Staggered joint curtain wall framework mounting structure

Through the modular prefabricated frame modules, the complex problem of traditional misslit curtain wall construction is solved, efficient installation and precise assembly are achieved, and building effects and safety performance needs are met, and engineering costs are reduced.

CN223226910UActive Publication Date: 2025-08-15GUANGZHOU DAGUANG MECHANICAL ENG TECH DEV CO
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422567223.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-23
Publication Date
2025-08-15
Estimated Expiration
2034-10-23

AI Technical Summary

Technical Problem

The construction of traditional staggered curtain walls is complex, the construction period is long, the installation quality is difficult to control, and the facade design effect is limited, which cannot meet the architect's new definition and pursuit of the external facade.

Method used

Modular and prefabricated systems are adopted, and prefabricated frame modules are transported to the site for lifting and fixing. The column fixing and connecting parts are used to form a staggered curtain wall skeleton, including the main column, main beam and connecting column, which are fixed by channel steel and screws. The connectors are plugged into an oric or I-shaped frame.

Benefits of technology

It has achieved improvement in construction efficiency, reduced on-site measures, accelerated construction cycle, ensured installation accuracy and safety performance, met building effect needs, and reduced project cost.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223226910U_ABST
    Figure CN223226910U_ABST
Patent Text Reader

Abstract

The utility model discloses a staggered joint curtain wall framework installation structure which comprises a bearing body, a plurality of frame modules, a plurality of stand column fixing pieces, a plurality of first connecting pieces and a plurality of second connecting pieces. The frame modules are connected in pairs and fixed to the front side of the bearing main body through the stand column fixing pieces, every two vertically adjacent frame modules are connected and fixed through a first connecting piece, and every two horizontally adjacent frame modules are connected and fixed through a second connecting piece. According to the staggered joint curtain wall framework installation structure, the frame modules are produced and assembled in advance in a factory and then transported to the site to be hoisted, modular production and assembly type construction are achieved in the whole process, the machining and assembling precision can be guaranteed, the system safety performance can also be guaranteed, and the building effect requirement can also be met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of curtain walls, in particular to a staggered curtain wall skeleton installation structure. Background Art

[0002] Conventional architectural curtain wall effects are mostly displayed in a way that is continuous from top to bottom and extends vertically to form a shape with straight lines. It mainly uses the traditional component-type curtain wall system, first installing the vertical keel, and then connecting the beams to complete the construction of the skeleton system; among them, the traditional staggered curtain wall is affected by the position of the interlayer structure, and has strict requirements on the division of the curtain wall and the arrangement of the skeleton. It also has many requirements for the setting of the skeleton openings and connection structures. The construction is more complicated and the installation quality control is more difficult, which can easily affect the construction period and limit the facade design effect.

[0003] In recent years, architects have had new definitions and pursuits for the effects of facades, and various forms and expression techniques have emerged one after another. In order to meet and achieve the architectural effects, it is necessary to innovate technology starting from the details of the structure. Utility Model Content

[0004] In order to solve the problems arising from the above-mentioned background technology, the purpose of the present invention is to provide a staggered curtain wall frame installation structure, which is more cost-effective than the unitized curtain wall and more efficient in construction than the traditional component curtain wall. It can effectively reduce the cost of construction site measures, speed up the construction period, and thus reduce the project cost.

[0005] In order to achieve the above-mentioned purpose, the technical solution adopted by the present utility model is:

[0006] A staggered curtain wall skeleton installation structure includes a load-bearing body, a plurality of frame modules, a plurality of column fixings, a plurality of first connecting members, and a plurality of second connecting members. The plurality of column fixings are arranged at intervals on the front side of the load-bearing body. The plurality of frame modules are connected in pairs and are respectively fixed to the front side of the load-bearing body through the column fixings. Two frame modules adjacent to each other are connected and fixed by the first connecting members, and two frame modules adjacent to each other on the left and right are connected and fixed by the second connecting members.

