Early warning device for edge protection in building construction

By designing mechanical structures of support columns, guardrails and early warning components in construction, a sound warning to overturning personnel is achieved, the problem of insufficient warning of existing guardrails is solved, and the safety of the construction site is improved.

CN223164347UActive Publication Date: 2025-07-29SHANDONG JUSHENG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422291448.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-20
Publication Date
2025-07-29
Estimated Expiration
2034-09-20

AI Technical Summary

Technical Problem

The warning effect of guardrails on overpassers during existing construction is not obvious, and early warning equipment such as infrared rays and alarms is expensive and unstable in bad weather.

Method used

Design an early warning device including support columns, guardrails, mounting seats and early warning components. Through a mechanical structure of skateboards, racks, gears and ringing bells, a sound warning is issued when a person climbs over the guardrail, and a reflective warning sticker is combined to improve visibility.

Benefits of technology

It provides real-time early warning, effectively improving the safety protection level in the border area and reducing the probability of safety accidents.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223164347U_ABST
    Figure CN223164347U_ABST
Patent Text Reader

Abstract

The utility model discloses an early warning device for edge protection in building construction, which comprises two adjacent support columns and a guardrail mounted between the support columns, and two mounting seats are fixedly connected to one side, close to the guardrail, of each support column. The side, close to the supporting column, of the guardrail is fixedly connected with two connecting plates which are connected with the mounting bases in a matched mode and are each of an L-shaped structure, and early warning assemblies are arranged in the two mounting bases located on the upper portion. The early warning assembly comprises a sliding plate slidably connected to the interior of the mounting base, two springs symmetrically and fixedly connected to the bottom of the sliding plate, and two supporting plates fixedly connected to the interior of the mounting base and located at the bottoms of the springs. By means of the structure, the early warning assembly can send out early warning information to remind a climb-over person to go to a dangerous area, meanwhile, related personnel can be reminded to pay attention and take corresponding safety measures, real-time early warning is provided, the safety protection level of a limb area is effectively improved, and the occurrence probability of safety accidents is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to an early warning device for edge protection during building construction. Background Art

[0002] With the development of the construction industry and technological advancements, national and industry requirements for construction safety are becoming increasingly stringent, and relevant regulations and standards are constantly being improved. Construction site protective measures, such as edge protection, scaffolding safety, and personal protective equipment, have become essential requirements for ensuring worker safety.

[0003] The guardrails currently used in construction are primarily designed to provide physical barriers, but their warning effect on people attempting to climb over is not significant, and they are unable to provide effective warnings and barriers for some people attempting to climb over. Furthermore, in order to achieve this warning effect, some guardrails typically use infrared rays and alarms as early warning methods. However, the manufacturing and installation costs of these devices are high. Furthermore, the use of infrared devices in severe weather or complex environments also presents certain challenges. Therefore, the present invention provides an early warning device for edge protection in construction to address the problems raised in the above-mentioned background technology. Utility Model Content

[0004] The purpose of the utility model is to provide an early warning device for edge protection during construction. The early warning component can send out early warning information to remind people who are climbing over to enter the dangerous area. At the same time, it can also remind relevant personnel to pay attention and take corresponding safety measures, providing real-time early warning, effectively improving the safety protection level of the edge area, and reducing the probability of safety accidents.

[0005] To achieve the above-mentioned object, an early warning device for edge protection during construction is provided, comprising two adjacent support columns and a guardrail installed between the support columns, wherein the support columns are fixedly connected to two mounting seats on one side close to the guardrail, and the guardrail is fixedly connected to two connecting plates that cooperate with the mounting seats and are both L-shaped structures on one side close to the support columns, wherein the two upper mounting seats are each provided with an early warning component;

[0006] The warning component includes a sliding plate slidably connected inside the mounting base, two symmetrically fixed springs at the bottom of the sliding plate, two support plates fixed inside the mounting base and located at the bottom of the springs, a rack fixed to the bottom of the sliding plate, two fixing plates fixed to the top of the corresponding support plates, a rotating shaft rotatably connected inside one of the fixing plates, a gear fixed to the outside of the rotating shaft and meshed with the rack, a plurality of uniformly fixed knocking rods at one end of the rotating shaft, and a knocking bell installed on one side of the fixing plate close to the knocking rods. The bottoms of the springs are fixedly connected to the adjacent support plates, the other end of the rotating shaft is fixedly connected to the corresponding fixing plate, the knocking rods can contact the outside of the knocking bell through the rotation of the rotating shaft, and the bottom of the connecting plate contacts the top of the sliding plate.

