Copper pipe positioning protrusion forming device

The copper pipe positioning projection forming device forms the projection on the copper pipe, which solves the problem of automatic drop of copper pipe on the water collection pipe, and improves welding efficiency and safety.

CN223277062UActive Publication Date: 2025-08-29ZHUJI QIAOZHUO MACHINERY CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422567715.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-23
Publication Date
2025-08-29
Estimated Expiration
2034-10-23

AI Technical Summary

Technical Problem

Copper pipes are easily dropped automatically on the water collecting pipe, which increases welding difficulty and increases safety risks and reduces welding efficiency.

Method used

A copper pipe positioning and protrusion forming device is designed. Through the cooperation of the forming press rod, the mold groove and the die hole, the protrusions are quickly formed and positioned on the copper pipe to ensure the stable positioning of the copper pipe and the water collecting pipe.

Benefits of technology

It improves the efficiency and safety of copper pipe welding and reduces safety hazards during welding.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223277062U_ABST
    Figure CN223277062U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of copper pipe machining, and discloses a copper pipe positioning protrusion forming device which comprises a rack, a lifting column is connected to the rack in a sliding mode, a transversely-arranged forming pressing rod is fixed to the bottom of the lifting column, and a protrusion is formed on the outer wall of the lower end of the forming pressing rod. A lower die base is arranged below the forming pressing rod, a die groove is formed in the lower die base, and a female die hole corresponding to the protrusion is formed in the die groove. Through the cooperation of the forming pressing rod, the die groove and the female die hole, the positioning protrusion can be quickly and conveniently formed in the corresponding position of the copper pipe, follow-up welding work of the copper pipe is facilitated, and the welding efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of copper tube processing, in particular to a copper tube positioning bulge forming device. Background Art

[0002] The structure of the air conditioning water collecting pipe is as shown in the attached instruction manual. Figure 4 As shown, it includes a water collecting pipe body and a plurality of copper pipes fixed on the water collecting pipe body. The copper pipes are first inserted into the water collecting pipe and then fixed to the water collecting pipe by welding. Since the copper pipe holes on the water collecting pipe are generally slightly larger than the outer diameter of the copper pipes, the copper pipes are likely to fall off automatically after being inserted, which increases the difficulty of the subsequent welding work. In addition, the welder needs to fix the copper pipe during the welding process, which increases the safety hazard of welding and reduces the welding efficiency. In order to prevent the copper pipe from falling before welding, a positioning protrusion is set on the copper pipe. Before welding, the positioning protrusion can be knocked into the copper pipe hole of the water collecting pipe by tapping, so that the copper pipe can be positioned. Therefore, there is an urgent need for a forming device for the copper pipe positioning protrusion. Utility Model Content

[0003] The purpose of the utility model is to provide a copper tube positioning protrusion forming device, which can quickly and conveniently form a positioning protrusion at the corresponding position of the copper tube through the cooperation of the forming pressure rod and the die groove and the die hole, thereby facilitating the subsequent welding work of the copper tube and improving the welding efficiency.

[0004] The above technical objectives of the present invention are achieved through the following technical solutions:

[0005] A copper tube positioning protrusion forming device comprises a frame, a lifting column is slidably connected to the frame, a horizontally arranged forming pressure rod is fixed to the bottom of the lifting column, and a protrusion is formed on the outer wall of the lower end of the forming pressure rod;

[0006] A lower die base is provided below the forming pressure rod, a die groove is formed on the lower die base, and a concave die hole corresponding to the protrusion is formed on the die groove.

[0007] Insert the small section of copper tube into the forming pressure rod, and the lifting column moves downward to drive the forming pressure rod to move downward. The forming pressure rod drives the copper tube to move downward and insert it into the mold groove. Then the forming pressure rod continues to move downward to press a positioning convex point on the side wall of the copper tube through the protrusion. The positioning convex point can facilitate the positioning work between the copper tube and the water collection pipe before subsequent welding.

[0008] The utility model is further configured as follows: a rack arranged parallel to the lifting column is fixed on the lifting column, the rack is meshed with a gear, the gear is fixed to the middle of the rotating shaft, and the rotating shaft is rotatably connected to the frame;

[0009] A handle is fixed on one end of the rotating shaft passing through the frame.

[0010] The handle drives the rotating shaft to rotate, the rotating shaft drives the gear to rotate, the gear drives the rack to move downward, and the rack drives the lifting column to move downward, thereby completing the downward forming work of the forming machine.

[0011] The utility model is further configured as follows: a limit support plate is fixed on the upper end of the lifting column, a vertically arranged adjusting screw is screwed on the limit support plate, and the adjusting screw is directly facing the upper end plane of the frame.

