Building steel bar recycling device

By designing a movable and adjustable building steel bar recycling device, the problem that existing devices cannot adapt to different cement block sizes and steel bar lengths is solved, and more efficient steel bar recycling and transportation is achieved.

CN222856583UActive Publication Date: 2025-05-13ZHONG JIE HAI MING JIAN SHE JI TUAN YOU XIAN GONG SI
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421551025.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-07-03
Publication Date
2025-05-13
Estimated Expiration
2034-07-03

AI Technical Summary

Technical Problem

The existing building steel bar recycling device is inconvenient to move and cannot be adjusted according to the size of the cement block, making it difficult to recycle and transport the steel bars.

Method used

A building steel bar recycling device including a square tube and a telescopic rod is designed, by providing a first movable circle and a first movable rod, these components are allowed to move relative to the telescopic rod, and cut off the steel bars through the hydraulic cylinder and the push rod.

Benefits of technology

The device is easy to move and adjust to accommodate cement blocks of different sizes, improves the recycling efficiency of steel bars, and simplifies the collection and transportation of steel bars through the cutoff function.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222856583U_ABST
    Figure CN222856583U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of building steel bar recycling devices, and discloses a building steel bar recycling device which comprises a square pipe, a telescopic rod is movably inserted into the square pipe, a first movable round block and a second movable round block are movably inserted into the telescopic rod, and a first movable rod is movably connected to the outer surface of the circumference of the first movable round block in a sleeved mode. A first cone is fixedly installed at one end of the upper side of the first movable rod, cylinders are fixedly installed at the positions, close to the two ends, of the lower side of the first movable rod, circular grooves are formed in the lower sides of the two cylinders, and the outer surface of the circumference of a second movable circular block is movably sleeved with a second movable plate. According to the building reinforcing steel bar recycling device, through the arrangement of the square pipe and the telescopic rod, the problems that an existing building reinforcing steel bar recycling device is inconvenient to move and cannot be adjusted according to the size of a cement block can be solved; the problem that building steel bars of an existing building steel bar recycling device are difficult to collect and transport can be solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of construction steel bar recovery devices, in particular to a construction steel bar recovery device. Background Art

[0002] When recycling construction steel bars, the tendency is to melt the entire steel bars and then recast them, so the treatment of the construction steel bars before melting is very important. During the recycling process of construction steel bars, cement blocks of varying sizes will adhere to the construction steel bars, making it difficult to move the construction steel bars, thus causing the problem of construction steel bars being difficult to recycle. In addition, since construction steel bars are usually long, collection and transportation are difficult. For this reason, a construction steel bar recycling device is proposed. Utility Model Content

[0003] The main purpose of the utility model is to provide a construction steel bar recovery device, which can effectively solve the problem that the existing construction steel bar recovery device is inconvenient to move and cannot be adjusted according to the size of the cement block. The construction steel bars of the existing construction steel bar recovery device are usually relatively long, which makes collection and transportation difficult.

[0004] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0005] A construction steel bar recovery device comprises a square tube, wherein a telescopic rod is movably inserted inside the square tube, and a first movable round block and a second movable round block are movably inserted on the telescopic rod respectively, the first movable round block is movably sleeved on the circumferential outer surface of the first movable round block, a first cone is fixedly installed on one end of the upper side of the first movable rod, cylinders are fixedly installed on the lower side of the first movable rod near both ends, circular grooves are provided on the lower sides of the two cylinders, a second movable plate is movably sleeved on the circumferential outer surface of the second movable round block, and a second cone is fixedly installed on one end of the lower side of the second movable plate, a fixing frame is fixedly installed on one side of the square tube, a hydraulic cylinder is fixedly installed on one end of the fixing frame, and a push rod is movably inserted inside the hydraulic cylinder.

[0006] Furthermore, a block is provided on the lower side of the hydraulic cylinder, the block is fixedly connected to the square tube, both ends of the hydraulic cylinder are connected to a hydraulic pump through a hydraulic pipe, and a handrail is fixedly installed on one side of the square tube.