[0007] According to the warning device for edge protection during building construction described above, a positioning component for positioning the connecting plate is provided on the top of the mounting base. The positioning component includes a U-shaped positioning plate, two symmetrically arranged guide grooves on the outside of the mounting base, two sliders slidably connected inside the corresponding guide grooves, and a bolt screwed inside the positioning plate and located above the connecting plate. Both ends of the positioning plate are fixedly connected to the adjacent sliders.

[0008] According to the warning device for edge protection during building construction described above, a chute is provided on one side of the mounting base close to the guardrail, and the connecting plates are slidably matched with the adjacent chutes.

[0009] According to the warning device for edge protection during building construction described above, a reflective warning sticker is provided on one side of the guardrail close to the bottom.

[0010] According to the warning device for edge protection during building construction described above, the warning component further includes two limiting rods slidably connected inside the corresponding support plates. The limiting rods are inserted inside the corresponding springs, and the bottoms of the limiting rods are fixedly connected to the limiting plates in contact with the bottoms of the support plates. The tops of the limiting rods are fixedly connected to the sliding plate.

[0011] According to the warning device for edge protection during building construction described above, a bottom plate is fixedly connected to the bottom of each support column, and a plurality of through holes are provided inside the bottom plate.

[0012] According to the warning device for edge protection during building construction described above, the mounting bases are all of a structure with upper and lower openings.

[0013] The utility model has the following beneficial effects:

[0014] Compared with the prior art, for the early warning device for edge protection in building construction, when a person attempts to climb over the guardrail and enter the construction area, the person exerts pressure on the guardrail, causing it to move downward. Through the provided early warning component, early warning information can be sent to remind the person climbing over that they are entering a dangerous area. At the same time, it can also remind relevant personnel to pay attention and take corresponding safety measures, providing real-time early warning and effectively improving the safety protection level of the edge area to reduce the probability of safety accidents.

[0015] Additional aspects and advantages of the present utility model will be given in part in the following description, become apparent in part from the following description, or be understood through the practice of the present utility model. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The present utility model will be further described below in conjunction with the drawings and embodiments;

[0017] Figure 1 is the first overall structural schematic diagram of the early warning device for edge protection in building construction of the present utility model;

[0018] Figure 2 is the second overall structural schematic diagram of the early warning device for edge protection in building construction of the present utility model;

[0019] Figure 3 is for the Figure 1 cross-sectional structural schematic diagram at A of the early warning device for edge protection in building construction of the present utility model;

[0020] Figure 4 is for the Figure 1 magnified structural schematic diagram at A of the early warning device for edge protection in building construction of the present utility model.

[0021] LEGEND DESCRIPTION:

[0022] 1. Support column; 2. Guardrail; 3. Mounting seat; 4. Connecting plate; 5. Slide plate; 6. Spring; 7. Rack; 8. Fixed plate; 9. Rotating shaft; 10. Gear; 11. Knocking rod; 12. Knocking bell; 13. Limiting rod; 14. Support plate; 15. Guide groove; 16. Slide block; 17. Positioning plate; 18. Bolt; 19. Chute; 20. Reflective warning sticker. DETAILED DESCRIPTION OF THE EMBODIMENTS

[0023] This part will describe in detail the specific embodiments of the present utility model. The preferred embodiments of the present utility model are shown in the drawings. The role of the drawings is to supplement the description in the text part of the specification, enabling people to intuitively and vividly understand each technical feature and the overall technical solution of the present utility model, but it cannot be understood as a limitation on the protection scope of the present utility model.

