Assembly type fulcrum adjusting device for steel structure hoisting

The assemblable fulcrum adjustment device solves the problems of complicated fulcrum setting and material waste in traditional steel structure construction, realizes efficient and safe fulcrum adjustment, and improves construction efficiency and appearance quality.

CN223330270UActive Publication Date: 2025-09-12SHANGHAI BAOYE GRP CORP
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422529712.4
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-10-20
Publication Date
2025-09-12
Estimated Expiration
2034-10-20

AI Technical Summary

Technical Problem

The method of setting the fulcrum for hoisting components in traditional steel structure construction is cumbersome, results in serious material waste, and is not suitable for steel beams of different sizes, affecting construction safety and aesthetics.

Method used

It adopts an assembled fulcrum adjustment device, including a fulcrum rod, a width adjustment rod, a height adjustment rod, vertical and horizontal movable rods, which are connected by sleeves and fixed with high-strength bolts to adapt to the fixation and adjustment of steel beams of different sizes.

Benefits of technology

It simplifies the construction process, improves construction efficiency and safety, reduces material waste, and enhances the construction appearance quality and applicability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223330270U_ABST
    Figure CN223330270U_ABST
Patent Text Reader

Abstract

The utility model discloses an assembly type fulcrum adjusting device for hoisting a steel structure, and relates to the technical field of steel structure construction members, a fulcrum rod is used for providing a fulcrum for hoisting equipment, and a width adjusting rod A and a height adjusting rod B are respectively connected with the fulcrum rod. The vertical movable rod and the transverse movable rod are connected with the width adjusting rod A and the height adjusting rod B correspondingly so that the device can be fixed to steel beams of different sizes, and the height and the width can be adjusted. Repeated welding is avoided in construction, the working procedure efficiency is remarkably improved, and the installation time is shortened. According to the method, materials are saved, the purchase cost is reduced, the material turnover efficiency is improved, and the construction process is optimized. The technology is suitable for steel beams of various sizes, operation is easy and convenient, construction safety is enhanced, damage to the attractiveness of steel members is reduced, and the appearance quality is improved. On the whole, the improvement improves the efficiency, reduces the cost, ensures the safety, and comprehensively improves the quality of a construction project.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of steel structure construction components, in particular to a steel structure hoisting and assembling fulcrum adjustment device. Background Art

[0002] During the construction of steel structures, the setting of fulcrums for hoisting components is a key step in ensuring construction safety and efficiency. Traditional methods of setting fulcrums usually use welding technology to connect and fix the supports to embedded parts. However, this method has some problems, such as cumbersome procedures, material waste, impact on the aesthetics of the structure, and the need to remove welded parts after construction is completed, all of which may affect the overall integrity and aesthetics of the steel structure. In addition, for components that cannot be lifted by lifting machinery, the traditional method uses lifting equipment for lifting, and the fulcrum setting is fixed and cannot be adjusted, which limits its applicability to different steel beams. Utility Model Content

[0003] The purpose of the utility model is to provide an assemblable fulcrum adjustment device for hoisting a steel structure, so as to solve the problems raised in the above-mentioned background technology.

[0004] The purpose of the utility model can be achieved through the following technical solutions:

[0005] A preassembled fulcrum adjustment device for lifting steel structures includes a fulcrum rod, a width adjustment rod A, a height adjustment rod B, a vertical movable rod and a transverse movable rod, wherein the fulcrum rod is used to provide a fulcrum for the lifting equipment, the width adjustment rod A and the height adjustment rod B are respectively connected to the fulcrum rod, and the vertical movable rod and the transverse movable rod are respectively connected to the width adjustment rod A and the height adjustment rod B to achieve the fixation of the device on steel beams of different sizes and the adjustment of height and width.

[0006] As a further optional solution of the present invention, the width adjustment rod A and the height adjustment rod B are connected by a sleeve, and the vertical movable rod and the horizontal movable rod are connected by a sleeve, and the sleeve is made of a steel plate with a wall thickness of 5 mm.

[0007] As a further optional solution of the present invention, the transverse movable rod includes 4 round steels with a diameter of 10 cm welded to the sleeve.

[0008] As a further optional solution of the present invention, the height adjustment rod B adopts an I-beam with a length of 2.5m; the fulcrum rod adopts an I-beam with a length of 2m; and the width adjustment rod A adopts an I-beam with a length of 1.5m.

[0009] As a further optional solution of the present invention, the ends of the vertical movable rod and the horizontal movable rod adopt sleeve joints with a wall thickness of 5mm, and the center of the sleeve is punched to serve as a bolt fixing hole after the sleeve is connected to the rod.

