Crossed and staggered ceramic rod decoration component for building curtain wall

Through the bolt connection between the cantilever support arm and the ceramic stick support arm and the aluminum ferrule load transmission, the cross-displacement installation of the ceramic stick is achieved, solving the problem that it is difficult to achieve three-dimensional effect in the existing ceramic stick curtain wall decoration, and improving construction stability and design flexibility.

CN222976189UActive Publication Date: 2025-06-13DECORATION CO LTD OF CHINA CONSTR 3RD ENG BUREAU +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422172513.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-05
Publication Date
2025-06-13
Estimated Expiration
2034-09-05

AI Technical Summary

Technical Problem

The existing pottery curtain wall decoration is difficult to achieve a more three-dimensional double-layer cross-dislocation design, which limits the decorative performance and construction flexibility of the building's exterior surface.

Method used

The cantilever support arm and the ceramic stick support arm are bolted to achieve the cross-displacement installation of the ceramic stick, and the load is transferred through the aluminum ferrule to ensure structural stability.

Benefits of technology

The three-dimensional adjustment of the pottery stick and the more complex facade effect are achieved, which improves the flexibility of the building design and the stability of construction, simplifies the installation process, and shortens the construction cycle.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222976189U_ABST
    Figure CN222976189U_ABST
Patent Text Reader

Abstract

The utility model discloses a building curtain wall crossed and staggered ceramic rod decoration component which comprises a stand column. An overhanging supporting arm is fixedly connected through an opening in the outer surface of the stand column, a ceramic rod is fixedly connected to the overhanging supporting arm and transmits loads to a ceramic rod supporting arm through an aluminum inserting core, the ceramic rod supporting arm is connected with the overhanging supporting arm through a special bolt, the supporting arm is divided into two parts, one part is the overhanging supporting arm connected with the stand column, and the other part is the ceramic rod supporting arm connected with the stand column through a special bolt. One part is a ceramic rod supporting arm connected with a ceramic rod, the ceramic rod supporting arm and the ceramic rod supporting arm are connected through a special bolt to fix the ceramic rod on the outer surface of the curtain wall, the overhanging supporting arm and the ceramic rod supporting arm are connected through the bolt, the same supporting arm is connected with the two ceramic rod supporting arms to achieve the vertical face crossed and staggered installation effect, and according to the scheme, construction of the multi-layer curtain wall is facilitated, and three-dimensional adjustment can be achieved; and more difficult construction requirements can be met, and a better building design effect is achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building curtain wall construction, and particularly relates to a building curtain wall cross-misaligned ceramic stick decorative member. Background Technique

[0002] A building curtain wall refers to the non-load-bearing external wall enclosure of a building, which is usually composed of a panel (glass, metal plate, stone plate, ceramic plate, etc.) and a supporting structure behind (aluminum cross beams and columns, steel structure, glass ribs, etc.). A ceramic stick is a newly emerging external decoration material in recent years, mainly made of ceramic materials, and has characteristics such as good texture, strong anti-pollution property, and good weather resistance.

[0003] The classification of curtain walls includes framed curtain walls and unitized curtain walls, etc. Among them, the double-layer curtain wall can form a relatively enclosed space between the inner and outer curtain walls, and can utilize the principles of air pressure difference, thermal pressure difference, and chimney effect to enable the outer layer of the building to effectively adapt to natural weather changes, improve the heat insulation and sound insulation performance of the curtain wall, improve the indoor conditions, and enhance the comfort of people's working and living environments.

[0004] Traditional ceramic stick curtain walls usually arrange a layer of ceramic sticks on the surface of the structural main body for decoration. However, with the development of the industry, people pursue more distinctive three-dimensional building effects and need to endow the ceramic stick curtain wall with more facade effects. For example, two layers of ceramic stick decorative surfaces are used to achieve the required effect requirements. This component system is used to solve the problem of the design of double-layer cross-misaligned ceramic sticks arranged on the outer surface of the curtain wall. Content of the Utility Model

[0005] The purpose of the utility model is to provide a building curtain wall cross-misaligned ceramic stick decorative member to solve the construction technical problem of cross-misaligned installation of two layers of ceramic stick decoration on the outer surface of the building.

