Novel outer frame punching net fixing device

Through the integrated design of the combined structure of fixed plates and T-plate and steel pipe, the problems of low connection strength and inconvenient installation of the outer frame punching mesh are solved, and stable connections, simplified installation and multiple turnovers are achieved, and construction safety and efficiency are improved.

CN223227027UActive Publication Date: 2025-08-15CHINA CONSTR SECOND ENG BUREAU LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422450472.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-10
Publication Date
2025-08-15
Estimated Expiration
2034-10-10

AI Technical Summary

Technical Problem

In the prior art, the connection strength of the outer frame punching mesh is not high and is inconvenient to install, and cannot effectively resist high wind loads, which poses safety hazards.

Method used

The integrated design of the fixed plate and the T-shaped plate and the steel pipe combines the structure, and the bolt connection is achieved to achieve a stable connection between the punching mesh and the outer foot, enhancing the load-bearing capacity and simplifying the installation process.

Benefits of technology

It improves the connection strength and stability of the punching mesh, simplifies the installation process, reduces the material usage, reduces weight, and is highly adaptable. It is suitable for punching mesh of various specifications and sizes, improving the safety and efficiency of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223227027U_ABST
    Figure CN223227027U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building construction, and discloses a novel outer frame punching net fixing device in order to solve the problems that in the prior art, the connecting strength is not high, and installation is not convenient. Comprising two fixing plates and two T-shaped plates which are integrally arranged, the lower ends of the fixing plates are fixed to the upper ends of two punching net outer frames through first bolts, the T-shaped plates are symmetrically arranged, the fixing plates and the T-shaped plates are arranged in a square shape, one end of a steel pipe is fixed between the T-shaped plates through second bolts, and the other end of the steel pipe is fixedly connected with the punching net outer frames. And the other end of the steel pipe is fixed on the outer foot stool. All the components of the device are connected through bolts, the disassembly and assembly process is simple and rapid, the number of fixed net racks is large, the components cannot be damaged, and therefore the device can be used repeatedly, and the requirement for green construction is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of building construction, in particular to a novel external frame punching mesh fixing device. Background Art

[0002] In construction projects, the increasing number of novel architectural designs and diverse architectural shapes make facade protection increasingly difficult. Due to the height of some buildings and the high wind loads, conventional dense mesh safety nets and external scaffolding secured with wire ties are easily damaged by strong wind loads or human error, rendering them ineffective and posing a significant safety hazard.

[0003] The prior art (publication number: CN214423985U) discloses a connection device for fixing a perforated mesh on an external frame, which comprises a steel plate connecting piece (2), a bolt (3), a flat head steel pipe (4), a steel pipe fastener (5), a scaffolding longitudinal horizontal rod (6), a scaffolding inner vertical rod (7), a perforated mesh and a perforated mesh column (1), wherein the perforated mesh columns (1) are symmetrically fixed at both ends of the perforated mesh; a steel plate connecting piece (2) is provided at one end of the perforated mesh column (1) away from the perforated mesh, and the steel plate connecting piece (2) is welded and fixed to the perforated mesh column (1); a flat head steel pipe (4) is provided between two adjacent perforated meshes, and one end of the flat head steel pipe (4) is located between the two symmetrically arranged steel plate connecting pieces (2); a bolt (3) is provided on one side of the flat head steel pipe (4), and the bolt (3) is fixed on the other side of the flat head steel pipe (4). One end of the bolt (3) passes through two symmetrically arranged steel plate connecting pieces (2) and a flat-head steel pipe (4); one end of the bolt (3) is provided with a nut, and the bolt (3) is meshed and connected with the nut; scaffolding inner vertical poles (7) are equidistantly provided on one side of the punching mesh; a scaffolding longitudinal horizontal pole (6) is provided on one side of the punching mesh; a steel pipe fastener (5) is provided on one side of the scaffolding inner vertical pole (7); one end of the steel pipe fastener (5) is sleeved and fixed on the outside of the scaffolding inner vertical pole (7), and the other end of the steel pipe fastener (5) is sleeved and fixed on the scaffolding longitudinal horizontal pole (6); the end of the flat-head steel pipe (4) away from the punching mesh is provided below the corresponding scaffolding longitudinal horizontal pole (6), and the scaffolding longitudinal horizontal pole (6) is fixedly connected to the flat-head steel pipe (4) through the steel pipe fastener (5).

[0004] Although this device can realize the connection of the perforated mesh, it is necessary to construct a large number of devices when using it to realize the perforated mesh fixed connection system for multiple perforated meshes, which is inconvenient to install and disassemble. Utility Model Content

[0005] The purpose of the utility model is to provide a novel external frame punching mesh fixing device to solve the problems of low connection strength and inconvenient installation in the prior art.