[0007] Furthermore, a first shear block is fixedly mounted on one end of the upper side of the first movable rod, and a second shear block is fixedly mounted on one end of the lower side of the second movable plate.

[0008] Furthermore, one side of the two cylinders is threadedly connected with a first fixing screw, one end of the two first fixing screws can be inserted into the inside of the two circular grooves respectively, and one end of the push rod can be inserted into the inside of the two circular grooves.

[0009] Furthermore, two bolts are movably connected to the square tube, one end of the two bolts is threadedly connected to a nut, and the other end of the two bolts is fixedly connected to a connecting plate. A plurality of circular through holes are opened on the telescopic rod, and the plurality of circular through holes are arranged in an array, and the two bolts are movably inserted through two adjacent circular through holes respectively.

[0010] Furthermore, a second fixing screw is inserted into one side of the second movable round block, the second movable round block is threadedly connected to the second fixing screw, and one end of the second fixing screw can be inserted through the second movable round block and movably abut against one side of the telescopic rod.

[0011] Furthermore, support frames are fixedly installed on both sides of the telescopic rod, one end of the two support frames are movably abutted against the two ends of the second movable plate, two fixed plates are fixedly installed on the upper sides of the two ends of the second movable plate, and the two fixed plates at the two ends of the second movable plate are respectively arranged on both sides of the two support frames.

[0012] Compared with the prior art, the utility model has the following beneficial effects:

[0013] 1. The utility model can solve the problem that the existing construction steel bar recovery device is inconvenient to move and cannot be adjusted according to the size of the cement block by providing a square tube and a telescopic rod. By providing a first movable round block and a first movable rod, the first movable rod is movably sleeved on the first movable round block, and the first movable round block is movably inserted on the telescopic rod, so that the first movable round block and the first movable rod can move relative to the telescopic rod, and then the mounting component on the first movable rod can move. In addition, by providing the square tube and the telescopic rod, the user can increase the moving distance of the first movable round block and the first movable rod on the telescopic rod by adjusting the relative positions of the square tube and the telescopic rod. When in use, the user can increase the moving distance of the first cone on the first movable rod relative to the telescopic rod by adjusting the relative positions of the square tube and the telescopic rod, so that the distance between the first cone and the second cone can be increased or decreased, so as to facilitate the adjustment of the device according to the size of the cement block.

[0014] 2. By setting the first shear block and the second shear block, the problem that the construction steel bars of the existing construction steel bar recovery device are usually long and difficult to collect and transport can be solved. The first movable rod is movably sleeved on the first movable circular block, and the first movable rod can rotate around the first movable circular block, so that it is convenient for the user to adjust the position of the first cone and the first shear block. The second movable plate is movably sleeved on the second movable circular block, and the second movable plate can rotate around the second movable circular block, so that it is convenient for the user to adjust the position of the second cone and the second shear block. When in use, the user can push out the hydraulic cylinder by controlling the push rod, and then the push rod pushes the cylinder, the first movable rod and the second shear block to move. When the first shear block and the second shear block respectively abut against the construction steel bars, as the push rod continues to push the first shear block, the construction steel bars will be cut off at the contact position of the first shear block and the second shear block.

[0015] The parts not involved in the device are the same as those in the prior art or can be implemented by using the prior art. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 The utility model is a schematic diagram of the overall structure of a construction steel bar recovery device.

[0017] Figure 2 This is a schematic diagram of another side of a construction steel bar recovery device of the utility model.

[0018] Figure 3 This is a schematic diagram of the shearing state of a construction steel bar recovery device of the utility model.

[0019] Figure 4 This is a partial enlarged view of the bottle body of a construction steel bar recovery device of the utility model.

[0020] Figure 5 The utility model is a construction steel bar recycling device Figure 2 A is an enlarged view of the middle image.

