Forming device for steel cylinder concrete pipe mold
By adopting the pre-fixed design of slots, blocks, protrusions and grooves in the molding device for steel cylinder concrete pipes, combined with the threaded connection of the fastening nuts and knobs, the problem of long connection time for the molding device for steel cylinder concrete pipes is solved, and quick connection and efficient construction are achieved.
Patent Information
- Application Number
- CN202422221448.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-11
- Publication Date
- 2025-08-01
- Estimated Expiration
- 2034-09-11
AI Technical Summary
The connection between the existing steel cylinder concrete pipe molding device between the first steel cylinder body and the second steel cylinder body takes a lot of time, affecting the progress of the project.
The design of card slots, card blocks, projections and grooves is adopted. The connecting ring is pre-fixed through plug-in and clamping, and combined with the threaded connection of the fastening nut and knob, to achieve quick connection.
The connection time between the first steel cylinder body and the second steel cylinder body is reduced, and construction efficiency is improved.
Smart Images

Figure CN223173258U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field related to construction sites, and particularly relates to a forming device for a steel cylinder concrete pipe mold. Background Technique
[0002] The forming device for a steel cylinder concrete pipe mold is a mold used for pouring concrete pipes. The concrete pipes can play a supporting role in construction sites. The existing forming device for a steel cylinder concrete pipe mold is composed of components such as a first steel cylinder body, a second steel cylinder body, a first connecting plate, a second connecting plate, a first connecting ring, a second connecting ring, mounting holes, connecting holes, reinforcing rings, reinforcing blocks, a first fastening nut, and a second fastening nut. When the existing forming device for a steel cylinder concrete pipe mold is used, a large amount of time is required for the connection between the first steel cylinder body and the second steel cylinder body, which will affect the project progress. Therefore, a forming device for a steel cylinder concrete pipe mold is essential. Content of the Utility Model
[0003] The purpose of the utility model is to provide a forming device for a steel cylinder concrete pipe mold to solve the problem that a large amount of time is required for the connection between the first steel cylinder body and the second steel cylinder body when the existing forming device for a steel cylinder concrete pipe mold is used, which will affect the project progress as mentioned in the above background technique.
[0004] To achieve the above purpose, the utility model provides the following technical solution: A forming device for a steel cylinder concrete pipe mold, comprising
[0005] A first steel cylinder body and a second steel cylinder body arranged at the front side of the first steel cylinder body;
[0006] First connecting rings are respectively connected to the upper and lower ends of the first steel cylinder body and the second steel cylinder body;
[0007] Reinforcing rings are arranged on the outer sides of the first steel cylinder body and the second steel cylinder body and inside the first connecting rings and the second connecting rings;
[0008] Reinforcing blocks are arranged on the outer sides of the first steel cylinder body and the second steel cylinder body and inside the reinforcing rings;
[0009] First connecting plates are connected to the left and right positions at the front of the first connecting ring, and second connecting plates are connected to the left and right positions at the rear of the second connecting ring;
[0010] A card slot is arranged at the inner side position of the first connecting plate, and grooves are arranged at the upper and lower ends of the card slot;
[0011] A clamping block is arranged at an inner position close to the inside of the second connecting plate, and protrusions are arranged at the upper and lower ends of the clamping block;
[0012] Through the arrangements of the clamping groove, the clamping block, the protrusion and the groove, the connection between the first connecting ring and the second connecting ring can be pre-fixed.
[0013] Preferably, the clamping block and the clamping groove are connected by plugging, and the groove and the protrusion are connected by clamping.
[0014] Preferably, the clamping block and the protrusion are connected by gluing, and the protrusion is made of rubber material.
[0015] Preferably, connection holes are arranged at outer positions close to the inside of the first connecting plate and the second connecting plate, and the connection holes penetrate through the first connecting plate and the second connecting plate.
[0016] Preferably, a second fastening nut is installed at the inner position of the connection hole, and a second fastening knob is installed at the outer side and at the rear position of the first connecting plate of the second fastening nut.
[0017] Preferably, the second fastening nut and the second fastening knob are connected by threads, so that the first connecting plate and the second connecting plate are connected, and further the first connecting ring and the second connecting ring are connected.
[0018] Preferably, mounting holes are arranged at the inner positions of the first connecting ring and the second connecting ring, and the mounting holes penetrate through the first connecting ring and the second connecting ring.
