Quick cleaning device for basement prestressed pipe pile head
By feeding water into the pile core of the prestressed pipe pile and cleaning with an air compressor, the problem of poor quality cleaning of large fluid soil in the existing technology is solved, and efficient cleaning of sand and silt soil is achieved to adapt to different construction environments.
Patent Information
- Application Number
- CN202422033680.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2025-08-19
- Estimated Expiration
- 2034-08-21
AI Technical Summary
When cleaning sand or silt soil with high fluidity, the air compressor has poor cleaning effect, resulting in the residual sand and soil on the pile wall and insufficient cleaning capacity.
A rapid cleaning device for pile heads of prestressed pipes in the basement is adopted. Water is fed into the round tube and the sand and soil in the pile core is soaked. Then, an air compressor is used to perform mechanical hole cleaning, combining the use of water and air to improve the cleaning effect.
It realizes effective cleaning of sand and silt soil with high fluidity, with a simple structure, adapted to different construction sites, quickly disassembled and assembled, and facilitates construction.
Smart Images

Figure CN223240690U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of building construction, in particular to a quick cleaning device for prestressed pipe pile heads in a basement. Background Art
[0002] Building construction may involve basement construction. During basement construction, prestressed pipe piles are generally used to improve the bearing capacity. The connection between prestressed hollow pipe piles and the foundation mostly adopts the method of in-hole core pouring. That is, after the debris in the pile core is cleaned, a prefabricated steel cage is placed and micro-expansive concrete is poured. The steel cage is used to form an effective and reliable connection with the subsequently poured foundation concrete.
[0003] Before using prestressed pipe piles, debris in the pile core needs to be cleared. The existing technology generally adopts manual hole cleaning or mechanical hole cleaning. The existing mechanical hole cleaning generally adopts a rotary drilling rig or an air compressor.
[0004] The principle of using an air compressor to clean the pile core is to send compressed air into the core of the pipe pile. Due to the high internal air pressure, the compressed air rises along the pile wall, thereby blowing the debris in the hole out of the pile mouth. If the soil is highly fluid sand or silt, using an air compressor will cause sand and gravel to splash, and sand and soil will remain on the pile wall, resulting in poor cleaning ability. Utility Model Content
[0005] In order to solve the problem in the background technology that if the soil in the hole core to be cleaned is sand or silt with high fluidity, the cleaning effect produced by using an air compressor is poor, the utility model proposes a quick cleaning device for the pile head of a basement prestressed pipe pile.
[0006] The technical solution of the utility model is: comprising a support plate and an air compressor,
[0007] The upper surface of the support plate is provided with a plurality of sliding openings which are transparent from top to bottom. The positions of the sliding openings are all located above the prestressed pipe piles. Round tubes are slidably arranged in the sliding openings.
[0008] The four corners of the upper surface of the support plate are provided with up and down transparent sockets, and the sockets are all inserted with installation rods;
[0009] The mounting rods are all inserted into the ground, and a support member is provided on the mounting rod. The support member is located below the support plate, and the upper surface of the support member contacts the lower surface of the support plate;
[0010] The upper end of one of the circular tubes is fixedly connected to a connecting water pipe, which is used to connect to an external water supply system;
[0011] The air compressor is arranged outside the supporting plate and is connected to the air inlets at the upper ends of the other circular tubes through connecting air pipes.
[0012] Preferably, the installation rod includes a screw rod and a ground nail, and the lower end of the screw rod is fixedly connected to the ground nail;
[0013] The threaded sleeve on the screw rod is provided with a support piece.
[0014] Preferably, the support member includes a first connecting plate, which extends in the left and right directions. The first connecting plate is provided with a connecting port that is transparent up and down. A threaded structure that is adapted to the screw is provided in the connecting port. The first connecting plate is threadedly sleeved on the screw through the connecting port, and the upper surface of the first connecting plate is in contact with the lower surface of the support plate.
