Soil breaker for construction engineering
By designing a groundbreaker including a motor-driven drill rod and a lifting and adjustment mechanism, the problems of high labor intensity and unadjustable handle in the prior art are solved, and mechanized groundbreaking and efficient work to adapt to different heights are achieved.
Patent Information
- Application Number
- CN202421645520.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-12
- Publication Date
- 2025-06-13
- Estimated Expiration
- 2034-07-12
AI Technical Summary
The existing groundbreaker for construction projects has problems such as high labor intensity, heavy workload and low efficiency. The handle position is fixed and cannot be adjusted, which is inconvenient to use for staff of different heights and arm lengths.
A groundbreaker is designed including a fixed cylinder, a motor, a drill rod, a drilling mechanism, a pedal and a lifting adjustment mechanism. The drill rod is driven downward by a motor to reduce manual labor, and the handle height is adjusted through a lifting adjustment mechanism to adapt to staff of different heights and arm lengths.
Through the mechanized groundbreaking process, the labor burden on staff is reduced, the work efficiency is improved, and the device is suitable for staff of different heights and arm lengths, making it easier to use.
Smart Images

Figure CN222975821U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of earth breakers, in particular to an earth breaker for construction projects. Background Technique
[0002] Construction projects are a special type of construction activity organized by humans, aiming to build infrastructure and other structural buildings that people need. It is a general term for various buildings and engineering facilities that provide the material and technical basis for human life and production. It is mainly divided into three categories: building engineering, civil engineering, and mechanical and electrical engineering. An earth breaker is a commonly used device for ground leveling in construction project quality inspection.
[0003] According to the search, the Chinese patent document, publication number: CN216809836U, discloses an earth breaker for construction project quality inspection. By setting a support rod, a handle is fixedly connected to the top of the support rod. A double-headed threaded rod is arranged at the bottom of the outer wall of the support rod. An impact box is arranged at the bottom of the support rod and below the double-headed threaded rod. Pedal plates are fixedly connected to both sides of the outer wall of the impact box. In the utility model, by stepping on the pedal plates with feet, the earth-breaking collection head is inserted into the soil, so as to detect the quality of the construction project. When the soil is relatively hard, the double-headed threaded rod is rotated, so that the bottom of the double-headed threaded rod is threadedly connected to the outer wall of the ramming rod, so that the support rod has a certain moving space, which is convenient for the support rod to ram the support rod, so as to achieve the purpose of detecting the construction project. Under the action of the loose sleeve, lubrication is carried out between the ramming rod and the box body, reducing the wear of the ramming rod when ramming the support rod. However, this device has deficiencies. That is, the device uses a manual downward pressing method for earth breaking, with high labor intensity, heavy workload, and low efficiency. Moreover, the position of the handle in the device is fixed and cannot be adjusted, which is not user-friendly for workers with different heights and arm lengths, is not handy during work use, and has low work efficiency. Content of the Utility Model
[0004] (I) Technical Problems to be Solved
[0005] The purpose of the utility model is to provide an earth breaker for construction projects to solve the problems put forward in the above background technique.
[0006] (II) Technical Solutions
[0007] To achieve the above object, the utility model provides the following technical solution: A ground-breaking device for construction projects, which includes a first fixed cylinder with an opening at the lower side. The upper end of the first fixed cylinder is fixedly installed with a second fixed cylinder. A cover is arranged at the lower end of the first fixed cylinder. A first motor is arranged at the upper inner side of the first fixed cylinder. A drill rod is fixedly installed on the output shaft of the first motor. A drilling mechanism for drilling the drill rod is arranged in the first fixed cylinder. Pedal boards are fixedly installed on both sides of the bottom of the first fixed cylinder. Handles are symmetrically arranged at both ends of the second fixed cylinder, and adjustment grooves are opened on both sides of the second fixed cylinder. A lifting adjustment mechanism for adjusting the height of the handles is arranged in the second fixed cylinder.
