Coating device for rail transit cable production
By using the first motor to stir the slurry and condensate water recycling method in the cable coating device, the problems of slurry precipitation and the increase in the condensate water temperature are solved, the cladding effect and cooling efficiency of the cable are improved, and the service life and safety of the cable are extended.
Patent Information
- Application Number
- CN202420424727.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-03-05
- Publication Date
- 2025-05-02
- Estimated Expiration
- 2034-03-05
AI Technical Summary
The existing cable coating device easily precipitates and hardens after a long period of time, resulting in poor coating effect. At the same time, the increase in the temperature of the condensate will affect the condensation effect.
The first motor is used to drive the stirring rod to stir the slurry to avoid precipitation; the condensate structure is used to recycle the water chamber and the second ring chamber to maintain the low temperature of the condensate and increase the forming rate of the cable outer slurry layer.
It effectively avoids slurry precipitation, improves the cladding effect of the cable surface, and maintains its cooling effect by recycling condensate, extending the service life and safety of the cable.
Smart Images

Figure CN222826138U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of rail transit cable production, in particular to a coating device for rail transit cable production. Background Art
[0002] In production and life, cables are particularly common in people's use, and their safety is also an important indicator in the process of selecting cables in people's daily life. Rail transit is one of the important means of transportation for contemporary people. In the selection process of cables used in the initial construction, the safety and service life of the cables are used as hard indicators. During the use of the cable, its external coating device serves as an external protective layer, which determines the service life and safety of the cable during use.
[0003] The outer layer of the existing cable is coated with a thermoplastic molded slurry. When the slurry is static for a long time, it is easy to precipitate and harden, which makes its coating effect on the cable poor. In addition, the cooling device of the cable usually adopts a condensation water structure. After working for a long time, the temperature of the condensation water increases, which easily leads to the deterioration of its condensation effect. Utility Model Content
[0004] In order to solve the above technical problems, the utility model provides a covering device for rail transit cable production, including a workbench and a slurry pump, a slurry pump is installed on the upper end surface of the workbench, a first motor is arranged below the slurry pump, an annular frame is installed on the output end of the first motor, the annular frame is arranged in the slurry pump, a plurality of stirring rods are installed on the outer wall of the annular frame, a first annular cavity is arranged on the right side of the slurry pump, the first annular cavity and the slurry pump are connected by a first connecting pipe, the first connecting pipe part is arranged in the slurry pump, a feed pipe is installed on the outer wall of the slurry pump, and a plurality of nozzles are installed on the inner wall of the first annular cavity along its circumferential direction.
[0005] Preferably: a water cavity is arranged in front of the slurry pump, a second annular cavity is arranged on the right of the water cavity, and the water cavity and the second annular cavity are connected by a second connecting pipe.
[0006] Preferably: a water pump is installed on the upper surface of the workbench, and the water pump is connected to the water cavity and the second annular cavity through a connecting pipe.
[0007] Preferably: a plurality of temperature sensors are installed on the inner wall of the second annular cavity along its circumferential direction, and the temperature sensors are electrically connected to the water pump.
[0008] Preferably: an electric slider is arranged in front of the second annular cavity, and a limiting sleeve is installed on the upper end surface of the electric slider through a connecting piece.
[0009] Preferably, a first spring is installed symmetrically on the inner side wall of the limiting sleeve, and an arc plate is installed on the other end of the first spring.
[0010] Technical effects and advantages of the utility model:
[0011] 1. The utility model adopts the first motor structure, and the first motor drives the stirring rod to stir the slurry to avoid the slurry settling after being stationary for a long time, thereby failing to achieve the coating effect on the cable surface.
