Portable movable bridge hanging basket

By designing a convenient movable bridge hanging basket, the problems of high construction difficulty, high cost and complex road occupation in existing bridge inspection and repair technologies are solved, and bridge inspection and repair effects with convenient operation, low cost and high safety are achieved.

CN223017426UActive Publication Date: 2025-06-24BEIJING CHENGJIANQI CONSTRUCT ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422238092.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2025-06-24
Estimated Expiration
2034-09-12

AI Technical Summary

Technical Problem

Existing bridge inspection and repair technologies require the use of large-scale mechanical equipment, which leads to increased construction difficulty, high cost, complex road occupation, affects traffic passage and increases approval procedures and costs.

Method used

A convenient movable bridge hanging basket is designed, which adopts a lightweight design without large-scale mechanical assistance. Through components such as hanging racks, guardrails, limiting components and pulleys, bridge inspection and repair with convenient operation and high flexibility.

Benefits of technology

It significantly reduces construction costs, avoids road occupation construction and related approval procedures, improves construction efficiency and enhances construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223017426U_ABST
    Figure CN223017426U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of bridge detection, and discloses a portable movable bridge hanging basket which comprises a guardrail and a suspension frame, and the guardrail comprises a guardrail pier, a group of supporting ribs and two handrails; the supporting ribs are fixedly connected with the top ends of the piers. According to the portable movable bridge hanging basket, the lightweight design is adopted, large-scale machinery assistance is not needed, the construction cost is remarkably reduced, meanwhile, road-occupying construction is avoided, related approval procedures and expenses are reduced, the total construction cost is further reduced, and the hanging frame is compact in design, convenient to operate and high in practicability. The length of the limiting assembly can be flexibly adjusted according to a specific guardrail, close fit with a pier is achieved, the hanging basket can move on a bridge easily and rapidly through the arranged pulleys, the construction efficiency is greatly improved, safety is fully considered, and measures such as stable hoop fixing and iron sheet wrapping for preventing small objects from falling off are taken, so that the safety of the hanging basket is greatly improved. And the safety risk in the construction process is effectively reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of bridge inspection, and specifically relates to a portable and movable bridge hanging basket. Background Technique

[0002] Bridge inspection refers to the regular technical investigation, inspection and evaluation of bridge structures to ensure the safety and reliability of bridges. This process aims to discover possible defects, damages or potential problems in bridge structures, and accordingly take repair and maintenance measures in a timely manner to ensure the normal use and traffic safety of bridges.

[0003] The outside of bridges is often at high altitudes, and large mechanical equipment such as hanging baskets and lifting platforms are required for inspection and repair operations. The use of these devices not only increases the construction difficulty, but also places higher requirements on the professional skills and safety awareness of operators. Due to the need to use large mechanical equipment and involve complex processes such as road occupation for construction, the inspection and repair costs on the outside of bridges are often relatively high. These costs include equipment rental fees, labor costs, material costs, and possible road occupation construction costs, etc., bringing greater economic pressure to bridge maintenance units. Secondly, the repair work on the outside of bridges often requires occupying road space, which not only affects traffic flow, but also involves coordination and approval among multiple departments. Multiple departments including the road management department, the traffic management department of the public security organ, and the municipal facilities management department need to participate together to ensure the legality and safety of the construction process. The handling process of road occupation construction procedures is cumbersome and time-consuming, increasing the uncertainty of construction. Content of the Utility Model

[0004] In view of the deficiencies of the prior art, the present application provides a portable and movable bridge hanging basket, which has the advantages of convenient operation and high flexibility, and solves the problems raised in the background technique.

[0005] To achieve the above object, the present application provides the following technical solution: A portable and movable bridge hanging basket, including a guardrail and a suspension bracket. The guardrail includes pier columns, a group of support ribs and two railings;

[0006] The support ribs are fixedly connected to the top ends of the pier columns, and the two railings are fixedly connected to the support ribs;

[0007] Two groups of connecting ribs are fixedly connected to the right side surface of the suspension bracket, and clamping components are provided at the top ends of the two groups of connecting ribs;

[0008] The clamping component includes a clamping frame and two hoop fasteners;

[0009] Two limiting components are provided on the right inner side wall of the guardrail;

[0010] Each limiting component includes a telescopic sleeve and an inverted U-shaped clamping rod.