[0008] Preferably, the drilling mechanism includes a fixed ring, a first threaded rod, a first fixing plate and a smooth rod. The fixed ring is fixedly installed at the lower end inside the first fixed cylinder. The upper right inner wall of the first fixed cylinder is fixedly installed with the first fixing plate. The first threaded rod is rotatably installed between the fixed ring and the top wall of the first fixed cylinder. A smooth rod is fixedly connected between the fixed ring and the first fixing plate.
[0009] Through the above technical solution, the inner diameter of the fixed ring is small, allowing the drill rod to pass through downward, and the first threaded rod can rotate.
[0010] Preferably, the drilling mechanism further includes a pushing ring. The pushing ring is fixedly installed outside the first motor. The left end of the pushing ring is threadedly connected to the outside of the first threaded rod, and the right end of the pushing ring is movably sleeved on the outside of the smooth rod.
[0011] Through the above technical solution, when the first threaded rod rotates, cooperating with the smooth rod, it can drive the pushing ring to move downward steadily, thereby driving the first motor to move downward, starting the first motor to drive the drill rod to rotate and drill into the soil.
[0012] Preferably, the drilling mechanism further includes a first bevel gear, a second fixing plate, a second motor and a second bevel gear. The first bevel gear is fixedly installed on the outer side of the upper end of the first threaded rod. The second fixing plate is fixedly installed on the upper right inner wall of the upper part inside the first fixed cylinder. The second motor is fixedly installed on the second fixing plate. The second bevel gear is fixedly installed on the output shaft of the second motor. The second bevel gear and the first bevel gear are meshed and connected.
[0013] Through the above technical solution, starting the second motor drives the second bevel gear to rotate. The second bevel gear drives the first bevel gear to rotate, and thus the first bevel gear drives the first threaded rod to rotate.
[0014] Preferably, the lifting adjustment mechanism includes a second threaded rod, a connecting column and a turning cap. The second threaded rod is rotatably installed in the second fixed cylinder. The connecting column is fixedly installed at the upper end of the second threaded rod. The upper end of the connecting column movably penetrates through the top wall of the second fixed cylinder and is fixedly installed with the turning cap.
[0015] Through the above technical solution, rotating the rotating cap drives the connecting column to rotate, and the connecting column drives the second threaded rod to rotate.
[0016] Preferably, the lifting and adjusting mechanism further includes a lifting ring and a connecting rod. A lifting ring is threadedly connected to the outside of the second threaded rod. Connecting rods are symmetrically and fixedly installed at both ends of the lifting ring. The relatively far ends of the two connecting rods pass through the adjusting groove and are fixedly installed on the corresponding handle.
[0017] Through the above technical solution, when the second threaded rod rotates, it drives the lifting ring to perform a lifting motion, and drives the handle to perform a lifting motion through the connecting rod, thereby adjusting the height of the handle, which is suitable for staff with different heights and arm lengths to use.
[0018] Preferably, an internal thread ring is fixedly installed on the inner bottom wall of the first fixed cylinder, and an external thread ring is fixedly installed on the upper end of the sealing cover. The external thread ring is threadedly connected to the internal thread ring.
[0019] Through the above technical solution, the external thread ring is screwed into the internal thread ring, so that the sealing cover seals the bottom opening of the first fixed cylinder for sealing protection.
[0020] Preferably, multiple rows of anti-slip teeth are fixedly installed on the upper end of the pedal, and an anti-slip sleeve is fixedly sleeved on the outside of the handle.
[0021] Through the above technical solution, the staff steps on the pedal to apply a counterweight to the device. The anti-slip teeth can prevent the soles of the feet from slipping. Hold the handle and pull or push down to apply a stable force to the device. The anti-slip sleeve can prevent the palms from slipping.
