Support structure for cable construction
By designing a cable construction bracket structure containing positioning components and adjustment components, the existing bracket support problems are solved, and the height and angle are easily adjusted, and the practicality and adaptability of the device are improved.
Patent Information
- Application Number
- CN202421968835.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2025-07-01
- Estimated Expiration
- 2034-08-14
AI Technical Summary
The existing cable construction brackets have the problem of relatively single support performance and low practical adaptability, and it is impossible to effectively adjust the height and angle of the cable.
A support structure for cable construction is designed, including a fixing base and a support auxiliary device for cable construction, and the auxiliary device consists of a positioning component and an adjustment component. The adjustment assembly includes an electro-hydraulic cylinder, a support telescopic column, a stabilizing pad and a waterproof telescopic sleeve, through which the height and angle of the bracket can be adjusted.
By adjusting the use of components, the height and angle of the cable construction bracket can be adjusted easily and conveniently, improving the adaptability and practicality of the device and avoiding the problem of single support function.
Smart Images

Figure CN223052716U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of supports for cable construction, and more specifically, to a support structure for cable construction. Background Technique
[0002] With the continuous development of urban construction, the cableization of urban power lines is the trend of development in the world today. A large number of cables need to be routed in cable trenches and cable shafts, and cable supports are used for laying. The existing cable supports mainly include buried cable supports, screw-type cable supports, combined cable supports, etc. These cable supports are widely used in the power system and other industries due to their simple structure and many manufacturers.
[0003] The existing patent number is: CN218216629U, a cable support fixing structure for power construction, including a shock absorption mechanism, an adjustment mechanism, a support mechanism and a fixing mechanism. The adjustment mechanism is located at the upper end of the shock absorption mechanism, the support mechanism is located at the lower end of the adjustment mechanism, and the fixing mechanism is located above the support mechanism. The fixing mechanism includes a fixing rod, a connecting block, a U-shaped block and a screw. The U-shaped block is fixedly installed at the upper end of the connecting block. For this cable support fixing structure for power construction, by installing the U-shaped block, when in use, the staff fixes the wire at the inner end of the U-shaped block to play a limiting role, and a screw is installed at the upper end of the threaded nail, and the screw penetrates into the inside of the threaded nail, which is convenient for the staff to disassemble and install, avoiding wire knotting and causing unstable circuits during use. The rod body of this device is an integral type, and the upper fixed part cannot perform the installation and auxiliary support angle adjustment work, resulting in a single support performance and a low practical adaptability. Content of the Utility Model
[0004] In order to overcome the above-mentioned defects of the prior art, an embodiment of the utility model provides a support structure for cable construction to solve the problems raised in the above-mentioned background technique.
[0005] To achieve the above object, the utility model provides the following technical solution: A support structure for cable construction, including a fixed base, and a cable construction support auxiliary device is arranged at the upper end of the fixed base; the cable construction support auxiliary device includes: a positioning component and an adjustment component, and the lower end of the adjustment component is installed at the upper end of the fixed base.
[0006] In a preferred embodiment, the adjusting assembly includes: an upper support column, a lower support bin, a waterproof telescopic sleeve, an upper stabilizing backing plate, a lower stabilizing backing plate, and a support telescopic column. The lower end of the support telescopic column is installed on the upper end of the lower stabilizing backing plate, and the upper end of the support telescopic column is installed on the lower end of the upper stabilizing backing plate. The interior of the upper stabilizing backing plate is installed on the outer wall of the lower end of the upper support column, and the inner wall of the lower stabilizing backing plate is installed on the outer wall of the upper end of the lower support bin. The lower end of the lower support bin is installed on the upper end of the fixed base, the upper end of the lower support bin is installed on the lower end of the waterproof telescopic sleeve, the upper end of the waterproof telescopic sleeve is installed on the lower end of the upper support column, an electric hydraulic cylinder is installed inside the lower support bin, and the output end of the electric hydraulic cylinder is installed at the bottom end of the upper support column.
[0007] In a preferred embodiment, the positioning assembly includes: an upper magnetic adsorption stabilizing cover, a lower magnetic adsorption support tray, a rotation adjustment wrench, a rotation shaft, a top rod, a cross beam, a longitudinal beam, a first through assembly hole, an upper adjustment washer, a lower adjustment washer, a first assembly bolt, a second assembly screw rod, and a nut group. The nut group is detachably installed on the outer wall of the lower end of the second assembly screw rod, the lower end of the second assembly screw rod is detachably installed at the upper and lower ends of the first through assembly hole, the first through assembly hole is opened at the upper and lower ends of the longitudinal beam, there are four groups of longitudinal beams, and the inner sides of the four groups of longitudinal beams are respectively installed on the front and rear outer walls of the cross beam.
