Isolation warning device for road construction

By designing an adjustable width isolation warning device, the problem that the guardrail cannot adapt to different isolation environments is solved, and the effect of reducing space occupation and cost is achieved during transportation.

CN223151786UActive Publication Date: 2025-07-25唐洋
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422390742.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-29
Publication Date
2025-07-25
Estimated Expiration
2034-09-29

AI Technical Summary

Technical Problem

The horizontal width of the existing road construction guardrail is unadjustable and cannot adapt to different isolation environments, resulting in a large space occupied during transportation and an increase in transportation costs.

Method used

An isolation warning device including the first column, the second column, the transverse pipe and the railing is designed. The flashing warning is performed by a solar warning light. The transverse pipe can be slidably adjusted, the railing can be adjusted in width, and the support stability and storage space are adjusted through different forms of the support legs.

Benefits of technology

The horizontal width of the guardrail is adjusted to adapt to different isolation environments, reduce transportation space, reduce transportation costs, and maintain protective effect.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223151786U_ABST
    Figure CN223151786U_ABST
Patent Text Reader

Abstract

The utility model discloses an isolation warning device for road construction, and belongs to the technical field of road construction protection equipment. The guardrail comprises a first stand column, a second stand column, two first transverse pipes perpendicularly fixed to the two ends of the first stand column, two second transverse pipes perpendicularly fixed to the two ends of the second stand column, a plurality of first handrails perpendicularly fixed between the two first transverse pipes and a plurality of second handrails perpendicularly fixed between the two second transverse pipes. Supporting legs are fixed to the lower ends of the first stand column and the second stand column and can be adjusted to be in a cross shape and a linear shape, a solar warning lamp is fixedly installed on a first transverse pipe at the upper end, the first handrail is arranged in front of the second handrail, and a second transverse pipe is inserted into the first transverse pipe in a sliding mode. And the transverse width of the isolation guardrail can be adjusted to adapt to different isolation environments, and the technical effects that the transportation space is reduced in the transportation process, and the transportation cost is reduced are achieved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This application relates to the technical field of road construction protection equipment, and more specifically, to an isolation warning device for road construction. Background Art

[0002] The isolation warning guardrail for road construction is an important traffic safety facility, mainly used to protect the safety of construction workers and drivers during road construction, and at the same time ensure the smooth progress of the construction process. By clearly separating the construction area from the normal driving area, it prevents vehicles and pedestrians from straying into the construction area, thus protecting the safety of construction workers.

[0003] The road isolation environment is complex and changeable, and different sections may require guardrails of different widths to achieve the best protection effect. However, guardrails with non-adjustable lateral widths cannot be adjusted according to specific needs, may not be able to fully adapt to all isolation environments, and at the same time, due to the fixed lateral width of the guardrails and the inability to be adjusted according to needs, a large amount of space on the engineering vehicle will be occupied during transportation. This not only limits the engineering vehicle's ability to transport other construction materials simultaneously but also may increase transportation costs.

[0004] In view of this, we propose an isolation warning device for road construction. Utility Model Content

[0005] 1. Technical Problems to be Solved

[0006] The purpose of this application is to provide an isolation warning device for road construction, which solves the technical problems in the above background art, and realizes the technical effect of adjusting the lateral width of the isolation guardrail while ensuring the protection and isolation effect, so as to be applicable to different isolation environments, and reducing the transportation space and transportation costs during transportation.

[0007] 2. Technical Solutions

[0008] The technical solution of this application provides an isolation warning device for road construction, including: a guardrail, the guardrail includes a first upright post, a second upright post, two first horizontal pipes vertically fixed at both ends of the first upright post, two second horizontal pipes vertically fixed at both ends of the second upright post, multiple first railings vertically fixed between the two first horizontal pipes, and multiple second railings vertically fixed between the two second horizontal pipes. Support legs are fixed at the lower ends of the first upright post and the second upright post, and the support legs can be adjusted into a "cross" shape and a "one" shape. A solar warning light is fixedly installed on the upper first horizontal pipe. The first railings are placed in front of the second railings, and the second horizontal pipes are slidably inserted into the first horizontal pipes.

[0009] As an alternative solution to the technical solution of this application document, strip-shaped holes are provided on both opposite sides of the first horizontal pipe. One end of the strip-shaped hole away from the first upright post is an open structure. The strip-shaped hole is placed behind the first railing. The second railing slides along the strip-shaped hole. A plurality of first screws are threadedly connected to the first railing on the side away from the first upright post. Positioning holes corresponding to and adapted to the first screws are provided on both of the outer two second railings.