[0011] Through the above solution, a lightweight design is adopted, eliminating the need for large machinery assistance, significantly reducing the construction cost. At the same time, road occupation during construction is avoided, reducing relevant approval procedures and costs, further lowering the overall construction cost. The suspension bracket is compact in design and convenient to operate. The length of the limit component can be flexibly adjusted according to the specific guardrail to achieve a tight fit with the pier. The equipped pulleys make the movement of the hanging basket on the bridge easy and fast, greatly improving the construction efficiency. This application fully considers safety. Through measures such as fixing with a stable hoop and covering with iron sheets to prevent small objects from falling, the safety risks during construction are effectively reduced.

[0012] Furthermore, a bottom plate is fixedly connected to the bottom end of the suspension bracket.

[0013] Through the above solution, the setting of the bottom plate facilitates the standing of workers.

[0014] Furthermore, a group of iron sheets are fixedly installed on the outer surface of the suspension bracket.

[0015] Through the above solution, the setting of the iron sheets can seal the suspension bracket and prevent tools from falling from a height.

[0016] Furthermore, a group of handles are fixedly connected to the mutually approaching surfaces of the two leftmost connecting ribs.

[0017] Through the above solution, the setting of the handles facilitates the support of workers.

[0018] Furthermore, two pulleys are installed on the right side of the suspension bracket, and both of the two pulleys are in contact with the left side surface of the pier.

[0019] Through the above solution, the setting of the pulleys can reduce the friction coefficient and improve the smoothness of the movement of the suspension bracket.

[0020] Furthermore, the top end of each connecting rib is fixedly connected to the clamping frame. The inner bottom wall of each hoop is in contact with the bottom of the clamping frame. Threaded connection bolts are arranged on both side surfaces of each hoop. The uppermost railing is located between the hoop and the clamping frame, and each threaded connection bolt is in contact with the inner bottom wall of the clamping frame.

[0021] Through the above solution, the setting of the threaded connection bolts can achieve the connection purpose of the hoop and the clamping frame, and further achieve the purpose of wrapping the railing inside the clamping frame.

[0022] Furthermore, each inverted U-shaped clamping rod is slidably inserted into the telescopic sleeve adjacent to it, and the top end of each inverted U-shaped clamping rod is slidably connected to the top end of the pier.

[0023] Through the above solution, by the sliding connection between the inverted U-shaped clamping rod and the railing pier, the overall safety can be further improved.

[0024] Furthermore, a set of fixing holes are formed on the outer surface of each telescopic sleeve, and each set of fixing holes penetrates through the inverted U-shaped clamping rod.

[0025] Through the above solution, by the arrangement of the fixing holes, an external bolt can be used to fix the inverted U-shaped clamping rod.

[0026] Compared with the prior art, the technical solution of the present application has the following beneficial effects:

[0027] The portable movable bridge hanging basket adopts a lightweight design, without the assistance of large machinery, significantly reducing the construction cost. At the same time, it avoids construction occupying the road, reduces relevant approval procedures and costs, and further reduces the overall construction cost. The suspension bracket is compact in design and convenient to operate. The length of the limiting component can be flexibly adjusted according to the specific guardrail to achieve a tight fit with the railing pier. The equipped pulley makes the movement of the hanging basket on the bridge easy and fast, greatly improving the construction efficiency. The present application fully considers safety. Through measures such as firm hoop fixation and iron sheet cladding to prevent small objects from falling, the safety risks during the construction process are effectively reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 is a three-dimensional schematic diagram of the overall structure of the present application Figure 1 ;

[0029] Figure 2 is a sectional view of the overall structure of the present application;

[0030] Figure 3 is a structural diagram of the clamping frame of the present application;

[0031] Figure 4 is a structural diagram of the limiting component of the present application.

[0032] In the figure:

[0033] 1, guardrail; 101, railing pier; 102, support rib; 103, railing; 3, suspension bracket; 4, connecting rib; 5, clamping component; 501, clamping frame; 502, hoop; 6, limiting component; 601, telescopic sleeve; 602, inverted U-shaped clamping rod; 7, bottom plate; 8, iron sheet; 9, handle; 10, pulley; 11, clamping bolt; 12, fixing hole. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0034] Next, the technical solutions in the embodiments of the present application will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, rather than all the embodiments. All other embodiments obtained by those of ordinary skill in the art based on the embodiments in the present application without creative efforts shall fall within the protection scope of the present application.