[0006] To achieve the above purpose, a building curtain wall cross-misaligned ceramic stick decorative member is provided, including a column. A cantilever arm is fixedly connected to the outer surface of the column through an opening. A ceramic stick is fixedly connected to the cantilever arm. The ceramic stick transfers the load to the ceramic stick arm through an aluminum core insert. The ceramic stick arm and the cantilever arm are connected by a special bolt.

[0007] The arm is divided into two parts. One part is the cantilever arm connected to the column, and the other part is the ceramic stick arm connected to the ceramic stick. The two are connected by a special bolt to fix the ceramic stick on the outer surface of the curtain wall.

[0008] According to the above-mentioned building curtain wall cross-misaligned ceramic stick decorative member, the ceramic stick arm is divided into two types, one is the inner ceramic stick arm and the other is the outer ceramic stick arm.

[0009] According to the described cross - misaligned ceramic stick decorative component for building curtain walls, the connection between the ceramic stick support arm and the ceramic stick is fixed by bolts and self - tapping screws.

[0010] According to the described cross - misaligned ceramic stick decorative component for building curtain walls, the base of the cantilever support arm is connected to the column by machine - threaded screws, and machine - threaded holes are reserved during the processing of the column.

[0011] According to the described cross - misaligned ceramic stick decorative component for building curtain walls, fiberglass non - woven fabric is pasted inside the ceramic stick.

[0012] According to the described cross - misaligned ceramic stick decorative component for building curtain walls, the ceramic sticks are divided into two types, one is the inner - side ceramic stick and the other is the outer - side ceramic stick. The ceramic sticks are arranged in a bilateral cross - misaligned and inclined manner and are connected by internal through - length core inserts.

[0013] According to the described cross - misaligned ceramic stick decorative component for building curtain walls, clamping parts are arranged at both ends of the through - length core insert. The clamping parts are divided into high - side core - insert clamping parts and low - side core - insert clamping parts. One end of the low - side core - insert clamping part is fixed to the through - length core insert using a customized stainless - steel countersunk hexagon bolt set, and one end of the high - side core - insert clamping part is connected to the through - length core insert in a plug - in and sliding manner.

[0014] According to the described cross - misaligned ceramic stick decorative component for building curtain walls, the clamping part is connected to the ceramic stick support arm by bolts. The bolts can move back and forth in the groove of the clamping part. The ceramic stick support arm is provided with a vertical long round hole for the up - and - down adjustment of the ceramic stick. The connection method is that one end of the clamping part is fixedly connected to the ceramic stick, and the other end is in a plug - in form for the left - and - right adjustment of the ceramic stick.

[0015] According to the described cross - misaligned ceramic stick decorative component for building curtain walls, the cantilever support arm needs to pass through the pressing plate cover to be installed on the column, and a clearance - milling needs to be performed on the pressing plate cover.

[0016] Advantageous effects

[0017] Compared with the prior art, the advantageous effects of the present utility model are as follows: Bolts are used to connect the cantilever support arm and the ceramic stick support arm. The same support arm connects two ceramic stick support arms to achieve the effect of vertical cross - misaligned installation. This solution facilitates the construction of multi - layer curtain walls, can achieve three - dimensional adjustment, can meet more difficult construction requirements, achieve a better architectural design effect, and at the same time, the stability of the support structure is greatly improved.

[0018] Compared with the prior art, the advantageous effects of the present utility model are as follows: The connection of the same cantilever support arm and multiple ceramic stick support arms is used to complete the connection of the ceramic sticks at the cross - misaligned positions, increasing the three - dimensional effect of the ceramic sticks. At the same time, it has the characteristics of convenient installation, shortened construction period, safety and reliability.

