Engineering cost site construction progress management assembly
By designing the engaging structure of connecting columns, management boards and storage components, the problem of easy damage to the project cost progress management components during on-site construction and inconvenient viewing of multiple types is solved, achieving stable connection, convenient rotation and quick viewing.
Patent Information
- Application Number
- CN202422030217.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2025-07-18
- Estimated Expiration
- 2034-08-21
AI Technical Summary
The existing project cost progress management components are susceptible to dust damage during on-site construction, and it is inconvenient for personnel from multiple industries to view, resulting in reduced practicality.
A project cost-based construction progress management component is designed, using connecting columns, management boards and storage components. It is fixed by engaging and magnets to achieve stable connection and convenient rotation, supports multiple types of work to view simultaneously, and paper is placed in a classified manner through storage components.
It improves the stability and convenience of components, supports multiple types of work to view simultaneously, reduces maintenance costs, shortens viewing time, and facilitates disassembly and transportation.
Smart Images

Figure CN223121076U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of project cost, in particular to a component for managing the on-site construction progress of project cost. Background Technique
[0002] Project cost consultation refers to accepting entrustment from the society and undertaking the whole-process and dynamic cost management of construction projects, including feasibility study, investment estimation, project economic evaluation, project budget estimate, budget, project settlement, project completion settlement, preparation and review of project tender base price and bid quotation, monitoring of project cost, and providing relevant project cost information and materials, etc.
[0003] According to the search, the Chinese patent document, publication number: CN220228497U, discloses a component for managing the project cost progress. By setting the cooperation of an LED screen, a limiting rod, a limiting block, an adjusting block, an annular rod, an annular block and a fixing mechanism, rotating the LED screen, the LED screen drives the limiting rod to rotate in the inner cavities of the limiting block and the adjusting block, and the LED screen drives the annular rod to rotate in the inner cavity of the annular block. After rotating to the corresponding position, the limiting block is fixed through the fixing mechanism to complete the adjustment, solving the problem that most of the existing rotation structures of LED displays adopt some limiting structures and the rotation and positioning of threads and bolts, but the stability during the rotation process is poor, the positioning speed is slow, and the process is relatively inconvenient. This component for managing the project cost progress has the advantages of solving the rotation problem and being convenient for adjustment, and is worthy of promotion. However, during the use process, since the device uses an LED screen, when it is used in the on-site construction area, a large amount of dust in the air is likely to enter the inside of the LED screen, which is likely to cause damage to the LED screen, and then the maintenance and inspection lead to an increase in the intake cost. At the same time, during the use process, due to a large number of design projects, it is easy to cause trouble when different types of workers view, and they need to queue up one by one to view, resulting in a decrease in practicability and a long viewing time. Content of the Utility Model
[0004] Aiming at the deficiencies of the prior art, the utility model provides a component for managing the on-site construction progress of project cost, which has the advantages of freely adding management components according to the use requirements, being able to simultaneously view the project completion degree by multiple different types of workers during the use process, and being convenient for disassembly, transportation and carrying, and solves the above technical problems.
[0005] To achieve the above object, the utility model provides the following technical solutions: a component for on-site construction progress management of project cost, including a base, a fixed rod is fixedly installed on the top side of the base, a connection component is arranged on the top side of the fixed rod, a connection column is installed on the upper end of the connection component by clamping, a first management board is fixedly installed on the top end of the connection column, second management boards are installed on the left and right ends of the first management board by clamping, a clamping component is arranged between the first management board and the second management board, and storage components are respectively arranged on the front side and the rear side of the first management board and the second management board.
[0006] Preferably, an arc-shaped sliding groove is opened on the top side of the fixed rod, a ball is movably installed inside the arc-shaped sliding groove, and a plurality of groups of the arc-shaped sliding grooves and the balls are arranged, and are respectively arranged in an annular and equally spaced manner on the top side of the fixed rod.