[0015] Preferably, it comprises a connecting frame, wherein the connecting frame is provided with a plurality of connecting grooves, and the upper ends of the round tubes are fixedly inserted into the connecting grooves;
[0016] A height adjusting member is provided on the support plate, the upper portion of which is fixedly connected to the connecting frame. The upper portion of the height adjusting member can move up and down on the height adjusting member, and the upper portion of the height adjusting member can drive the connecting frame to move up and down when the upper portion of the height adjusting member moves up and down.
[0017] Preferably, the height adjustment member includes a support screw, which is fixedly connected to the upper surface of the support plate. An adjustment frame is provided on the support screw, and a transparent avoidance opening is opened on the adjustment frame. The adjustment frame is movably mounted on the support screw through the avoidance opening, and the outer surface of the adjustment frame is fixedly connected to the outer surface of the connecting frame.
[0018] Preferably, the support screw is provided with a second support plate, the second support plate extends in the left-right direction, a connecting hole is opened in the second support plate, a threaded structure adapted to the support screw is provided in the connecting hole, and the second support plate is threadedly sleeved on the support screw through the connecting hole;
[0019] The upper surface of the second supporting plate contacts the lower surface of the adjusting frame.
[0020] Preferably, the air compressor further includes a mobile trolley, and the air compressor is arranged on the mobile trolley.
[0021] Preferably, a limiting ring is fixedly connected to the outer surface of the ground nail, and the diameter of the limiting ring is larger than the inner wall diameter of the insertion hole.
[0022] The advantages of this utility model are: water is sent into the pile core through a circular pipe to soak the sand and soil, thereby making the soil bonded, and then the hole is cleaned by a mechanical cleaning method using an air compressor, so that it has a better cleaning effect on sand and silt with high fluidity. At the same time, the structure is simple, and it can be quickly disassembled and assembled to adapt to different construction sites. BRIEF DESCRIPTION OF THE DRAWINGS
[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative work.
[0024] Figure 1 A schematic diagram of the main structure of Example 1;
[0025] Figure 2 for Figure 1 Schematic diagram of the installation rod structure.
[0026] In the figure, 1 is an installation rod, 101 is a ground nail, 102 is a screw, 103 is a first connecting plate, 2 is a support plate, 3 is a slide, 4 is a round tube, 5 is a connecting frame, 6 is a height adjustment member, 601 is a support screw, 602 is an adjustment frame, 603 is a second supporting plate, 7 is a connecting water pipe, and 8 is an air compressor. DETAILED DESCRIPTION
[0027] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0028] Example 1: This example aims to provide a quick cleaning device for the heads of prestressed pipe piles in basements.
[0029] according to Figures 1 to 2 As shown, it includes a support plate 2, an air compressor 8 and a connecting frame 5.
[0030] The upper surface of the support plate 2 is provided with a plurality of sliding openings 3 which are transparent from top to bottom. The sliding openings 3 are all located above the prestressed pipe piles. A round tube 4 is slidably provided in the sliding openings 3 .
[0031] The upper end of one of the circular tubes 4 is fixedly connected to a connecting water pipe 7, which is used to connect to an external water supply system.
[0032] The air compressor 8 is arranged outside the support plate 2, and is connected to the upper air inlets of the remaining circular tubes 4 through connecting air pipes. The air compressor 8 also includes a mobile trolley, and the air compressor 8 is arranged on the mobile trolley.
[0033] The four corners of the upper surface of the support plate 2 are provided with upper and lower transparent sockets, and the sockets are inserted with installation rods 1. The installation rods 1 are inserted into the ground. The installation rods include screws 102 and ground nails 101. The lower end of the screw 102 is fixedly connected to the ground nail 101. The outer surface of the ground nail 101 is fixedly connected to a limiting ring. The diameter of the limiting ring is larger than the inner wall diameter of the socket. The ground nail 101 facilitates the installation rod 1 to be inserted into the soil.
[0034] A support member is threadedly mounted on the screw rod 102, and the support member includes a first connecting plate 103. The first connecting plate 103 extends in the left and right directions. A connecting port that is transparent up and down is opened on the first connecting plate 103. A threaded structure that is adapted to the screw rod 102 is provided in the connecting port. The first connecting plate 103 is threadedly mounted on the screw rod 102 through the connecting port, and the upper surface of the first connecting plate 103 contacts the lower surface of the support plate 2.