[0006] To achieve the above purpose, the specific technical solution of a new type of external frame punching mesh fixing device of the utility model is as follows:

[0007] A novel external frame perforated mesh fixing device comprises two integrally arranged fixing plates and two T-shaped plates. The lower ends of the fixing plates are fixed to the upper ends of two perforated mesh outer frames via first bolts. The T-shaped plates are symmetrically arranged, forming a square shape. One end of a steel pipe is fixed between the T-shaped plates via a second bolt, and the other end of the steel pipe is fixed to the external legs. Through the cross-shaped design of the two parallel fixing plates and the T-shaped plates, the device effectively connects the perforated mesh to the external legs, forming a stable support structure and improving overall stability.

[0008] Furthermore, the T-shaped plate includes a vertically arranged straight steel plate and a zigzag plate disposed in the middle of the straight steel plate, with the opening of the zigzag plate being welded to the straight steel plate. By disposing the zigzag plate in the middle of the straight steel plate and welding it to the straight steel plate, a more robust structure is formed. This effectively increases the load-bearing capacity of the T-shaped plate, enabling it to withstand greater loads without deformation. The zigzag plate structure design reduces material usage while maintaining strength, thus reducing costs and overall weight, making transportation and installation easier.

[0009] Furthermore, the fixing plate comprises a main steel plate, with butt joints provided at the lower ends of both sides of the main steel plate, each of which has a first screw hole for securing with a first bolt. By providing butt joints at the lower ends of both sides of the main steel plate and securing with the first bolt, the structural stability of the entire fixing plate is enhanced, enabling the fixing plate to be more securely connected to other components, such as the perforated mesh outer frame or the outer leg, thereby improving the overall structure's resistance to wind pressure and earthquake resistance.

[0010] Furthermore, the second screw holes of the straight steel plate, T-shaped plate, and steel pipe are correspondingly arranged, and the straight steel plate, T-shaped plate, and steel pipe are fixed together by second bolts engaging with the second screw holes. By correspondingly arranging the second screw holes of the straight steel plate, T-shaped plate, and steel pipe, and fixing them with second bolts, the connection strength between the three can be significantly enhanced, effectively increasing the connection strength between the steel pipe and the T-shaped plate, and thus increasing the connection strength between the outrigger and the perforated mesh.

[0011] Furthermore, a gasket is provided between the first bolt and the docking plate. Under vibration or impact loads, the gasket can provide additional friction to help prevent relative movement between the first bolt and the docking plate, thereby reducing the risk of the bolt loosening due to vibration.

[0012] Furthermore, the steel pipe is a flat-head steel pipe. The shape of the flat-head steel pipe makes the installation process simpler and faster. Construction workers only need to align the flat-head steel pipe with the corresponding screw hole, insert the second bolt, and tighten it to complete the installation, greatly reducing installation time and labor intensity.

[0013] Furthermore, the first and second bolts are all of the same size and type. When replacement or repair is required, since all bolts are of the same size and type, only one tool is needed to complete all operations. This effectively simplifies the installation and maintenance process, saving time and labor costs.

[0014] The utility model provides a novel external frame punching mesh fixing device with the following advantages:

[0015] 1. Simple structure and easy operation: The materials of the device are all common building materials on the construction site. The design is simple and clear, and the connection method between the components is intuitive and easy to understand, so that construction workers can quickly master its use and improve construction efficiency.

[0016] 2. Easy to disassemble and assemble, and can be used repeatedly: The components of the device are connected by bolts. The perforated mesh is simple and quick to disassemble and assemble, and will not cause damage to the components. Therefore, it can be used repeatedly, which meets the requirements of green construction.

[0017] 3. Strong structural bearing capacity: Through the close combination of components such as steel plate connecting pieces, bolts and flat head steel pipes, a stable connection system is formed, which effectively prevents the perforated mesh from falling off during high-altitude operations, thereby greatly improving the safety of the construction site.

[0018] 4. Wide range of applications: The device is suitable for punching meshes of various specifications and sizes. By adjusting the size and shape of the components, it can flexibly adapt to different construction needs and has strong versatility and adaptability. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is an overall schematic diagram of the installation of the device provided by the utility model;

[0020] Figure 2 An enlarged view of the installation portion of the device provided by the utility model;

[0021] Figure 3 The overall schematic diagram of the device provided by the utility model Figure 1 ;

[0022] Figure 4 An exploded view of the device provided by the utility model;

[0023] Figure 5 The overall schematic diagram of the device provided by the utility model Figure 2 .

[0024] In the figure: 1. Perforated mesh; 2. Steel pipe; 3. Fixing plate; 31. Main steel plate; 32. Docking plate; 33. First bolt; 34. First screw hole; 38. Gasket; 4. T-shaped plate; 41. Straight steel plate; 42. T-shaped plate; 43. Second bolt; 44. Second screw hole. DETAILED DESCRIPTION

[0025] In order to make the purpose, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are only used to explain the present invention and are not intended to limit the present invention.

[0026] Example 1

[0027] See Figure 1 and Figure 2 The utility model provides a novel external frame perforated mesh fixing device, which is used in external frame perforated mesh construction occasions. The novel external frame perforated mesh fixing device comprises two integrally arranged fixing plates (3) and two T-shaped plates (4). The lower end of the fixing plate (3) is fixed to the upper end of the outer frame of two perforated meshes (1) by a first bolt (33). The T-shaped plates (4) are symmetrically arranged. The fixing plates (3) and the T-shaped plates (4) are arranged in a square shape. One end of a steel pipe (2) is fixed between the T-shaped plates (4) by a second bolt (43), and the other end of the steel pipe (2) is fixed to the external leg.

