Technical Problem

The assembly process of existing construction safety fences is cumbersome, resulting in low construction efficiency and unfavorable transportation.

Method used

The design of folding unit, bearing assembly, clamping assembly and limiting unit is adopted. Through the cooperation of the insertion shaft, slot and clip, the guardrail can be quickly folded and locked, and the operation process is simplified.

Benefits of technology

It improves construction efficiency, simplifies the assembly and disassembly process of guardrails, enhances the reliability of the fence, and facilitates transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223281835U_ABST
    Figure CN223281835U_ABST
Patent Text Reader

Abstract

The utility model discloses a construction safety fence which comprises a first fence and second fences arranged on the two sides of the first fence, and further comprises a folding unit which comprises a bearing assembly used for supporting the bottoms of the first fence and the second fences and a clamping assembly arranged in the bearing assembly and used for clamping the first fence and the second fences. And the limiting unit is arranged at the joint of the first guardrail and the second guardrail and used for limiting the first guardrail and the second guardrail in the folding process. The second guardrail drives the second inserting shaft to rotate in the inserting hole, and the second inserting shaft also rotates relative to the arc-shaped clamping groove, so that the fence in the folded state can be quickly switched into the fence in the U-shaped state, the operation is simple, and the overall construction efficiency is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of construction fences, in particular to a construction safety fence. Background Art

[0002] During construction, to prevent others from mistakenly entering the construction area, it is necessary to put up a construction fence in the construction area to remind others that construction is in progress and serve as a good warning. Especially during road construction, the construction area needs to be fenced off in time to prevent pedestrians or vehicles from mistakenly entering;

[0003] However, the safety fences in the prior art are usually assembled by assembling single guardrails, resulting in that after each switch of the road construction area, several guardrails need to be disassembled at the previous construction site and transferred to the switched construction area for assembly. The operation is cumbersome, which reduces the construction efficiency, and it is difficult to transport the several guardrails that are disassembled into a single state each time.

[0004] The above content is only used to assist in understanding the technical solution of the present invention and does not mean that the above content is the closest prior art. Utility Model Content

[0005] The purpose of the utility model is to provide a construction safety fence to solve the problems in the above background technology that the existing construction safety fence has a complicated assembly process, reduces construction efficiency, and is not conducive to transportation.

[0006] To achieve the above objectives, the present invention provides the following technical solutions:

[0007] A construction safety fence includes a first guardrail, second guardrails arranged on both sides of the first guardrail, and further includes:

[0008] The folding unit includes a bearing assembly for supporting the bottom of the first guardrail and the second guardrail, and a clamping assembly provided inside the bearing assembly for clamping the first guardrail and the second guardrail;

[0009] The limiting unit is provided at the connection between the first guardrail and the second guardrail, and is used to limit the first guardrail and the second guardrail during the folding process.

[0010] Furthermore, one side of the first guardrail is provided with a first plug-in shaft fixedly connected thereto for being plugged into the interior of the bearing assembly, and a first outer circular groove is provided outside the first plug-in shaft and inside the bearing assembly;

[0011] A second plug-in shaft for plugging into the interior of the carrier is fixedly connected to one side of the second guardrail, and a second outer circular groove is provided on the outside of the second plug-in shaft and inside the carrier assembly.

[0012] Furthermore, the bearing assembly includes:

[0013] A fixed block is provided directly below the first plug shaft and the second plug shaft;

[0014] There are two groups of jacks at the upper end of the fixed block, which are used to accommodate the lower parts of the first plug-in shaft and the second plug-in shaft respectively.

[0015] Furthermore, the clamping assembly includes:

[0016] An insert rod is slidably inserted into the fixed block;

[0017] The guide groove extends from the interior of the fixed block on one side of the fixed block and is used to guide the movement of the insertion rod.

[0018] Furthermore, the guide groove is in communication with the two groups of the jacks;

[0019] One side of the insertion rod is located in the first outer circular groove and the second outer circular groove, and is used to clamp and limit the first insertion shaft and the second insertion shaft.

[0020] Furthermore, the limiting unit includes:

[0021] There are two groups of clips, which are respectively located on both sides of the first plug-in shaft and the second plug-in shaft, and are used to bind the first plug-in shaft and the second plug-in shaft;

[0022] Arc-shaped clamping grooves are provided at both ends of the clamping piece, and are used to accommodate the first plug-in shaft and the second plug-in shaft respectively, and the arc-shaped clamping grooves are rotatably connected to the first plug-in shaft and the second plug-in shaft;

[0023] A fastening bolt is inserted between the two sets of clips;

[0024] A fastening nut is threadably connected to the fastening bolt and is used to fasten the two groups of clips.

[0025] Compared with the prior art, the beneficial effects of the present invention are:

[0026] 1. The utility model drives the second plug shaft to rotate in the plug hole through the second guardrail, and the second plug shaft also rotates relative to the arc-shaped clamping groove, so that the fence in the folded state can be quickly switched to the U-shaped fence, which is easy to operate and improves the overall construction efficiency.

