Valve group mounting structure

By hanging and floor-standing C-shaped steel bracket fixing valve group, the problem of limited installation space of the air-conditioning room valve group is solved, and reasonable layout and convenient maintenance are achieved.

CN223242966UActive Publication Date: 2025-08-19JIANGSU BAICHENG ENG INC CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422202003.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-09
Publication Date
2025-08-19
Estimated Expiration
2034-09-09

AI Technical Summary

Technical Problem

The installation space of the valve group in the air-conditioned computer room in the industrial factory is limited, which leads to difficulty in installation and inconvenient maintenance.

Method used

The suspended C-shaped steel bracket and floor-standing C-shaped steel bracket are used to fix the valve group on the wall and the ground, and the upper space of the machine room is used to improve stability and facilitate operation.

Benefits of technology

The valve group structure is reasonably arranged in a limited space to meet daily operation and maintenance needs, and improve the stability and convenience of installation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223242966U_ABST
    Figure CN223242966U_ABST
Patent Text Reader

Abstract

The utility model discloses a valve group mounting structure, and particularly relates to the technical field of valve group mounting, the valve group mounting structure comprises a pipeline I, a filtering pipeline I, a pipeline II and a filtering pipeline II which are sequentially distributed from top to bottom, a suspended C-shaped steel bracket is arranged behind the pipeline I, a plurality of hoops I are fixedly arranged at the front end of the suspended C-shaped steel bracket, and a plurality of hoops II are fixedly arranged at the back of the pipeline II. The first pipeline, the first filtering pipeline, the second pipeline and the second filtering pipeline are fixedly sleeved with the multiple first hoops respectively, two floor C-shaped steel supports are arranged between the second filtering pipeline and the second pipeline, and the two floor C-shaped steel supports are each fixedly provided with two second hoops. The whole valve bank is fixed on the wall and the ground through the suspension C-shaped steel support and the two floor C-shaped steel supports, the upper space of a machine room is fully utilized under the condition that the horizontal space is insufficient, the structure of the valve bank is reasonably arranged, the technical requirements are met, and the working efficiency is improved. And meanwhile, daily maintenance such as daily valve operation and filter disassembly and cleaning is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of valve group installation, and more specifically to a valve group installation structure. Background Art

[0002] Industrial plants usually have separate air-conditioning rooms, and the valve groups in the air-conditioning rooms are often installed individually on the ground. Although this is convenient for daily inspection and maintenance, it also takes up a large part of the space in the room.

[0003] As owners make full use of building areas, and improper renovation or investment increases will result in a smaller machine room area, the installation space of the valve group is limited, resulting in no installation space for the valve group to be installed. Based on this, the utility model provides a valve group installation structure. Utility Model Content

[0004] In order to overcome the above-mentioned defects of the prior art, the utility model provides a valve group installation structure, which fixes the entire valve group on the wall and the ground by hanging a C-shaped steel bracket and two floor-standing C-shaped steel brackets. In the case of insufficient horizontal space, the upper space of the machine room is fully utilized, and the structure of the valve group is reasonably arranged to meet technical requirements. At the same time, it meets daily valve operation and daily maintenance such as disassembly and cleaning of the filter, so as to solve the problems arising from the above-mentioned background technology.

[0005] To achieve the above-mentioned purpose, the present invention provides the following technical solutions: a valve group installation structure, comprising pipeline one, filter pipeline one, pipeline two and filter pipeline two distributed in sequence from top to bottom, a hanging C-shaped steel bracket is provided at the rear of pipeline one, a plurality of clamps one are fixedly provided at the front end of the hanging C-shaped steel bracket, and the plurality of clamps one are fixedly sleeved on pipeline one, filter pipeline one, pipeline two and filter pipeline two respectively, two floor-standing C-shaped steel brackets are provided between the filter pipeline two and pipeline two, two clamps two are fixedly sleeved on pipeline two and filter pipeline two respectively, pipeline one and filter pipeline one, and filter pipeline two and pipeline two are fixed by two connecting brackets, and a connecting component is provided between the hanging C-shaped steel bracket and the two floor-standing C-shaped steel brackets.