[0035] Please refer to Figure 1 and Figure 2 , a portable and movable bridge hanging basket in this embodiment includes a guardrail 1 and a suspension bracket 3. The guardrail 1 includes pier columns 101, a group of support ribs 102, and two railings 103. The bottom end of the suspension bracket 3 is fixedly connected with a bottom plate 7. Through the setting of the bottom plate 7, it is convenient for workers to stand. A group of iron sheets 8 are fixedly installed on the outer surface of the suspension bracket 3. Through the setting of the iron sheets 8, the suspension bracket 3 can be sealed to prevent tools from falling from a height. Two pulleys 10 are installed on the right side surface of the suspension bracket 3, and both of the two pulleys 10 are in contact with the left side surface of the pier column 101. Through the setting of the pulleys 10, the friction coefficient can be reduced, and the smooth movement of the suspension bracket 3 can be improved.

[0036] The support ribs 102 are fixedly connected to the top ends of the pier columns 101, and the two railings 103 are fixedly connected to the support ribs 102.

[0037] Please refer to Figure 1 , Figure 2 and Figure 3 , two groups of connecting ribs 4 are fixedly connected to the right side surface of the suspension bracket 3. A group of handles 9 are fixedly connected to the mutually approaching surfaces of the two leftmost connecting ribs 4. Through the setting of the handles 9, it is convenient for workers to hold. A clamping component 5 is provided at the top ends of the two groups of connecting ribs 4.

[0038] Please refer to Figure 1 , Figure 2 and Figure 3 , the clamping component 5 includes a clamping frame 501 and two hoop fasteners 502. The top end of each connecting rib 4 is fixedly connected to the clamping frame 501. The inner bottom wall of each hoop fastener 502 is in contact with the bottom of the clamping frame 501. Threaded clamping bolts 11 are connected to both side surfaces of each hoop fastener 502. The uppermost railing 103 is located between the hoop fastener 502 and the clamping frame 501. Each clamping bolt 11 is in contact with the inner bottom wall of the clamping frame 501. Through the setting of the clamping bolts 11, the connection between the hoop fastener 502 and the clamping frame 501 can be achieved, and thus the purpose of wrapping the railing 103 inside the clamping frame 501 can be achieved.

[0039] Two limiting components 6 are provided on the right inner side wall of the guardrail 1.

[0040] Please refer to Figure 1 , Figure 2 andFigure 4 Each limiting component 6 includes a telescopic sleeve 601 and an inverted U-shaped clamping rod 602. Each inverted U-shaped clamping rod 602 is slidably inserted into the telescopic sleeve 601 adjacent to it. The top end of each inverted U-shaped clamping rod 602 is slidably connected to the top end of the railing pier 101. Through the sliding connection between the inverted U-shaped clamping rod 602 and the railing pier 101, the overall safety can be further improved. A set of fixing holes 12 are formed on the outer surface of each telescopic sleeve 601, and each set of fixing holes 12 penetrates through the inverted U-shaped clamping rod 602. Through the arrangement of the fixing holes 12, external bolts can be used to fix the inverted U-shaped clamping rod 602.

[0041] A portable and movable bridge hanging basket in this embodiment adopts a lightweight design, without the assistance of large machinery, significantly reducing the construction cost. At the same time, it avoids construction occupying the road, reduces relevant approval procedures and costs, and further reduces the overall construction cost. The suspension bracket 3 is designed compactly and is easy to operate. It can flexibly adjust the length of the limiting component 6 according to the specific guardrail 1 to achieve a tight fit with the railing pier 101. The equipped pulley 10 makes the movement of the hanging basket on the bridge easy and fast, greatly improving the construction efficiency. This application fully considers safety. Through measures such as fixing with a stable hoop 502 and covering with iron sheets to prevent small objects from falling, the safety risks during the construction process are effectively reduced.

[0042] The working principle of the above embodiment is as follows: First, adjusting the telescopic sleeve 601 and the inverted U-shaped clamping rod 602 in the limiting component 6 is the first and crucial step in the installation of the hanging basket. This step requires the operator to accurately adjust the length of the telescopic sleeve 601 according to the actual size of the guardrail 1 so that the inverted U-shaped clamping rod 602 can be smoothly inserted and cooperate with it. Subsequently, through the fixing holes 12, high-strength bolts are used to firmly fix the inverted U-shaped clamping rod 602 on the telescopic sleeve 601 to ensure a tight connection between the two, thereby realizing the stable clamping connection between the guardrail 1 and the suspension bracket 3.