[0007] Through the above technical solution, during use, under the action of multiple groups of arc-shaped sliding grooves and balls, when the connection seat rotates, its stability can be effectively improved, and thus it is beneficial to avoid jamming during the rotation process.
[0008] Preferably, the connection component includes a connection shaft, a torsion spring, a connection seat and a limit post. A connection shaft is fixedly installed on the bottom side of the connection seat, the connection shaft is movably installed inside the fixed rod through a bearing, a torsion spring is arranged on the outer side of the connection shaft, and a limit post is fixedly installed inside the connection seat.
[0009] Through the above technical solution, when in use, the connection column can be rotated. At this time, the connection shaft rotates, which is convenient for rotating the first management board and the second management board for easy viewing. Then, under the action of the torsion spring, it is beneficial to drive the connection seat to return to its original position.
[0010] Preferably, a connection head is fixedly installed at the bottom end of the connection column, a limit groove is opened on the outer side of the connection head, the size and shape of the limit groove respectively match those of the limit post, and four limit grooves are arranged, and are respectively opened on the outer side of the connection head in an annular and equally spaced manner.
[0011] Through the above technical solution, during assembly, the connection head at the bottom end of the connection column is clamped with the connection seat, so as to facilitate the assembly connection. At the same time, during the connection process, by clamping the limit groove on the outer side of the connection head with the limit post, it is beneficial to facilitate positioning and clamping, improve the connection stability, and is also convenient for disassembly and transportation.
[0012] Preferably, pen grooves and grooves are opened on the front sides of the first management board and the second management board. The pen grooves and the grooves are a group, and are respectively opened on the front sides and the rear sides of the first management board and the second management board, and a first magnetic seat is arranged inside the groove.
[0013] Through the above technical solution, under the action of the second magnetic seat, it is beneficial to adhere to the magnets that are not needed to avoid loss. And under the action of the first magnetic seat, it is beneficial to cooperate with the magnets to fix the paper to avoid sliding or falling. Subsequently, under the action of the pen slot, it is beneficial to prevent the pen from being lost or dropped.
[0014] Preferably, the engaging component includes a first card seat, a limiting cavity, a second card seat and a fitting plate. A limiting cavity is formed inside the first card seat. The size and shape of the limiting cavity match those of the fitting plate. The first card seat is fixedly installed on the left and right sides of the first management board. The right side of the second card seat is fixedly installed with a fitting plate, and the second card seat is fixedly installed on the side of the second management board close to the first management board.
[0015] Through the above technical solution, when the management board needs to be expanded, the second management board is installed by engaging the fitting plate on the second card seat with the limiting cavity on the first card seat, thereby facilitating the quick combination of the second management board and facilitating the expanded use.
[0016] Preferably, the storage component includes a card board, a card slot and a second magnetic seat. The card board is of an L-shaped structure. The card boards are grouped in twos. Card slots are formed on the opposite sides of the card boards. A second magnetic seat is arranged on the front side of the card board.
[0017] Through the above technical solution, during the use process, the progress paper is clamped between the card boards through the card slots, and then the magnet is removed from the second magnetic seat and pasted to the first magnetic seat, which is beneficial to fixing the paper. And by classifying and placing the paper through multiple groups of storage components, it is beneficial to quickly view the project progress.