[0007] Furthermore, the several frame modules each include several main columns, several main beams and several connecting columns. The several main columns and several main beams are welded to form a main frame. The several connecting columns are respectively welded on the upper and lower sides of the main frame. The connecting columns are fixed in the column fixing pieces. The connecting columns of the two adjacent frame modules above and below are both plugged and fixed by the first connecting piece, and the main beams of the two adjacent frame modules on the left and right are both plugged and fixed by the second connecting piece.

[0008] Furthermore, the several column fixing parts each include two channel steels and several screws, and the two channel steels are spaced apart to form an installation channel that is compatible with the connecting columns. The connecting columns are respectively embedded in the installation channels of the two channel steels, and the two side surfaces of the connecting columns are respectively fixed to the two channel steels by screws.

[0009] Furthermore, the plurality of second connecting members each include a plurality of connecting steel plates and a plurality of stainless steel countersunk machine wires, one end of the plurality of connecting steel plates being fixed to one side of the main beam of the frame module by means of the stainless steel countersunk machine wires, and the other end thereof being inserted into the other side of the main beam of the adjacent frame module.

[0010] Furthermore, the main frame is configured as a U-shaped frame or an I-shaped frame.

[0011] Furthermore, the diameter of the first connecting member is adapted to the inner dimension of the connecting column.

[0012] Furthermore, the plurality of main columns, the plurality of main beams and the plurality of connecting columns are all made of steel with a hollow interior.

[0013] Furthermore, a plurality of embedded parts are fixed to the front side of the load-bearing body, the plurality of embedded parts are arranged in an interval, and one end of the plurality of column fixing parts is respectively welded and fixed to the plurality of embedded parts.

[0014] The beneficial effects of the present invention are:

[0015] This utility model takes advantage of the modular and assembled system, prefabricates frame modules in the factory, and then transports them to the site for fixing through hoisting, realizing modular production and construction throughout the entire process; it can ensure the accuracy of processing and assembly, as well as the safety performance of the system, and can also meet the requirements of architectural effects. It saves costs compared to unit curtain walls and is more efficient than the construction of traditional component curtain walls, which can effectively reduce the cost of on-site measures, speed up the construction period, and thus reduce the project cost, thus saving costs for the project; and the installation structure is reasonably designed and easy to operate, which can ensure the overall visual effect and meet the system's wind pressure resistance and other performance requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural diagram of the utility model;

[0017] Figure 2 This is a schematic diagram of the structure installation of the utility model;

[0018] Figure 3 It is a side sectional view of a local structure of the utility model;

[0019] Figure 4 This is a top sectional view of a local structure of the utility model;

[0020] Figure 5 This is a schematic diagram of a frame module in which the main frame is in an I-shape in an embodiment of the present utility model;

[0021] Figure 6 This is a schematic diagram of a frame module in which the main frame is in a U-shaped shape in an embodiment of the present utility model.

[0022] In the figure, 1 is the load-bearing body, 11 is the embedded part; 2 is the column fixing part, 21 is the channel steel, and 22 is the screw; 3 is the frame module, 31 is the main column, 32 is the main beam, and 33 is the connecting column; 4 is the first connecting part; 5 is the second connecting part, 51 is the connecting steel plate, and 52 is the stainless steel countersunk machine screw; 6 is the curtain wall panel. DETAILED DESCRIPTION

[0023] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0024] As attached Figure 1-6 As shown, in an embodiment of the present invention, a staggered curtain wall skeleton installation structure is provided, including a load-bearing body 1, a plurality of frame modules 3, a plurality of column fixings 2, a plurality of first connecting members 4 and a plurality of second connecting members 5. The plurality of column fixings 2 are arranged at intervals on the front side of the load-bearing body 1, and the plurality of frame modules 3 are connected in pairs and are respectively fixed to the front side of the load-bearing body 1 through the column fixings 2. The two upper and lower adjacent frame modules 3 are connected and fixed through the first connecting member 4, and the two left and right adjacent frame modules 3 are connected and fixed through the second connecting member 5, thereby forming a staggered curtain wall skeleton.

