Bracket for brine extraction pump station

By designing a stable halogen pump station support, the problems of unstable and troublesome disassembly and assembly of the temporary halogen pump station support are solved, the stability and convenience of the structure are achieved, safety risks are reduced, and work efficiency is improved.

CN223190606UActive Publication Date: 2025-08-05QINGHAI SALT LAKE IND
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422260103.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-14
Publication Date
2025-08-05
Estimated Expiration
2034-09-14

AI Technical Summary

Technical Problem

The bracket structure of the existing temporary halogen pump station is unstable and prone to collapse. It is laborious to disassemble and assembly, and there are safety hazards.

Method used

A halogen-harvest pump station bracket including an operating platform and a lifting member is designed. The operating platform is horizontally arranged, with multiple vertical support legs at the bottom, the lower end of the support legs is tapered, and a lifting member is equipped for fixing the halogen-transporting pipe. The lifting member can be detachably connected for transportation and installation.

Benefits of technology

The stability and convenience of the bracket are achieved, the collapse is avoided, the risk of falling of the operator is reduced, the working efficiency is improved, and the installation and maintenance of halogen pumps and halogen transport pipelines are facilitated.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223190606U_ABST
    Figure CN223190606U_ABST
Patent Text Reader

Abstract

The utility model relates to a brine extraction pump station support which comprises an operation platform (1) and a lifting piece (2), the operation platform (1) is of a flat-plate-shaped structure and is horizontally arranged, and a plurality of supporting legs (11) used for supporting the operation platform (1) are arranged at the bottom of the operation platform (1) and used for supporting the operation platform (1). The supporting legs (11) are vertically arranged, the upper ends are fixedly connected with the operation platform (1), and the lower ends are conical. The hoisting piece (2) is fixedly arranged on the operation platform (1), is detachably connected with the operation platform (1) and is used for fixing a brine conveying pipeline. The device is convenient to disassemble, assemble and transport, is stable in structure after being installed, can avoid collapse, reduces the risk that operators fall off, and can improve the working efficiency. The problems that an existing support of a temporary brine mining pump station is unstable in structure, prone to collapse and troublesome and strenuous to disassemble and assemble are solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a brine extraction pump station bracket, in particular to the structure of the brine extraction pump station bracket. Background Art

[0002] Salt lake brine is rich in various salts, including sodium chloride, potassium chloride, magnesium chloride, and lithium chloride. As an important mineral resource, carnallite, formed by brine drying, is the primary raw material for the production of potassium, magnesium, and lithium. During brine drying, the mined brine is pumped into salt pans for evaporation, concentration, and crystallization to form carnallite. Mining begins once the carnallite ore reaches the required thickness.

[0003] When mining brine and carnallite, a brine pump is usually required when mining brine in a brine channel or discharging brine in a salt pan. Due to the large flow rate of brine extraction and the heavy weight of the brine pipe, if the weight of the brine pipe is directly applied to the brine pump, it will cause damage to the brine pump. Therefore, the brine pipe needs to be supported. At the same time, in order to facilitate the operation of the brine pump, a brine pump station is usually set up. The brine pump station includes a pontoon-type brine pump station floating on the brine and a fixed brine pump station set up on the shore. The fixed brine pump station includes some temporary brine pump stations. Temporary brine pump stations are easy to disassemble and move. The existing temporary brine pump station is fixed by multiple steel pipes to form a bracket, and an operating table is formed on the bracket. The bottom of the bracket is fixed with a ton bag, which is laborious and time-consuming to disassemble and assemble.

[0004] After prolonged use, salt will form on the outer wall of the brine pump. This salt will not only block the pump inlet, resulting in a decrease in brine extraction, but also reduce the pump's heat dissipation efficiency, leading to damage to the pump. Therefore, when salt forms on the brine pump, it needs to be cleaned with fresh water to dissolve the salt.

[0005] When cleaning the brine pump to remove salt, workers are required to operate on the operating table of the bracket. However, the structural stability of the bracket fixed by the ton bag is poor. Moreover, during the cleaning process of the brine pump, fresh water will seep into the ton bag, causing the filler (salt) therein to melt, which may cause the bracket to collapse, resulting in accidents to personnel and equipment, and affecting normal production.

