Precast arch bar plugging operation platform for flood drainage well of tailing pond

By designing a prefabricated arch plate sealing operation platform for drainage wells of tailings ponds, using a surrounding operating platform and a small electric crane, the problems of low efficiency and high safety risks of traditional sealing methods are solved, efficient and safe sealing effects are achieved, and daily patrol functions are provided.

CN223190423UActive Publication Date: 2025-08-05YUNNAN HUALIAN ZINC & INDIUM
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423135138.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2025-08-05
Estimated Expiration
2034-12-18

AI Technical Summary

Technical Problem

The sealing method of traditional tailings ponds is low in efficiency and has high safety risks, and the quality of sealing is difficult to guarantee, resulting in serious seepage leakage ore slurry, affecting the safe and stable operation of the warehouse.

Method used

A prefabricated arch sealing operation platform for drainage wells of tailings ponds is designed, using a surrounding operating platform equipped with a small electric crane and a detachable guardrail. The prefabricated arch is lifted through an electric crane and a concrete smear to treat the gaps, achieving efficient sealing.

Benefits of technology

It greatly improves the efficiency of sealing, ensures the quality of sealing, reduces safety risks, and reduces labor intensity. It can also serve as a platform for daily inspections and inspections to improve safety and efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223190423U_ABST
    Figure CN223190423U_ABST
Patent Text Reader

Abstract

The utility model discloses a tailing pond flood drainage well prefabricated arch slab plugging operation platform, which belongs to the field of tailing pond flood drainage facility management research, and comprises an operation platform, a platform buoy, a small-sized electric crane, a safety protection device and the like, and the tailing pond flood drainage well prefabricated arch slab plugging platform is erected around a tailing pond flood drainage vertical shaft in a surrounding manner; the electric crane is installed on the operation table, a detachable protective fence is arranged around the operation table, and when plugging is conducted on the prefabricated arch slab of the flood drainage shaft of the tailing pond, the prefabricated arch slab is firstly transported to the position beside the flood drainage shaft prefabricated arch slab plugging platform, and the small electric crane is used for transporting the prefabricated arch slab to the flood drainage shaft to be installed; when the operation platform is used for plugging the prefabricated arch slab of the flood drainage well of the tailing pond, the working efficiency can be greatly improved, the operation safety risk is reduced, the operation labor intensity is relieved, meanwhile, the operation platform can be used as a daily patrol inspection platform of the flood drainage vertical shaft, and the practical value is good.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model discloses a prefabricated arch plate blocking operation platform for a tailings pond flood discharge shaft, which is particularly used for blocking and daily inspection operations of a tailings pond flood discharge shaft. Background Art

[0002] The drainage shaft of the tailings pond is an important drainage facility of the tailings pond. The quality of the prefabricated arch plate sealing of the drainage shaft is related to the safe and stable operation of the tailings pond. The traditional method of sealing the drainage shaft is a combination of mobile floating boats and manual sealing, which has low work efficiency. In addition, there are greater safety risks such as falling from heights, drowning, collision and squeezing during the operation, and the sealing quality cannot be guaranteed. As a result, after the prefabricated arch plate is sealed, water seepage and slurry leakage are very serious, posing a serious threat to the safe and stable operation of the tailings pond. Utility Model Content

[0003] In response to the above-mentioned problems existing in the prior art, the utility model provides a prefabricated arch plate sealing operation platform for the tailings pond drainage shaft. The prefabricated arch plate sealing platform for the tailings pond drainage shaft is erected around the tailings pond drainage shaft, an electric crane is installed on the operation platform, and a detachable guardrail is provided around the operation platform. When the prefabricated arch plate of the tailings pond drainage shaft is sealed, the prefabricated arch plate is first transported to the prefabricated arch plate sealing platform for the drainage shaft, and a small electric crane is used to transfer the prefabricated arch plate to the drainage shaft for installation. After that, the gap is treated with concrete, and the operation platform is used to seal the prefabricated arch plate of the tailings pond drainage shaft.

[0004] In order to achieve the above purpose, the utility model adopts the following technical solution: the operating platform is set up around the tailings pond drainage shaft, the platform is paved with patterned plates, the platforms are connected movably, and buoys are installed at the bottom of the platform for support.

[0005] Furthermore, the operating platform further comprises: platform buoys, which are used to support the operating platform and are evenly arranged below the operating platform;

[0006] Small electric crane is installed on the platform and fixed to the platform with bolts. It is powered by a 24V battery when lifting prefabricated arch panels.