[0019] Additional aspects and advantages of the present utility model will be given in part in the following description, become apparent in part from the following description, or be understood through the practice of the present utility model. Brief Description of the Drawings

[0020] The present utility model will be further described below in conjunction with the drawings and embodiments;

[0021] Figure 1 is a schematic structural diagram of a cross - staggered ceramic stick decorative member for a building curtain wall of the present utility model;

[0022] Figure 2 is an analysis diagram of the installation of cross - staggered ceramic sticks of a cross - staggered ceramic stick decorative member for a building curtain wall of the present utility model;

[0023] Figure 3 is an internal sectional view of the inner ceramic stick of a cross - staggered ceramic stick decorative member for a building curtain wall of the present utility model;

[0024] Figure 4 is an internal sectional view of the outer ceramic stick of a cross - staggered ceramic stick decorative member for a building curtain wall of the present utility model.

[0025] In the figure: 1, ceramic stick; 101, inner ceramic stick; 102, outer ceramic stick; 2, ceramic stick support arm; 201, inner ceramic stick support arm; 202, outer ceramic stick support arm; 3, cantilever support arm; 4, stainless steel countersunk socket head hexagon custom bolt set; 5, through - length insert core; 6, clip; 601, high - side insert core clip; 602, low - side insert core clip; 7, column; 8, press plate cover. Detailed Description of the Embodiments

[0026] The technical solutions in the embodiments of the present utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all of the embodiments. Based on the embodiments in the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.

[0027] Please refer to Figures 1-4 , the embodiments of the present utility model provide a technical solution: a cross - staggered ceramic stick decorative member for a building curtain wall, the cantilever support arm 3 passes through the press plate cover 8 and is connected to the column 7 through machine screws. It is necessary to prepare the machine screw holes required for the cantilever support arm 3 during the processing of the column 7. At the same time, it is necessary to cooperate with milling the through - holes required for the cantilever support arm 3 on the press plate cover 8. The method of using a round hole at the top for positioning and an oblong hole at the lower end to absorb errors for opening holes on the press plate cover 8 is convenient for on - site construction and speeds up the construction period;

[0028] Inside the inner ceramic rod 101, a through-core insert 5 is passed through. Inside the through-core insert 5, the low-side insert core fixture 602 is connected by a countersunk head nail to bear the load of the ceramic rod. At the same time, the low-side insert core fixture 602 is connected to the inner ceramic rod support arm 201 by bolts. The high-side insert core fixture 601 is connected to the inner ceramic rod support arm 201 and is inserted at the other end of the ceramic rod 1 for adjustment and limit.

[0029] Inside the outer ceramic rod 102, an outer through-core insert 5 is passed through. The low-side insert core fixture 602 inside the through-core insert 5 is fixed by a countersunk head nail. The high-side insert core fixture 601 is bolted to the outer ceramic rod support arm 202. The outer ceramic rod 102 is composed of two ceramic rods 1 integrated together. The two sides of the ceramic rod 1 are connected by the outer ceramic rod support arm 202 to form a whole.

[0030] The overall structure composed of the inner ceramic rods 101 is installed at a high altitude through the inner ceramic rod support arm 201 and the cantilever arm 3 using a customized stainless steel countersunk head socket head bolt set 4. The whole composed of the outer ceramic rods 102 is connected to the same cantilever arm 3 through the outer ceramic rod support arm 202, achieving an effect of cross dislocation in the elevation.

[0031] Working principle: When the device is in use, first, after the column 7 is firmly fixed to the ground and mounting holes are opened on the outer surface of the column 7, the cantilever arm 3 is fixedly connected to the column 7 through the mounting holes and the pressing plate cover 8. Then, the ceramic rod 1 is fixedly connected to the cantilever arm 3. The other end of the cantilever arm 3 is fixedly connected to the ceramic rod support arm 2 by a special bolt. The special bolt can greatly improve the structural stability. The ceramic rod 1 also transfers the load to the ceramic rod support arm 2 through the action of the aluminum insert core. At the same time, the ceramic rod support arm 2 and the other end of the cantilever arm 3 are fixedly connected to the outer surface of the curtain wall by a special bolt. A through-core insert 5 is passed through the inside of the inner ceramic rod 101, and a through-core insert 5 is passed through the inside and outside of the outer ceramic rod 102. After the through-core inserts 5 of the two sides of the ceramic rod are connected to the low-side insert core fixture 602 by countersunk head nails, it plays a role in bearing the overall structure. The high-side insert core fixture 601 is connected to the inner ceramic rod support arm 201 at the other end of the ceramic rod 1 and has the ability to adjust and limit.