[0021] In the figure: 1, square tube; 2, telescopic rod; 3, first movable round block; 4, second movable round block; 5, first movable rod; 6, second movable plate; 7, first cone; 8, second cone; 9, first shear block; 10, second shear block; 11, stopper; 12, fixing frame; 13, hydraulic cylinder; 14, push rod; 15, cylinder; 16, circular groove; 17, bolt; 18, nut; 19, connecting plate; 20, circular through hole; 21, fixing plate; 22, first fixing screw; 23, second fixing screw; 24, supporting frame; 25, handrail. DETAILED DESCRIPTION

[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further described below in conjunction with specific implementation methods.

[0023] like Figure 1-Figure 5 As shown, a construction steel bar recovery device comprises a square tube 1, wherein a telescopic rod 2 is movably inserted inside the square tube 1, and a first movable round block 3 and a second movable round block 4 are movably inserted into the telescopic rod 2 respectively, a first movable rod 5 is movably sleeved on the circumferential outer surface of the first movable round block 3, a first cone 7 is fixedly installed on one end of the upper side of the first movable rod 5, a cylinder 15 is fixedly installed on the lower side of the first movable rod 5 near both ends, and a circular groove 16 is provided on the lower side of the two cylinders 15, a second movable plate 6 is movably sleeved on the circumferential outer surface of the second movable round block 4, and a second cone 8 is fixedly installed on one end of the lower side of the second movable plate 6, a fixing frame 12 is fixedly installed on one side of the square tube 1, a hydraulic cylinder 13 is fixedly installed on one end of the fixing frame 12, a push rod 14 is movably inserted inside the hydraulic cylinder 13, and the hydraulic cylinder 13 can be fixed by setting the fixing frame 12.

[0024] A block 11 is provided at the lower side of the hydraulic cylinder 13, and the block 11 is fixedly connected to the square tube 1. Both ends of the hydraulic cylinder 13 are connected to a hydraulic pump through a hydraulic pipe. A handrail 25 is fixedly installed on one side of the square tube 1. The handrail 25 can facilitate users to use the device.

[0025] A first shear block 9 is fixedly installed on one end of the upper side of the first movable rod 5, and a second shear block 10 is fixedly installed on one end of the lower side of the second movable plate 6. The first shear block 9 and the second shear block 10 can be easily cut off to facilitate the collection and transportation of the construction steel bars.

[0026] One side of the two cylinders 15 is threadedly connected with a first fixing screw 22, and one end of the two first fixing screws 22 can be respectively inserted into the inside of the two circular grooves 16, and one end of the push rod 14 can be inserted into the inside of the two circular grooves 16. The circular grooves 16 are provided to facilitate fixing the push rod 14 and prevent the push rod 14 from being offset during pushing, thereby causing damage to the device.

[0027] Two bolts 17 are movably inserted on the square tube 1, and one end of the two bolts 17 is threadedly connected with a nut 18, and the other end of the two bolts 17 is fixedly connected with a connecting plate 19. A plurality of circular through holes 20 are opened on the telescopic rod 2, and the plurality of circular through holes 20 are arranged in an array. The two bolts 17 are movably inserted through two adjacent circular through holes 20 respectively. The relative positions of the square tube 1 and the telescopic rod 2 can be fixed by the plurality of circular through holes 20 and the two bolts 17.

[0028] like Figure 5 As shown, a second fixing screw 23 is inserted into one side of the second movable round block 4 , and the second movable round block 4 is threadedly connected to the second fixing screw 23 . One end of the second fixing screw 23 can pass through the second movable round block 4 and movably abut against one side of the telescopic rod 2 .

[0029] Support frames 24 are fixedly installed on both sides of the telescopic rod 2, and one ends of the two support frames 24 are movably abutted against the two ends of the second movable plate 6 respectively. Two fixing plates 21 are fixedly installed on the upper sides of the two ends of the second movable plate 6 respectively. The two fixing plates 21 at the two ends of the second movable plate 6 are respectively arranged on both sides of the two support frames 24. By setting the support frames 24, the second movable plate 6 of the device can be reinforced to prevent the device from being damaged during operation. By setting the fixing plates 21, the second movable plate 6 of the device can be prevented from being displaced during operation.