[0012] 2. The utility model adopts a water cavity structure to quickly cool down the outer slurry layer of the cable through condensed water to improve its molding rate. At the same time, a temperature sensor structure is adopted to avoid the water temperature in the second ring cavity from rising after long-term cooling treatment, which will not have the cooling effect on the cable. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a structural front view of a covering device for rail transit cable production provided in an embodiment of the present application;
[0014] Figure 2 This is a left view of the structure of a covering device for rail transit cable production provided in an embodiment of the present application;
[0015] Figure 3 It is a first sectional front view of a covering device for rail transit cable production provided in an embodiment of the present application;
[0016] Figure 4 It is a second sectional front view of a covering device for rail transit cable production provided in an embodiment of the present application;
[0017] In the figure: 1. workbench; 2. slurry pump; 11. first motor; 12. annular frame; 13. stirring rod; 14. first annular cavity; 15. first connecting pipe; 16. nozzle; 17. water cavity; 18. second annular cavity; 19. second connecting pipe; 21. water pump; 22. temperature sensor; 23. electric slider; 24. limit sleeve; 25. first spring; 26. arc plate. DETAILED DESCRIPTION
[0018] The present invention is further described in detail below in conjunction with the accompanying drawings and specific embodiments. The embodiments of the present invention are provided for the purpose of illustration and description, and are not intended to be exhaustive or to limit the present invention to the disclosed forms. Many modifications and variations are obvious to those of ordinary skill in the art. The embodiments are selected and described in order to better illustrate the principles and practical applications of the present invention, and to enable those of ordinary skill in the art to understand the present invention and thereby design various embodiments with various modifications suitable for specific purposes.
[0019] See also Figures 1 to 4In this embodiment, a coating device for rail transit cable production is provided, including a workbench 1 and a slurry pump 2, the slurry pump 2 is installed on the upper end surface of the workbench 1, a first motor 11 is arranged below the slurry pump 2, an annular frame 12 is installed at the output end of the first motor 11, the annular frame 12 is arranged in the slurry pump 2, a plurality of stirring rods 13 are installed on the outer wall of the annular frame 12, a first annular cavity 14 is arranged on the right side of the slurry pump 2, the first annular cavity 14 is connected to the slurry pump 2 through a first connecting pipe 15, the first connecting pipe 15 is partially arranged in the slurry pump 2, a feed pipe is installed on the outer wall of the slurry pump 2, and the first annular cavity A plurality of nozzles 16 are installed along the circumferential direction of the inner wall 14. When working, the slurry enters the slurry pump 2 through the feed pipe after thermal treatment, and the cable is arranged in the first annular cavity 14. The valve on the first connecting pipe 15 is opened, and the slurry enters the first annular cavity 14 through the first connecting pipe 15. The cable surface is sprayed by the nozzle 16. In order to avoid the slurry settling due to long-term static state, so as to achieve the failure of coating the cable surface, the first motor 11 is started to drive the annular frame 12 to rotate, and the annular frame 12 drives the stirring rod 13 to rotate, so as to stir the slurry to prevent it from static hardening.
[0020] A water chamber 17 is arranged in front of the slurry pump 2, and a second annular chamber 18 is arranged on the right side of the water chamber 17. The water chamber 17 and the second annular chamber 18 are connected by a second connecting pipe 19. When working, the water chamber 17 is filled with condensed water, and the water in the water chamber 17 is transported to the first annular chamber 14 through the second connecting pipe 19. The cable passes through the inner end of the first annular chamber 14, and the condensed water in the second annular chamber 18 quickly cools down the outer slurry layer of the cable, thereby increasing its forming rate.
[0021] A water pump 21 is installed on the upper end surface of the workbench 1, and the water pump 21 is connected to the water cavity 17 and the second annular cavity 18 through a connecting pipe. When working, after a long period of cooling treatment, the water temperature in the second annular cavity 18 will increase, and at this time, it will not have a cooling effect on the cable. At this time, the water pump 21 is turned on, and the water in the second annular cavity 18 enters the water cavity 17 through the connecting pipe, thereby realizing the recycling of water.