[0008] In a preferred embodiment, the upper end of the first assembly bolt is installed on the lower end of the lower magnetic adsorption support tray, and the lower magnetic adsorption support tray is adsorbed and installed on the upper end of the lower magnetic adsorption support tray.
[0009] In a preferred embodiment, the upper end of the top rod is installed on the lower end of the cross beam, the lower end of the cross beam is rotatably installed on the upper end of the rotation shaft, and the lower end of the rotation shaft is installed on the upper end of the upper support column.
[0010] In a preferred embodiment, there are multiple groups of the rotation adjustment wrenches, and one ends of the multiple groups of rotation adjustment wrenches are respectively installed on the outer wall of the top rod.
[0011] In a preferred embodiment, the inner wall of the upper adjustment washer is installed on the outer wall of the lower end of the top rod, the inner wall of the lower adjustment washer is installed on the outer wall of the upper end of the upper support column, and the first assembly bolt is detachably installed at the upper and lower ends of the upper adjustment washer and the lower adjustment washer.
[0012] The technical effects and advantages of the present utility model:
[0013] A bracket structure for cable construction. Compared with the prior art, after the installation angle of the longitudinal beam is adjusted, the upper adjusting washer and the lower adjusting washer can be stably fixed by the first assembly bolt. After the upper adjusting washer and the lower adjusting washer are stably fixed, the electric hydraulic cylinder can be started. After the electric hydraulic cylinder is started, the upper support column at the output end is driven to move upward. After the upper support column moves upward, the height adjustment work can be carried out. The height and angle of the upper support column can be adjusted simply and conveniently, which greatly improves the use adaptability of the whole device and the practicality of the whole device. The device effectively avoids the problem of single cable construction support function through its high-strength adjustable performance. Brief Description of the Drawings
[0014] Figure 1 It is a schematic diagram of the overall structure of the present utility model.
[0015] Figure 2 It is a schematic diagram of the structure of the bracket auxiliary device for cable construction of the present utility model.
[0016] Figure 3 It is a schematic diagram of the structure of the adjustment component of the present utility model.
[0017] Figure 4 It is a schematic diagram of the structure of the positioning component of the present utility model.
[0018] The reference numerals are: 1, fixed base; 2, bracket auxiliary device for cable construction; 21, adjustment component; 211, electric hydraulic cylinder; 212, lower support bin; 213, waterproof expansion sleeve; 214, upper stable backing plate; 215, support expansion column; 216, lower stable backing plate; 217, upper support column; 22, positioning component; 221, rotating shaft; 222, ejector rod; 223, rotating adjustment wrench; 224, first assembly bolt; 225, lower adjusting washer; 226, upper adjusting washer; 227, cross beam; 228, longitudinal beam; 229, first through assembly hole; 220, upper magnetic attraction stable cover; 2201, lower magnetic attraction support tray; 2202, second assembly screw; 2203, nut set. Detailed Description of the Preferred Embodiments
[0019] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.
[0020] As shown in the atta Figures 1-4As shown in the figure, the present utility model provides a support structure for cable construction, including a fixed base 1, and a cable construction support auxiliary device 2 is arranged at the upper end of the fixed base 1; the cable construction support auxiliary device 2 includes: a positioning component 22 and an adjustment component 21, and the lower end of the adjustment component 21 is installed at the upper end of the fixed base 1.
[0021] The adjustment component 21 includes: an upper support column 217, a lower support bin 212, a waterproof expansion sleeve 213, an upper stable backing plate 214, a lower stable backing plate 216, and a support expansion column 215. The lower end of the support expansion column 215 is installed at the upper end of the lower stable backing plate 216, the upper end of the support expansion column 215 is installed at the lower end of the upper stable backing plate 214, the inside of the upper stable backing plate 214 is installed on the outer wall of the lower end of the upper support column 217, the inner wall of the lower stable backing plate 216 is installed on the outer wall of the upper end of the lower support bin 212, the lower end of the lower support bin 212 is installed at the upper end of the fixed base 1, the upper end of the lower support bin 212 is installed at the lower end of the waterproof expansion sleeve 213, the upper end of the waterproof expansion sleeve 213 is installed at the lower end of the upper support column 217, an electric hydraulic cylinder 211 is installed inside the lower support bin 212, and the output end of the electric hydraulic cylinder 211 is installed at the bottom end of the upper support column 217.