[0027] 2. The utility model inserts the insertion rod into the guide groove so that one side of the insertion rod is located inside the first outer circular groove and the second outer circular groove respectively. When the first insertion shaft and the second insertion shaft are rotated and adjusted during the folding process, the insertion rod can lock the first insertion shaft and the second insertion shaft inside the fixed block to prevent the first insertion shaft and the second insertion shaft from falling off from the fixed block, thereby improving the overall reliability of the fence. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 This is a schematic diagram of the overall structure of the utility model;

[0029] Figure 2 For this utility model Figure 1 Enlarged view of point A in the middle;

[0030] Figure 3 This is a schematic diagram of the structure of the limit unit of the utility model;

[0031] Figure 4 This is a diagram showing the matching relationship between the clamping assembly and the first plug shaft of the utility model;

[0032] Figure 5 This is a diagram showing the limiting state of the first insertion shaft by the insertion rod of the utility model;

[0033] Figure 6 This is a diagram of the first guardrail and the second guardrail of the utility model after folding.

[0034] Figure numerals: 100, first guardrail; 1001, first plug shaft; 1002, first outer circular groove; 101, second guardrail; 1011, second plug shaft; 1012, second outer circular groove; 1, folding unit; 11, clamping assembly; 111, plug rod; 112, guide groove; 12, bearing assembly; 121, fixing block; 122, mounting hole; 123, plug hole; 2, limiting unit; 21, clip; 22, arc-shaped clip groove; 23, fastening bolt; 24, fastening nut. DETAILED DESCRIPTION

[0035] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0036] See also Figure 1-6 , the utility model provides a technical solution:

[0037] A construction safety fence includes a first guardrail 100, second guardrails 101 provided on both sides of the first guardrail 100, and further includes:

[0038] The folding unit 1 includes a bearing assembly 12 for supporting the bottom of the first guardrail 100 and the second guardrail 101, and a clamping assembly 11 provided inside the bearing assembly 12 for clamping the first guardrail 100 and the second guardrail 101;

[0039] The limiting unit 2 is provided at the connection between the first guardrail 100 and the second guardrail 101 and is used to limit the first guardrail 100 and the second guardrail 101 during the folding process.

[0040] As an improvement, Figure 4-5 As shown, one side of the first guardrail 100 is provided with a first plug shaft 1001 fixedly connected to be plugged into the inside of the bearing assembly 12, and a first outer circular groove 1002 is provided outside the first plug shaft 1001 and inside the bearing assembly 12;

[0041] A second plug-in shaft 1011 for plugging into the interior of the support is fixedly connected to one side of the second guardrail 101 , and a second outer circular groove 1012 is provided outside the second plug-in shaft 1011 and inside the support assembly 12 .

[0042] Furthermore, the bearing assembly 12 includes:

[0043] The fixing block 121 is provided directly below the first plug shaft 1001 and the second plug shaft 1011;

[0044] There are two groups of insertion holes 123 at the upper end of the fixed block 121, which are used to accommodate the lower parts of the first insertion shaft 1001 and the second insertion shaft 1011 respectively;

[0045] The first plug shaft 1001 and the second plug shaft 1011 can both rotate inside the plug hole 123 .

[0046] Preferably, a mounting hole 122 is provided inside the fixing block 121 from top to bottom, for fixing the fixing block 121 by driving a screw into the ground through the mounting hole 122;

[0047] Furthermore, if Figure 2 , Figure 5 As shown, the clamping assembly 11 includes:

[0048] The insertion rod 111 is slidably inserted into the interior of the fixing block 121;

[0049] The guide groove 112 extends from the interior of the fixing block 121 on one side of the fixing block 121 and is used to guide the movement of the insertion rod 111 .

[0050] The guide groove 112 is connected to the two groups of the insertion holes 123;

[0051] One side of the insertion rod 111 is located in the first outer circular groove 1002 and the second outer circular groove 1012 , and is used to clamp and limit the first insertion shaft 1001 and the second insertion shaft 1011 .

[0052] As an improvement, Figure 2-3 As shown, the limiting unit 2 includes:

[0053] There are two groups of clips 21, which are respectively located on both sides of the first plug shaft 1001 and the second plug shaft 1011, and are used to bind the first plug shaft 1001 and the second plug shaft 1011;

[0054] The arc-shaped clamping groove 22 is provided at both ends of the clamping piece 21, and is used to accommodate the first plug-in shaft 1001 and the second plug-in shaft 1011 respectively. The arc-shaped clamping groove 22 is rotatably connected to the first plug-in shaft 1001 and the second plug-in shaft 1011;

[0055] The fastening bolt 23 is inserted between the two sets of clips 21;

[0056] The fastening nut 24 is threadedly connected to the fastening bolt 23 and is used to fasten the two sets of clips 21.

