Sliding plate assembly installing and welding tool
By designing the skateboard assembly welding equipment, using the combined positioning of the base and multiple positioning seats and positioning shafts, the positioning problem during the welding of the skateboard assembly is solved, and the production efficiency and product quality are improved.
Patent Information
- Application Number
- CN202422233798.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-12
- Publication Date
- 2025-07-18
- Estimated Expiration
- 2034-09-12
AI Technical Summary
In the prior art, the skateboard assembly cannot be accurately positioned during welding, resulting in low production efficiency and unstable product quality, affecting product quality and running smoothness.
A skateboard assembly welding tool is designed, including a base, a variety of positioning seats and positioning shafts. Through the combined positioning of these components, it is ensured that each component of the skateboard assembly is accurately positioned before welding, and avoid welding after assembly one by one.
It realizes the precise positioning of skateboard assembly welding, improves production efficiency and product accuracy, and is suitable for mass production, ensuring product quality and smooth operation.
Smart Images

Figure CN223114475U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of welding jigs, in particular to a welding jig for assembling a skateboard assembly. Background Art
[0002] The 25-ton compression garbage truck designed and manufactured by our company is the main model of our company. The welding quality of the welded parts of the skateboard assembly will directly affect the efficiency of garbage collection and transportation. The original conventional welding operation cannot position the skateboard assembly, and the components of the skateboard assembly need to be welded at the corresponding welding positions during welding. This operation method results in low production efficiency, and the manual positioning accuracy is poor, and manufacturing defects such as the geometric dimensions cannot be guaranteed, which will cause problems such as interference in the assembly of the skateboard and the hopper and unsmooth operation, seriously affecting the product quality. Therefore, a jig suitable for welding the skateboard assembly is proposed. Content of the Utility Model
[0003] The purpose of the utility model is to solve the defects existing in the prior art, and a welding jig for assembling a skateboard assembly is proposed.
[0004] To achieve the above purpose, the technical solution adopted by the utility model is: a welding jig for assembling a skateboard assembly, including a base. At the four corners of the top of the base, two oil cylinder seat positioning seats and two connecting ear seat positioning seats are respectively provided. Two oil cylinder seat spacers are installed through the sides of the oil cylinder seat positioning seats. A slider positioning shaft and an oil cylinder seat positioning shaft are respectively inserted and slid in the two oil cylinder seat spacers. A connecting ear seat positioning plate is provided on one side of the connecting ear seat positioning seat. The connecting ear seat positioning plate is installed on the top of the base. A connecting ear seat spacer is installed through the side of the connecting ear seat positioning plate. A connecting ear seat positioning shaft is inserted between the connecting ear seat spacer and the connecting ear seat positioning seat. A plurality of longitudinal middle beam positioning plates are installed on the top of the base.
[0005] Preferably, a pipe end positioning shaft is installed through the side of the connecting ear seat positioning seat.
[0006] Preferably, on one side of each of the two connecting ear seat positioning plates, a skateboard oil cylinder lower support positioning seat is provided. The skateboard oil cylinder lower support positioning seat is installed on the top of the base. An oil cylinder support positioning shaft is installed through the top end of the skateboard oil cylinder lower support positioning seat. A steel pipe positioning plate is installed at the top end of the oil cylinder support positioning shaft.
[0007] Preferably, on one side of each of the two oil cylinder seat positioning seats, an inner positioning seat for the hook bucket plate is provided. The two inner positioning seats for the hook bucket plate are installed on the top of the base.
[0008] Preferably, the sides of the plurality of longitudinal middle beam positioning plates are respectively in a stepped shape or an arc shape.
[0009] Preferably, push rod seats are provided on the other sides of the two cylinder seat positioning seats. The push rod seats are installed on the top of the base, a screw tube is installed on the top of the push rod seats, and a threaded push rod is threadedly inserted into the screw tube.
[0010] Preferably, a support square tube and a fixed retaining tube are provided between the two cylinder seat positioning seats and the connecting ear seat positioning seat. The support square tube and the fixed retaining tube are both installed on the top of the base.
[0011] Compared with the prior art, the utility model has the following beneficial effects:
[0012] In this solution, by setting the connecting ear seat positioning shaft, the cylinder seat positioning shaft and the slider positioning shaft, the cylinder seat positioning shaft is used to penetrate the through hole of the cylinder seat in the skateboard assembly, the slider positioning shaft abuts against the side of the square tube, the connecting ear seat positioning shaft is used to penetrate the connecting ear seat in the skateboard assembly, and multiple longitudinal middle beam positioning plates are used to support multiple square tubes in the skateboard assembly, which facilitates the assembly of multiple components in the skateboard assembly before welding. There is no need to weld them one by one after assembly. It ensures accurate positioning during component welding, good weld formation, improves product accuracy and production efficiency, solves the problem of difficult production positioning, is suitable for mass production, and makes the group welding tooling have the advantages of simple structure, convenient operation and stable reliability. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 Isometric view of the skateboard assembly group welding tooling of the utility model;
[0014] Figure 2 Front view of the skateboard assembly group welding tooling of the utility model;
[0015] Figure 3 Side view of the skateboard assembly group welding tooling of the utility model;
[0016] Figure 4 Top view of the skateboard assembly group welding tooling of the utility model;
[0017] Figure 5 Schematic diagram of the fixation of each component of the utility model and the skateboard assembly.