[0006] The utility model aims to solve the problems of unstable support structure of existing temporary brine pumping stations, easy collapse, and time-consuming and laborious assembly and disassembly. Utility Model Content

[0007] To address the aforementioned issues, the present invention provides a brine pump station support, comprising an operating platform 1 and a lifting fixture 2. The operating platform 1 is a flat, horizontally arranged structure. A plurality of support legs 11 are provided on the bottom surface of the operating platform 1 to support the operating platform 1. The support legs 11 are vertically arranged, with their upper ends fixedly connected to the operating platform 1 and their lower ends tapered. The lifting fixture 2 is fixedly mounted on the operating platform 1 and detachably connected to the operating platform 1, and is used to secure the brine pipeline.

[0008] When the present invention is used, the operating platform 1 is placed on the embankment of the brine extraction channel or salt field where the brine extraction pump 3 is to be installed, so that one end of the operating platform 1 is located on the shore, which is convenient for personnel to get on and off the operating platform 1, and the other end is located above the brine 32, which is convenient for operating the brine extraction pump 3 and the brine delivery pipeline 31. The lower end of each supporting leg 11 is inserted into the soil to fix the brine extraction pump station bracket, and then the lifting component 2 is fixedly installed on the operating platform 1, and the brine extraction pump 3 and the brine delivery pipeline 31 can be installed. After the installation is completed, the brine delivery pipeline 31 is fixed by the lifting component 2.

[0009] The utility model is convenient for disassembly, assembly and transportation, and the structure is stable after installation, which can avoid collapse, reduce the risk of operators falling, and improve work efficiency. It solves the problems of the existing temporary brine pump station with unstable support structure, easy collapse, and laborious disassembly and assembly.

[0010] Preferably, a plurality of fixing plates 12 are provided at the lower end of the support leg 11 . The fixing plates 12 are inverted triangles and are vertically arranged on the support leg 11 . The plurality of fixing plates 12 are evenly distributed along the outer circumference of the support leg 11 .

[0011] By arranging a plurality of evenly distributed fixing plates 12 on the periphery of the lower end of the support leg 11, the contact area and friction between the support leg 11 and the soil are increased, thereby improving the grip of the support leg 11, improving the firmness of the brine pump station support, and preventing the brine pump station support from being unstable and collapsing.

[0012] Preferably, the lifting component 2 includes a lifting rod 21 and a support rod 22. The upper end of the support leg 11 extends above the operating platform 1. The lifting rod 21 is horizontally arranged, and a lifting ring 23 is provided on the lifting rod 21. The support rod 22 is vertically arranged, the upper end is fixedly connected to the lifting rod 21, and the lower end is detachably connected to the support leg 11.

[0013] By providing a lifting ring 23 on the lifting rod 21, the brine pipeline 31 can be fixed to prevent the weight of the brine pipeline 31 from being directly applied to the brine pump 3, causing damage to the brine pump 3, and at the same time facilitate the operation of the brine pump 3. The lower end of the support rod 22 is detachably connected to the support leg 11, which can facilitate the disassembly and assembly of the lifting member 2 and the support leg 11, and facilitate transportation.

[0014] Preferably, the support rod 22 is connected to the support leg 11 by a flange 24. By setting the support rod 22 and the support leg 11 to be connected by the flange 24, the lifting member 2 and the support leg 11 can be easily disassembled and transported while ensuring the firmness of the installation.

[0015] Preferably, the lifting member 2 includes two support rods 22. The lifting member 2 includes two support rods 22, which can improve the firmness of the lifting rod 21 and maintain stability when lifting the brine pump 3 and the brine pipeline 31.

[0016] Preferably, an electric hoist 25 is provided on the lifting ring 23. By arranging the electric hoist 25 on the lifting ring 23, the brine pump 3 and the brine delivery pipeline 31 can be lifted, which is convenient for repairing the brine pump 3 and cleaning salt.

[0017] Preferably, a reinforcing rod 13 is provided on the support leg 11, and both ends of the reinforcing rod 13 are respectively fixedly connected to the support leg 11 and the operating platform 1. By providing the reinforcing rod 13 on the support leg 11, the strength of the brine pump station support can be improved to prevent the brine pump station support from being unstable and collapsing.

