Construction mold for rapidly reinforcing roadbed through special clay solidification slurry
By designing a special clay solidification slurry to quickly reinforce the roadbed construction mold, and using components such as screws and nozzles to achieve uniform spraying and smearing of the clay solidification slurry, the surface construction problems of the solidification slurry in the existing technology are solved, and the solidification effect and construction stability are improved.
Patent Information
- Application Number
- CN202422973736.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-03
- Publication Date
- 2025-09-16
- Estimated Expiration
- 2034-12-03
AI Technical Summary
Most of the existing special clay solidification slurry hardening methods use insertion pouring, which makes the surface difficult to construct after the bottom of the soil is solidified, and the floating dust on the surface has insufficient fixing force when covered with concrete or asphalt, resulting in soil erosion.
A special clay solidification slurry rapid reinforcement roadbed construction mold has been designed. Components such as a screw, a limiting sleeve, a nozzle, and a traveling wheel are used to achieve uniform spraying and smearing of the clay solidification slurry. The motor drives the screw to rotate and the output box to move. The air pump provides pressure to ensure that the clay is evenly distributed and fixed.
It improves the uniform distribution and fixing force of clay solidification slurry on the roadbed surface, avoids soil erosion, and enhances the feasibility of construction and the fixing effect of the cover.
Smart Images

Figure CN223343111U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of road construction, and in particular relates to a special clay solidified slurry fast reinforcement roadbed construction mould. Background Art
[0002] Special clay solidification slurry is a new type of anti-seepage reinforcement material. It uses clay as the main raw material and improves its performance by adding specific solidification regulators. This slurry has attracted widespread attention due to its dual functions of anti-seepage and reinforcement. The core component of special clay solidification slurry is clay slurry solidification regulator, which is a composite material made from a variety of natural mineral materials through high-temperature activation treatment, grinding, mixing and blending. These mineral materials usually include aluminates, silicates, etc., which can react rapidly in water to form a stable gel structure. They are used in water conservancy projects, municipal engineering, transportation engineering, construction engineering and other fields. Special clay solidification slurry is a new material with multiple functions. Its preparation method is simple, its application fields are wide, and its market prospects are promising. With the continuous advancement of technology and the deepening of application, this product is expected to play an important role in more engineering fields in the future.
[0003] Most existing methods of hardening soil with special clay solidification slurry adopt the insertion pouring method. However, in some cases, after the bottom of the soil is solidified, the surface is still difficult to construct. In addition, when the surface dust is covered with concrete or asphalt, it is very easy to cause insufficient fixing force between the cover and the roadbed, resulting in soil erosion at the bottom.
[0004] Therefore, a special clay solidification slurry rapid reinforcement roadbed construction mold is proposed to solve the above problems. Utility Model Content
[0005] The utility model proposes a special clay solidification slurry fast reinforcement roadbed construction mold, which solves the problem that the existing special clay solidification slurry hardening soil method in the related art mostly adopts the insertion pouring method, but in some cases, after the soil bottom is solidified, the surface is still difficult to construct, and the dust on the surface is easily caused to insufficient fixing force between the cover and the roadbed when covered with concrete or asphalt, resulting in soil erosion at the bottom.
[0006] The technical solution of the utility model is as follows: a special clay solidification slurry rapid reinforcement roadbed construction mold, comprising: a fixed side plate, a screw and an output box, the fixed side plate is internally connected to a motor for rotation, the output end of the motor is fixedly connected to one side of the screw, and the screw passes through the fixed side plate;
[0007] The outer surface of the output box is fixedly connected to a driving sleeve, which is threadedly connected to the outer wall of the screw, the interior of the fixed side plate is fixedly connected to a support and restriction rod, the outer surface of the output box is fixedly connected to a restriction sleeve, which is slidably connected to the outer surface of the support and restriction rod;
[0008] An input hose is fixedly connected to the upper surface of the output box, and the input hose and the output box are communicated with each other. A nozzle is fixedly connected to the lower surface of the output box, and the nozzle is communicated with the output box.
[0009] Preferably, a small air pump is fixedly connected to the upper surface of the output box, an output end of the small air pump is fixedly connected to an air pressure tube, and the air pressure tube is fixedly connected to the inside of the output box and communicated with the output box.