[0006] In a preferred embodiment, the connecting assembly includes reinforcing ribs, and a plurality of cross bars are fixed between the two reinforcing ribs. The plurality of cross bars are distributed in sequence from top to bottom between the two reinforcing ribs. The plurality of cross bars are all arranged in front of the second pipeline to facilitate the staff to climb up to operate.

[0007] In a preferred embodiment, two manual valves are fixedly provided on the pipeline 1, the filter pipeline 1, the pipeline 2 and the filter pipeline 2.

[0008] In a preferred embodiment, a regulating valve is fixedly provided on both the pipeline 1 and the pipeline 2, a static balancing valve is fixedly provided on both the pipeline 1 and the pipeline 2, and the static balancing valve is arranged on one side of the regulating valve.

[0009] In a preferred embodiment, pressure gauges and thermometers are fixedly provided on pipeline one, filter pipeline one, pipeline two and filter pipeline two. The thermometers on pipeline one and pipeline two are arranged between the static balancing valve and the regulating valve, and the pressure gauges on pipeline one and pipeline two are arranged on the other side of the regulating valve. The pressure gauges and thermometers can be used to monitor the pressure and temperature of pipeline one, filter pipeline one, pipeline two and filter pipeline two in real time to ensure the safety of operation.

[0010] In a preferred embodiment, a filter is fixedly provided on both the first filter line and the second filter line, and the filter is provided between the pressure gauge and the thermometer.

[0011] In a preferred embodiment, a plurality of cross bars are spaced apart from the regulating valve, the pressure gauge, the thermometer, the manual valve and the filter to prevent the cross bars from obstructing the operation of the staff.

[0012] Technical effects and advantages of this utility model:

[0013] 1. This utility model fixes the entire valve group on the wall and the ground through a hanging C-shaped steel bracket and two floor-standing C-shaped steel brackets. In the case of insufficient horizontal space, it makes full use of the upper space of the machine room, arranges the structure of the valve group reasonably, meets technical requirements, and meets daily maintenance such as daily valve operation and filter disassembly and cleaning.

[0014] 2. The stability of the entire valve group is improved by two reinforcing ribs, and the staff can climb up and operate with the help of multiple cross bars between the two reinforcing ribs without the need for other tools, which is very convenient to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0016] Figure 2 for Figure 1 The main view;

[0017] Figure 3 This is a schematic diagram of the installation of multiple valve groups of the present invention;

[0018] Figure 4 This is a schematic diagram of the connection component structure of the present utility model.

[0019] The accompanying drawings are marked as follows: 1, pipeline 1; 2, filter pipeline 1; 3, pipeline 2; 4, filter pipeline 2; 5, hanging C-shaped steel bracket; 6, clamp 1; 7, floor-standing C-shaped steel bracket; 8, clamp 2; 9, connecting bracket; 10, connecting assembly; 11, manual valve; 12, regulating valve; 13, static balancing valve; 14, pressure gauge; 15, thermometer; 16, filter;

[0020] 1001. Reinforcement rib; 1002. Cross bar. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0022] Refer to the instruction manual Figure 1-4 The utility model provides a valve group installation structure, including pipeline 1, filter pipeline 2, pipeline 2 3 and filter pipeline 2 4, which are distributed in sequence from top to bottom. A hanging C-shaped steel bracket 5 is provided at the rear of the pipeline 1. A plurality of clamps 6 are fixedly provided at the front end of the hanging C-shaped steel bracket 5. The plurality of clamps 6 are fixedly sleeved on pipeline 1, filter pipeline 2, pipeline 2 3 and filter pipeline 2 4 respectively.