[0010] As an alternative solution to the technical solution of this application document, a second screw is threadedly connected to one side of the first railing. An indicating arrow board is installed on the second screw. The indicating arrow board is provided with a mounting hole. A reflective sticker is pasted on the surface of the indicating arrow board.

[0011] As an alternative solution to the technical solution of this application document, the support leg includes a U-shaped leg, a shaft rod fixed at the center of the lower end of the U-shaped leg, and a support plate rotatably provided at the lower end of the shaft rod. A stepped hole is provided at the center of the support plate. Two limiting rings are fixed at the lower end of the shaft rod. The limiting rings are placed on the upper and lower sides of the support plate. The length of the support plate is less than the opening distance of the U-shaped leg.

[0012] As an alternative solution to the technical solution of this application document, a plurality of mounting sleeves are fixed to the first upright post, and a plurality of L-shaped rods adapted to the mounting sleeves are fixed to the second upright post.

[0013] As an alternative solution to the technical solution of this application document, L-shaped support frames are fixed to the first railings on both sides of the second screw. The indicating arrow board is placed on the support frames.

[0014] 3. Beneficial effects

[0015] One or more technical solutions provided in the embodiments of this application have at least the following technical effects or advantages:

[0016] 1. In this application, the isolation area is flashed and warned by the solar warning light. The second horizontal pipe is slidably inserted along the first horizontal pipe to adjust the horizontal width of the guardrail. With the cooperation of multiple first railings and second railings, the isolation and protection effect of the guardrail is ensured. Moreover, the second railing is placed behind the first railing. Therefore, when storing, the first railing does not affect the sliding of the second railing. At the same time, when the support leg is in a "cross" shape, the support range of the support leg is increased to improve the support stability. When the bottom support area of the support leg is in a "one" shape, the space occupied by the support leg is reduced to facilitate the overall storage. It realizes the adjustment of the horizontal width of the isolation guardrail while ensuring the protection and isolation effect, so as to adapt to different isolation environments, and reduces the transportation space and transportation cost during the transportation process. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 Schematic diagram of the overall support state structure of an isolation warning device for road construction disclosed in a preferred embodiment of the present application;

[0018] Figure 2 Schematic diagram of the overall storage state structure of an isolation warning device for road construction disclosed in a preferred embodiment of the present application;

[0019] Figure 3 Schematic diagram of the first upright post and the first railing of an isolation warning device for road construction disclosed in a preferred embodiment of the present application;

[0020] Figure 4 For an isolation warning device for road construction disclosed in a preferred embodiment of the present application Figure 3 Enlarged schematic diagram at position A;

[0021] Figure 5 Schematic diagram of the second upright post and the second railing of an isolation warning device for road construction disclosed in a preferred embodiment of the present application;

[0022] Figure 6 For an isolation warning device for road construction disclosed in a preferred embodiment of the present application Figure 5 Enlarged schematic diagram at position B;

[0023] Figure 7 Schematic diagram of the indicating arrow board of an isolation warning device for road construction disclosed in a preferred embodiment of the present application;

[0024] Figure 8 Schematic diagram of the support plate of an isolation warning device for road construction disclosed in a preferred embodiment of the present application;

[0025] Explanation of the reference numerals in the figure: 100, guardrail; 1, first upright post; 11, installation sleeve; 2, second upright post; 21, L-shaped rod; 3, first horizontal pipe; 31, strip-shaped hole; 4, second horizontal pipe; 5, first railing; 51, first screw; 52, second screw; 53, support frame; 6, second railing; 61, positioning hole; 7, support leg; 71, U-shaped leg; 72, shaft rod; 721, limit ring; 73, support plate; 731, stepped hole; 8, indicating arrow board; 81, reflective sticker; 82, installation hole; 200, solar warning light. Detailed implementation manners

[0026] The present application will be further described in detail below with reference to the accompanying drawings of the specification.

[0027] A road construction isolation warning device, comprising: a guardrail 100, the guardrail 100 includes a first upright post 1, a second upright post 2, two first horizontal pipes 3 vertically fixed at both ends of the first upright post 1, two second horizontal pipes 4 vertically fixed at both ends of the second upright post 2, multiple first railings 5 vertically fixed between the two first horizontal pipes 3 and multiple second railings 6 vertically fixed between the two second horizontal pipes 4. Support legs 7 are fixed at the lower ends of the first upright post 1 and the second upright post 2. The support legs 7 can be adjusted into a "cross" shape and a "one" shape. A solar warning light 200 is fixedly installed on the upper first horizontal pipe 3. The first railing 5 is placed in front of the second railing 6, and the second horizontal pipe 4 is slidably inserted into the first horizontal pipe 3.