[0012] The downward movement of the lifting column can be limited by adjusting the screw to prevent the copper tube from being broken due to overpressure on the formed pressure rod; at the same time, the relative height of the adjusting screw can be changed by screwing the adjusting screw to the limit support plate, thereby adjusting the lowest downward position of the lifting column.

[0013] The utility model is further configured such that the top end of the lifting column is fixed to the bottom end of the tension spring, the top end of the tension spring is fixed to the spring bracket, and the spring bracket is fixed to the frame. After the copper tube positioning protrusion is completed, the handle is released, and the lifting column automatically moves upward under the action of the tension spring, while the lifting column can be stopped at a certain height, facilitating the installation and removal of the copper tube.

[0014] The utility model is further configured as follows: the forming pressure rod includes a round rod portion and a square column portion;

[0015] The lower end of the lifting column is formed with a front sunken surface, and the front sunken surface is formed with a square sunken hole. The square column part is inserted into and fixed in the square sunken hole.

[0016] The protrusion can be positioned by the cooperation of the square column part and the square countersunk hole, thereby preventing the forming pressure rod from rotating freely.

[0017] The utility model is further configured such that a through hole is formed on the bottom surface of the square countersunk hole, a screw is inserted into the through hole, and the screw is screwed onto the square column portion. The screw facilitates the locking of the square column portion, and when the forming pressure rod is to be replaced, the worker can push the forming pressure rod out from the rear end through the through hole.

[0018] The utility model is further configured as follows: a plurality of die grooves are arranged in parallel on the lower die base, and the sizes of the plurality of die grooves are different.

[0019] The lower die base can move on the frame and be fixed to the frame by screws. By setting a plurality of die grooves, the positioning convex forming work can be performed on copper tubes with various diameters.

[0020] The outstanding effects of the utility model are:

[0021] Compared with the existing technology, through the cooperation of the forming pressure rod, the die groove and the die hole, the positioning protrusion can be quickly and conveniently formed at the corresponding position of the copper tube, which facilitates the subsequent welding work of the copper tube and improves the welding efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0022] Figure 1 A schematic diagram of the structure of an embodiment of the utility model;

[0023] Figure 2 for Figure 1 A partial enlarged view of A;

[0024] Figure 3 for Figure 2 About the cross-sectional view of BB;

[0025] Figure 4 This is a schematic diagram of the assembly of the copper tube with positioning protrusions and the water collecting pipe.

[0026] Reference numerals: 10, frame;

[0027] 20. Lifting column; 21. Rack; 22. Gear; 23. Rotating shaft; 24. Handle; 25. Limiting support plate; 26. Adjusting screw; 27. Tension spring; 28. Spring bracket; 29. ​​Screw;

[0028] 201, front sunken surface; 202, square countersunk hole; 203, through hole;

[0029] 30. Molded pressure rod; 301. Protrusion; 302. Round rod portion; 303. Square column portion;

[0030] 40, lower die base; 401, die groove; 402, die hole;

[0031] 90. Copper tube; 901. Positioning bump. DETAILED DESCRIPTION

[0032] The following embodiments are used to illustrate the present invention, but are not intended to limit the scope of the present invention.

[0033] The following references Figures 1 to 3 The following describes the embodiments of the present invention:

[0034] A copper tube positioning protrusion forming device includes a frame 10, a lifting column 20 is slidably connected to the frame 10, a horizontally arranged forming pressure rod 30 is fixed to the bottom of the lifting column 20, and a protrusion 301 is formed on the outer wall of the lower end of the forming pressure rod 30;

[0035] A lower die base 40 is provided below the forming pressure rod 30 . A die groove 401 is formed on the lower die base 40 . A die hole 402 corresponding to the protrusion 301 is formed on the die groove 401 .

[0036] Insert the small section of copper tube 90 onto the forming pressure rod, and the lifting column 20 moves downward to drive the forming pressure rod to move downward, and the forming pressure rod drives the copper tube to move downward and insert it into the mold groove, and then the forming pressure rod continues to move downward to press out a positioning convex point 901 on the side wall of the copper tube through the protrusion. The positioning convex point can facilitate the positioning work between the copper tube and the water collecting pipe before subsequent welding.

[0037] The lifting column 20 is fixed with a rack 21 arranged parallel thereto, the rack 21 is meshed with a gear 22, the gear 22 is fixed to the middle of a rotating shaft 23, and the rotating shaft 23 is rotatably connected to the frame 10;

[0038] A handle 24 is fixed to one end of the rotating shaft 23 passing through the frame 10 .