[0018] Compared with the prior art, the present utility model provides a project cost on-site construction progress management component, which has the following beneficial effects:
[0019] 1. In the present utility model, the connection head at the bottom end of the connection column is engaged with the connection seat, so as to facilitate the assembly connection. At the same time, during the connection process, the limiting groove on the outer side of the connection head is engaged with the limiting column, which is beneficial to convenient positioning and engagement and improves the connection stability. Subsequently, when in use, the connection column can be rotated. At this time, through the rotation of the connection shaft, it is convenient to rotate the first management board and the second management board for convenient viewing. Then, under the action of the torsion spring, it is beneficial to drive the connection seat to return to its original position;
[0020] 2. When the management board needs to be expanded in the present utility model, the second management board is installed by engaging the fitting plate on the second card seat with the limiting cavity on the first card seat, thereby facilitating the quick combination of the second management board and facilitating the expanded use. The installation is convenient and fast, and the use is convenient;
[0021] 3. During the use of the present utility model, the progress paper is clamped between the card plates through the card slots, and then the magnet is removed from the second magnetic seat and pasted to the first magnetic seat, which is beneficial to fixing the paper. Moreover, the papers are classified and placed through multiple sets of storage components, which is beneficial to quickly checking the project progress. Under the action of the second magnetic seat, it is beneficial to adhere the unused magnets to avoid loss. And under the action of the first magnetic seat, it is beneficial to cooperate with the magnet to fix the paper and prevent it from sliding or falling. Subsequently, under the action of the pen slot, it is beneficial to prevent the pen from being lost or dropped. Description of the Drawings
[0022] Figure 1 is a three-dimensional structural schematic diagram of the present utility model;
[0023] Figure 2 is a front sectional structural schematic diagram of the present utility model;
[0024] Figure 3 is a disassembled three-dimensional structural schematic diagram of the connection component and the connection column of the present utility model;
[0025] Figure 4 is an exploded three-dimensional structural schematic diagram of the clamping component of the present utility model;
[0026] Figure 5 is a three-dimensional structural schematic diagram of the storage component of the present utility model.
[0027] Wherein: 1. Base; 2. Fixed rod; 3. Connection component; 4. Connection column; 5. First management board; 6. Second management board; 7. Clamping component; 8. Storage component; 201. Arc-shaped chute; 202. Ball; 301. Connection shaft; 302. Torque spring; 303. Connection seat; 304. Limit post; 401. Connection head; 402. Limit groove; 601. Pen slot; 602. Groove; 603. First magnetic seat; 701. First card seat; 702. Limit cavity; 703. Second card seat; 704. Fitting board; 801. Card board; 802. Card slot; 803. Second magnetic seat. Detailed Embodiment
[0028] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model. Embodiment
[0029] As Figures 1-5As shown in the figure, the on-site construction progress management component for project cost provided by the utility model includes a base 1. A fixing rod 2 is fixedly installed on the top side of the base 1. A connecting component 3 is arranged on the top side of the fixing rod 2. The upper end of the connecting component 3 is snap-fitted with a connecting column 4. The top end of the connecting column 4 is fixedly installed with a first management board 5. The left and right ends of the first management board 5 are snap-fitted with second management boards 6. A snap-fitting component 7 is arranged between the first management board 5 and the second management board 6. Storage components 8 are respectively arranged on the front side and the rear side of the first management board 5 and the second management board 6.
[0030] Specifically, an arc-shaped sliding groove 201 is formed on the top side of the fixing rod 2. A ball 202 is movably installed inside the arc-shaped sliding groove 201. And a plurality of groups of the arc-shaped sliding groove 201 and the ball 202 are provided, which are respectively arranged in a circular and equally spaced manner on the top side of the fixing rod 2. The advantage is that through multiple groups of the arc-shaped sliding groove 201 and the ball 202, the stability of the connecting seat 303 can be effectively improved when it rotates, and the phenomenon of jamming during the rotation process can be avoided.
[0031] Specifically, the connecting component 3 includes a connecting shaft 301, a torsion spring 302, a connecting seat 303 and a limiting column 304. The connecting shaft 301 is fixedly installed on the bottom side of the connecting seat 303. The connecting shaft 301 is movably installed inside the fixing rod 2 through a bearing. And a torsion spring 302 is arranged on the outer side of the connecting shaft 301. The limiting column 304 is fixedly installed inside the connecting seat 303. The advantage is that by rotating the connecting shaft 301, it is convenient to rotate the first management board 5 and the second management board 6 for viewing. Then, under the action of the torsion spring 302, it is beneficial to drive the connecting seat 303 to return to its original position.