[0043] Next, the installation of the clamping component 5 further enhances the overall stability of the hanging basket. The hoop 502, as a key component, is ingeniously designed to tightly hold the uppermost railing 103. By rotating the clamping bolt 11, the operator can easily adjust the tightening degree of the hoop 502 until it completely holds the railing 103, forming a stable support structure. This design not only enhances the connection strength between the hanging basket and the guardrail but also effectively prevents accidental detachment during the construction process, providing reliable safety protection for high-altitude operations.

[0044] In addition, the bottom plate 7 of the suspension hanger 3 provides a spacious and stable working platform for workers. This design fully considers the actual needs of construction personnel, enabling them to perform various operations in a safe and comfortable environment. At the same time, the iron sheet 8 on the outer surface of the suspension hanger 3 plays a crucial role. It can not only prevent small construction tools or materials from accidentally falling, ensuring the safety of high-altitude operations, but also effectively resist the influence of adverse weather such as wind and rain, protecting the equipment and materials inside the hanging basket from damage.

[0045] When moving the hanging basket on the bridge, the application of the pulley 10 makes the operation easier and faster. By reducing the friction coefficient, the pulley 10 enables the hanging basket to slide smoothly along the bridge, greatly saving manpower and material resources. Workers only need to gently push the hanging basket to achieve its rapid movement on the bridge, thereby improving the construction efficiency and flexibility.

[0046] It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the term "comprising", "including" or any other variant thereof is intended to cover non-exclusive inclusion, so that a process, method, article or device comprising a series of elements not only includes those elements, but also includes other elements not expressly listed, or elements inherent to such process, method, article or device. Without further limitation, an element defined by the statement "comprising an..." does not exclude the presence of additional identical elements in the process, method, article or device comprising the said element.

[0047] Although the embodiments of the present application have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions and variations can be made to these embodiments without departing from the principles and spirit of the present application. The scope of the present application is defined by the appended claims and their equivalents.

Claims

1. A portable and movable bridge hanging basket, comprising a guardrail (1) and a suspension frame (3), characterized in that: The guardrail (1) comprises a pier (101), a group of supporting ribs (102) and two railings (103); The supporting rib (102) is fixedly connected to the top of the balustrade (101), and the two handrails (103) are fixedly connected to the supporting rib (102); Two groups of connecting ribs (4) are fixedly connected to the right side surface of the suspension frame (3), and the top ends of the two groups of connecting ribs (4) are provided with clamping components (5); The clamping assembly (5) comprises a clamping frame (501) and two clamping hoops (502); The right inner wall of the guardrail (1) is provided with two limit assemblies (6); Each of the position limiting components (6) comprises a telescopic sleeve (601) and an inverted U-shaped clamping rod (602).

2. The portable movable bridge hanging basket according to claim 1 is characterized in that: The bottom end of the suspension frame (3) is fixedly connected to a bottom plate (7).

3. The portable movable bridge hanging basket according to claim 1 is characterized in that: A group of iron sheets (8) are fixedly mounted on the outer surface of the suspension frame (3).

4. The portable movable bridge hanging basket according to claim 1 is characterized in that: A set of handles (9) are fixedly connected to the mutually adjacent sides of the two connecting ribs (4) located on the far left.

5. The portable movable bridge hanging basket according to claim 1 is characterized in that: Two pulleys (10) are installed on the right side of the suspension frame (3), and the two pulleys (10) are in contact with the left side of the pier (101).

6. The portable movable bridge hanging basket according to claim 1 is characterized in that: The top end of each connecting rib (4) is fixedly connected to the clamping frame (501), the inner bottom wall of each clamping hoop (502) contacts the bottom of the clamping frame (501), both side surfaces of each clamping hoop (502) are threadedly connected with clamping bolts (11), the uppermost railing (103) is located between the clamping hoop (502) and the clamping frame (501), and each clamping bolt (11) contacts the inner bottom wall of the clamping frame (501).

7. The portable movable bridge hanging basket according to claim 1 is characterized in that: Each of the inverted U-shaped clamping rods (602) is slidably plugged into a telescopic sleeve (601) adjacent thereto, and the top end of each of the inverted U-shaped clamping rods (602) is slidably connected to the top end of the balustrade (101).

8. The portable movable bridge hanging basket according to claim 1 is characterized in that: A group of fixing holes (12) is formed on the outer surface of each telescopic sleeve (601), and each group of fixing holes (12) passes through the inverted U-shaped clamping rod (602).