[0039] The handle drives the rotating shaft to rotate, the rotating shaft drives the gear to rotate, the gear drives the rack to move downward, and the rack drives the lifting column to move downward, thereby completing the downward forming work of the forming machine.

[0040] A limit support plate 25 is fixed to the upper end of the lifting column 20 , and a vertically arranged adjusting screw 26 is screwed onto the limit support plate 25 . The adjusting screw 26 faces the upper end plane of the frame 10 .

[0041] The downward movement of the lifting column can be limited by adjusting the screw to prevent the copper tube from being broken due to overpressure on the formed pressure rod; at the same time, the relative height of the adjusting screw can be changed by screwing the adjusting screw to the limit support plate, thereby adjusting the lowest downward position of the lifting column.

[0042] The top end of the lifting column 20 is fixed to the bottom end of the tension spring 27, the top end of the tension spring 27 is fixed to the spring bracket 28, and the spring bracket 28 is fixed to the frame 10. After the copper tube positioning protrusion is completed, the handle is released, and the lifting column automatically moves up under the action of the tension spring, and the lifting column can be stopped at a certain height, which facilitates the installation and removal of the copper tube.

[0043] The forming pressure rod 30 includes a round rod portion 302 and a square column portion 303;

[0044] The lower end of the lifting column 20 is formed with a front sunken surface 201 , and the front sunken surface 201 is formed with a square countersunk hole 202 . The square column portion 303 is inserted into and fixed in the square countersunk hole 202 .

[0045] The protrusion 301 can be positioned by the cooperation between the square column portion and the square countersunk hole to prevent the forming pressure rod from rotating freely.

[0046] A through hole 203 is formed on the bottom surface of the square countersunk hole 202, and a screw 29 is sleeved in the through hole 203. The screw 29 is screwed to the square column part 303. The screw can facilitate the locking of the square column part. At the same time, when the forming pressure rod needs to be replaced, the staff can push out the forming pressure rod from the rear end through the through hole.

[0047] A plurality of die grooves 401 are arranged in parallel on the lower die base 40 , and the sizes of the plurality of die grooves 401 are different.

[0048] The lower die base can move on the frame and be fixed to the frame by screws. By setting a plurality of die grooves, the positioning convex forming work can be performed on copper tubes with various diameters.

[0049] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principles of the present invention. These improvements and modifications based on the above assumptions should also be regarded as within the scope of protection of the present invention.

Claims

1. A copper tube positioning protrusion forming device, comprising a frame (10), characterized in that: A lifting column (20) is slidably connected to the frame (10), a horizontally arranged forming pressure rod (30) is fixed to the bottom of the lifting column (20), and a protrusion (301) is formed on the outer wall of the lower end of the forming pressure rod (30); A lower die base (40) is provided below the forming pressure rod (30), a die groove (401) is formed on the lower die base (40), and a die hole (402) corresponding to the protrusion (301) is formed on the die groove (401).

2. A copper tube positioning protrusion forming device according to claim 1, characterized in that: A rack (21) arranged parallel to the lifting column (20) is fixed on the lifting column (20), the rack (21) is meshed with a gear (22), the gear (22) is fixed to the middle of the rotating shaft (23), and the rotating shaft (23) is rotatably connected to the frame (10); A handle (24) is fixed to one end of the rotating shaft (23) passing through the frame (10).

3. A copper tube positioning protrusion forming device according to claim 2, characterized in that: A limit support plate (25) is fixed to the upper end of the lifting column (20), and a vertically arranged adjustment screw (26) is screwed onto the limit support plate (25), and the adjustment screw (26) is directly opposite to the upper end plane of the frame (10).

4. A copper tube positioning protrusion forming device according to claim 2, characterized in that: The top end of the lifting column (20) is fixed to the lower end of the tension spring (27), the upper end of the tension spring (27) is fixed to the spring bracket (28), and the spring bracket (28) is fixed to the frame (10).

5. The copper tube positioning protrusion forming device according to claim 1, characterized in that: The forming pressure rod (30) comprises a round rod portion (302) and a square column portion (303); The lower end of the lifting column (20) is formed with a front sunken surface (201), and a square sunken hole (202) is formed on the front sunken surface (201). The square column portion (303) is inserted into and fixed in the square sunken hole (202).

6. The copper tube positioning protrusion forming device according to claim 5, characterized in that: A through hole (203) is formed on the bottom surface of the square countersunk hole (202), a screw (29) is sleeved in the through hole (203), and the screw (29) is screwed onto the square column portion (303).

7. The copper tube positioning protrusion forming device according to claim 1, characterized in that: A plurality of die grooves (401) are arranged in parallel on the lower die base (40), and the sizes of the plurality of die grooves (401) are different.