[0030] It should be noted that the utility model is a construction steel bar recovery device. When in use, first, the user needs to confirm the size of the cement block adhered to the construction steel bar, then pull the telescopic rod 2 out of the inside of the square tube 1, and wait until the telescopic rod 2 is moved to a suitable position. The user can hold the connecting plate 19, insert the two bolts 17 on one side of the connecting plate 19 through the square tube 1 and two adjacent circular through holes 20 in the plurality of circular through holes 20, and then screw the two nuts 18 onto the two bolts 17 respectively. Then, the user needs to rotate the first movable rod 5 and the second movable plate 6 respectively, so that the end of the first movable rod 5 equipped with the first cone 7 is rotated to the position corresponding to the push rod 14, and then The first movable rod 5 moves toward the position where the push rod 14 is located, so that the push rod 14 is inserted into the corresponding circular groove 16, and then the corresponding first fixing screw 22 is turned so that one end of the first fixing screw 22 abuts against the push rod 14, and then the second movable plate 6 is rotated so that one end of the second movable plate 6 on which the second cone 8 is installed is rotated to the position corresponding to the first cone 7 on the first movable rod 5, and then the second movable plate 6 is moved to the position where the two support frames 24 are located, so that one end of the two support frames 24 is between the two fixing plates 21 at the two ends of the second movable plate 6, and the second fixing screw 23 is turned so that one end of the second fixing screw 23 abuts against one side of the telescopic rod 2;

[0031] Then the user can hold the device with both hands and move the device so that the cement block to be crushed is placed between the first cone 7 and the second cone 8. Then the user needs to control the hydraulic pump so that the hydraulic oil is pumped into the interior of the hydraulic cylinder 13 from one end of the hydraulic cylinder 13, so that the push rod 14 extends out of the hydraulic cylinder 13, and then the push rod 14 drives the cylinder 15, the first movable rod 5 and the first cone 7 to move toward the location of the cement block. When the first cone 7 and the second cone 8 respectively abut against the cement block, as the push rod 14 continuously pushes the first cone 7, cracks begin to appear on the cement block from the contact position between the first cone 7 and the second cone 8, and thus the cement block begins to be crushed. Then the user controls the hydraulic pump to pump the hydraulic oil from the other end of the hydraulic cylinder 13 into the interior of the hydraulic cylinder 13, so that the push rod 14 contracts toward the interior of the hydraulic cylinder 13, and drives the bolt 17 to move toward the location of the hydraulic cylinder 13, and wait until the device is detached from the cement block, and then the next round of cement block crushing operation can be carried out.

[0032] If the user wants to cut off a long building steel bar, the user needs to confirm the thickness of the building steel bar, and then pull the telescopic rod 2 out of the inside of the square tube 1. When the telescopic rod 2 is moved to a suitable position, the user can hold the connecting plate 19, insert the two bolts 17 on one side of the connecting plate 19 through the square tube 1 and two adjacent circular through holes 20 in the plurality of circular through holes 20, and then screw the two nuts 18 onto the two bolts 17 respectively. The user then needs to rotate the first movable rod 5 and the second movable plate 6 respectively, so that the end of the first movable rod 5 on which the first shear block 9 is installed rotates to the position corresponding to the push rod 14, and the first movable rod 5 is moved toward the push rod 1 4 is moved to the position where the push rod 14 is located, so that the push rod 14 is inserted into the corresponding circular groove 16, and then the corresponding first fixing screw 22 is turned so that one end of the first fixing screw 22 abuts against the push rod 14, and then the second movable plate 6 is rotated so that one end of the second movable plate 6 on which the second shear block 10 is installed is rotated to the position corresponding to the first shear block 9 on the first movable rod 5, and then the second movable plate 6 is moved to the position where the two support frames 24 are located, so that one end of the two support frames 24 is located between the two fixing plates 21 at the two ends of the second movable plate 6, and the second fixing screw 23 is turned so that one end of the second fixing screw 23 abuts against one side of the telescopic rod 2;