[0018] Preferably, an anti-skid pad 14 is provided on the top surface of the operating platform 1. By arranging the anti-skid pad 14 on the operating platform 1, it is possible to prevent workers from slipping and falling during operation. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 .Schematic diagram of the overall structure of the brine pump station support;

[0020] Figure 2 .Side view of the structure of the brine pump station support;

[0021] Figure 3 .Schematic diagram of the overhead structure of the brine pump station support;

[0022] Figure 4 . Figure 1 A in the middle is an enlarged schematic diagram;

[0023] Figure 5 . Figure 1 The enlarged schematic diagram of point B in the middle;

[0024] Figure 6 .Diagram of usage status.

[0025] In the figure, 1. operating platform, 11. supporting legs, 12. fixing plate, 13. reinforcing rod, 14. anti-slip pad, 2. lifting parts, 21. lifting rod, 22. supporting rod, 23. lifting ring, 24. flange, 25. electric hoist, 3. brine pump, 31. brine pipeline, 32. brine, 33. salt field dam. DETAILED DESCRIPTION

[0026] The preferred embodiments of the present invention are described in detail below with reference to the accompanying drawings.

[0027] like Figure 1 、 Figure 2 and Figure 3 As shown, the brine pump station bracket includes an operating platform 1 and a lifting component 2. The operating platform 1 is a rectangular flat plate, which is arranged horizontally. An anti-slip pad 14 is arranged on the top surface of the operating platform 1, and a plurality of supporting legs 11 are arranged on the bottom of the operating platform 1.

[0028] By providing the anti-slip mat 14 on the operating platform 1 , workers can be prevented from being injured due to slipping and falling when working on the operating platform 1 .

[0029] The support leg 11 is a cylindrical steel pipe, which is arranged vertically. The position near the upper end of the support leg 11 is fixedly connected to the operating platform 1, and the upper end extends above the operating platform 1.

[0030] The lower end of the support leg 11 is tapered, and a plurality of fixing plates 12 are provided near the lower end of the support leg 11. The fixing plates 12 are inverted triangles and are vertically provided on the support leg 11. The plurality of fixing plates 12 are evenly distributed along the periphery of the support leg 11 (refer to FIG. Figure 5 ).

[0031] By arranging a plurality of evenly distributed fixing plates 12 on the periphery of the lower end of the support leg 11, the contact area and friction between the support leg 11 and the soil are increased, thereby improving the grip of the support leg 11, improving the firmness of the brine pump station support, and preventing the brine pump station support from being unstable and collapsing.

[0032] The support legs 11 are provided with reinforcing rods 13, and the two ends of the reinforcing rods 13 are respectively fixedly connected to the support legs 11 and the operating platform 1. By providing the reinforcing rods 13 on the support legs 11, the strength of the brine pump station support can be improved to prevent the brine pump station support from being unstable and collapsing.

[0033] like Figure 1 and Figure 4 As shown, the lifting member 2 includes a lifting rod 21 and two supporting rods 22 . The lifting rod 21 is horizontally arranged and fixed by the two supporting rods 22 . A lifting ring 23 is provided on the lifting rod 21 .

[0034] By setting a lifting ring 23 on the lifting rod 21, the brine pipeline 31 can be fixed to prevent the weight of the brine pipeline 31 from being directly applied to the brine pump 3, causing damage to the brine pump 3, and at the same time facilitate the operation of the brine pump 3.

[0035] The support rod 22 is vertically arranged, the upper end is fixedly connected to the lifting rod 21, and the lower end is detachably connected to the support leg 11. The lower end of the support rod 22 is detachably connected to the support leg 11, which can facilitate the disassembly and assembly of the lifting member 2 and the support leg 11 for convenient transportation.

[0036] In this embodiment, the support rod 22 is connected to the support leg 11 by a flange 24. By setting the support rod 22 and the support leg 11 to be connected by the flange 24, the lifting member 2 and the support leg 11 can be easily disassembled and transported while ensuring the firmness of the installation.

[0037] An electric hoist 25 is provided on the lifting ring 23. By arranging the electric hoist 25 on the lifting ring 23, the brine pump 3 and the brine delivery pipeline 31 can be lifted, which makes it convenient to overhaul the brine pump 3 and clean the salt.