[0057] It should be noted that the present invention is described by taking the folding process of three groups of guardrails as an example.

[0058] It should be noted that: in the specific implementation process of this utility model, Figure 1-3 , Figure 6 As shown, when the fence is needed at the construction site, the fence in the folded state is placed on the construction site, so that the fixing block 121 is placed on the ground, the first guardrail 100 and the second guardrail 101 are in the upright state, and then the second guardrails 101 on both sides of the first guardrail 100 are pulled apart. During this process, the second guardrail 101 drives the second plug shaft 1011 to rotate in the plug hole 123, and the second plug shaft 1011 also rotates relative to the arc-shaped clamping groove 22, so that the fence in the folded state can be quickly switched to the U-shaped fence, thereby eliminating the need to assemble the single-state guardrail at the construction site, simplifying the operation, and improving the overall construction efficiency.

[0059] Similarly, when the U-shaped fence needs to be folded after each use, it is only necessary to pull the second guardrail 101 in the opposite direction so that the second guardrail 101 rotates toward the first guardrail 100 until it is close to the first guardrail 100 to complete the folding work, which is convenient for subsequent transportation of the safety fence.

[0060] like Figure 2 , Figure 4-5 As shown, in addition, the utility model inserts the insertion rod 111 into the guide groove 112 so that one side of the insertion rod 111 is located inside the first outer circular groove 1002 and the second outer circular groove 1012 respectively, so that when the first insertion shaft 1001 and the second insertion shaft 1011 are rotated and adjusted during the folding process, the insertion rod 111 can lock the first insertion shaft 1001 and the second insertion shaft 1011 inside the fixed block 121 to prevent the first insertion shaft 1001 and the second insertion shaft 1011 from falling off from the fixed block 121, thereby improving the overall reliability of the fence.

[0061] It should be noted that, in this document, relational terms such as first and second, etc., are used only to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any actual relationship or order between these entities or operations. Moreover, the terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus.

[0062] Although the embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and variations may be made to these embodiments without departing from the principles and spirit of the present invention, and the scope of the present invention is defined by the appended claims and their equivalents.

Claims

1. A construction safety fence, comprising a first guardrail (100), and second guardrails (101) arranged on both sides of the first guardrail (100), characterized in that: Also includes: A folding unit (1) comprises a bearing assembly (12) for supporting the bottoms of a first guardrail (100) and a second guardrail (101), and a clamping assembly (11) disposed inside the bearing assembly (12) for clamping the first guardrail (100) and the second guardrail (101); The limiting unit (2) is provided at the connection between the first guardrail (100) and the second guardrail (101) and is used to limit the first guardrail (100) and the second guardrail (101) during the folding process.

2. A construction safety fence according to claim 1, characterized in that: One side of the first guardrail (100) is provided with a first plug shaft (1001) fixedly connected thereto for plugging into the interior of the bearing assembly (12); a first outer circular groove (1002) is provided outside the first plug shaft (1001) and inside the bearing assembly (12); One side of the second guardrail (101) is fixedly connected to a second plug shaft (1011) for plugging into the bearing assembly (12); a second outer circular groove (1012) is provided outside the second plug shaft (1011) and inside the bearing assembly (12).

3. A construction safety fence according to claim 2, characterized in that: The bearing assembly (12) comprises: A fixed block (121) is provided directly below the first plug shaft (1001) and the second plug shaft (1011); Two groups of insertion holes (123) are provided at the upper end of the fixed block (121), respectively used to accommodate the lower parts of the first insertion shaft (1001) and the second insertion shaft (1011).

4. A construction safety fence according to claim 3, characterized in that: The clamping assembly (11) comprises: An inserting rod (111) is slidably inserted into the interior of the fixing block (121); The guide groove (112) extends from the interior of the fixing block (121) on one side of the fixing block (121) and is used to guide the movement of the insertion rod (111).

5. A construction safety fence according to claim 4, characterized in that: The guide groove (112) is in communication with the two groups of the insertion holes (123); One side of the insertion rod (111) is located in the first outer circular groove (1002) and the second outer circular groove (1012), and is used to clamp and limit the first insertion shaft (1001) and the second insertion shaft (1011).

6. A construction safety fence according to claim 2, characterized in that: The limiting unit (2) comprises: The clips (21) are provided in two groups and are respectively located on both sides of the first plug-in shaft (1001) and the second plug-in shaft (1011), and are used to bind the first plug-in shaft (1001) and the second plug-in shaft (1011); Arc-shaped clamping grooves (22) are provided at both ends of the clamping piece (21) and are used to accommodate the first plug-in shaft (1001) and the second plug-in shaft (1011) respectively. The arc-shaped clamping grooves (22) are rotatably connected to the first plug-in shaft (1001) and the second plug-in shaft (1011); A fastening bolt (23) is inserted between the two sets of clips (21); A fastening nut (24) is threadedly connected to the fastening bolt (23) and is used to fasten the two groups of clips (21).