[0033] Then the user can hold the device with both hands and move the device so that the construction steel bar to be cut is placed between the first shear block 9 and the second shear block 10. Then the user needs to control the hydraulic pump so that the hydraulic oil is pumped into the interior of the hydraulic cylinder 13 from one end of the hydraulic cylinder 13, so that the push rod 14 extends out of the hydraulic cylinder 13, and then the push rod 14 drives the cylinder 15, the first movable rod 5 and the first shear block 9 to move toward the position of the construction steel bar. When the first shear block 9 and the second shear block 10 respectively abut against the construction steel bar, as the push rod 14 continuously pushes the first shear block 9, the construction steel bar will be cut off at the contact position between the first shear block 9 and the second shear block 10. After the construction steel bar is cut off, the user then controls the hydraulic pump to pump the hydraulic oil into the interior of the hydraulic cylinder 13 from the other end of the hydraulic cylinder 13, so that the push rod 14 contracts toward the interior of the hydraulic cylinder 13 and drives the bolt 17 to move to its original position.

[0034] The above shows and describes the basic principle and main features of the utility model and the advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and descriptions are only for explaining the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model may have various changes and improvements, which fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A construction steel bar recovery device, comprising a square tube (1), characterized in that: A telescopic rod (2) is movably inserted into the interior of the square tube (1), and a first movable round block (3) and a second movable round block (4) are movably inserted into the telescopic rod (2), respectively; a first movable rod (5) is movably sleeved on the circumferential outer surface of the first movable round block (3); a first cone (7) is fixedly installed on the upper end of the first movable rod (5); a cylinder (15) is fixedly installed on the lower side of the first movable rod (5) near both ends; a circular groove (16) is provided on the lower side of the two cylinders (15); a second movable plate (6) is movably sleeved on the circumferential outer surface of the second movable round block (4); a second cone (8) is fixedly installed on the lower end of the second movable plate (6); a fixing frame (12) is fixedly installed on one side of the square tube (1); a hydraulic cylinder (13) is fixedly installed on one end of the fixing frame (12); a push rod (14) is movably inserted into the interior of the hydraulic cylinder (13).

2. A construction steel bar recovery device according to claim 1, characterized in that: A stopper (11) is provided on the lower side of the hydraulic cylinder (13), and the stopper (11) is fixedly connected to the square tube (1). Both ends of the hydraulic cylinder (13) are connected to a hydraulic pump via a hydraulic pipe, and a handrail (25) is fixedly installed on one side of the square tube (1).

3. A construction steel bar recovery device according to claim 1, characterized in that: A first shear block (9) is fixedly mounted on one end of the upper side of the first movable rod (5), and a second shear block (10) is fixedly mounted on one end of the lower side of the second movable plate (6).

4. A construction steel bar recovery device according to claim 1, characterized in that: One side of the two cylinders (15) is threadedly connected with a first fixing screw (22), one end of the two first fixing screws (22) can be inserted into the inside of the two circular grooves (16) respectively, and one end of the push rod (14) can be inserted into the inside of the two circular grooves (16).

5. A construction steel bar recovery device according to claim 1, characterized in that: Two bolts (17) are movably inserted on the square tube (1), one end of the two bolts (17) is threadedly connected to a nut (18), and the other end of the two bolts (17) is fixedly connected to a connecting plate (19). The telescopic rod (2) is provided with a plurality of circular through holes (20), and the plurality of circular through holes (20) are arranged in an array, and the two bolts (17) are movably inserted through two adjacent circular through holes (20).

6. A construction steel bar recovery device according to claim 1, characterized in that: A second fixing screw (23) is inserted into one side of the second movable round block (4), the second movable round block (4) is threadedly connected to the second fixing screw (23), and one end of the second fixing screw (23) can be inserted through the second movable round block (4) and movably abut against one side of the telescopic rod (2).

7. A construction steel bar recovery device according to claim 1, characterized in that: Support frames (24) are fixedly mounted on both sides of the telescopic rod (2), one end of the two support frames (24) are movably abutted against the two ends of the second movable plate (6), two fixed plates (21) are fixedly mounted on the upper sides of the two ends of the second movable plate (6), and the two fixed plates (21) at the two ends of the second movable plate (6) are respectively arranged on both sides of the two support frames (24).