[0023] Two floor-standing C-shaped steel brackets 7 are provided between the filter pipeline 2 4 and the filter pipeline 2 3. Two clamps 2 8 are fixed on the two floor-standing C-shaped steel brackets 7. The two clamps 2 8 are fixedly sleeved on the pipeline 2 3 and the filter pipeline 2 4 respectively. The pipeline 1 and the filter pipeline 1 2, and the filter pipeline 2 4 and the pipeline 2 3 are fixed by two connecting brackets 9.

[0024] Two manual valves 11 are fixedly provided on the pipeline 1, the filter pipeline 1 2, the pipeline 2 3 and the filter pipeline 2 4. A regulating valve 12 is fixedly provided on the pipeline 1 and the pipeline 2 3. A static balancing valve 13 is fixedly provided on the pipeline 1 and the pipeline 2 3, and the static balancing valve 13 is arranged on one side of the regulating valve 12. The regulating valve 12 is fixedly provided on the pipeline 1 and the pipeline 2 3. A static balancing valve 13 is fixedly provided on the pipeline 1 and the pipeline 2 3, and the static balancing valve 13 is arranged on one side of the regulating valve 12.

[0025] The pipe 1, filter pipe 1, pipe 2, pipe 2, and filter pipe 2 are all fixedly provided with a pressure gauge 14 and a thermometer 15. The thermometers 15 on the pipe 1 and pipe 2 are located between the static balancing valve 13 and the regulating valve 12. The pressure gauges 14 on the pipe 1 and pipe 2 are located on the other side of the regulating valve 12. The pressure gauges 14 and thermometers 15 can be used to monitor the pressure and temperature of the pipe 1, filter pipe 1, pipe 2, pipe 2, and filter pipe 2 in real time to ensure operational safety.

[0026] The filter line 1 2 and the filter line 2 4 are both fixedly provided with a filter 16 . The filter 16 is provided between the pressure gauge 14 and the thermometer 15 and is used for filtering the transported gas or liquid.

[0027] When in use, the tops of pipeline 1, filter pipeline 1 2, pipeline 2 3 and filter pipeline 2 4 are fixed by hanging C-shaped steel brackets 5 and multiple clamps 1 6. At the same time, two floor-standing C-shaped steel brackets 7 are used to support and reinforce between pipeline 2 3 and filter pipeline 2 4, and two connecting brackets 9 are used to reinforce between pipeline 1 and filter pipeline 1 2, and between filter pipeline 2 4 and pipeline 2 3. In this way, the entire valve group is fixed to the wall and the ground. In the case of insufficient horizontal space, the upper space of the machine room is fully utilized, the structure of the valve group is reasonably arranged to meet the technical requirements, and at the same time, daily valve operation and daily maintenance such as disassembly and cleaning of the filter 16 are met.

[0028] It is worth noting that the installation height of the manual valve 11 is 2.5 meters from the ground to facilitate daily maintenance operations. The filter 16 is 400 mm from the ground. This distance mainly meets the daily disassembly and cleaning of the internal filter screen of the filter 16. The distance between the regulating valve 12 and the lower filter 16 is controlled at 300 mm. This distance is mainly to meet the installation and insulation of pipeline fittings. The distance between the regulating valve 12 and the upper filter 16 is controlled at 400 mm to meet the installation and operation space of the regulating valve 12.

[0029] Refer to the instruction manual Figure 1-4 , a connecting assembly 10 is provided between the hanging C-shaped steel bracket 5 and the two ground C-shaped steel brackets 7, and the connecting assembly 10 includes a reinforcing rib 1001, and a plurality of cross bars 1002 are fixedly provided between the two reinforcing ribs 1001. The plurality of cross bars 1002 are distributed from top to bottom between the two reinforcing ribs 1001. The plurality of cross bars 1002 are all provided in front of the pipeline 2 3 to facilitate the staff to climb up and operate;

[0030] The plurality of cross bars 1002 are spaced apart from the regulating valve 12 , the pressure gauge 14 , the thermometer 15 , the manual valve 11 and the filter 16 to prevent the cross bars 1002 from obstructing the operation of the staff.