[0010] Preferably, a hose sleeve is fixedly connected to the upper surface of the output box, the inner wall of the hose sleeve is sleeved on the outer wall of the input hose, the inner wall of the fixed side plate is rotatably connected to a drag plate, and the bottom edge of the drag plate is lower than the height of the nozzle.
[0011] Preferably, the outer wall of the fixed side plate is fixedly connected with four support shafts, and the outer surface of the bottom end of the support shaft is rotatably connected with a walking wheel.
[0012] Preferably, a bent rod is fixedly connected to the outer surface of the fixed side plate, and the other end of the bent rod is fixedly connected to a fixed block.
[0013] Preferably, a fixing pin is inserted into the interior of the fixing block, and the fixing pin passes through the two fixing blocks.
[0014] The working principle and beneficial effects of the utility model are as follows:
[0015] Through the setting of the screw and the limiting sleeve, when the equipment is in use, the limiting sleeve drives the movement of the output box as the screw rotates. Through the setting of the nozzle, the special clay solidifying slurry inside the output box can be evenly sprayed on the roadbed surface. Through the setting of the drag plate, the sprayed special clay solidifying slurry can be smeared to make its distribution more uniform. Through the setting of the walking wheel, when the equipment is connected to the special clay solidifying slurry source and is operating, only a very small force is required to drag it forward. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] The present invention will be further described in detail below with reference to the accompanying drawings and specific implementation methods.
[0017] Figure 1 This is a schematic diagram of the three-dimensional structure proposed by the utility model;
[0018] Figure 2 This is a schematic diagram of the rear-view stereoscopic structure proposed by the utility model;
[0019] Figure 3 This is a bottom-up three-dimensional structural diagram of the present invention;
[0020] Figure 4 This is a side view schematic diagram of the three-dimensional structure proposed by the utility model.
[0021] As shown in the figure: 1. Fixed side plate; 2. Screw; 3. Motor; 4. Drive sleeve; 5. Limit sleeve; 6. Support limit rod; 7. Output box; 8. Small air pump; 9. Air pressure pipe; 10. Input hose; 11. Nozzle; 12. Drag board; 13. Hose sleeve; 14. Support shaft; 15. Travel wheel; 16. Bending rod; 17. Fixed block; 18. Fixed pin. DETAILED DESCRIPTION
[0022] The following will be combined with the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.
[0023] See also Figure 1 -4. A mold for rapidly reinforcing a roadbed with a special clay-cured slurry, comprising: a fixed side plate 1, a screw 2, and an output box 7. The fixed side plate 1 is internally rotatably connected to a motor 3, the output end of which is fixedly connected to one side of the screw 2, which passes through the fixed side plate 1.
[0024] The outer surface of the output box 7 is fixedly connected to a driving sleeve 4, which is threadedly connected to the outer wall of the screw 2. The interior of the fixed side plate 1 is fixedly connected to a support and limit rod 6. The outer surface of the output box 7 is fixedly connected to a limit sleeve 5, which is slidably connected to the outer surface of the support and limit rod 6.
[0025] An input hose 10 is fixedly connected to the upper surface of the output box 7 , and the input hose 10 and the output box 7 are communicated with each other. A nozzle 11 is fixedly connected to the lower surface of the output box 7 , and the nozzle 11 is communicated with the output box 7 .
[0026] The technical solution provided by this embodiment is: first, pull out the fixing pin 18, then place the fixing block 17 in the towing position behind the construction vehicle, and then insert the fixing pin 18 to fix it. Next, input the hose 10, pass it through the hose sleeve 13, and connect it to the special clay solidification slurry source. Next, start the motor 3, drive the vehicle and the special clay solidification slurry source to operate. During operation, the motor 3 drives the screw 2 to rotate, so that the output box 7 moves left and right, and limits the movement of the output box 7 through the limiting sleeve 5 and the support limiting rod 6. The small air pump 8 will deliver pressurized air to the inside of the output box 7, so that the special clay solidification slurry can be output more evenly. The drag plate 12 will further spread the sprayed special clay solidification slurry. During operation, the walking wheel 15 will start the supporting function, while preventing the bent rod 16 from being continuously stressed and causing it to break, and can prevent the nozzle 11 from directly contacting the ground.
[0027] Furthermore, a small air pump 8 is fixedly connected to the upper surface of the output box 7 , and an air pressure tube 9 is fixedly connected to the output end of the small air pump 8 . The air pressure tube 9 is fixedly connected to the inside of the output box 7 and is interconnected with the output box 7 .