[0024] Refer to Figures 1-4, in an embodiment of the utility model, an early warning device for edge protection in building construction includes two adjacent support columns 1 and a guardrail 2 installed between the support columns 1. On one side of each support column 1 close to the guardrail 2, two mounting seats 3 are fixedly connected. The mounting seats 3 are all of a structure with upper and lower openings, and the bottom of the mounting seat 3 is of an open structure to avoid the closed structure of the mounting seat 3 affecting the emission of the bell sound. On one side of the guardrail 2 close to the support column 1, two connecting plates 4 which are L-shaped structures and are cooperatively connected with the mounting seats 3 are fixedly connected. On one side of each mounting seat 3 close to the guardrail 2, a chute 19 is opened. The connecting plates 4 are all cooperatively slid with the adjacent chutes 19 to ensure the smooth movement operation of the guardrail 2. Among them, early warning components are arranged inside two of the upper mounting seats 3;

[0025] The early warning component includes a sliding plate 5 slidably connected inside the mounting seat 3, two springs 6 symmetrically and fixedly connected to the bottom of the sliding plate 5, two support plates 14 fixedly connected inside the mounting seat 3 and located at the bottom of the springs 6, a rack 7 fixedly connected to the bottom of the sliding plate 5, two fixing plates 8 fixedly connected to the top of the corresponding support plates 14, a rotating shaft 9 rotatably connected inside one of the fixing plates 8, a gear 10 fixedly connected to the outside of the rotating shaft 9 and meshed with the rack 7, a plurality of knocking rods 11 uniformly fixedly connected to one end of the rotating shaft 9, and a knocking bell 12 installed on one side of the fixing plate 8 close to the knocking rod 11. The bottoms of the springs 6 are all fixedly connected to the adjacent support plates 14. The other end of the rotating shaft 9 is fixedly connected to the corresponding fixing plate 8. The knocking rod 11 can contact the outside of the knocking bell 12 through the rotation of the rotating shaft 9. The bottom of the connecting plate 4 contacts the top of the sliding plate 5.

[0026] The guardrail 2 surrounds the construction area to protect and enclose the construction area. When a person wants to climb over the guardrail 2 and enter the construction area, the person exerts pressure on the guardrail 2 to make it move downward. The downward-moving guardrail 2 simultaneously pushes the sliding plate 5 downward through the connecting plate 4. The downward-moving sliding plate 5 can thus realize the rotation of the rotating shaft 9 through the cooperation of the rack 7 and the gear 10. The rotation of the rotating shaft 9 drives the knocking rod 11 at the end to strike the knocking bell 12 to make a sound, sending out an early warning message to remind the climbing person of the dangerous area. At the same time, it can also remind relevant personnel to pay attention and take corresponding safety measures, providing real-time early warning and effectively improving the safety protection level of the edge area to reduce the probability of safety accidents.

[0027] The early warning component further includes two limiting rods 13 slidably connected inside the corresponding support plates 14. The limiting rods 13 are all inserted inside the corresponding springs 6, and the bottoms of the limiting rods 13 are all fixedly connected to a limiting plate in contact with the bottom of the support plate 14. The tops of the limiting rods 13 are all fixedly connected to the sliding plate 5. When the sliding plate 5 moves upward and is reset under the action of the spring 6, the limiting rods 13 and the limiting plate at their bottoms can limit the sliding plate 5.

[0028] A positioning component for positioning the connecting plate 4 is provided at the top of each mounting base 3. The positioning component includes a positioning plate 17 with a U-shaped structure, two guide grooves 15 symmetrically opened on the outer side of the mounting base 3, two sliders 16 slidably connected to the inside of the corresponding guide grooves 15, and a bolt 18 threadedly connected to the inside of the positioning plate 17 and located above the connecting plate 4. Both ends of the positioning plate 17 are fixedly connected to the adjacent sliders 16.

[0029] After the connecting plate 4 is inserted into the mounting base 3, move the positioning plate 17 above the connecting plate 4, and tighten the bolt 18 so that its bottom contacts the top of the connecting plate 4 to position the connecting plate 4, which is beneficial to ensuring the stability of the installation of the guardrail 2. Moreover, the movable connection method facilitates the disassembly and assembly work between the guardrail 2 and the support column 1, making it convenient to use.

[0030] A bottom plate is fixedly connected to the bottom of each support column 1. The larger support area of the bottom plate can support the support column 1 more stably. A plurality of through holes are opened in the bottom plate, which is convenient for fixing the support column 1 to the installation surface. A reflective warning sticker 20 is provided on one side of the guardrail 2 near the bottom to enhance visibility at night or in low-light environments.