[0035] The connecting frame 5 is provided with a plurality of connecting grooves, and the upper ends of the round tubes 4 are fixedly inserted into the connecting grooves.
[0036] A height adjustment member 6 is provided on the support plate 2, and the height adjustment member 6 includes a support screw 601, which is fixedly connected to the upper surface of the support plate 2. An adjustment frame 602 is provided on the support screw 601, and an upper and lower transparent avoidance opening is opened on the adjustment frame 602. The adjustment frame 602 is movably mounted on the support screw 601 through the avoidance opening, and the outer surface of the adjustment frame 602 is fixedly connected to the outer surface of the connecting frame 5.
[0037] A second support plate 603 is provided on the support screw 601, and the second support plate 603 extends in the left and right directions. A connecting hole that is transparent from top to bottom is opened in the second support plate 603, and a threaded structure that is adapted to the support screw 601 is provided in the connecting hole. The second support plate 603 is threadedly sleeved on the support screw 601 through the connecting hole, and the upper surface of the second support plate 603 contacts the lower surface of the adjustment frame 602.
[0038] Working principle: Before construction, the workers first bury the prestressed pipe piles using a pile driver, and then clean the pile cores of the prestressed pipe piles.
[0039] First, insert the installation rod 1 into the soil around the prestressed pipe pile so that the ground nail 101 is inserted into the soil. Then the construction personnel rotate the first connecting plate 103 so that the first connecting plate 103 moves up and down on the screw rod 102, thereby adjusting the position of the first connecting plate 103 on the screw rod 102. After adjusting the first connecting plates 103 on the four installation rods 1 to the appropriate height, the construction personnel place the support plate 2 on the installation structure composed of the four installation rods 1, so that the installation rod 1 is inserted into the socket on the support plate 2, so that the lower surface of the support plate 2 is in contact with the upper surface of the first connecting plate 103.
[0040] The construction workers connected the external water supply system to one of the circular pipes 4 through the connecting water pipe 7, and the remaining circular pipes 4 were connected to the air compressor 8.
[0041] The construction personnel can rotate the second support plate 603 to move the second support plate 603 up and down on the screw rod 102. After moving the second support plate 603, the construction personnel can move the adjustment frame 602. The adjustment frame 602 moves up and down to drive the connecting frame 5 to move up and down.
[0042] When it is necessary to insert the circular tube 4 into the core of the prestressed pipe pile, the construction personnel apply a downward thrust to the connecting frame 5, and the connecting frame 5 moves downward under the force. The downward movement of the connecting frame 5 drives the circular tube 4 to move, and the circular tube 4 is inserted downward into the soil until the lower surface of the adjusting frame 602 contacts the upper surface of the second support plate 603. In this way, the downward displacement distance of the circular tube 4 can be limited, so that the depth of the circular tube 4 inserted into the soil is more accurate, and thus the hole cleaning depth is more accurate.
[0043] After the circular tube 4 is inserted into the soil, the construction workers start the water supply system, which sends water into the circular tube 4 through the connecting water pipe 7, and the circular tube 4 sends water into the pile core, so that the sand and silt in the pile core are soaked. Since the sand has good water permeability, it can quickly absorb water and bond the soil. Then the construction workers use the air compressor 8 to supply air to the circular tube 4, and the circular tube 4 sends air into the lower part of the pile core. The internal air pressure becomes greater, causing the compressed air to rise along the pile wall, and finally blow the sand out of the prestressed pipe pile, and finally the water and sand are cleaned together.
[0044] In this way, water can be used to make the sand and soil stick together first, and then an air compressor can be used for mechanical cleaning, thereby achieving a better cleaning effect on the pile core debris in sand and silt soil. At the same time, the device has a simple structure and is easy to disassemble and assemble quickly. It can be quickly assembled before construction and quickly disassembled and assembled after completion, adapting to different construction sites.