[0019] Preferably, a first fastening nut is installed at the inner position of the mounting hole, and a first fastening knob is installed at the outer side and at the lower position of the second connecting ring of the first fastening nut, and the first fastening nut and the first fastening knob are connected by threads.
[0020] Compared with the prior art, the present utility model provides a forming device for a steel cylinder concrete pipe mold, and has the following beneficial effects:
[0021] The utility model improves a forming device for a steel cylinder concrete pipe mold. When using the forming device for the steel cylinder concrete pipe mold, first insert the clamping block into the inside of the clamping groove. When the clamping block enters the inside of the clamping groove, the protrusions at the upper and lower ends of the clamping block will be stuck into the grooves at the upper and lower ends of the clamping groove, so that the first connecting plate and the second connecting plate are in contact, and further the connecting holes inside the first connecting plate and the second connecting plate are aligned. At this time, insert the second fastening nut into the inside of the connecting hole, and then connect the second fastening nut and the second fastening knob through threads, so that the first connecting ring and the second connecting ring are connected together, and thus the first steel cylinder body and the second steel cylinder body are connected together. Then, the concrete can be poured into the first steel cylinder body and the second steel cylinder body for pouring. Through the settings of the clamping groove, the clamping block, the protrusion and the groove, it can play a role in pre-fixing the connection of the first connecting ring and the second connecting ring, thereby reducing the connection time between the first steel cylinder body and the second steel cylinder body. Brief Description of the Drawings
[0022] Figure 1 FIG. is a schematic structural diagram of the overall forming device for the steel cylinder concrete pipe mold of the present utility model.
[0023] Figure 2 FIG. is a schematic enlarged structural diagram of the clamping groove of the forming device for the steel cylinder concrete pipe mold of the present utility model.
[0024] Figure 3 FIG. is a schematic enlarged structural diagram of the clamping block of the forming device for the steel cylinder concrete pipe mold of the present utility model.
[0025] Figure 4 FIG. is a schematic structural diagram of the practical diagram of the forming device for the steel cylinder concrete pipe mold of the present utility model.
[0026] In the figure: 1, mounting hole; 2, first connecting ring; 3, first steel cylinder body; 4, reinforcing ring; 5, first connecting plate; 6, second connecting plate; 7, second steel cylinder body; 8, reinforcing block; 9, second connecting ring; 10, connecting hole; 11, groove; 12, clamping groove; 13, clamping block; 14, protrusion; 15, first fastening nut; 16, second fastening nut. Detailed Embodiment
[0027] Next, the technical solutions in the embodiments of the present utility model will be clearly and completely described in conjunction with the drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present utility model.
[0028] The present utility model provides asFigures 1-4 The forming device for a steel cylinder concrete pipe mold shown, a forming device for a steel cylinder concrete pipe mold, includes a first steel cylinder body 3 and a second steel cylinder body 7 arranged at the front side of the first steel cylinder body 3; first connection rings 2 are respectively connected to the upper and lower ends of the first steel cylinder body 3 and the second steel cylinder body 7; a reinforcing ring 4 is arranged outside the first steel cylinder body 3 and the second steel cylinder body 7 and at the inner side of the first connection rings 2 and the second connection rings 9; reinforcing blocks 8 are arranged outside the first steel cylinder body 3 and the second steel cylinder body 7 and at the inner side of the reinforcing ring 4; first connection plates 5 are connected to the left and right sides at the front part of the first connection rings 2, and second connection plates 6 are connected to the left and right sides at the rear part of the second connection rings 9; a clamping groove 12 is arranged at the inner and relatively side position of the first connection plate 5, and grooves 11 are arranged at the upper and lower ends of the clamping groove 12; a clamping block 13 is arranged at the inner and relatively side position of the second connection plate 6, and protrusions 14 are arranged at the upper and lower ends of the clamping block 13; through the arrangements of the clamping groove 12, the clamping block 13, the protrusions 14 and the grooves 11, the connection of the first connection ring 2 and the second connection ring 9 can be pre-fixed.