[0010] As a further optional solution of the present invention, the width adjustment rod A and the height adjustment rod B are made into I-beams with scale positioning holes, which are suitable for various steel beam sizes under normal circumstances. The vertical rods are for height adjustment, and positioning holes are generally made every 50 cm. The middle horizontal rods are for width positioning holes, and positioning holes are generally made every 50 cm.

[0011] As a further optional solution of the present invention, the movable rod is connected to the width adjustment rod A and the vertical movable rod through the connecting sleeve bolt holes and the positioning holes with high-strength bolts. After the device is in place, the transverse movable rod is installed to fix the vertical movable rod and the transverse movable rod, the height adjustment rod B and the transverse movable rod respectively. The fixing method is to connect the vertical movable rod and the height adjustment rod B positioning holes with the bolt holes of the transverse movable rod connecting sleeve with high-strength bolts.

[0012] As a further optional solution of the present invention, a lifting device is installed on the fulcrum rod to conduct a trial lift, and the lifting is performed after the force on the device is stabilized and no abnormal conditions occur.

[0013] Compared with the prior art, the beneficial effects of the present invention are:

[0014] During the construction process, repeated welding operations were eliminated, a key improvement that significantly optimized the entire construction process. This significantly reduced installation time, thereby improving construction efficiency. This approach not only avoided material waste during welding but also made material procurement easier, effectively reducing procurement costs. Furthermore, material turnover efficiency was significantly improved, further optimizing the construction process.

[0015] This technology is not only suitable for steel beams of various sizes, but also has a wide range of applications and is extremely easy to use. By adopting this technology, construction safety has been significantly improved, avoiding many potential safety hazards. It also reduces the damage caused by welding to the aesthetics and integrity of the steel components, making the installation itself more beautiful and elegant, thereby enhancing the overall appearance quality of the construction. This improvement not only improves construction efficiency, but also reduces costs and ensures construction safety, ultimately resulting in significant improvements in all aspects of the entire construction project. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0017] Figure 1 It is a structural diagram of the utility model;

[0018] Figure 2 This is a structural diagram of the present utility model;

[0019] Figure 3 It is a structural diagram of the utility model;

[0020] Figure 4 It is a structural front view of the present utility model.

[0021] In the figure: 1. Fulcrum rod; 2. Width adjustment rod A; 3. Height adjustment rod B; 4. Vertical movable rod; 5. Horizontal movable rod; 6. Diagonal brace; 7. Casing; 8. High-strength bolt. DETAILED DESCRIPTION

[0022] The following is a clear and complete description of the technical solution of the present invention in conjunction with the embodiments. Obviously, the embodiments described are only a part of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative efforts are within the scope of protection of the present invention. Example

[0023] See also Figure 1 - Figure 4 The figure shows a prefabricated steel structure lifting fulcrum system, comprising the following components: a fulcrum rod 1, a width adjustment rod A2, a height adjustment rod B3, a vertical movable rod 4, and a transverse movable rod 5. The fulcrum rod 1 supports the lifting equipment, while the width adjustment rod A2 and the height adjustment rod B3 are connected to the fulcrum rod 1. The vertical movable rod 4 and the transverse movable rod 5 are connected to the width adjustment rod A2 and the height adjustment rod B3, respectively, to facilitate fixing to steel beams of different sizes and adjusting height and width.

[0024] The width adjustment rod A2 and the height adjustment rod B3 are connected by a sleeve 7. The vertical movable rod 4 and the transverse movable rod 5 are also connected by a sleeve 7. The sleeve 7 is made of 5mm thick steel plate. The transverse movable rod 5 is welded to the sleeve 7 by four round steel bars with a diameter of 10cm.

[0025] The height adjustment rod B3 and the fulcrum rod 1 are both made of 2.5m and 2m long I-beams, while the width adjustment rod A2 is made of 1.5m long I-beams. The ends of the vertical movable rod 4 and the horizontal movable rod 5 are connected by 5mm thick sleeves 7 and fixed with bolts through the center holes.

[0026] Width adjustment rod A2 and height adjustment rod B3 are equipped with scale holes on the I-beam to accommodate various beam sizes. Vertical movable rods typically have holes every 50 cm for height adjustment, while the center crossbar has width holes every 50 cm.

[0027] The movable rods are connected to the locating holes through the bolt holes in the connecting sleeve 7 using high-strength bolts 8. Once the assembly is in place, install the transverse movable rod 5 and secure the vertical movable rod 4, transverse movable rod 5, height adjustment rod B3, and transverse movable rod 5. This is secured by connecting the locating holes in the vertical movable rod 4 and height adjustment rod B3 to the bolt holes in the connecting sleeve 7 of the transverse movable rod 5 using high-strength bolts 8.