[0022] The positioning component 22 includes: an upper magnetic adsorption stable cover 220, a lower magnetic adsorption support tray 2201, a rotation adjustment wrench 223, a rotation shaft 221, a top rod 222, a cross beam 227, a longitudinal beam 228, a first through assembly hole 229, an upper adjustment washer 226, a lower adjustment washer 225, a first assembly bolt 224, a second assembly screw 2202, and a nut group 2203. The nut group 2203 is detachably installed on the outer wall of the lower end of the second assembly screw 2202, the lower end of the second assembly screw 2202 is detachably installed at the upper and lower ends of the first through assembly hole 229, the first through assembly hole 229 is opened at the upper and lower ends of the longitudinal beam 228, there are four groups of longitudinal beams 228, and the inner sides of the four groups of longitudinal beams 228 are respectively installed on the front and rear outer walls of the cross beam 227. The upper end of the first assembly bolt 224 is installed at the lower end of the lower magnetic adsorption support tray 2201, the lower magnetic adsorption support tray 2201 is adsorbed and installed at the upper end of the lower magnetic adsorption support tray 2201, the upper end of the top rod 222 is installed at the lower end of the cross beam 227, the lower end of the cross beam 227 is rotatably installed at the upper end of the rotation shaft 221, the lower end of the rotation shaft 221 is installed at the upper end of the upper support column 217, there are multiple groups of rotation adjustment wrenches 223, and one ends of the multiple groups of rotation adjustment wrenches 223 are respectively installed on the outer wall of the top rod 222. The inner wall of the upper adjustment washer 226 is installed on the outer wall of the lower end of the top rod 222, the inner wall of the lower adjustment washer 225 is installed on the outer wall of the upper end of the upper support column 217, and the first assembly bolt 224 is detachably installed at the upper and lower ends of the upper adjustment washer 226 and the lower adjustment washer 225.
[0023] The specific implementation method is as follows: When using the present utility model, first place the cable to be fixed on the upper end of the lower magnetic attraction support tray 2201, and fixedly install the lower end of the upper magnetic attraction stabilizing cover 220 on the upper end of the lower magnetic attraction support tray 2201 through bolts. After the upper magnetic attraction stabilizing cover 220 and the lower magnetic attraction support tray 2201 are fixed, install the lower end of the lower magnetic attraction support tray 2201 inside the first through assembly hole 229. Before installing the cable, the rotation adjustment wrench 223 can be rotated. After the rotation adjustment wrench 223 is rotated and adjusted, the installation stable angles of the cross beam 227 and the longitudinal beam 228 installed at the upper end can be adjusted. After the installation angle of the longitudinal beam 228 is adjusted, the upper adjustment washer 226 and the lower adjustment washer 225 can be stably fixed through the first assembly bolt 224. After the upper adjustment washer 226 and the lower adjustment washer 225 are stably fixed, the electric hydraulic cylinder 211 can be started. After the electric hydraulic cylinder 211 is started, it drives the upper support column 217 at the output end to move upward. After the upper support column 217 moves upward, height adjustment work can be carried out. The height and angle of the upper support column 217 can be adjusted simply and conveniently, which greatly improves the use adaptability of the entire device and the practicality of the entire device. The device effectively avoids the problem of single cable construction support function through its high-strength adjustable performance.
[0024] The working principle of the present utility model: When using the present utility model, first place the cable to be fixed on the upper end of the lower magnetic attraction support tray 2201, and fixedly install the lower end of the upper magnetic attraction stabilizing cover 220 on the upper end of the lower magnetic attraction support tray 2201 through bolts. After the upper magnetic attraction stabilizing cover 220 and the lower magnetic attraction support tray 2201 are fixed, install the lower end of the lower magnetic attraction support tray 2201 inside the first through assembly hole 229. Before installing the cable, the rotation adjustment wrench 223 can be rotated. After the rotation adjustment wrench 223 is rotated and adjusted, the installation stable angles of the cross beam 227 and the longitudinal beam 228 installed at the upper end can be adjusted. After the installation angle of the longitudinal beam 228 is adjusted, the upper adjustment washer 226 and the lower adjustment washer 225 can be stably fixed through the first assembly bolt 224. After the upper adjustment washer 226 and the lower adjustment washer 225 are stably fixed, the electric hydraulic cylinder 211 can be started. After the electric hydraulic cylinder 211 is started, it drives the upper support column 217 at the output end to move upward. After the upper support column 217 moves upward, height adjustment work can be carried out.
