PE plastic pipe hot drawing device capable of being adjusted and positioned

By designing an adjustable positioning PE plastic pipe hot pulling device, using a screw and motor-driven slider structure for fixing and stretching, and combining rotation heating and fan cooling, the problems of cumbersome and unstable use of existing devices are solved, and stable and all-round heating and stretching effects are achieved.

CN223354931UActive Publication Date: 2025-09-19CHUZHOU HUAXING PLASTIC CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202422326598.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-09-24
Publication Date
2025-09-19
Estimated Expiration
2034-09-24

AI Technical Summary

Technical Problem

The existing PE plastic pipe hot drawing device is cumbersome to use, has a low degree of automation, and the stretching process is unstable, easily damaged, and has poor use effect.

Method used

A PE plastic pipe hot-pulling device with adjustable positioning is designed. It adopts a slider structure driven by a screw rod and a motor for fixing and stretching, and combines rotation heating and fan cooling to achieve the fixing, heating and stretching of plastic pipes of different sizes. All-round heating and cooling are achieved through gear transmission.

Benefits of technology

It realizes the stable fixation and all-round heating and stretching of PE plastic pipes of different sizes, improves the degree of automation, and ensures the stability and use effect of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223354931U_ABST
    Figure CN223354931U_ABST
Patent Text Reader

Abstract

The utility model discloses a PE plastic pipe hot drawing device capable of adjusting and positioning, which relates to the technical field of PE plastic pipes and comprises a machine body, the inside of the machine body is fixedly connected with a first motor, the front end of the first motor is connected with a screw rod, the screw rod is connected with a sliding block through threads, and the upper part of the sliding block is fixedly connected with the bottom of a fixed block. The device is provided with a hot drawing structure, when the device is used, a PE plastic pipe is inserted into a rotating pipe, at the moment, the push rods on the two sides of the fixing blocks at the two ends are started to drive the fixing mechanisms to fix the PE plastic pipes of different sizes, at the moment, the PE plastic pipes are heated, meanwhile, a first motor is started to drive a lead screw to rotate, and the hot drawing structure is arranged on the rotating pipe. According to the PE plastic pipe stretching device, a screw rod is arranged in the machine body, a sliding block above the screw rod moves in a sliding groove in the machine body, meanwhile, the sliding block drives a fixing block on the left side of the machine body to move, a PE plastic pipe is stretched, PE plastics of different sizes can be fixed, and meanwhile the stretching length can be adjusted.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of PE plastic pipes, in particular to a PE plastic pipe hot-drawing device with adjustable positioning. Background Art

[0002] PE plastic pipes are made of synthetic resin, stabilizers, lubricants, etc., and are extruded through a pipe making machine. Due to the large diameter of some PE plastic pipes, a heat-stretching device is usually used to heat, soften, and stretch the PE plastic pipes for easy processing. However, the existing device still has some defects; for example;

[0003] For example, a plastic pipe hot pulling device with the publication number CN219466993U, when using the technology, the pipe body is inserted into the interior of the two clamping frames through one end of the device, and the adjusting screw is rotated. The adjusting screw drives the extrusion plate to clamp and fix the two ends of the pipe body. At this time, the pipe body is arranged inside the rotating tube. The rotating tube is rotated to align the side holes with the electric heating rods on both sides. The electric heating rods heat the pipe body through the side holes. The heat generated by the electric heating rods can also enter the interior of the rotating tube, which is convenient for all-round heating of the pipe body. There is no need to rotate the pipe body to prevent the pipe body from being twisted due to rotation. After the heating is completed, the servo motor is started. The servo motor can adjust the clamping mechanism on one side through the stretching screw, sliding rod and fixed plate, which is convenient for stretching the heated pipe body.

[0004] There are some problems with the above device. The device is cumbersome to use and has a low degree of automation. In addition, the device is stretched by stretching the screw and the slide rod. When the slide rod is extended too long, it becomes unstable and may be damaged, resulting in poor performance.

[0005] Therefore, we propose a PE plastic pipe hot pulling device with adjustable positioning to solve the above problems. Utility Model Content

[0006] The purpose of the utility model is to provide a PE plastic pipe hot pulling device with adjustable positioning to solve the problems raised in the above background technology that the hot pulling effect of PE plastic pipes on the current market is poor and inconvenient to use.