[0028] Refer to Figures 1 - 8 , the solar warning light 200 is used to flash and warn the isolation area, and the second horizontal pipe 4 slides and inserts along the first horizontal pipe 3 to adjust the lateral width of the guardrail 100. With the cooperation of multiple first railings 5 and second railings 6, the isolation and protection effect of the guardrail 100 is ensured. And the second railing 6 is placed behind the first railing 5. Therefore, when storing, the first railing 5 does not affect the sliding of the second railing 6. At the same time, when the support legs 7 are in the "cross" shape, the support range of the support legs 7 is increased to improve the support stability. When the bottom support area of the support legs 7 is in the "one" shape, the space occupied by the support legs 7 is reduced to facilitate the overall storage.

[0029] Strip-shaped holes 31 are opened on opposite sides of the first horizontal pipe 3. One end of the strip-shaped hole 31 away from the first upright post 1 is an open structure. The strip-shaped hole 31 is placed behind the first railing 5. The second railing 6 slides along the strip-shaped hole 31. Multiple first screws 51 are threadedly connected to the first railing 5 on the side away from the first upright post 1. Positioning holes 61 corresponding to and adapted to the first screws 51 are opened on both outer second railings 6.

[0030] Refer to Figures 1 - 5 , the second horizontal pipe 4 is slidably inserted into the first horizontal pipe 3, and the second railing 6 corresponds to the strip-shaped hole 31. The first railing 5 is placed at one side edge of the strip-shaped hole 31. Therefore, when the second horizontal pipe 4 slides and adjusts in the first horizontal pipe 3, at this time the second railing 6 slides in the strip-shaped hole 31. And when the first screw 51 is inserted into the positioning hole 61 on the second railing 6 on the side away from the second upright post 2, the guardrail 100 with an increased lateral width can be fixed at this time (refer to Figure 1 ). When in the storage state, the first screw 51 is inserted into the positioning hole 61 on the second railing 6 on the side close to the second upright post 2, and the fixing of the guardrail 100 after storage can be completed at this time (refer to Figure 2 ).

[0031] On one side, a second screw rod 52 is threadedly connected to the first railing 5. An indicating arrow board 8 is installed on the second screw rod 52. The indicating arrow board 8 is provided with a mounting hole 82, and a reflective sticker 81 is pasted on the surface of the indicating arrow board 8.

[0032] Refer to Figure 2 and Figure 4 and Figure 7 , after the second screw rod 52 passes through the mounting hole 82, it is threadedly connected to the first railing 5. By flipping the indicating arrow board 8, the indicating direction of the arrow can be changed, so as to adjust the guiding direction according to the usage situation. After the adjustment is completed, by rotating the second screw rod 52 clockwise, under the action of extrusion and / or friction, the indicating arrow board 8 is fixed on the first railing 5.

[0033] The support leg 7 includes a U-shaped leg 71, a shaft rod 72 fixed at the center of the lower end of the U-shaped leg 71, and a support plate 73 rotatably arranged at the lower end of the shaft rod 72. A stepped hole 731 is provided at the center of the support plate 73. Two limiting rings 721 are fixed at the lower end of the shaft rod 72, and the limiting rings 721 are placed on the upper and lower sides of the support plate 73. The length of the support plate 73 is less than the opening distance of the U-shaped leg 71.

[0034] Refer to Figure 1 , Figure 2 , Figure 6 and Figure 8 , the shaft rod 72 passes through the stepped hole 731, and the limiting ring 721 is larger than the outer diameter of the stepped hole 731 to realize the rotational connection between the support plate 73 and the shaft rod 72 and prevent it from falling off the shaft rod 72. At the same time, the lower surface of the support plate 73 is coplanar with the lower end of the U-shaped leg 71. The support plate 73 rotates within the bottom opening of the U-shaped leg 71 and is parallel to the first cross tube 3. At this time, a cross state is formed between the U-shaped leg 71 and the support plate 73. When the support plate 73 is perpendicular to the first cross tube 3, the support plate 73 is received inside the opening of the U-shaped leg 71 to complete the storage.

[0035] A plurality of mounting sleeves 11 are fixed on the first column 1, and a plurality of L-shaped rods 21 matching the mounting sleeves 11 are fixed on the second column 2.