[0025] Specifically, the curtain wall panel 6 can be installed on the front side of the staggered curtain wall frame. The curtain wall panel 6 includes a glass curtain wall, a metal plate curtain wall, an artificial board curtain wall, etc.

[0026] The frame modules 3 each include a plurality of main columns 31, a plurality of main beams 32, and a plurality of connecting columns 33. The main columns 31 and the main beams 32 are welded to form a main frame. The connecting columns 33 are respectively welded to the upper and lower sides of the main frame. The connecting columns 33 are fixed in the column fixing members 2, thereby fixing the frame module 3 to the front side of the load-bearing body 1.

[0027] The connecting columns 33 of the two upper and lower adjacent frame modules 3 are both plugged and fixed by the first connecting member 4, and the main beams 32 of the two left and right adjacent frame modules 3 are both plugged and fixed by the second connecting member 5. Each frame module 3 retains telescopic adaptive displacement, which can ensure that each frame module 3 can adapt to environmental changes and load changes, ensure the safety and stability of the structure, and at the same time improve its service life.

[0028] The several column fixing parts 2 each include two channel steels 21 and several screws 22. The two channel steels 21 are spaced apart to form an installation channel that is compatible with the connecting column 33. The connecting columns 33 are respectively embedded in the installation channels of the two channel steels 21, and the two side surfaces of the connecting columns 33 are respectively fixed to the two channel steels 21 by screws 22.

[0029] The plurality of second connecting members 5 each include a plurality of connecting steel plates 51 and a plurality of stainless steel countersunk machine screws 52. One end of the plurality of connecting steel plates 51 is fixed to one side of the main beam 32 of the frame module 3 through the stainless steel countersunk machine screws 52, and the other end thereof is inserted into the other side of the main beam 32 of the adjacent frame module 3.

[0030] Reference Figure 5-6 In an embodiment of the present utility model, the main frame is configured as a U-shaped frame or an I-shaped frame; during construction, one of the above-mentioned frame modules 3 can be used for installation according to needs, or the above-mentioned two shapes of frame modules 3 can be used for alternating installation.

[0031] Specifically, the diameter of the first connecting member 4 is adapted to the inner size of the connecting column 33 , so as to better connect and fix the two upper and lower adjacent frame modules 3 .

[0032] The plurality of main columns 31 , the plurality of main beams 32 and the plurality of connecting columns 33 are all made of steel with a hollow interior, so as to facilitate the embedding or plugging of the first connecting member 4 and the second connecting member 5 .

[0033] A plurality of embedded parts 11 are fixed to the front side of the load-bearing body 1 . The embedded parts 11 are arranged at intervals. One ends of the plurality of column fixing parts 2 are respectively welded and fixed to the embedded parts 11 .

[0034] In the specific implementation of the present invention, the installation method of the staggered curtain wall frame installation structure is:

[0035] Combined with the on-site re-measurement of the civil engineering structure, the skeleton system is divided into sections, and several frame modules 3 are prefabricated and assembled in the factory. They are then transported to the construction site for positioning and installation. A connecting steel plate 51 is fixed to one side of the main crossbeam 32 of each frame module 3 using stainless steel countersunk machine screws 52, with the other end of the connecting steel plate 51 exposed.

[0036] The installation positions of the connecting columns 33 of the frame modules 3 are located by laying out the lines at the construction site. After welding the column fixing parts 2 to the embedded parts 11 on the load-bearing body 1, the hoisting is started.