[0022] Compared with the prior art, the utility model provides a ground-breaking device for construction projects, which has the following beneficial effects:
[0023] Through the first fixed cylinder, the first motor, the drill rod, the drilling mechanism, the pedal, the anti-slip teeth, etc. provided by the utility model, when breaking the ground, step on the pedal to apply a counterweight to the device, hold the handle and pull or push down to keep the device stable, start the first motor to drive the drill rod to rotate, and at the same time start the drilling mechanism to push the drill rod to drill downward, so as to complete the rapid downward ground-breaking work. The mechanical replacement of manual labor reduces the labor burden of the staff, reduces the workload, makes the drilling work easy and simple, and improves the work efficiency;
[0024] Through the second fixed cylinder, the sealing cover, the lifting and adjusting mechanism, the handle, the internal thread ring, the external thread ring, the anti-slip sleeve, etc. provided by the utility model, the height position of the handle can be adjusted by using the lifting and adjusting mechanism, which is suitable for different people with different heights and arm lengths to use, making it more convenient for the staff to use and improving the work efficiency. When the device is not in use, the sealing cover seals the bottom opening of the first fixed cylinder to prevent the staff from accidentally touching the internal structure and getting injured. Brief Description of the Drawings
[0025] Figure 1 This is a schematic three-dimensional structure diagram of the whole of the present utility model;
[0026] Figure 2 This is a schematic cross-sectional structure diagram of the whole of the present utility model;
[0027] Figure 3 This is a schematic cross-sectional structure diagram of the first fixing cylinder of the present utility model;
[0028] Figure 4 This is a schematic partial cross-sectional structure diagram of the second fixing cylinder of the present utility model.
[0029] In the figure: 1. The first fixing cylinder; 2. The second fixing cylinder; 3. The cover; 4. The first motor; 5. The drill pipe; 6. The drilling mechanism; 601. The fixing ring; 602. The first threaded rod; 603. The first fixing plate; 604. The smooth rod; 605. The pushing ring; 606. The first bevel gear; 607. The second fixing plate; 608. The second motor; 609. The second bevel gear; 7. The pedal; 8. The anti-slip teeth; 9. The lifting and adjusting mechanism; 901. The second threaded rod; 902. The connecting column; 903. The rotating cap; 904. The lifting ring; 905. The connecting rod; 10. The handle; 11. The adjusting groove; 12. The internal threaded ring; 13. The external threaded ring; 14. The anti-slip sleeve. Detailed Description of the Preferred Embodiment
[0030] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments of the present utility model without creative efforts shall fall within the protection scope of the present utility model. Embodiment
[0031] As Figure 1 , Figure 2 and Figure 3 shown, a ground-breaking device for construction projects provided by the present utility model includes a first fixing cylinder 1 with an open lower side. A second fixing cylinder 2 is fixedly installed at the upper end of the first fixing cylinder 1. A cover 3 is arranged at the lower end of the first fixing cylinder 1. A first motor 4 is arranged at the upper inner side of the first fixing cylinder 1. A drill pipe 5 is fixedly installed on the output shaft of the first motor 4. A drilling mechanism 6 for drilling the drill pipe 5 is arranged in the first fixing cylinder 1. Pedals 7 are fixedly installed on both sides of the bottom of the first fixing cylinder 1. Handles 10 are symmetrically arranged at both ends of the second fixing cylinder 2, and adjusting grooves 11 are formed on both sides of the second fixing cylinder 2. A lifting and adjusting mechanism 9 for adjusting the height of the handles 10 is arranged in the second fixing cylinder 2.
[0032] Specifically, the drilling mechanism 6 includes a fixed ring 601, a first threaded rod 602, a first fixing plate 603, and a smooth rod 604. The fixed ring 601 is fixedly installed at the lower end inside the first fixed cylinder 1. The upper end of the right inner wall of the first fixed cylinder 1 is fixedly installed with the first fixing plate 603. A first threaded rod 602 is rotatably installed between the fixed ring 601 and the top wall of the first fixed cylinder 1. A smooth rod 604 is fixedly connected between the fixed ring 601 and the first fixing plate 603. The advantage is that the inner diameter of the fixed ring 601 is small, allowing the drill rod 5 to pass downward through it, and the first threaded rod 602 can rotate.
[0033] Specifically, the drilling mechanism 6 further includes a pushing ring 605. The pushing ring 605 is fixedly installed outside the first motor 4. The left end of the pushing ring 605 is threadedly connected to the outside of the first threaded rod 602, and the right end of the pushing ring 605 is movably sleeved on the outside of the smooth rod 604. The advantage is that when the first threaded rod 602 rotates, in cooperation with the smooth rod 604, it can drive the pushing ring 605 to move smoothly downward, thereby driving the first motor 4 to move downward, starting the first motor 4 to drive the drill rod 5 to rotate and drill into the soil.