[0018] In the figure: base 1, cylinder seat positioning seat 2, cylinder seat spacer 3, screw tube 4, slider positioning shaft 5, cylinder seat positioning shaft 6, longitudinal middle beam positioning plate 7, hook barrel plate inner positioning seat 8, threaded push rod 9, support square tube 10, fixed retaining tube 11, connecting ear seat positioning seat 12, connecting ear seat positioning shaft 13, pipe end positioning shaft 14, connecting ear seat spacer 15, connecting ear seat positioning plate 16, skateboard cylinder lower support positioning seat 17, cylinder support positioning shaft 18, steel pipe positioning plate 19, push rod seat 20, skateboard assembly 21. DETAILED DESCRIPTION OF THE EMBODIMENTS
[0019] The following description is used to disclose the present utility model so that those skilled in the art can implement the present utility model. The preferred embodiments in the following description are only examples, and those skilled in the art can think of other obvious variations.
[0020] As Figures 1-5 shown in the welding tooling for assembling the skateboard assembly group, it includes a base 1. At the four corners of the top of the base 1, there are respectively two oil cylinder seat positioning seats 2 and connecting ear seat positioning seats 12. Two oil cylinder seat spacers 3 are installed through the sides of the oil cylinder seat positioning seats 2. A slider positioning shaft 5 and an oil cylinder seat positioning shaft 6 are respectively slidably inserted into the interiors of the two oil cylinder seat spacers 3. On one side of the connecting ear seat positioning seat 12, there is a connecting ear seat positioning plate 16. The connecting ear seat positioning plate 16 is installed on the top of the base 1. A connecting ear seat spacer 15 is installed through the side of the connecting ear seat positioning plate 16. A connecting ear seat positioning shaft 13 is inserted between the connecting ear seat spacer 15 and the connecting ear seat positioning seat 12. A plurality of longitudinal middle beam positioning plates 7 are installed on the top of the base 1. The oil cylinder seat positioning shaft 6 is used to be inserted into the through hole of the oil cylinder seat in the skateboard assembly, while the slider positioning shaft 5 abuts against the side of the square tube arranged longitudinally. The connecting ear seat positioning shaft 13 is used to be inserted into the connecting ear seat in the skateboard assembly. The plurality of longitudinal middle beam positioning plates are used to support the multiple middle beam square tubes in the skateboard assembly.
[0021] A pipe end positioning shaft 14 is installed through the side of the connecting ear seat positioning seat 12. The pipe end positioning shaft 14 is used to laterally limit one end of the two longitudinally arranged square tubes.
[0022] On one side of the two connecting ear seat positioning plates 16, there are both skateboard oil cylinder lower support positioning seats 17. The skateboard oil cylinder lower support positioning seats 17 are installed on the top of the base 1. An oil cylinder support positioning shaft 18 is installed through the top end of the skateboard oil cylinder lower support positioning seat 17. A steel pipe positioning plate 19 is installed at the top end of the oil cylinder support positioning shaft 18. The steel pipe positioning plate 19 presses on the top of one of the horizontally arranged square tubes. The oil cylinder support in the skateboard assembly is assembled on the top of one of the horizontally arranged square tubes. The inner cavity of the oil cylinder support can allow the steel pipe positioning plate 19 to pass through, and the oil cylinder support positioning shaft 18 is inserted between the oil cylinder support and the top end of the connecting ear seat positioning plate 16 to fix the position of one of the horizontally arranged square tubes.
[0023] On one side of the two oil cylinder seat positioning seats 2, there are both hook bucket plate inner positioning seats 8. The two hook bucket plate inner positioning seats 8 are installed on the top of the base 1. The hook bucket plate inner positioning seats 8 are used to press on the top of the other horizontally arranged square tube to limit its position.
[0024] The sides of the plurality of longitudinal middle beam positioning plates 7 are respectively in a stepped shape or an arc shape, which is convenient to be set according to the horizontal plane or arc surface at the bottom of the square tube, and is convenient to support the square tube.
[0025] On the other side of each of the two oil cylinder seat positioning seats 2, a push rod seat 20 is provided. The push rod seat 20 is installed on the top of the base 1, and a screw tube 4 is installed on the top of the push rod seat 20. A threaded push rod 9 is inserted into the internal thread of the screw tube 4. In the skateboard assembly, the oil cylinder seat is assembled on the top of the longitudinally arranged square tube. By rotating the threaded push rod 9, the threaded push rod 9 moves spirally in the screw tube 4, facilitating one end of the threaded push rod 9 to abut against the side of the oil cylinder seat, thereby playing a role in laterally limiting the oil cylinder seat.