[0028] Specifically, the air pressure pipe 9 can provide a certain pressure inside the output box 7, so that the output power of the special clay solidification slurry is more sufficient, and the nozzle 11 can be cleaned simply by gas in time after the operation is completed.
[0029] Furthermore, a hose sleeve 13 is fixedly connected to the upper surface of the output box 7, the inner wall of the hose sleeve 13 is sleeved on the outer wall of the input hose 10, and the inner wall of the fixed side plate 1 is rotatably connected to the drag plate 12, the bottom edge of the drag plate 12 is lower than the height of the nozzle 11.
[0030] Specifically, the drag plate 12 can be coated after the special clay curing slurry is sprayed by the nozzle, so that the contact with the ground is more uniform.
[0031] Furthermore, four support shafts 14 are fixedly connected to the outer wall of the fixed side plate 1 , and the outer surface of the bottom end of the support shaft 14 is rotatably connected to the running wheel 15 .
[0032] Specifically, during operation, the running wheels 15 can provide support and a relatively stable running track for the equipment, preventing devices other than the carriage 12 from contacting the ground.
[0033] Furthermore, a bent rod 16 is fixedly connected to the outer surface of the fixed side plate 1 , and a fixed block 17 is fixedly connected to the other end of the bent rod 16 .
[0034] Specifically, the entire device including the bending rod 16 and the fixing block 17 can be equipped on the back of various construction vehicles for towing.
[0035] Furthermore, a fixing pin 18 is inserted into the interior of the fixing block 17 , and the fixing pin 18 passes through the two fixing blocks 17 .
[0036] Specifically, the fixing pin 18 and the fixing block 17 allow for more carriers to be selected when the equipment is towed.
[0037] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention should be included in the scope of protection of the present invention.
Claims
1. A special clay solidification slurry rapid reinforcement roadbed construction mold, comprising: A fixed side plate (1), a screw rod (2) and an output box (7), characterized in that a motor (3) is rotatably connected to the interior of the fixed side plate (1), an output end of the motor (3) is fixedly connected to one side of the screw rod (2), and the screw rod (2) passes through the fixed side plate (1); The outer surface of the output box (7) is fixedly connected to a driving sleeve (4), and the driving sleeve (4) is threadedly connected to the outer wall of the screw rod (2); the interior of the fixed side plate (1) is fixedly connected to a support and restriction rod (6); the outer surface of the output box (7) is fixedly connected to a restriction sleeve (5), and the restriction sleeve (5) is slidably connected to the outer surface of the support and restriction rod (6); An input hose (10) is fixedly connected to the upper surface of the output box (7), and the input hose (10) and the output box (7) are communicated with each other. A nozzle (11) is fixedly connected to the lower surface of the output box (7), and the nozzle (11) is communicated with the output box (7).
2. The special clay solidification slurry rapid reinforcement roadbed construction mold according to claim 1, characterized in that: A small air pump (8) is fixedly connected to the upper surface of the output box (7), and an air pressure pipe (9) is fixedly connected to the output end of the small air pump (8). The air pressure pipe (9) is fixedly connected to the inside of the output box (7) and is in communication with the output box (7).
3. The special clay solidification slurry rapid reinforcement roadbed construction mold according to claim 1, characterized in that: The upper surface of the output box (7) is fixedly connected to a hose sleeve (13), the inner wall of the hose sleeve (13) is sleeved on the outer wall of the input hose (10), and the inner wall of the fixed side plate (1) is rotatably connected to a drag plate (12), the bottom edge of the drag plate (12) is lower than the height of the nozzle (11).
4. The special clay solidification slurry rapid reinforcement roadbed construction mold according to claim 1, characterized in that: Four support shafts (14) are fixedly connected to the outer wall of the fixed side plate (1), and the outer surface of the bottom end of the support shaft (14) is rotatably connected to a walking wheel (15).
5. The special clay solidification slurry rapid reinforcement roadbed construction mold according to claim 1, characterized in that: The outer surface of the fixed side plate (1) is fixedly connected to a bent rod (16), and the other end of the bent rod (16) is fixedly connected to a fixed block (17).
6. A special clay solidification slurry rapid reinforcement roadbed construction mold according to claim 5, characterized in that: A fixing pin (18) is inserted into the interior of the fixing block (17), and the fixing pin (18) passes through the two fixing blocks (17).