[0029] As Figure 1 、 Figure 2 and Figure 3 shown, in order to pre-fix the connection of the first connection ring 2 and the second connection ring 9, when using the forming device for a steel cylinder concrete pipe mold, first insert the clamping block 13 into the inside of the clamping groove 12. When the clamping block 13 enters the inside of the clamping groove 12, the protrusions 14 at the upper and lower ends of the clamping block 13 will be stuck into the grooves 11 at the upper and lower ends of the clamping groove 12, so that the first connection plate 5 and the second connection plate 6 are in contact, and then the connection holes 10 inside the first connection plate 5 and the second connection plate 6 are aligned. At this time, insert the second fastening nut 16 into the inside of the connection hole 10, and then thread-connect the second fastening nut 16 with the second fastening knob, so that the first connection ring 2 and the second connection ring 9 are connected together, and then the first connection ring 2 and the second connection ring 9 are connected together, and further the first steel cylinder body 3 and the second steel cylinder body 7 are connected together. Then, concrete can be poured into the first steel cylinder body 3 and the second steel cylinder body 7 for pouring. Through the arrangements of the clamping groove 12, the clamping block 13, the protrusions 14 and the grooves 11, the connection of the first connection ring 2 and the second connection ring 9 can be pre-fixed, thus reducing the connection time of the first steel cylinder body 3 and the second steel cylinder body 7.
[0030] The clamping block 13 and the clamping groove 12 are connected by a plug-in method, the groove 11 and the protrusion 14 are connected by a clamping method, the clamping block 13 and the protrusion 14 are connected by an adhesive method, and the protrusion 14 is made of rubber material.
[0031] As Figure 1, Figure 2 and Figure 3 As shown in Figure 2 and Figure 3 , in order to strengthen the connection stability between the first connecting plate 5 and the second connecting plate 6, when using the forming device for steel cylinder concrete pipe molds, first insert the clamping block 13 into the inside of the clamping groove 12. First, bond the protrusions 14 to the upper and lower ends of the clamping block 13, and then insert the clamping block 13 into the inside of the clamping groove 12. When the clamping block 13 enters the inside of the clamping groove 12, the protrusions 14 at the upper and lower ends of the clamping block 13 will snap into the grooves 11 at the upper and lower ends of the clamping groove 12, so that the first connecting plate 5 and the second connecting plate 6 come into contact. Through the setting of the snap connection between the protrusions 14 and the grooves 11, the connection stability between the first connecting plate 5 and the second connecting plate 6 is strengthened.
[0032] Connecting holes 10 are provided at positions on the outer sides of the first connecting plate 5 and the second connecting plate 6. The connecting holes 10 penetrate through the first connecting plate 5 and the second connecting plate 6. A second fastening nut 16 is installed at the inner position of the connecting hole 10. A second fastening knob is installed outside the second fastening nut 16 and at the rear side position of the first connecting plate 5. The second fastening nut 16 and the second fastening knob are connected by threads, so that the first connecting plate 5 and the second connecting plate 6 are connected, and further the first connecting ring 2 and the second connecting ring 9 are connected.
[0033] As Figure 1 , Figure 2 , Figure 3 and Figure 4 As shown in Figure 1 , Figure 2 , Figure 3 and Figure 4 , in order to facilitate the connection between the first steel cylinder body 3 and the second steel cylinder body 7, when using the forming device for steel cylinder concrete pipe molds, first insert the clamping block 13 into the inside of the clamping groove 12, so that the first connecting plate 5 and the second connecting plate 6 come into contact, and further align the connecting holes 10 inside the first connecting plate 5 and the second connecting plate 6. At this time, insert the second fastening nut 16 into the inside of the connecting hole 10, and then connect the second fastening nut 16 and the second fastening knob by threads, so that the first connecting ring 2 and the second connecting ring 9 are connected together, and further the first steel cylinder body 3 and the second steel cylinder body 7 are connected together. Through the settings of the first connecting plate 5, the second connecting plate 6, the first connecting ring 2, the second connecting ring 9, the connecting hole 10, the second fastening nut and the second fastening knob, the connection between the first steel cylinder body 3 and the second steel cylinder body 7 is facilitated.
[0034] Mounting holes 1 are provided at the inner positions of the first connecting ring 2 and the second connecting ring 9. The mounting holes 1 penetrate through the first connecting ring 2 and the second connecting ring 9. A first fastening nut 15 is installed at the inner position of the mounting hole 1. A first fastening knob is installed outside the first fastening nut 15 and at the lower position of the second connecting ring 9. The first fastening nut 15 and the first fastening knob are connected by threads.
