Electric power engineering construction investigation device
By using a hollow installation box and a synchronous adjustment mechanism in the power engineering construction survey device, combined with the design of the installation connector and plug pin, the problem of inconvenient replacement of the air gauge is solved, and the practicality and installation stability of the device are improved.
Patent Information
- Application Number
- CN202422328796.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-24
- Publication Date
- 2025-06-10
- Estimated Expiration
- 2034-09-24
AI Technical Summary
In the existing power engineering construction survey device, the air meter and the second sleeve are integrated, which makes the air meter inconvenient to replace and reduces the practicality of the device.
A power engineering construction survey device is designed, using a hollow installation box and a synchronous adjustment mechanism. Through the coordination of the installation connector and the plug pin, the survey equipment can be easily installed and replaced.
Through the coordination of the synchronous adjustment mechanism and the installation connection, the convenient installation and replacement of the survey equipment is achieved, the practicality of the device is improved, and the installation stability is improved through the coordination of the plug pin and the plug slot.
Smart Images

Figure CN222963587U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of power engineering, and particularly relates to a construction survey device for power engineering. Background Technique
[0002] Power engineering, that is, the engineering related to the production, transmission, and distribution of electric energy. In a broad sense, it also includes the engineering of applying electricity as power and energy in various fields. After the 20th century, the production of electric energy mainly relies on thermal power plants, hydropower stations, and nuclear power plants. Where conditions permit, tides, geothermal energy, and wind energy are also used for power generation. The transmission and distribution of electric energy are mainly realized through high- and low-voltage AC power networks;
[0003] Before the construction operation of power engineering, it is necessary to survey a certain range of construction sites to ensure that the construction location is appropriate before construction. After retrieval, the Chinese utility model application number is 202223428790.2, and the patent document name is a construction survey device for power engineering, which includes a bracket and an anemometer. An elevating mechanism for lifting the anemometer is installed on the bracket. The elevating mechanism includes a first elevating component and a second elevating component installed on the first elevating component. The anemometer is installed on the second elevating component;
[0004] Although the above patent document can realize the lifting adjustment of the anemometer (that is, the survey device) according to the survey needs, there are still some problems. The anemometer and the second sleeve are integrally arranged, which results in the anemometer being integrally and fixedly connected to the device, making it inconvenient to replace the anemometer according to the survey needs later, thereby reducing the practicability of the device.
[0005] Therefore, based on the above problems, the present invention provides a construction survey device for power engineering. Content of the Utility Model
[0006] Aiming at the deficiencies of the prior art, the utility model provides a construction survey device for power engineering, which solves the problems mentioned in the background technique.
[0007] To achieve the above objectives, the utility model is realized through the following technical solutions:
[0008] A construction survey device for power engineering includes a hollow installation box. An inspection device is arranged above the hollow installation box. An installation connecting piece is fixedly installed on the bottom surface of the inspection device. An installation groove is opened on the top surface of the hollow installation box. The installation connecting piece is fitted in the installation groove, and a synchronous adjustment mechanism is installed on the hollow installation box. The synchronous adjustment mechanism is used to fix the installation connecting piece in the installation groove to realize the installation of the inspection device.
[0009] Further, the synchronous adjustment mechanism includes a driving motor and a plurality of fixed shafts. The driving motor is fixedly installed in the hollow mounting box. A cross plate is fixedly provided on the power output end of the driving motor. Four mounting shafts are installed on the cross plate. One end of each mounting shaft away from the cross plate is provided with an adjustment plate, and two adjustment pins are installed on the top surface of each adjustment plate.
[0010] Each fixed shaft is installed on the top surface of the hollow mounting box, and a moving plate is movably hinged at the top end of each fixed shaft. A circular block is fixedly provided at one end of each moving plate. Each circular block is matched with the installation connecting piece. An elliptical sliding hole is penetrated and opened at the other end of each moving plate, and each adjustment pin is located in the elliptical sliding hole.
[0011] Further, two circular through holes are provided on each side of the installation groove. Each circular through hole is penetrated and opened on the hollow mounting box and is communicated with the hollow mounting box, and each adjustment pin is located in the corresponding circular through hole.
[0012] Further, a plurality of the circular blocks are of the same specification and size.
[0013] Further, the installation connecting piece includes an installation plate. The installation plate is fixedly connected to the bottom surface of the surveying device, and two arc-shaped matching grooves are opened on the outer side surfaces around the installation plate. Each circular block is located in the corresponding arc-shaped matching groove.
[0014] Further, plug pins are fixedly provided at the four corners of the bottom surface of the installation plate. Plugging grooves matched with the plug pins are penetrated and opened on the hollow mounting box, and each plugging groove is communicated with the installation groove.