[0007] Furthermore, the operating platform also includes a safety protection device, the height of the guardrail is 1.2 meters, and the guardrail adopts a detachable installation method.

[0008] Furthermore, the patterned plate platforms are connected to each other in a movable manner.

[0009] Beneficial effects of the utility model:

[0010] The utility model invention provides a prefabricated arch plate sealing operation platform for the tailings pond drainage shaft, which can greatly improve work efficiency, effectively ensure the sealing quality of the prefabricated plate, prevent water seepage or tailings leakage caused by water sealing, reduce operational safety risks, and alleviate operational labor intensity. At the same time, it can be used as a daily inspection and examination platform for the drainage shaft, and has good practical value. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 It is a schematic diagram of the utility model;

[0012] Figure 1 Among them, 1 is the patterned plate platform, 2 is the movable connection of each platform, 3 is the outer guardrail of the platform, 4 is the inner guardrail of the platform, 5 is the vertical shaft for flood discharge, 6 is a small electric crane, 7 is the steel tugboat for prefabricated arch panels, 8 is the prefabricated arch panels to be installed. DETAILED DESCRIPTION

[0013] In order to make the purpose, technical solutions and beneficial effects of the present invention clearer, the preferred embodiments of the present invention will be described in detail below with reference to the accompanying drawings to facilitate understanding and application.

[0014] like Figure 1 As shown, a prefabricated arch plate plugging operation platform for a tailings pond drainage shaft comprises four patterned plate platforms 1, multiple platform movable connections 2, platform outer guardrails 3, platform inner guardrails 4, a drainage shaft 5, a small electric crane 6, a prefabricated arch plate steel tugboat 7, and prefabricated arch plates 8 to be installed. The four patterned plate platforms 1 are prefabricated, and a buoyancy-compliant float is provided under the platform to support the platform for installation on the water surface of the tailings pond. The platform can be rotated around the drainage shaft to the required position and then fixed to the periphery of the drainage shaft 5; the platforms are connected by movable connections 2 to facilitate later disassembly or relocation; 1.2-meter-high safety guardrails 3 and 4 are provided inside and outside the platform to ensure safety of operations on the water surface; a small electric crane 6 is provided on the platform for transportation operations during the installation of the prefabricated arch plates. After the prefabricated arch plate steel tugboat 7 transports the prefabricated plates to the designated location, the small electric crane 6 is used to lift the prefabricated arch plates for installation operations.

[0015] The utility model discloses a prefabricated arch plate sealing operation platform for a tailings pond drainage shaft, which belongs to the research field of tailings pond drainage facilities. The platform comprises an operation platform, a platform buoy, a small electric crane, a safety protection device, etc. The prefabricated arch plate sealing platform for the tailings pond drainage shaft is built around the tailings pond drainage shaft, the electric crane is installed on the operation platform, and a detachable guardrail is arranged around the operation platform. When the prefabricated arch plate sealing of the tailings pond drainage shaft is performed, the prefabricated arch plate is first transported to the prefabricated arch plate sealing platform for the drainage shaft, and a small electric crane is used to transfer the prefabricated arch plate to the drainage shaft for installation. After that, concrete is used to plaster the gap. The operation platform is used to seal the prefabricated arch plate of the tailings pond drainage shaft, which can greatly improve work efficiency, reduce work safety risks, and alleviate work labor intensity. At the same time, it can be used as a daily inspection and examination platform for the drainage shaft, and has good practical value.

[0016] Finally, it should be noted that the above preferred embodiments are only used to illustrate the technical solutions of the present invention and are not limiting. Although the present invention has been described in detail through the above preferred embodiments, various changes can be made to it in form and details according to actual needs when it is used in this field without departing from the scope defined by the claims of the present invention.

Claims

1. A prefabricated arch plate plugging operation platform for a tailings pond flood discharge well, characterized in that: include: operating platforms, checkered plates, pontoons and small electric cranes; The operating platform is built around the tailings pond drainage shaft, and the operating platform is paved with patterned plates. The patterned plates between the operating platforms are movably connected, and buoys are evenly distributed under the operating platform to support the operating platform. The small electric crane is installed on the operating platform and fixed to the operating platform with bolts. When lifting the prefabricated arch panels, the small electric crane is powered by a 24V battery.

2. A tailings pond flood discharge well prefabricated arch plate blocking operation platform according to claim 1, characterized in that: The operating platform also includes: Safety protection device, the safety protection device includes the platform outer guardrail and the platform inner guardrail. The height of the platform outer guardrail and the platform inner guardrail is 1.2 meters and is installed in a detachable manner.