[0034] Specifically, the drilling mechanism 6 further includes a first bevel gear 606, a second fixing plate 607, a second motor 608, and a second bevel gear 609. The first bevel gear 606 is fixedly installed on the outside of the upper end of the first threaded rod 602. The second fixing plate 607 is fixedly installed on the upper right inner wall inside the first fixed cylinder 1. The second motor 608 is fixedly installed on the second fixing plate 607. The second bevel gear 609 is fixedly installed on the output shaft of the second motor 608. The second bevel gear 609 is meshed and connected with the first bevel gear 606. The advantage is that starting the second motor 608 drives the second bevel gear 609 to rotate, the second bevel gear 609 drives the first bevel gear 606 to rotate, and thus the first bevel gear 606 drives the first threaded rod 602 to rotate. Embodiment
[0035] As Figure 3 and Figure 4 shown, as an improvement over the previous embodiment. Specifically, the lifting and adjusting mechanism 9 includes a second threaded rod 901, a connecting column 902, and a turning cap 903. The second threaded rod 901 is rotatably installed inside the second fixed cylinder 2. The upper end of the second threaded rod 901 is fixedly installed with the connecting column 902. The upper end of the connecting column 902 movably penetrates through the top wall of the second fixed cylinder 2 and is fixedly installed with the turning cap 903. The advantage is that turning the turning cap 903 drives the connecting column 902 to rotate, and the connecting column 902 drives the second threaded rod 901 to rotate.
[0036] Specifically, the lifting and adjusting mechanism 9 further includes a lifting ring 904 and a connecting rod 905. The outer side of the second threaded rod 901 is threadedly connected with the lifting ring 904. Both ends of the lifting ring 904 are symmetrically and fixedly installed with connecting rods 905. The relatively far ends of the two connecting rods 905 pass through the adjusting slot 11 and are fixedly installed on the corresponding handle 10. The advantage is that when the second threaded rod 901 rotates, it drives the lifting ring 904 to move up and down, and drives the handle 10 to move up and down through the connecting rod 905, thereby adjusting the height of the handle 10, which is suitable for workers with different heights and arm lengths.
[0037] Specifically, an internal threaded ring 12 is fixedly installed on the inner bottom wall of the first fixed cylinder 1, and an external threaded ring 13 is fixedly installed on the upper end of the cover 3. The external threaded ring 13 is threadedly connected inside the internal threaded ring 12. The advantage is that the external threaded ring 13 is screwed into the internal threaded ring 12, so that the cover 3 seals the bottom opening of the first fixed cylinder 1 for sealing protection.
[0038] Specifically, multiple rows of anti-slip teeth 8 are fixedly installed on the upper end of the pedal 7, and an anti-slip sleeve 14 is fixedly sleeved on the outer side of the handle 10. The advantage is that the worker steps on the pedal 7 to apply a counterweight to the device. The anti-slip teeth 8 can prevent the sole from slipping. When the worker holds the handle 10 and pulls or pushes downward, a stable force is applied to the device. The anti-slip sleeve 14 can prevent the palm from slipping.
[0039] During use, first, the worker adjusts the height position of the handle 10 according to their physical conditions. Rotate the rotating cap 903 to drive the connecting column 902 to rotate. The second threaded rod 901 rotates to drive the lifting ring 904 to move up and down, and the connecting rod 905 drives the handle 10 to move up and down, so as to adjust the height of the handle 10 for use. Then the worker removes the cover 3 from the bottom of the first fixed cylinder 1, and then aligns and fits the bottom of the first fixed cylinder 1 on the land to be broken. Step on the pedal 7 to apply a counterweight to the device, hold the handle 10 and pull or push downward to keep the device stable. Then start the second motor 608 to drive the second bevel gear 609 to rotate. The second bevel gear 609 drives the first bevel gear 606 to rotate. The first bevel gear 606 drives the first threaded rod 602 to rotate, so as to cooperate with the smooth rod 604. The pushing ring 605 pushes the first motor 4 to move downward. Start the first motor 4 to drive the drill rod 5 to rotate. The drill rod 5 drills into the soil through the lower side of the first fixed cylinder 1.