[0032] Specifically, a connecting head 401 is fixedly installed at the bottom end of the connecting column 4. A limiting groove 402 is formed on the outer side of the connecting head 401. The size and shape of the limiting groove 402 respectively match those of the limiting column 304. And four limiting grooves 402 are provided, which are respectively arranged in a circular and equally spaced manner on the outer side of the connecting head 401. The advantage is that by snap-fitting the connecting head 401 at the bottom end of the connecting column 4 with the connecting seat 303, the assembly connection is convenient. At the same time, during the connection process, by snap-fitting the limiting groove 402 on the outer side of the connecting head 401 with the limiting column 304, it is beneficial to facilitate the positioning snap-fitting and improve the connection stability.
[0033] Specifically, pen slots 601 and grooves 602 are provided on the front sides of the first management board 5 and the second management board 6. The pen slots 601 and the grooves 602 form a group and are respectively provided on the front and rear sides of the first management board 5 and the second management board 6, and a first magnetic seat 603 is provided inside the groove 602. The advantage is that the magnets that are not needed are adhered by the second magnetic seat 803 to avoid loss, and under the action of the first magnetic seat 603, it is beneficial to cooperate with the magnets to fix the paper and prevent it from sliding or falling. Subsequently, under the action of the pen slot 601, it is beneficial to prevent the pen from being lost or dropped. Embodiment
[0034] As Figures 1-5 shown, as an improvement over the previous embodiment. Specifically, the engaging component 7 includes a first card seat 701, a limiting cavity 702, a second card seat 703 and a fitting plate 704. A limiting cavity 702 is provided inside the first card seat 701, and the size and shape of the limiting cavity 702 match those of the fitting plate 704. The first card seat 701 is fixedly installed on the left and right sides of the first management board 5. A fitting plate 704 is fixedly installed on the right side of the second card seat 703, and the second card seat 703 is fixedly installed on the side of the second management board 6 close to the first management board 5. The advantage is that the second management board 6 is snap-fitted and installed through the fitting plate 704 on the second card seat 703 and the limiting cavity 702 on the first card seat 701, thereby facilitating the quick combination of the second management board 6 and facilitating extended use.
[0035] Specifically, the storage component 8 includes a card board 801, a card slot 802 and a second magnetic seat 803. The card board 801 has an L-shaped structure, and the card boards 801 are grouped in twos. Card slots 802 are provided on the opposite sides of the card boards 801, and a second magnetic seat 803 is provided on the front side of the card board 801. The advantage is that the progress paper is clamped between the card boards 801 through the card slots 802, and then the magnet is removed from the second magnetic seat 803 and pasted to the first magnetic seat 603, which is beneficial to fixing the paper. Moreover, by classifying and placing the paper through multiple groups of storage components 8, it is convenient to quickly check the project progress.
[0036] In use, the connector 401 at the bottom end of the connecting column 4 is engaged with the connecting seat 303, facilitating assembly and connection. Meanwhile, during the connection process, the limiting groove 402 on the outer side of the connector 401 is engaged with the limiting post 304, which is beneficial for convenient positioning and engagement and improves the connection stability. Subsequently, when in use, the connecting column 4 can be rotated. At this time, it rotates through the connecting shaft 301, facilitating the rotation of the first management board 5 and the second management board 6 for convenient viewing. Then, under the action of the torsion spring 302, it is beneficial to drive the connecting seat 303 to return to its original position. At the same time, under the action of multiple arc-shaped chutes 201 and balls 202, when the connecting seat 303 rotates, its stability is improved, avoiding jamming during the rotation process. Then, when it is necessary to expand the management board, the second management board 6 is engaged and installed with the limiting cavity 702 on the first card seat 701 through the fitting plate 704 on the second card seat 703, facilitating the quick combination of the second management board 6 and thus convenient for expansion and use. Then, during the use process, the progress paper is engaged between the card plates 801 through the card slot 802. Subsequently, the magnet is removed from the second magnetic seat 803 and pasted onto the first magnetic seat 603, which is beneficial for fixing the paper. And the paper is classified and placed through multiple storage components 8, which is beneficial for quickly viewing the project progress. Under the action of the second magnetic seat 803, it is beneficial to adhere the unused magnets to avoid loss. And under the action of the first magnetic seat 603, it is beneficial to cooperate with the magnet to fix the paper, avoiding sliding or falling. Then, under the action of the pen slot 601, it is beneficial to prevent the pen from being lost or dropped.
