Pouring device for pouring concrete on top of constructional column
By designing a new casting device, the construction problem of the top formwork of the structural column is solved, and the one-time pouring of concrete is achieved, which improves construction efficiency and quality and reduces costs.
Patent Information
- Application Number
- CN202421601264.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-08
- Publication Date
- 2025-07-11
- Estimated Expiration
- 2034-07-08
AI Technical Summary
In the prior art, it is difficult to pour the top formwork on the structural column in one go, resulting in the need of secondary repair of concrete voids, which affects the construction quality and cost.
A new casting device including casting bevels and lower fixed slides are designed. It is welded with 3mm steel plates and fixed with U-shaped slot hangings and bolts. It has a compact structure and is easy to adjust and turnover.
The construction efficiency of concrete pouring on the top of the structural column is improved, process steps and material consumption is reduced, construction quality is ensured and costs are reduced.
Smart Images

Figure CN223088925U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of building construction engineering, in particular to a pouring device for pouring concrete at the top of a structural column. Background Technique
[0002] During the construction of a structural column, since the formwork cannot be properly supported at the position where the top meets the beam and column, the concrete cannot be poured full at one time, leaving a large number of gaps that need to be repaired later, which has a significant impact on the construction quality and cost. The formwork of the structural column is a key process in the construction of the structural column, and the quality of its formwork construction directly affects the subsequent forming quality of the structural column. Among them, the most difficult to control is the construction of the formwork at the top of the structural column. The following problems will occur when using traditional construction methods:
[0003] (1) Use wooden formwork to make a pouring port, manually bind it to the formwork of the structural column, then pour concrete with a shovel, and remove it to the next column after pouring;
[0004] (2) Do not set a pouring buckle formwork, and repair the area where the concrete is not poured full after the concrete is poured;
[0005] The above solutions are difficult to ensure that the concrete is poured in place at one time, and secondary repair is still required, which is time-consuming and laborious, with low efficiency, and the consumption of materials for making the wooden pouring port is large, and the turnover rate is low, and the quality of the concrete pouring of the structural column cannot be guaranteed. Content of the Utility Model
[0006] To overcome the deficiencies in the prior art, the utility model provides a new type of standardized pouring device for structural column concrete that is simple in structure, convenient to use, reasonable in force, and low in use cost and can be recycled.
[0007] To solve the above technical problems, the utility model adopts the following technical solutions:
[0008] A pouring device for pouring concrete at the top of a structural column, comprising: a pouring groove;
[0009] The pouring groove includes a vertical plate and an inclined plate. The vertical plate is set as a right triangle plate, and the inclined plate is connected to the inclined surface of the vertical plate;
[0010] A lower fixed sliding member is welded to the lower part of the pouring groove. The lower fixed sliding member includes a horizontal part and a vertical part. Vertical parts are arranged on both sides of the horizontal part, and slot holes are opened on the vertical parts;
[0011] A U-shaped card slot hanging part is fixedly arranged in the slot hole of the vertical part through a bolt.
[0012] Further: The U-shaped card slot hanging part includes a U-shaped part and a connecting rod. The U-shaped parts are connected through the connecting rod; the lengths of both ends of the U-shaped part are inconsistent.
[0013] Further: The welded joints of the pouring groove and the lower fixed sliding member are welded with 3mm steel plates.
[0014] The pouring groove and the lower fixed sliding member are welded into a whole. The overall height is 320mm and the overall width is 250mm.
[0015] Further: The pouring groove, the lower fixed sliding member and the U-shaped groove card hanger are all made of Q235 steel plates with a thickness of 3mm.
[0016] Further: The height of the pouring groove is 200mm and the width of the pouring groove is 250mm.
[0017] Further: The width of the lower fixed sliding member is 250mm, the width of the slot hole is 12mm, the length of the slot hole is 80mm, and the width of the vertical part is 30mm.
[0018] Further: The length of the bolt is 30mm.
[0019] Compared with the prior art, the present utility model has at least one of the following beneficial effects:
[0020] The present utility model is convenient to install and use, very convenient for turnover, has a high turnover rate, its structure is compact and simple, has good integrity, low manufacturing and use costs, can effectively improve the construction efficiency of concrete pouring at the top of the structural column, reduce the process steps, reduce the materials required for processing, improve the turnover rate, and ensure the construction quality. BRIEF DESCRIPTION OF THE DRAWINGS
[0021] Figure 1 It is a schematic structural diagram of the present utility model.
[0022] Figure 2 It is a side view of the structure of the present utility model.
[0023] Figure 3 It is a schematic structural diagram of the U-shaped groove card hanger of the present utility model.
[0024] Figure 4 It is a side view of the U-shaped groove card hanger of the present utility model.
[0025] In the figure: 1 - pouring groove, 2 - lower fixed sliding member, 3 - U-shaped groove card hanger, 4 - bolt, 5 - vertical plate, 6 - inclined plate, 7 - horizontal part, 8 - vertical part, 9 - slot hole, 10 - U-shaped part, 11 - connecting rod. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0026] In order to make the objectives, technical solutions and advantages of the present utility model more clear and understandable, the present utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present utility model and are not used to limit the present utility model.