[0031] Working principle: The guardrail 2 surrounds the construction area, and can protect and enclose the construction area. When a person attempts to climb over the guardrail 2 and enter the construction area, the person exerts pressure on the guardrail 2 to make it move downward. The downward-moving guardrail 2 simultaneously pushes the sliding plate 5 downward through the connecting plate 4. The downward-moving sliding plate 5 can thus drive the rotation of the rotating shaft 9 through the cooperation of the rack 7 and the gear 10. The rotation of the rotating shaft 9 drives the knocking rod 11 at the end to strike the knocking bell 12 to emit a sound, sending a warning message to remind the climbing person of the dangerous area, and at the same time, it can also remind relevant personnel to pay attention and take corresponding safety measures, providing real-time warning and effectively improving the safety protection level of the edge area to reduce the probability of safety accidents.

[0032] The embodiments of the present invention have been described in detail above with reference to the drawings. However, the present invention is not limited to the above embodiments. Within the scope of knowledge possessed by those of ordinary skill in the art in the said technical field, various changes can be made without departing from the purpose of the present invention.

Claims

1. An early warning device for edge protection in building construction, characterized in that, It includes two support columns (1) arranged adjacent to each other and a guardrail (2) installed between the support columns (1). On one side of each support column (1) close to the guardrail (2), two mounting seats (3) are fixedly connected. On one side of each guardrail (2) close to the support column (1), two connecting plates (4) which are L-shaped structures and are in cooperation connection with the mounting seats (3) are fixedly connected. Among them, warning components are arranged inside two upper mounting seats (3). The warning component includes a sliding plate (5) slidably connected inside the mounting seat (3), two springs (6) symmetrically and fixedly connected to the bottom of the sliding plate (5), two support plates (14) fixedly connected inside the mounting seat (3) and located at the bottom of the springs (6), a rack (7) fixedly connected to the bottom of the sliding plate (5), two fixing plates (8) fixedly connected to the tops of the corresponding support plates (14), a rotating shaft (9) rotatably connected inside one of the fixing plates (8), a gear (10) fixedly connected to the outside of the rotating shaft (9) and meshed with the rack (7), a plurality of knocking rods (11) evenly fixedly connected to one end of the rotating shaft (9), and a knocking bell (12) installed on one side of the fixing plate (8) close to the knocking rods (11). The bottoms of the springs (6) are fixedly connected to the adjacent support plates (14). The other end of the rotating shaft (9) is fixedly connected to the corresponding fixing plate (8). The knocking rods (11) can contact the outside of the knocking bell (12) through the rotation of the rotating shaft (9). The bottom of the connecting plate (4) contacts the top of the sliding plate (5).

2. The early warning device for edge protection in building construction according to claim 1, characterized in that, Positioning components for positioning the connecting plate (4) are arranged on the tops of the mounting seats (3). The positioning components include a positioning plate (17) with a U-shaped structure, two guide grooves (15) symmetrically opened on the outside of the mounting seat (3), two sliders (16) slidably connected inside the corresponding guide grooves (15), and a bolt (18) threadedly connected inside the positioning plate (17) and located above the connecting plate (4). Both ends of the positioning plate (17) are fixedly connected to the adjacent sliders (16).

3. The early warning device for edge protection in building construction according to claim 2, characterized in that, Chutes (19) are opened on one side of each mounting seat (3) close to the guardrail (2). The connecting plates (4) are in sliding cooperation with the adjacent chutes (19).

4. The warning device for edge protection in building construction according to claim 3, characterized in that, A reflective warning sticker (20) is arranged on one side of the guardrail (2) close to the bottom.

5. The warning device for edge protection in building construction according to claim 4, wherein The warning component further includes two limiting rods (13) slidably connected inside the corresponding support plates (14). The limiting rods (13) penetrate through the inner sides of the corresponding springs (6), and the bottoms of the limiting rods (13) are fixedly connected to limiting plates in contact with the bottoms of the support plates (14). The tops of the limiting rods (13) are fixedly connected to the sliding plate (5).

6. The early warning device for edge protection in building construction according to claim 1, wherein, Bottom plates are fixedly connected to the bottoms of the support columns (1). A plurality of through holes are opened inside the bottom plates.

7. The early warning device for edge protection in building construction according to claim 6, characterized in that, The mounting seats (3) are all of a structure with openings at the top and bottom.