[0026] Between the two oil cylinder seat positioning seats 2 and the connecting ear seat positioning seat 12, a support square tube 10 and a fixed stop tube 11 are provided. Both the support square tube 10 and the fixed stop tube 11 are installed on the top of the base 1. The support square tube 10 is used to support the base of the longitudinally arranged square tube in the skateboard assembly, and the fixed stop tube 11 is used to limit one side of the longitudinally arranged square tube, preventing the longitudinally arranged square tube from shifting in position when being bottled with the horizontally arranged square tube.
[0027] Working principle: First, in the two horizontally arranged square tubes in the skateboard assembly, one horizontally arranged square tube is placed on the bottom ends of the two hook bucket plate inner positioning seats 8, and the other horizontally arranged square tube is placed on the tops of multiple arc-shaped longitudinal middle beam positioning plates 7. Then, the two longitudinally arranged square tubes in the skateboard assembly are respectively placed on the tops of the four support square tubes 10. Next, the two connecting ear seats in the skateboard assembly are placed at the ends of the two longitudinally arranged square tubes. By inserting one end of the two push connecting ear seat positioning shafts 13 into the inner holes of the two connecting ear seats, the positions of the two connecting ear seats are fixed. Then, the two oil cylinder seats are placed on the tops of the other ends of the two longitudinally arranged square tubes, and then the two oil cylinder seat positioning shafts 6 are pushed into the two oil cylinder seats. Next, multiple middle beam square tubes are placed on the tops of multiple stepped longitudinal middle beam positioning plates 7, and the two ends of the multiple middle beam square tubes are respectively in contact with the sides of the two horizontally arranged square tubes, thereby completing the bottling and fixing of multiple components in the skateboard assembly, facilitating subsequent welding operations.
[0028] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited by the above embodiments. What is described in the above embodiments and the specification is only the principle of the present invention. Without departing from the spirit and scope of the present invention, the present invention will have various changes and improvements, and these changes and improvements all fall within the scope of the present invention claimed. The scope of protection required by the present invention is defined by the appended claims and their equivalents.
Claims
1. Skateboard assembly welding tooling, including a base (1), characterized in that, At the four corners of the top of the base (1), there are respectively two oil cylinder seat positioning seats (2) and connecting ear seat positioning seats (12). On the side of the oil cylinder seat positioning seat (2), two oil cylinder seat spacers (3) are installed through. Inside the two oil cylinder seat spacers (3), a slider positioning shaft (5) and an oil cylinder seat positioning shaft (6) are respectively slidably inserted. On one side of the connecting ear seat positioning seat (12), there is a connecting ear seat positioning plate (16). The connecting ear seat positioning plate (16) is installed on the top of the base (1). On the side of the connecting ear seat positioning plate (16), a connecting ear seat spacer (15) is installed through. A connecting ear seat positioning shaft (13) is inserted between the connecting ear seat spacer (15) and the connecting ear seat positioning seat (12). On the top of the base (1), a plurality of longitudinal middle beam positioning plates (7) are installed.
2. The welding fixture for the skateboard assembly group according to claim 1, wherein, On the side of the connecting ear seat positioning seat (12), a pipe end positioning shaft (14) is installed through.
3. The welding tooling for assembling the skateboard assembly according to claim 1, characterized in that, On one side of the two connecting ear seat positioning plates (16), there are both skateboard oil cylinder lower support seat positioning seats (17). The skateboard oil cylinder lower support seat positioning seats (17) are installed on the top of the base (1). At the top of the skateboard oil cylinder lower support seat positioning seat (17), an oil cylinder support positioning shaft (18) is installed through. At the top end of the oil cylinder support positioning shaft (18), a steel pipe positioning plate (19) is installed.
4. The welding fixture for assembling the skateboard assembly according to claim 1, characterized in that, On one side of the two oil cylinder seat positioning seats (2), there are both hook bucket plate inner positioning seats (8). The two hook bucket plate inner positioning seats (8) are installed on the top of the base (1).
5. The welding fixture for the skateboard assembly group according to claim 1, characterized in that, On the sides of the plurality of longitudinal middle beam positioning plates (7), they are respectively in a stepped shape or an arc shape.
6. The welding fixture for the skateboard assembly group according to claim 1, characterized in that On the other side of the two oil cylinder seat positioning seats (2), there are both push rod seats (20). The push rod seats (20) are installed on the top of the base (1). On the top of the push rod seat (20), a screw pipe (4) is installed. Inside the screw pipe (4), a threaded push rod (9) is threadedly inserted.
7. The welding fixture for assembling the skateboard assembly according to claim 1, wherein, Between the two oil cylinder seat positioning seats (2) and the connecting ear seat positioning seat (12), there are a support square pipe (10) and a fixed retaining pipe (11). The support square pipe (10) and the fixed retaining pipe (11) are both installed on the top of the base (1).