[0027] Embodiment 1:
[0028] A pouring device for pouring concrete at the top of a construction column, comprising: a pouring groove 1;
[0029] The pouring groove 1 includes a vertical plate 5 and an inclined plate 6. The vertical plate 5 is arranged as a right-angled triangular plate, and the inclined plate 6 is connected to the inclined surface of the vertical plate 5; the vertical plate 5 and the inclined plate 6 are arranged as an integrally formed structure;
[0030] A lower fixed sliding member 2 is welded to the lower part of the pouring groove 1. The lower fixed sliding member 2 includes a horizontal part 7 and a vertical part 8. Vertical parts 8 are arranged on both sides of the horizontal part 7, and a slot hole 9 is formed in the vertical part 8; the horizontal part 7 and the vertical part 8 are arranged as an integrally formed structure,
[0031] A U-shaped groove hanging part 3 is fixedly arranged in the slot hole 9 of the vertical part 8 through a bolt 4. The bolt 4 fixes the lower fixed sliding member 2 and the U-shaped groove hanging part 3 in the slot hole 9 of the vertical part 8. The position of the bolt 4 in the slot hole 9 of the vertical part 8 facilitates adjusting the fixing height;
[0032] The U-shaped groove hanging part 3 includes a U-shaped part 10 and a connecting rod 11. The U-shaped parts 10 are connected through the connecting rod 11; the U-shaped part 10 and the connecting rod 11 are arranged as an integrally formed structure,
[0033] The lengths of both ends of the U-shaped part 10 are inconsistent.
[0034] The welded joints of the pouring groove 1 and the lower fixed sliding member 2 are all welded with 3mm steel plates;
[0035] The pouring groove 1 and the lower fixed sliding member 2 are welded into a whole. The overall height is 320mm, and the overall width is 250mm. The height after welding the pouring groove 1 and the lower fixed sliding member 2 is 320mm. The width after welding the pouring groove 1 and the lower fixed sliding member 2 is 250mm. Since the overall width is 250mm, it can be known that the width at the connection where the inclined plate 6 is not connected to the vertical plate 5 is 250mm.
[0036] The pouring groove 1, the lower fixed sliding member 2 and the U-shaped groove hanging part 3 are all made of Q235 steel plates with a thickness of 3mm.
[0037] The height of the pouring groove 1 is 200mm, and the width of the pouring groove 1 is 250mm. It can also be known that the width at the connection where the inclined plate 6 is not connected to the vertical plate 5 is 250mm.
[0038] The width of the lower fixed slider 2 is 250 mm, the width of the slot 9 is 12 mm, the length of the slot 9 is 80 mm, and the width of the vertical part 8 is 30 mm.
[0039] The length of the bolt 4 is 30 mm.
[0040] Although the present invention has been described herein with reference to a number of illustrative embodiments of the present invention, it should be understood that those skilled in the art can design many other modifications and implementations that will fall within the scope and spirit of the principles disclosed in this application. More specifically, within the scope of this application's disclosure, the drawings, and the claims, various variations and improvements can be made to the components and / or layout of the subject combination layout. In addition to the variations and improvements made to the components and / or layout, other uses will also be apparent to those skilled in the art.
Claims
1. A pouring device for pouring concrete at the top of a structural column, characterized in that: Comprising: Pouring groove (1); The pouring groove (1) includes a vertical plate (5) and an inclined plate (6). The vertical plate (5) is arranged as a right-angled triangular plate, and the inclined plate (6) is connected to the inclined surface of the vertical plate (5); A lower fixed sliding member (2) is welded to the lower part of the pouring groove (1). The lower fixed sliding member (2) includes a horizontal part (7) and a vertical part (8). The vertical parts (8) are arranged on both sides of the horizontal part (7), and a slot hole (9) is formed in the vertical part (8); A U-shaped slot hanger (3) is fixedly arranged in the slot hole (9) of the vertical part (8) through a bolt (4).
2. The casting device for casting concrete at the top of a structural column according to claim 1, characterized in that: The U-shaped slot hanger (3) includes a U-shaped part (10) and a connecting rod (11), and the U-shaped parts (10) are connected through the connecting rod (11); The lengths of both ends of the U-shaped part (10) are inconsistent.
3. The pouring device for pouring concrete at the top of a structural column according to claim 1, characterized in that: The welding joints of the pouring groove (1) and the lower fixed sliding member (2) are welded with 3mm steel plates; The pouring groove (1) and the lower fixed sliding member (2) are welded into a whole. The overall height is 320mm, and the overall width is 250mm.
4. The casting device for casting concrete at the top of a construction column according to claim 1, characterized in that: The pouring groove (1), the lower fixed sliding member (2) and the U-shaped slot hanger (3) are all made of Q235 steel plates with a thickness of 3mm.
5. The casting device for casting concrete at the top of a structural column according to claim 1, characterized in that: The height of the pouring groove (1) is 200mm, and the width of the pouring groove (1) is 250mm.
6. The casting device for casting concrete at the top of a structural column according to claim 1, characterized in that: The width of the lower fixed sliding member (2) is 250mm, the width of the slot hole (9) is 12mm, the length of the slot hole (9) is 80mm, and the width of the vertical part (8) is 30mm.
7. The casting device for casting concrete at the top of a structural column according to claim 1, characterized in that: The length of the bolt (4) is 30mm.