[0037] Although the embodiments of the present invention have been shown and described, for those of ordinary skill in the art, it can be understood that various changes, modifications, substitutions, and variations can be made to these embodiments without departing from the principles and spirit of the present invention. The scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. On-site construction progress management component for project cost, including a base (1), characterized in that: A fixing rod (2) is fixedly installed on the top side of the base (1). A connecting component (3) is arranged on the top side of the fixing rod (2). The upper end of the connecting component (3) is snap-fitted with a connecting column (4). The top end of the connecting column (4) is fixedly installed with a first management board (5). The left and right ends of the first management board (5) are snap-fitted with second management boards (6). A snap-fitting component (7) is arranged between the first management board (5) and the second management board (6). Storage components (8) are respectively arranged on the front side and the rear side of the first management board (5) and the second management board (6).
2. The construction cost on-site construction progress management component according to claim 1, wherein: An arc-shaped sliding groove (201) is opened on the top side of the fixing rod (2). A ball (202) is movably installed inside the arc-shaped sliding groove (201). A plurality of groups of the arc-shaped sliding groove (201) and the ball (202) are arranged, and are respectively arranged in a ring at equal intervals on the top side of the fixing rod (2).
3. The on-site construction progress management component for project cost according to claim 1, characterized in that: The connecting component (3) includes a connecting shaft (301), a torsion spring (302), a connecting seat (303) and a limiting column (304). The connecting shaft (301) is fixedly installed on the bottom side of the connecting seat (303). The connecting shaft (301) is movably installed inside the fixing rod (2) through a bearing. A torsion spring (302) is arranged on the outer side of the connecting shaft (301). The limiting column (304) is fixedly installed inside the connecting seat (303).
4. The on-site construction progress management component for project cost according to claim 3, wherein: A connecting head (401) is fixedly installed at the bottom end of the connecting column (4). A limiting groove (402) is opened on the outer side of the connecting head (401). The size and shape of the limiting groove (402) are respectively matched with the limiting column (304). A total of four limiting grooves (402) are arranged, and are respectively arranged in a ring at equal intervals on the outer side of the connecting head (401).
5. The on-site construction progress management component for project cost according to claim 1, characterized in that: Pen grooves (601) and grooves (602) are opened on the front sides of the first management board (5) and the second management board (6). The pen grooves (601) and the grooves (602) are in a group, and are respectively opened on the front side and the rear side of the first management board (5) and the second management board (6). A first magnetic seat (603) is arranged inside the groove (602).
6. The on-site construction progress management component for project cost according to claim 1, characterized in that: The snap-fitting component (7) includes a first snap-fitting seat (701), a limiting cavity (702), a second snap-fitting seat (703) and a fitting plate (704). The limiting cavity (702) is opened inside the first snap-fitting seat (701). The size and shape of the limiting cavity (702) are matched with the fitting plate (704). The first snap-fitting seat (701) is fixedly installed on the left and right sides of the first management board (5). The fitting plate (704) is fixedly installed on the right side of the second snap-fitting seat (703). The second snap-fitting seat (703) is fixedly installed on one side of the second management board (6) close to the first management board (5).
7. The construction cost on-site construction progress management component according to claim 1, characterized in that: The storage component (8) includes a clamping plate (801), a clamping groove (802), and a second magnetic base (803). The clamping plate (801) has an L-shaped structure. The clamping plates (801) are grouped in twos. Clamping grooves (802) are formed on the opposite sides of the clamping plates (801), and a second magnetic base (803) is arranged on the front side of the clamping plates (801).