the platform with pins, and the guide frame body 4 is lifted to move to the next machine position.

[0024] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the existence of other identical elements in the process, method, article or device including the elements.

[0025] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A back pressure type bottom sinking pile guide frame, comprising a foundation pile (1), characterized in that: Also includes: An engineering pile (2) is arranged inside the foundation pile (1); the inner wall of the foundation pile (1) is provided with an auxiliary pile (3) for improving the stability of the foundation pile (1); the foundation pile (1) is provided with four; a guide frame body (4) for improving the stability of the foundation pile (1) is arranged between the four foundation piles (1); intersecting reinforcement rods (5) are fixed on the inner side of the guide frame body (4); and a steel mesh plate (6) and a rigging platform (7) are respectively arranged on the inner side of the guide frame body (4).

2. The back pressure type bottom sinking pile guide frame according to claim 1, characterized in that: An oblique support rod (8) is fixed on the outer side of the auxiliary pile (3), and a connecting rod (9) is fixed between the oblique support rod (8) and the auxiliary pile (3).

3. The back pressure type bottom sinking pile guide frame according to claim 2, characterized in that: A mounting seat (10) is fixed on the outside of the auxiliary pile (3), a first crossbar (11) is provided on one side of the mounting seat (10), and a first connecting member (12) for improving connection stability is provided between the first crossbar (11) and the diagonal brace (8).

4. The back pressure type bottom sinking pile guide frame according to claim 2, characterized in that: A second cross bar (13) is fixed to the outer side of the auxiliary pile (3), and a second connecting member (14) for improving connection stability is provided between the second cross bar (13) and the diagonal support rod (8).

5. The back pressure type bottom sinking pile guide frame according to claim 1, characterized in that: A positioning rod (15) is fixed on the outside of the auxiliary pile (3), a limiting rod (16) is fixed on the inside of the positioning rod (15), and a third connecting member (17) for improving connection stability is provided between the positioning rod (15) and the limiting rod (16).

6. The back pressure type bottom sinking pile guide frame according to claim 1, characterized in that: Two symmetrical mounting frames (18) are fixed on the outer side of the guide frame body (4), and a positioning instrument (19) is fixed on the outer side of the mounting frame (18).