[0025] Finally, several points should be noted: First, in the description of the present application, it should be noted that unless otherwise specified and limited, the terms "installation", "connection", and "connection" should be understood in a broad sense. It can be a mechanical connection or an electrical connection, or the communication inside two components. It can be directly connected. "Upper", "lower", "left", "right", etc. are only used to represent relative position relationships. When the absolute position of the object being described changes, the relative position relationship may change;
[0026] Secondly: In the attached drawings of the disclosed embodiments of the present utility model, only the structures related to the disclosed embodiments are involved. For other structures, reference can be made to the general design. Without conflict, the same embodiment and different embodiments of the present utility model can be combined with each other;
[0027] Finally: The above are only the preferred embodiments of the present utility model and are not used to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present utility model shall be included within the protection scope of the present utility model.
Claims
1. A support structure for cable construction, comprising a fixed base (1), characterized in that: The upper end of the fixed base (1) is provided with a cable construction support auxiliary device (2); The cable construction support auxiliary device (2) comprises: a positioning component (22) and an adjustment component (21), wherein the lower end of the adjustment component (21) is mounted on the upper end of the fixed base (1).
2. A cable construction support structure according to claim 1, characterized in that: The adjustment assembly (21) comprises: an upper support column (217), a lower support bin (212), a waterproof telescopic sleeve (213), an upper stabilizing pad (214), a lower stabilizing pad (216), and a support telescopic column (215), wherein the lower end of the support telescopic column (215) is mounted on the upper end of the lower stabilizing pad (216), the upper end of the support telescopic column (215) is mounted on the lower end of the upper stabilizing pad (214), and the interior of the upper stabilizing pad (214) is mounted on the outer wall of the lower end of the upper support column (217). The inner wall of the lower stabilizing pad (216) is mounted on the outer wall of the upper end of the lower support bin (212); the lower end of the lower support bin (212) is mounted on the upper end of the fixed base (1); the upper end of the lower support bin (212) is mounted on the lower end of the waterproof telescopic sleeve (213); the upper end of the waterproof telescopic sleeve (213) is mounted on the lower end of the upper support column (217); an electric hydraulic cylinder (211) is mounted inside the lower support bin (212); and the output end of the electric hydraulic cylinder (211) is mounted on the bottom end of the upper support column (217).
3. A cable construction support structure according to claim 2, characterized in that: The positioning assembly (22) comprises: an upper magnetic stabilizing cover (220), a lower magnetic support bracket (2201), a rotation adjustment wrench (223), a rotation shaft (221), a top rod (222), a crossbeam (227), a longitudinal beam (228), a first through assembly hole (229), an upper adjustment washer (226), a lower adjustment washer (225), a first assembly bolt (224), a second assembly screw (2202) and a nut group (2203), wherein the nut group (2203) is detachably mounted on the outer wall of the lower end of the second assembly screw (2202), the lower end of the second assembly screw (2202) is detachably mounted on the upper and lower ends of the first through assembly hole (229), the first through assembly hole (229) is provided at the upper and lower ends of the longitudinal beam (228), the longitudinal beam (228) is provided with four groups, and the inner sides of the four groups of longitudinal beams (228) are respectively mounted on the outer walls of the front and rear ends of the crossbeam (227).
4. A cable construction support structure according to claim 3, characterized in that: The upper end of the first assembly bolt (224) is mounted on the lower end of the lower magnetic support bracket (2201), and the lower end of the lower magnetic support bracket (2201) is adsorbed and mounted on the upper end of the lower magnetic support bracket (2201).
5. A cable construction support structure according to claim 3, characterized in that: The upper end of the push rod (222) is mounted on the lower end of the cross beam (227), the lower end of the cross beam (227) is rotatably mounted on the upper end of the rotating shaft (221), and the lower end of the rotating shaft (221) is mounted on the upper end of the upper support column (217).
6. A cable construction support structure according to claim 3, characterized in that: The rotary adjustment wrenches (223) are provided in multiple groups, and one end of the multiple groups of rotary adjustment wrenches (223) is respectively mounted on the outer wall of the push rod (222).
7. A cable construction support structure according to claim 3, characterized in that: The inner wall of the upper adjustment washer (226) is mounted on the outer wall of the lower end of the push rod (222), the inner wall of the lower adjustment washer (225) is mounted on the outer wall of the upper end of the upper support column (217), and the first assembly bolt (224) is detachably mounted on the upper and lower ends of the upper adjustment washer (226) and the lower adjustment washer (225).