[0022] A plurality of temperature sensors 22 are installed along the circumferential direction of the inner wall of the second annular cavity 18 . The temperature sensors 22 are electrically connected to the water pump 21 . When working, the temperature sensors 22 sense the water temperature in the second annular cavity 18 . When the temperature is too high, the water pump 21 is controlled to start.
[0023] An electric slider 23 is arranged in front of the second annular cavity 18, and a limit sleeve 24 is installed on the upper end surface of the electric slider 23 through a connecting piece. When working, the electric slider 23 is a linear guide slider structure, and the motor drives the lead screw to rotate to control the linear movement of the device.
[0024] The first spring 25 is symmetrically installed on the inner wall of the limiting sleeve 24, and an arc plate 26 is installed on the other end of the first spring 25. During operation, one end of the cable is fixed in the limiting sleeve 24, and the first spring 25 drives the arc plate 26 to move toward the inner end to fix the cable. The electric slider 23 is started to drive the cable to move forward, so that the entire cable is clad.
[0025] During specific operation, one end of the cable is fixed in the limit sleeve 24, and the first spring 25 drives the arc plate 26 to move toward the inner end to fix the cable. After the slurry is thermally treated, it enters the slurry pump 2 through the feed pipe, and the cable is arranged in the first annular cavity 14. The valve on the first connecting pipe 15 is opened, and the slurry enters the first annular cavity 14 through the first connecting pipe 15. The cable surface is sprayed through the nozzle 16. In order to avoid the slurry from settling for a long time and thus failing to cover the cable surface, the first motor 11 is started to drive the annular frame 12 to rotate, and the annular frame 12 drives the stirring rod 13 to rotate, thereby stirring the slurry to prevent it from hardening at rest. The electric slider 23 is started to drive the cable forward, thereby covering the entire cable.
[0026] Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field and related fields without creative work should fall within the scope of protection of the present invention. Structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to conventional means in the field unless otherwise specified and limited.
Claims
1. A coating device for rail transit cable production, comprising a workbench (1) and a slurry pump (2), characterized in that: A slurry pump (2) is installed on the upper end surface of the workbench (1), a first motor (11) is arranged below the slurry pump (2), an annular frame (12) is installed at the output end of the first motor (11), the annular frame (12) is arranged in the slurry pump (2), a plurality of stirring rods (13) are installed on the outer wall of the annular frame (12), a first annular cavity (14) is arranged on the right side of the slurry pump (2), the first annular cavity (14) and the slurry pump (2) are connected via a first connecting pipe (15), a portion of the first connecting pipe (15) is arranged in the slurry pump (2), a feed pipe is installed on the outer wall of the slurry pump (2), and a plurality of nozzles (16) are installed on the inner wall of the first annular cavity (14) along its circumferential direction.
2. A coating device for rail transit cable production according to claim 1, characterized in that A water cavity (17) is arranged in front of the slurry pump (2), a second annular cavity (18) is arranged on the right side of the water cavity (17), and the water cavity (17) and the second annular cavity (18) are connected via a second connecting pipe (19).
3. A covering device for rail transit cable production according to claim 1, characterized in that: A water pump (21) is installed on the upper end surface of the workbench (1), and the water pump (21) is connected to the water cavity (17) and the second annular cavity (18) via a connecting pipe.
4. A covering device for rail transit cable production according to claim 2, characterized in that: A plurality of temperature sensors (22) are installed on the inner wall of the second annular cavity (18) along its circumferential direction, and the temperature sensors (22) are electrically connected to the water pump (21).
5. A covering device for rail transit cable production according to claim 2, characterized in that: An electric slider (23) is arranged in front of the second annular cavity (18), and a limiting sleeve (24) is installed on the upper end surface of the electric slider (23) via a connecting piece.
6. A covering device for rail transit cable production according to claim 5, characterized in that: A first spring (25) is symmetrically mounted on the inner side wall of the limiting sleeve (24), and an arc-shaped plate (26) is mounted on the other end of the first spring (25).