[0037] According to the line positioning, the connecting columns 33 on the upper and lower sides of the first frame module 3 are mechanically fixed to the column fixing members 2 respectively, and the first connecting member 4 is plugged and fixed at the same time, thus completing the installation of the first frame module 3;

[0038] The second frame module 3 on the adjacent side is installed in the above order, and its main crossbeam 32 is plugged and fixed to the main crossbeam 32 of the first frame module 3 through the connecting steel plate 51, and the installation of the second frame module 3 is completed;

[0039] The third frame module 3 adjacent to the upper or lower part is installed in the above order, and its connecting column 33 is plugged and fixed with the connecting column 33 of the first frame module 3 through the first connecting member 4, and the installation of the third frame module 3 is completed;

[0040] The remaining frame modules 3 are arranged in sequence and installed continuously according to the above situation. After all the installation is completed, a staggered curtain wall skeleton is formed. Finally, the curtain wall panels can be installed on the staggered curtain wall skeleton.

[0041] The utility model takes advantage of the modular and assembled system, prefabricates the frame module 3 in the factory, and then transports it to the site for fixing by hoisting, so that the whole process realizes modular production and construction; it can ensure the accuracy of processing and assembly, as well as the safety performance of the system, and can also achieve the architectural effect requirements; and the installation structure is reasonably designed and easy to operate, which can ensure the overall visual effect and meet the system's wind pressure resistance and other performance requirements.

[0042] The present invention has been described in detail above. The above description is only a preferred embodiment of the present invention and should not limit the scope of implementation of the present invention. All equivalent changes and modifications made within the scope of this application should still fall within the scope of the present invention.

Claims

1. A staggered curtain wall frame installation structure, characterized by: It includes a load-bearing body, a number of frame modules, a number of column fixings, a number of first connecting members and a number of second connecting members. The number of column fixings are arranged at intervals on the front side of the load-bearing body. The number of frame modules are connected in pairs and are respectively fixed to the front side of the load-bearing body through the column fixings. The two frame modules adjacent to each other are connected and fixed through the first connecting member, and the two frame modules adjacent to each other on the left and right are connected and fixed through the second connecting member.

2. The staggered curtain wall frame installation structure according to claim 1, characterized in that: The several frame modules each include several main columns, several main beams and several connecting columns. The several main columns and several main beams are welded to form a main frame. The several connecting columns are respectively welded on the upper and lower sides of the main frame. The connecting columns are fixed in the column fixing pieces. The connecting columns of the two upper and lower adjacent frame modules are both plugged and fixed by the first connecting piece, and the main beams of the two left and right adjacent frame modules are both plugged and fixed by the second connecting piece.

3. The staggered curtain wall frame installation structure according to claim 2, characterized in that: The several column fixing parts each include two channel steels and several screws. The two channel steels are spaced apart to form an installation channel that is compatible with the connecting columns. The connecting columns are respectively embedded in the installation channels of the two channel steels, and the two side surfaces of the connecting columns are respectively fixed to the two channel steels by screws.

4. The staggered curtain wall frame installation structure according to claim 2, characterized in that: The several second connecting parts all include several connecting steel plates and several stainless steel countersunk machine wires. One end of the several connecting steel plates is fixed to one side of the main beam of the frame module through the stainless steel countersunk machine wires, and the other end thereof is inserted into the other side of the main beam of the adjacent frame module.

5. The staggered curtain wall frame installation structure according to claim 2, characterized in that: The main frame is arranged in a U-shaped frame or an I-shaped frame.

6. The staggered curtain wall frame installation structure according to claim 2, characterized in that: The diameter of the first connecting member is adapted to the inner size of the connecting column.

7. The staggered curtain wall frame installation structure according to claim 2, characterized in that: The plurality of main columns, the plurality of main beams and the plurality of connecting columns are all made of steel with a hollow interior.

8. The staggered curtain wall frame installation structure according to claim 1, characterized in that: A plurality of embedded parts are fixed on the front side of the load-bearing body. The embedded parts are arranged at intervals. One ends of the plurality of column fixing parts are respectively welded and fixed to the embedded parts.