[0028] Finally, the diagonal brace 6 is installed on the fulcrum rod 1 and the height adjustment rod B3, and the lifting equipment is installed on the fulcrum rod 1 for trial lifting. After confirming that the device is stably stressed and there is no abnormality, the lifting operation can be carried out.

[0029] During construction, the first step is to determine the specific installation location of the device on the steel beam. This step is crucial, as it directly affects the stability of the device and the reliability of the overall structure. Once the location is determined, the positioning of the locating holes for the width adjustment rod A2 must be determined based on the actual width of the steel beam. This step requires precise measurement and calculation to ensure that the width adjustment rod A2 is accurately fixed in the predetermined position.

[0030] Once the positioning holes for width adjustment rod A2 are located, the next step is to connect the vertical movable rod 4 to the width adjustment rod A2. This step involves fastening the bolt holes in the sleeve 7 of the vertical movable rod 4 to the positioning holes in rod 2 using high-strength bolts 8. High-strength bolts 8 are selected and used to ensure a secure and durable connection to withstand the various loads that may occur during subsequent construction and use.

[0031] After the vertical movable rod 4 is connected and secured to the width adjustment rod A2, the entire assembly must be installed using a lifting device. The selection and operation of the lifting device must strictly adhere to safety regulations to ensure the safety of the construction personnel and the correct installation of the assembly. Once the assembly is in place, the installation of the transverse movable rod 5 begins. This step also requires precise operation and the use of high-strength bolts 8 to ensure a secure connection between the transverse movable rod 5, the vertical movable rod 4, and the height adjustment rod B3.

[0032] After the transverse movable rod 5 is installed, the vertical movable rod 4 and transverse movable rod 5, as well as the height adjustment rod B3 and transverse movable rod 5, need to be secured separately. This is done by connecting the positioning holes of the vertical movable rod 4 and height adjustment rod B3 to the bolt holes of the connecting sleeve 7 of the transverse movable rod 5 using high-strength bolts 8. Precise operation in this step directly affects the overall stability and safety of the device.

[0033] After the device is installed, it is necessary to install a lifting device on fulcrum rod 1 and conduct a test lift. The purpose of this test lift is to check the stability of the device under load and whether there are any abnormalities. During the test lift, the device's response must be carefully observed and any necessary adjustments made. Only after confirming that the device is stable under load and has no abnormalities can the official lifting operation be carried out. This series of construction steps ensures the safe installation and long-term stable operation of the device.

[0034] The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. These preferred embodiments do not exhaustively describe all details, nor do they limit the present invention to specific embodiments. Obviously, numerous modifications and variations are possible based on the contents of this specification. These embodiments are selected and described in detail in this specification to better explain the principles and practical applications of the present invention, thereby enabling those skilled in the art to better understand and utilize the present invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A steel structure hoisting assembling fulcrum adjustment device, characterized in that: The utility model comprises a fulcrum rod (1), a width adjustment rod A (2), a height adjustment rod B (3), a vertical movable rod (4) and a transverse movable rod (5), wherein the fulcrum rod (1) is used to provide a fulcrum for the lifting device, the width adjustment rod A (2) and the height adjustment rod B (3) are respectively connected to the fulcrum rod (1), and the vertical movable rod (4) and the transverse movable rod (5) are respectively connected to the width adjustment rod A (2) and the height adjustment rod B (3).

2. The assemblable fulcrum adjustment device for steel structure hoisting according to claim 1, characterized in that: The width adjustment rod A (2) and the height adjustment rod B (3) are connected via a sleeve (7), and the vertical movable rod (4) and the horizontal movable rod (5) are connected via a sleeve (7).

3. A steel structure hoisting and assembling fulcrum adjustment device according to claim 1 or 2, characterized in that: The transverse movable rod (5) comprises four round steel bars with a diameter of 10 cm welded to a sleeve (7).

4. The assemblable fulcrum adjustment device for hoisting a steel structure according to claim 3, characterized in that: The height adjustment rod B (3) is made of I-steel and has a length of 2.5 m; the fulcrum rod (1) is made of I-steel and has a length of 2 m; and the width adjustment rod A (2) is made of I-steel and has a length of 1.5 m.

5. The assemblable fulcrum adjustment device for hoisting a steel structure according to claim 4, characterized in that: The ends of the vertical movable rod (4) and the horizontal movable rod (5) are connected by sleeves (7) with a wall thickness of 5 mm, and the sleeves (7) are provided with bolt fixing holes.