[0028] When the device is manufactured, the two fixing plates 3 are first placed in parallel, and then the T-shaped plates 4 are fixed in the fixing plates 3 in sequence. At this time, the protruding ends of the two T-shaped plates 4 are placed symmetrically, and the whole is in a mouth-shaped integrated setting; after the fixation of the T-shaped plate 4 and the fixing plate 3 is completed, a second screw hole 44 is opened at one end of the steel pipe 2, and the end with the second screw hole 44 is placed in the middle of the two symmetrically arranged T-shaped plates 4, and the second screw holes 44 of the steel pipe 2 are matched one by one with the screw holes of the T-shaped plate 4. At this time, the second bolt 43 is passed through the T-shaped plate 4 and the steel pipe 2 to complete the fixation.

[0029] When in use, first fix one end of the steel pipe 2 to the outer tripod, and place the end with the second screw hole 44 in the middle of the four perforated meshes 1; then place the fixed well-shaped device in the middle of the connection of the four perforated meshes 1, and place the two fixing plates 3 on the upper ends of the two perforated meshes 1 respectively. At this time, the first screw hole 34 on the docking plate 32 at the upper end of the perforated mesh 1 is aligned with the screw hole on the upper end of the perforated mesh 1, and the first bolt 33 is passed through the first screw hole 34 on the docking plate 32 and the perforated mesh 1 to fix the device to the perforated mesh 1. At this time, the steel pipe 2 is just in the middle of the T-shaped plate 42 of the two T-shaped plates 4. The second bolt 43 passes through the straight steel plate 41, the T-shaped plate 42, the steel pipe 2, the T-shaped plate 42, and the straight steel plate 41 at one time and then tightens the nut to complete the fixation. At this time, since the other end of the steel pipe 2 is fixed to the outer tripod, the outer tripod is fixed to the perforated mesh 1 by the device of the present application.

[0030] The novel external frame punching mesh 1 fixing device provided by the utility model has the following advantages:

[0031] Simple structure and easy operation: The materials of this device are all common building materials on the construction site. The design is simple and clear, and the connection method between the components is intuitive and easy to understand, so that construction workers can quickly master its use and improve construction efficiency.

[0032] Easy to assemble and disassemble, and can be used multiple times: The components of the device are connected by bolts to the perforated mesh. The disassembly and assembly process is simple and quick, and will not cause damage to the components. Therefore, it can be used multiple times, which meets the requirements of green construction.

[0033] Strong structural bearing capacity: Through the close combination of components such as steel plate connecting pieces, bolts and flat head steel pipes 2, a stable connection system is formed, which effectively prevents the perforated mesh 1 from falling off during high-altitude operations, thereby greatly improving the safety of the construction site.

[0034] Wide range of applications: The device is suitable for perforated meshes of various specifications and sizes. By adjusting the size and shape of the components, it can be flexibly adapted to different construction requirements, and has strong versatility and adaptability.

[0035] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A new type of external frame punching mesh fixing device, characterized in that: The invention comprises two integrally arranged fixing plates (3) and two T-shaped plates (4), the lower ends of the fixing plates (3) being fixed to the upper ends of the outer frames of two perforated nets (1) by means of first bolts (33), the T-shaped plates (4) being symmetrically arranged, the fixing plates (3) and the T-shaped plates (4) being arranged in a square shape, one end of a steel pipe (2) being fixed between the T-shaped plates (4) by means of second bolts (43), and the other end of the steel pipe (2) being fixed to an outer leg.

2. The novel external frame punching mesh fixing device according to claim 1 is characterized in that: The T-shaped plate (4) comprises a vertically arranged straight steel plate (41) and a T-shaped plate (42) arranged in the middle of the straight steel plate (41), and the opening of the T-shaped plate (42) is welded and fixed to the straight steel plate (41).

3. The novel external frame punching mesh fixing device according to claim 1 is characterized in that: The fixing plate (3) comprises a main steel plate (31), and docking plates (32) are provided at the lower ends of both sides of the main steel plate (31). The docking plates (32) are provided with first screw holes (34) for fixing first bolts (33).

4. The novel external frame punching mesh fixing device according to claim 2 is characterized in that: The straight steel plate (41), the shaped plate (42) and the second screw holes (44) of the steel pipe (2) are arranged correspondingly, and the straight steel plate (41), the shaped plate (42) and the steel pipe (2) are fixed by the second bolts (43) and the second screw holes (44).

5. The novel external frame punching mesh fixing device according to claim 3 is characterized in that: A gasket (38) is provided between the first bolt (33) and the docking plate (32).

6. The novel external frame punching mesh fixing device according to claim 1 is characterized in that: The steel pipe (2) is a flat head steel pipe (2).

7. The novel external frame punching mesh fixing device according to claim 1 is characterized in that: The first bolt (33) and the second bolt (43) are of the same model and specification.