[0032] The above has described the embodiments of the present invention in detail with reference to the accompanying drawings. However, the present invention is not limited to the above embodiments. Within the knowledge scope of those of ordinary skill in the art to which the present invention pertains, various changes can be made without departing from the gist of the present invention.

Claims

1. A building curtain wall cross-staggered pottery stick decorative component, comprising a column (7), characterized in that: The outer surface opening of the column (7) is fixedly connected to a cantilever support arm (3), the cantilever support arm (3) is fixedly connected to a ceramic stick (1), the ceramic stick (1) transfers load to the ceramic stick support arm (2) through an aluminum insert, and the ceramic stick support arm (2) is connected to the cantilever support arm (3) through a special bolt; The support arm is divided into two parts, one part is a cantilever support arm (3) connected to a column (7), and the other part is a ceramic stick support arm (2) connected to a ceramic stick (1), and the two parts are connected by special bolts to fix the ceramic stick (1) on the outer surface of the curtain wall.

2. A building curtain wall cross-staggered ceramic stick decorative component as claimed in claim 1, characterized in that: The ceramic stick support arm (2) is divided into two types, one is an inner ceramic stick support arm (201), and the other is an outer ceramic stick support arm (202).

3. A building curtain wall cross-staggered ceramic stick decorative component as claimed in claim 1, characterized in that: The ceramic stick support arm (2) is connected to the ceramic stick (1) by bolts and self-tapping screws.

4. A building curtain wall cross-staggered ceramic stick decorative component as claimed in claim 1, characterized in that: The base of the cantilever support arm (3) is connected to the column (7) by means of machine screws, and the column (7) is provided with a reserved machine screw hole during the processing.

5. The building curtain wall cross-staggered ceramic stick decorative component according to claim 1, characterized in that: Glass fiber non-woven fabric is pasted inside the ceramic stick (1).

6. A building curtain wall cross-staggered ceramic stick decorative component as claimed in claim 1, characterized in that: The ceramic sticks (1) are divided into two types, one is an inner ceramic stick (101), and the other is an outer ceramic stick (102). The ceramic sticks (1) are arranged in a double-sided cross-staggered and inclined manner and are connected by an internal through-length insert (5).

7. A building curtain wall cross-staggered ceramic stick decorative component as claimed in claim 6, characterized in that: Clamps (6) are arranged at both ends of the through-length ferrule (5), and the clamps (6) are divided into a high-side ferrule clamp (601) and a low-side ferrule clamp (602). One end of the low-side ferrule clamp (602) is fixed to the through-length ferrule (5) using a stainless steel countersunk hexagon socket custom bolt group (4), and one end of the high-side ferrule clamp (601) is plug-in and slidably connected to the through-length ferrule (5).

8. A building curtain wall cross-staggered ceramic stick decorative component as claimed in claim 7, characterized in that: The clamp (6) is connected to the ceramic stick support arm (2) by bolts. The bolts can move forward and backward in the groove of the clamp (6). The ceramic stick support arm (2) is provided with a vertical oblong hole for adjusting the ceramic stick up and down. The connection method adopts a method in which one end of the clamp (6) is fixedly connected to the ceramic stick (1), and the other end is plugged in to adjust the ceramic stick (1) left and right.

9. The building curtain wall cross-staggered ceramic stick decorative component according to claim 1, characterized in that: The cantilever support arm (3) needs to pass through the pressure plate buckle cover (8) to be installed on the column (7), and a clearance needs to be milled on the pressure plate buckle cover (8).