[0038] like Figure 6 As shown, when the present invention is used, the operating platform 1 is placed on the embankment of the brine canal or salt field where the brine pump 3 is to be installed, so that one end of the operating platform 1 is located on the shore, which is convenient for personnel to get on and off the operating platform 1, and the other end is located above the brine 32, which is convenient for operating the brine pump 3 and the brine pipeline 31. The lower end of each supporting leg 11 is inserted into the soil to fix the brine pump station bracket, and then the lifting component 2 is fixedly installed on the operating platform 1, and the brine pump 3 and the brine pipeline 31 can be installed. After the installation is completed, the brine pipeline 31 is fixed by the lifting component 2.

[0039] The utility model is convenient for disassembly, assembly and transportation, and the structure is stable after installation, which can avoid collapse, reduce the risk of operators falling, and improve work efficiency. The existing temporary brine pumping station has the problem of unstable structure, easy collapse, and laborious disassembly and assembly.

[0040] By arranging a plurality of evenly distributed fixing plates 12 on the periphery of the lower end of the support leg 11, the contact area and friction between the support leg 11 and the soil are increased, thereby improving the grip of the support leg 11, improving the firmness of the brine pump station support, and preventing the brine pump station support from being unstable and collapsing.

[0041] By providing a lifting ring 23 on the lifting rod 21, the brine pipeline 31 can be secured, preventing the weight of the brine pipeline 31 from directly exerting damage to the brine pump 3 and facilitating operation of the brine pump 3. The lower end of the support rod 22 is detachably connected to the support leg 11, facilitating assembly and disassembly of the lifting member 2 from the support leg 11 for easy transportation. Reinforcement rods 13 are provided on the support leg 11 to increase the strength of the brine pump station support, preventing instability and collapse.

[0042] The support rod 22 is connected to the support leg 11 via a flange 24, ensuring secure installation while facilitating assembly and disassembly of the lifting fixture 2 and support leg 11 for easy transport. An electric hoist 25 is installed on the lifting ring 23 to lift the brine pump 3 and brine pipeline 31, facilitating maintenance and cleaning of the brine pump 3. An anti-slip mat 14 is installed on the operating platform 1 to prevent workers from slipping and falling during operation.

[0043] It should be noted that the above-mentioned embodiments illustrate rather than limit the invention and that those skilled in the art will be able to design alternative embodiments without departing from the scope of the appended claims.

Claims

1. The brine pump station support is characterized by: It includes an operating platform (1) and a lifting device (2), The operating platform (1) is a flat plate-shaped structure, and a plurality of supporting legs (11) for supporting the operating platform (1) are provided at the bottom of the operating platform (1); The lower end of the support leg (11) is tapered; The lifting member (2) is fixedly arranged on the operating platform (1), is detachably connected to the operating platform (1), and is used to fix the brine delivery pipeline.

2. The brine pump station support according to claim 1, characterized in that: A plurality of fixing plates (12) are provided at the lower ends of the support legs (11). The fixing plate (12) is in the shape of an inverted triangle and is vertically arranged on the supporting leg (11); The plurality of fixing plates (12) are evenly distributed along the periphery of the supporting leg (11).

3. The brine pump station support according to claim 2, characterized in that: The lifting member (2) comprises a lifting rod (21) and a supporting rod (22); The upper end of the support leg (11) extends above the operating platform (1); The lifting rod (21) is arranged horizontally, and a lifting ring (23) is provided on the lifting rod (21); The support rod (22) is arranged vertically, with the upper end fixedly connected to the lifting rod (21) and the lower end detachably connected to the support leg (11).

4. The brine pump station support according to claim 3, characterized in that: The support rod (22) is connected to the support leg (11) via a flange (24).

5. The brine pump station support according to claim 4, characterized in that: The lifting member (2) comprises two support rods (22).

6. The brine pump station support according to claim 5, characterized in that: An electric hoist (25) is provided on the lifting ring (23).

7. The brine pump station support according to claim 6, characterized in that: The support leg (11) is provided with a reinforcing rod (13). Both ends of the reinforcing rod (13) are fixedly connected to the supporting legs (11) and the operating platform (1), respectively.

8. The brine pump station support according to any one of claims 1 to 7, characterized in that: An anti-slip pad (14) is provided on the top surface of the operating platform (1).