[0040] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principle and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A construction engineering earthbreaker, comprising a fixing tube (1) with an opening at the bottom, characterized in that: A fixing cylinder (2) is fixedly mounted on the upper end of the fixing cylinder (1), a sealing cover (3) is provided at the lower end of the fixing cylinder (1), a motor (4) is provided at the inner upper end of the fixing cylinder (1), a drill rod (5) is fixedly mounted on the output shaft of the motor (4), a drilling mechanism (6) for drilling the drill rod (5) is provided in the fixing cylinder (1), pedals (7) are fixedly mounted on both sides of the bottom of the fixing cylinder (1), handles (10) are symmetrically provided at both ends of the fixing cylinder (2), and adjustment slots (11) are provided on both sides of the fixing cylinder (2), and a lifting adjustment mechanism (9) for adjusting the height of the handle (10) is provided in the fixing cylinder (2).
2. A construction engineering earthbreaker according to claim 1, characterized in that: The drilling mechanism (6) comprises a fixing ring (601), a threaded rod (602), a fixing plate (603) and a smooth rod (604); the fixing ring (601) is fixedly mounted at the lower end of the fixing tube (1); the fixing plate (603) is fixedly mounted at the upper end of the right inner wall of the fixing tube (1); the threaded rod (602) is rotatably mounted between the fixing ring (601) and the top wall of the fixing tube (1); and the smooth rod (604) is fixedly connected between the fixing ring (601) and the fixing plate (603).
3. A construction engineering earthbreaker according to claim 2, characterized in that: The drilling mechanism (6) also includes a push ring (605), which is fixedly mounted on the outer side of the motor (4), the left end of the push ring (605) is threadedly connected to the outer side of the threaded rod (602), and the right end of the push ring (605) is movably sleeved on the outer side of the smooth rod (604).
4. A construction engineering earthbreaker according to claim 3, characterized in that: The drilling mechanism (6) further comprises a bevel gear (606), a fixing plate (607), a motor (608) and a bevel gear (609); the bevel gear (606) is fixedly mounted on the outer side of the upper end of the threaded rod (602); the fixing plate (607) is fixedly mounted on the right wall of the inner upper end of the fixing cylinder (1); the motor (608) is fixedly mounted on the fixing plate (607); the output shaft of the motor (608) is fixedly mounted with a bevel gear (609); the bevel gear (609) and the bevel gear (606) are meshingly connected.
5. The earthbreaker for construction engineering according to claim 1, characterized in that: The lifting and lowering adjustment mechanism (9) comprises a second threaded rod (901), a connecting column (902) and a rotating cap (903); the second threaded rod (901) is rotatably mounted in the second fixed cylinder (2); the connecting column (902) is fixedly mounted on the upper end of the second threaded rod (901); the upper end of the connecting column (902) movably passes through the top wall of the second fixed cylinder (2) and is fixedly mounted with the rotating cap (903).
6. A construction engineering earthbreaker according to claim 5, characterized in that: The lifting and adjusting mechanism (9) further comprises a lifting ring (904) and a connecting rod (905); the outer side of the second threaded rod (901) is threadedly connected to the lifting ring (904); connecting rods (905) are symmetrically fixedly mounted at both ends of the lifting ring (904); and the ends of the two connecting rods (905) that are relatively far away pass through the adjusting slot (11) and are fixedly mounted on the corresponding handles (10).
7. The earthbreaker for construction engineering according to claim 1, characterized in that: An internal threaded ring (12) is fixedly mounted on the inner bottom wall of the fixed cylinder (1), and an external threaded ring (13) is fixedly mounted on the upper end of the sealing cover (3), wherein the external threaded ring (13) is threadedly connected inside the internal threaded ring (12).
8. The earthbreaker for construction engineering according to claim 1, characterized in that: A plurality of rows of anti-skid teeth (8) are fixedly mounted on the upper end of the pedal (7), and an anti-skid sleeve (14) is provided on the outer fixed sleeve of the handle (10).
Citation Information
Patent Citations
Soil breaker for construction project quality detection
CN216809836U