[0035] AsFigure 1 and Figure 4 As shown, for the convenience of the installation between steel cylinder molds, when using the forming device for steel cylinder concrete pipe molds, first determine the number of steel cylinder molds according to the pouring length of the concrete pipe. Then place the first steel cylinder mold on the ground, and then place the second steel cylinder mold on the upper end of the first steel cylinder mold, so that the first connection ring 2 and the second connection ring 9 at the lower end of the second steel cylinder mold are in contact with the first connection ring 2 and the second connection ring 9 at the upper end of the first steel cylinder mold, thereby aligning the installation holes 1 inside the first connection ring 2 and the second connection ring 9. Then insert the first fastening nut 15 into the inside of the installation hole 1, and then thread-connect the first fastening nut 15 with the first fastening knob, so that the second steel cylinder mold is installed on the upper end of the first steel cylinder mold. Then install other steel cylinder molds in the same way. Through the settings of the first connection ring 2, the second connection ring 9, the installation hole 1, the first fastening nut 15 and the first fastening knob, the installation between steel cylinder molds is facilitated, so that the forming device for steel cylinder concrete pipe molds can be adjusted accordingly according to the length of the concrete pipe.
[0036] Finally, it should be noted that the above are only the preferred embodiments of the present invention and are not used to limit the present invention. Although the present invention has been described in detail with reference to the foregoing embodiments, for those skilled in the art, they can still modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some of the technical features. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principle of the present invention shall be included within the protection scope of the present invention.
Claims
1. A forming device for a steel cylinder concrete pipe mold, characterized in that: including a first steel cylinder body (3) and a second steel cylinder body (7) arranged at the front side position of the first steel cylinder body (3); first connecting rings (2) and second connecting rings (9) are respectively connected to the upper and lower ends of the first steel cylinder body (3) and the second steel cylinder body (7); a reinforcing ring (4) is arranged outside the first steel cylinder body (3) and the second steel cylinder body (7) and at the inner side position of the first connecting ring (2) and the second connecting ring (9); reinforcing blocks (8) are arranged outside the first steel cylinder body (3) and the second steel cylinder body (7) and at the inner side position of the reinforcing ring (4); first connecting plates (5) are connected to the left and right sides at the front part of the first connecting ring (2), and second connecting plates (6) are connected to the left and right sides at the rear part of the second connecting ring (9); a card slot (12) is arranged at the inner side position inside the first connecting plate (5), and grooves (11) are arranged at the upper and lower ends of the card slot (12); a card block (13) is arranged at the inner side position inside the second connecting plate (6), and protrusions (14) are arranged at the upper and lower ends of the card block (13); Through the settings of the card slot (12), the card block (13), the protrusions (14) and the grooves (11), the connection between the first connecting ring (2) and the second connecting ring (9) can be pre-fixed.
2. The forming device for a steel cylinder concrete pipe mold according to claim 1, characterized in that: The card block (13) and the card slot (12) are connected by plugging, and the groove (11) and the protrusion (14) are connected by clamping.
3. The forming device for a steel cylinder concrete pipe mold according to claim 2, characterized in that: The card block (13) and the protrusion (14) are connected by gluing, and the protrusion (14) is made of rubber material.
4. A forming device for a steel cylinder concrete pipe mold according to claim 1, characterized in that: connection holes (10) are arranged at the outer side position inside the first connecting plate (5) and the second connecting plate (6), and the connection holes (10) penetrate through the first connecting plate (5) and the second connecting plate (6).
5. The forming device for a steel cylinder concrete pipe mold according to claim 4, characterized in that: a second fastening nut (16) is installed at the inner position of the connection hole (10), and a second fastening knob is installed at the rear side position of the first connecting plate (5) outside the second fastening nut (16).
6. The forming device for a steel cylinder concrete pipe mold according to claim 5, characterized in that: The second fastening nut (16) and the second fastening knob are connected by threads, so that the first connecting plate (5) and the second connecting plate (6) are connected, and further the first connecting ring (2) and the second connecting ring (9) are connected.
7. The forming device for a steel cylinder concrete pipe mold according to claim 6, characterized in that: mounting holes (1) are arranged at the inner positions of the first connecting ring (2) and the second connecting ring (9), and the mounting holes (1) penetrate through the first connecting ring (2) and the second connecting ring (9).
8. The forming device for a steel cylinder concrete pipe mold according to claim 7, characterized in that: a first fastening nut (15) is installed at the inner position of the mounting hole (1), a first fastening knob is installed at the lower side position of the second connecting ring (9) outside the first fastening nut (15), and the first fastening nut (15) and the first fastening knob are connected by threads.