[0045] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments should be considered in all respects as illustrative and non-restrictive, and the scope of the present invention is determined by the appended claims rather than the foregoing description. It is intended that all variations within the meaning and range of equivalents of the claims be encompassed within the present invention. Any reference sign in a claim should not be construed as limiting the claim to which it relates.
Claims
1. A quick cleaning device for prestressed pile heads in basements, characterized by: comprising a support plate (2) and an air compressor (8), The upper surface of the support plate (2) is provided with a plurality of sliding openings (3) which are transparent from top to bottom. The sliding openings (3) are all located above the prestressed pipe piles. A circular tube (4) is slidably provided in the sliding openings (3). The four corners of the upper surface of the support plate (2) are each provided with a vertically transparent socket, and a mounting rod (1) is inserted into each socket; The mounting rods (1) are all inserted into the ground, and a support member is provided on the mounting rod (1), the support member is located below the support plate (2), and the upper surface of the support member is in contact with the lower surface of the support plate (2); A connecting water pipe (7) is fixedly connected to the upper end of one of the circular tubes (4), and the connecting water pipe (7) is used to connect to an external water supply system; The air compressor (8) is arranged outside the support plate (2), and the air compressor (8) is connected to the upper air inlets of the remaining circular tubes (4) via connecting air pipes.
2. The quick cleaning device for prestressed pipe pile heads in basements according to claim 1 is characterized by: The installation rod comprises a screw rod (102) and a ground nail (101), and the lower end of the screw rod (102) is fixedly connected to the ground nail (101); The threaded sleeve on the screw rod (102) is provided with a support member.
3. The quick cleaning device for prestressed pipe pile heads in basements according to claim 2 is characterized by: The support member comprises a first connecting plate (103), the first connecting plate (103) extending in the left-right direction, a connecting port being transparent in the upper and lower directions, a threaded structure being provided in the connecting port and being adapted for the screw rod (102), the first connecting plate (103) being threadedly sleeved on the screw rod (102) through the connecting port, and the upper surface of the first connecting plate (103) being in contact with the lower surface of the support plate (2).
4. The rapid cleaning device for prestressed pipe pile heads in basements according to claim 1 is characterized by: It comprises a connecting frame (5), wherein the connecting frame (5) is provided with a plurality of connecting grooves, and the upper ends of the round tubes (4) are fixedly inserted into the connecting grooves; A height adjustment member (6) is provided on the support plate (2). The upper portion of the height adjustment member (6) is fixedly connected to the connecting frame (5). The upper portion of the height adjustment member (6) can move up and down on the height adjustment member (6). The upper portion of the height adjustment member (6) can drive the connecting frame (5) to move up and down when the upper portion of the height adjustment member (6) moves up and down.
5. The rapid cleaning device for prestressed pipe pile heads in basements according to claim 4 is characterized in that: The height adjustment member (6) comprises a support screw (601), the support screw (601) being fixedly connected to the upper surface of the support plate (2), an adjustment frame (602) being provided on the support screw (601), and a clearance opening which is transparent from top to bottom being provided on the adjustment frame (602), the adjustment frame (602) being movably sleeved on the support screw (601) through the clearance opening, and the outer surface of the adjustment frame (602) being fixedly connected to the outer surface of the connecting frame (5).
6. The rapid cleaning device for prestressed pipe pile heads in basements according to claim 5, characterized in that: A second support plate (603) is provided on the support screw (601), and the second support plate (603) extends in the left-right direction. A connecting hole that is transparent from top to bottom is provided in the second support plate (603), and a threaded structure that is adapted to the support screw (601) is provided in the connecting hole. The second support plate (603) is threadedly sleeved on the support screw (601) through the connecting hole. The upper surface of the second support plate (603) contacts the lower surface of the adjustment frame (602).
7. The rapid cleaning device for prestressed pipe pile heads in basements according to claim 1 is characterized by: The air compressor (8) also includes a mobile trolley, and the air compressor (8) is arranged on the mobile trolley.
8. The rapid cleaning device for prestressed pipe pile heads in basements according to claim 2, characterized in that: The outer surface of the ground nail (101) is fixedly connected to a limiting ring, and the diameter of the limiting ring is larger than the inner wall diameter of the insertion hole.