[0015] The utility model provides a power engineering construction surveying device. Compared with the prior art, the following beneficial effects are achieved:
[0016] 1. Through the cooperative setting of the synchronous adjustment mechanism and the installation connecting piece, the utility model is convenient to drive each moving plate to movably hinge along the corresponding fixed shaft, and further convenient to drive each circular block to insert into / detach from the corresponding arc-shaped matching groove, so as to realize the installation and disassembly of the installation connecting piece, and further convenient for the later installation and replacement of the surveying device, which is beneficial to increasing the practicability of the device;
[0017] 2. Through the cooperative setting of the plug pin and the plugging groove, when the installation plate is placed into the installation groove, each plug pin is simultaneously driven to be inserted into the corresponding plugging groove. In this way, the stability of installing the installation plate can be further improved, and further the stability of installing the surveying device can be improved, which is beneficial to improving the practicability of the device and convenient for later surveying operations. Brief Description of the Drawings
[0018] In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings required for use in the description of the embodiments or the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For those of ordinary skill in the art, without creative efforts, other drawings can be obtained based on these drawings.
[0019] Figure 1 Shows the three-dimensional connection schematic diagram of the main view of the overall structure of the present invention;
[0020] Figure 2 Shows the three-dimensional schematic diagram of the main view cross-sectional structure of the present invention;
[0021] Figure 3 Shows the three-dimensional disassembly schematic diagram of the overall structure of the present invention;
[0022] Figure 4 Shows the three-dimensional connection schematic diagram of the hollow installation box and the circular through hole and other structures of the present invention;
[0023] Figure 5 Shows the three-dimensional schematic diagram of the installation connecting member and the synchronous adjustment mechanism of the present invention;
[0024] As shown in the figure: 1. Exploration equipment; 2. Hollow installation box; 3. Installation connecting member; 31. Installation plate; 32. Arc-shaped mating groove; 33. Plug pin; 4. Synchronous adjustment mechanism; 41. Circular block; 42. Moving plate; 43. Adjusting plate; 44. Driving motor; 45. Fixed shaft; 46. Adjusting pin; 47. Cross plate; 5. Installation groove; 6. Circular through hole. Detailed Embodiments
[0025] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention are clearly and completely described. Obviously, the described embodiments are some, but not all, of the embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts belong to the scope of protection of the present invention.
[0026] Embodiment 1
[0027] To solve the technical problems in the background art, the following power engineering construction exploration device is given:
[0028] Combined with Figures 1-5As shown in the figure, a power engineering construction survey device provided by the utility model includes a hollow installation box 2, which can be fixedly connected to the second sleeve in the technical background reference document, belonging to technical extension. An inspection device 1 is arranged above the hollow installation box 2. An installation connecting piece 3 is fixedly installed on the bottom surface of the inspection device 1. An installation groove 5 is opened on the top surface of the hollow installation box 2. The installation connecting piece 3 is fitted in the installation groove 5, and a synchronous adjustment mechanism 4 is installed on the hollow installation box 2. The synchronous adjustment mechanism 4 is used to fix the installation connecting piece 3 in the installation groove 5 to realize the installation of the inspection device 1.
[0029] The synchronous adjustment mechanism 4 includes a driving motor 44 and a plurality of fixed shafts 45. The driving motor 44 is fixedly installed in the hollow installation box 2. A cross plate 47 is fixedly arranged on the power output end of the driving motor 44. Four installation shafts are installed on the cross plate 47. One end of each installation shaft away from the cross plate 47 is movably hinged with an adjustment plate 43. Two adjustment pins 46 are installed on the top surface of each adjustment plate 43.
[0030] Each fixed shaft 45 is installed on the top surface of the hollow installation box 2, and a moving plate 42 is movably hinged at the top end of each fixed shaft 45. A circular block 41 is fixedly arranged at one end of each moving plate 42. A plurality of circular blocks 41 are all set in the same specification and size. Each circular block 41 is matched with the installation connecting piece 3. An elliptical sliding hole is penetrated and opened at the other end of each moving plate 42. Each adjustment pin 46 is located in the elliptical sliding hole.
[0031] Two circular through holes 6 are arranged on each side of the installation groove 5. Each circular through hole 6 is penetrated and opened on the hollow installation box 2 and is communicated with the hollow installation box 2. Each adjustment pin 46 is located in the corresponding circular through hole 6.
[0032] The installation connecting piece 3 includes an installation plate 31. The installation plate 31 is fixedly connected to the bottom surface of the inspection device 1. Two arc-shaped matching grooves 32 are opened on the outer side surfaces around the installation plate 31. Each circular block 41 is located in the corresponding arc-shaped matching groove 32.