[0031] By setting two reinforcing ribs 1001 between two ground-mounted C-shaped steel brackets 7 and a suspended C-shaped steel bracket 5, and fixing the top and bottom of the reinforcing ribs 1001 to the ceiling and the ground of the machine room respectively, the stability of the entire valve group can be further improved, and multiple cross bars 1002 are set between the two reinforcing ribs 1001. The staff can climb up with the help of the cross bars 1002 to operate the manual valve at a high place without the need for other tools, which is very convenient to use.

[0032] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.

Claims

1. A valve group installation structure, characterized by: The invention comprises pipeline 1 (1), filter pipeline 1 (2), pipeline 2 (3) and filter pipeline 2 (4) which are sequentially distributed from top to bottom. A hanging C-shaped steel bracket (5) is provided at the rear of the pipeline 1 (1). A plurality of clamps 1 (6) are fixedly provided at the front end of the hanging C-shaped steel bracket (5). The plurality of clamps 1 (6) are respectively fixedly sleeved on pipeline 1 (1), filter pipeline 1 (2), pipeline 2 (3) and filter pipeline 2 (4). Two floor-standing C-shaped steel brackets (7) are provided between the filter pipeline 2 (4) and the pipeline 2 (3), and two clamps 2 (8) are fixedly provided on the two floor-standing C-shaped steel brackets (7), and the two clamps 2 (8) are fixedly sleeved on the pipeline 2 (3) and the filter pipeline 2 (4) respectively; The pipeline 1 (1) and the filter pipeline 1 (2), as well as the filter pipeline 2 (4) and the pipeline 2 (3) are fixed via two connecting brackets (9), and a connecting assembly (10) is provided between the hanging C-shaped steel bracket (5) and the two floor-standing C-shaped steel brackets (7).

2. A valve group installation structure according to claim 1, characterized in that: The connecting assembly (10) includes a reinforcing rib (1001), a plurality of cross bars (1002) are fixedly arranged between two reinforcing ribs (1001), the plurality of cross bars (1002) are sequentially distributed from top to bottom between the two reinforcing ribs (1001), and the plurality of cross bars (1002) are all arranged in front of the second pipeline (3).

3. A valve group installation structure according to claim 2, characterized in that: Two manual valves (11) are fixedly provided on the pipeline one (1), the filter pipeline one (2), the pipeline two (3) and the filter pipeline two (4).

4. A valve group installation structure according to claim 3, characterized in that: A regulating valve (12) is fixedly provided on both the pipeline 1 (1) and the pipeline 2 (3), and a static balancing valve (13) is fixedly provided on both the pipeline 1 (1) and the pipeline 2 (3), and the static balancing valve (13) is arranged on one side of the regulating valve (12).

5. The valve assembly installation structure according to claim 4, characterized in that: The pipeline 1 (1), the filter pipeline 1 (2), the pipeline 2 (3) and the filter pipeline 2 (4) are all fixedly provided with a pressure gauge (14) and a thermometer (15); the thermometer (15) on the pipeline 1 (1) and the pipeline 2 (3) is arranged between the static balancing valve (13) and the regulating valve (12); and the pressure gauge (14) on the pipeline 1 (1) and the pipeline 2 (3) is arranged on the other side of the regulating valve (12).

6. The valve assembly installation structure according to claim 5, characterized in that: A filter (16) is fixedly provided on both the first filter line (2) and the second filter line (4), and the filter (16) is provided between the pressure gauge (14) and the thermometer (15).

7. The valve assembly installation structure according to claim 6, characterized in that: The plurality of cross bars (1002) are spaced apart from the regulating valve (12), the pressure gauge (14), the thermometer (15), the manual valve (11) and the filter (16).