[0036] Refer to Figure 2 , insert the L-shaped rod 21 between adjacent two groups of guardrails 100 into the mounting sleeve 11 to facilitate the connection of adjacent two groups of guardrails 100.

[0037] L-shaped support frames 53 are fixed on the first railing 5 on both sides of the second screw rod 52, and the indicating arrow board 8 is placed on the support frames 53.

[0038] Refer to Figure 2 and Figure 4, after the indicating arrow board 8 is turned over, the indicating arrow board 8 can be placed on the support frame 53 on the corresponding side to improve the support stability of the indicating arrow board 8 and prevent the indicating arrow board 8 from deflecting due to the loosening of the second screw 52.

[0039] Working principle: When it is necessary to adjust the lateral width of the guardrail 100 to be lengthened, loosen the first screw 51, the first screw 51 disengages from the positioning hole 61, then separate and adjust the first upright post 1 and the second upright post 2, and make the first railing 5 and the second railing 6 away from the upright post coincide. At the same time, rotate the first screw 51 clockwise so that the first screw 51 is screwed into the positioning hole 61 on the second railing 6 on the side away from the second upright post 2 to complete the overall fixation of the guardrail 100. And by rotating the support plate 73, make the support plate 73 perpendicular to the first horizontal pipe 3. At this time, the U-shaped legs 71 and the support plate 73 are in a cross state to increase the overall bottom support area. Then, according to the direction of vehicle and / or pedestrian travel, turn over and adjust the indicating arrow board 8 and place it on the support frame 53 on the corresponding side so that the indicating arrow board 8 points to the direction of vehicle and / or pedestrian travel. Finally, rotate the second screw 52 clockwise, and complete the fixation of the indicating arrow board 8 by the extrusion of the second screw 52. Under the action of the solar warning light 200, the isolated and protected area is flashed and warned.

Claims

1. An isolation warning device for road construction, characterized in that: Including: A guardrail (100), the guardrail (100) includes a first upright post (1), a second upright post (2), two first horizontal pipes (3) vertically fixed at both ends of the first upright post (1), two second horizontal pipes (4) vertically fixed at both ends of the second upright post (2), multiple first railings (5) vertically fixed between the two first horizontal pipes (3), and multiple second railings (6) vertically fixed between the two second horizontal pipes (4). Support legs (7) are fixed at the lower ends of the first upright post (1) and the second upright post (2). The support legs (7) can be adjusted into a "cross" shape and a "one" shape. A solar warning light (200) is fixedly installed on the upper end of the first horizontal pipe (3). The first railing (5) is placed in front of the second railing (6). The second horizontal pipe (4) is slidably inserted into the first horizontal pipe (3).

2. The isolation warning device for road construction according to claim 1, characterized in that: Strip-shaped holes (31) are formed on opposite sides of the first horizontal pipe (3). One end of the strip-shaped hole (31) far from the first upright post (1) is an open structure. The strip-shaped hole (31) is placed behind the first railing (5). The second railing (6) slides along the strip-shaped hole (31). A plurality of first screw rods (51) are threadedly connected to the first railing (5) on the side far from the first upright post (1). Positioning holes (61) corresponding to and adapted to the first screw rods (51) are formed on both of the outer two second railings (6).

3. The isolation warning device for road construction according to claim 1, characterized in that: A second screw rod (52) is threadedly connected to one side of the first railing (5). An indicating arrow board (8) is installed on the second screw rod (52). The indicating arrow board (8) is provided with a mounting hole (82). A reflective sticker (81) is pasted on the surface of the indicating arrow board (8).

4. A road construction isolation warning device according to claim 1, characterized in that: The support leg (7) includes a U-shaped leg (71), a shaft rod (72) fixed at the center of the lower end of the U-shaped leg (71), and a support plate (73) rotatably arranged at the lower end of the shaft rod (72). A stepped hole (731) is formed at the center of the support plate (73). Two limiting rings (721) are fixed at the lower end of the shaft rod (72). The limiting rings (721) are placed on the upper and lower sides of the support plate (73). The length of the support plate (73) is less than the opening spacing of the U-shaped leg (71).

5. The isolation warning device for road construction according to claim 1, characterized in that: A plurality of mounting sleeves (11) are fixed to the first upright post (1). A plurality of L-shaped rods (21) cooperating with the mounting sleeves (11) are fixed to the second upright post (2).

6. The isolation warning device for road construction according to claim 3, characterized in that: L-shaped support frames (53) are fixed to the first railings (5) on both sides of the second screw rod (52). The indicating arrow board (8) is placed on the support frames (53).