[0033] During specific use, when the surveying equipment 1 needs to be installed, the installation connecting piece 3 is placed in the installation groove 5, and the driving motor 44 is started. Under the power output of the driving motor 44, the cross plate 47 and several installation shafts on the cross plate 47 are driven to move synchronously, thereby driving the two adjusting pins 46 on each adjusting plate 43 to move within a certain range, so as to drive each adjusting pin 46 to slide along the corresponding elliptical sliding hole. At the same time, under the hinged operation, it is convenient to drive each moving plate 42 to be movably hinged along the corresponding fixed shaft 45, and then it is convenient to drive each circular block 41 to insert / separate from the corresponding arc-shaped mating groove 32, so as to realize the installation and disassembly of the installation connecting piece 3, and then it is convenient to install and replace the surveying equipment 1 later, which is beneficial to increasing the practicability of the device.
[0034] Embodiment 2
[0035] As Figures 1-5 shown, on the basis of the above embodiment, the present embodiment further gives the following content:
[0036] Insertion pins 33 are fixedly provided at the four corners of the bottom surface of the mounting plate 31. Insertion slots matching the insertion pins 33 are formed through the hollow mounting box 2, and each insertion slot is communicated with the installation groove 5.
[0037] During specific use, on the basis of Embodiment 1, when it is necessary to further increase the practicability of the device, the operation is as follows:
[0038] When it is necessary to further increase the connection stability between the installation connecting piece 3 and the hollow mounting box 2, since insertion pins 33 are fixedly provided at the four corners of the bottom surface of the mounting plate 31, and insertion slots matching the insertion pins 33 are formed through the hollow mounting box 2, when the mounting plate 31 is placed in the installation groove 5, each insertion pin 33 is simultaneously driven to be inserted into the corresponding insertion slot. In this way, the stability of installing the mounting plate 31 can be further improved, and then the stability of installing the surveying equipment 1 can be further improved, which is beneficial to improving the practicability of the device and facilitating later surveying operations.
[0039] It should be noted that in this text, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements not only includes those elements, but also includes other elements not expressly listed, or further includes elements inherent to such process, method, article or device. Without further limitation, an element defined by the statement "comprising an..." does not exclude the presence of additional identical elements in the process, method, article or device comprising the element.
[0040] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that they can still modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements for some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A power engineering construction survey device, characterized in that: The invention comprises a hollow installation box (2), wherein a survey device (1) is arranged above the hollow installation box (2), a mounting connector (3) is fixedly installed on the bottom surface of the survey device (1), a mounting groove (5) is provided on the top surface of the hollow installation box (2), the mounting connector (3) is cooperatively arranged in the mounting groove (5), and a synchronous adjustment mechanism (4) is installed on the hollow installation box (2), and the synchronous adjustment mechanism (4) is used to fix the mounting connector (3) in the mounting groove (5) to realize the installation of the survey device (1).
2. The electric power engineering construction survey device according to claim 1, characterized in that: The synchronous adjustment mechanism (4) comprises a driving motor (44) and a plurality of fixed shafts (45). The driving motor (44) is fixedly installed in the hollow installation box (2). A cross plate (47) is fixedly provided on the power output end of the driving motor (44). Four installation shafts are installed on the cross plate (47). An adjustment plate (43) is installed at one end of each installation shaft away from the cross plate (47). Two adjustment pins (46) are installed on the top surface of each adjustment plate (43). Each of the fixed shafts (45) is mounted on the top surface of the hollow mounting box (2), and a movable plate (42) is movably hinged at the top of each of the fixed shafts (45). A circular block (41) is fixedly mounted at one end of each of the movable plates (42), and each of the circular blocks (41) is matched with the mounting connector (3). An elliptical sliding hole is penetrated through the other end of each of the movable plates (42), and each of the adjusting pins (46) is located in the elliptical sliding hole.
3. The electric power engineering construction survey device according to claim 2, characterized in that: Two circular through holes (6) are provided on each side of the installation groove (5), each of the circular through holes (6) is penetrated through the hollow installation box (2) and is connected to the hollow installation box (2), and each of the adjustment pins (46) is located in the corresponding circular through hole (6).
4. The electric power engineering construction survey device according to claim 2, characterized in that: The plurality of circular blocks (41) are all arranged with the same specifications and sizes.
5. The electric power engineering construction survey device according to claim 2, characterized in that: The mounting connector (3) comprises a mounting plate (31), the mounting plate (31) being fixedly connected to the bottom surface of the surveying equipment (1), and two arc-shaped matching grooves (32) are provided on the outer sides of the mounting plate (31), and each of the circular blocks (41) is located in a corresponding arc-shaped matching groove (32).
6. The electric power engineering construction survey device according to claim 5, characterized in that: The four corners of the bottom surface of the installation plate (31) are all fixedly provided with plug pins (33), and the hollow installation box (2) is provided with plug slots matching with the plug pins (33), and each of the plug slots is connected to the installation slot (5).
Citation Information
Patent Citations
Electric power engineering construction investigation device
CN219263806U