[0007] To achieve the above-mentioned purpose, the present utility model provides the following technical solutions: a PE plastic pipe hot-pulling device with adjustable positioning, comprising a body;

[0008] The interior of the body is fixedly connected to the first motor, and the front end of the first motor is connected to the screw rod, and the screw rod is connected to the slider through a threaded connection, the top of the slider is fixedly connected to the bottom of the fixed block, and the interior of the fixed block is fixedly connected to the tail of the push rod, and the front end of the push rod is connected to the fixing mechanism;

[0009] The bottom of the body is fixedly connected to the second motor, and the front end of the second motor is connected to the rotating rod, and the front end of the rotating rod is connected to the first gear, the first gear and the second gear are meshed, and the second gear is fixedly connected to the rotating tube, and the rotating tube is connected to the inside of the body through a rotating connection, a heater is provided inside the rotating tube, and the inside of the body is connected to the fan through a rotating mechanism.

[0010] As a preferred technical solution of the present invention, the fixing blocks are symmetrically arranged about the center of the machine body, and a hard water pipe is arranged inside the machine body, and the hard water pipe is provided with a water inlet and a water outlet.

[0011] As the preferred technical solution of the present invention, the fixing mechanism includes a moving block, a spring, a support rod, and a fixed arm. The tail of the moving block is fixedly connected to the front end of the push rod, and the internal sliding groove of the moving block is fixedly connected to the tail end of the spring, and the front end of the spring is connected to the tail end of the support rod through a hinge shaft, and the front end of the support rod is connected to the middle position of the fixed arm through a hinge shaft.

[0012] As a preferred technical solution of the present invention, the fixed arm is symmetrically arranged about the center of the moving block, the tail of the fixed arm is connected to the moving block through a hinge shaft, and a protective layer is provided on the surface of the fixed arm.

[0013] As an optimal technical solution of the present utility model, the rotating mechanism includes a third motor, a third gear, a fourth gear, and a rotating shaft. The third motor is fixedly connected to the inside of the machine body, and the front end of the third motor is connected to the third gear, and the third gear and the fourth gear are meshed. The fourth gear is connected to the rotating shaft, and the bottom of the rotating shaft is fixedly connected to the fan.

[0014] As a preferred technical solution of the present invention, the rotating shaft is connected to the interior of the body through bearings, and the bearings are arranged in an array on the surface of the rotating shaft, and the bearings are made of metal.

[0015] As a preferred technical solution of the present invention, the heater is arranged in an array on the inner portion of the rotating tube, and filter holes are provided on the surface of the rotating tube, and the filter holes are arranged in an array on the surface of the rotating tube.

[0016] Compared with the prior art, the beneficial effects of the present invention are:

[0017] 1. The device is equipped with a heat-pulling structure. When in use, the PE plastic tube is inserted into the rotating tube. At this time, the push rods on both sides of the fixed blocks at both ends are started to drive the fixing mechanism to fix PE plastic tubes of different sizes. At this time, the PE plastic tube is heated, and at the same time, the first motor is started to drive the screw rod to rotate, so that the slider above the screw rod moves in the slide groove inside the body. At the same time, the slider drives the fixed block on the left side of the body to move, stretching the PE plastic tube. This device can fix PE plastics of different sizes, and the stretching length can be adjusted.

[0018] 2. The device is provided with a convenient use structure. During heating, the heater in the rotating tube heats the PE plastic tube, and at the same time, the second motor is started to drive the rotating rod to rotate, so that the first gear at the front end of the rotating rod rotates. Since the first gear and the second gear are engaged, the second gear drives the rotating tube to rotate inside the body, which can better heat the PE plastic tube in all directions. When the stretching is completed, the heater in the rotating tube is turned off, and the rotating mechanism drives the fan below to rotate. At the same time, the water inlet and outlet of the hard water pipe are connected to the external cold water. At this time, the wind fanned out by the fan enters the rotating tube to cool the PE plastic tube. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a schematic diagram of the main cross-sectional structure of the utility model;

[0020] Figure 2 This is a side structural diagram of the fixing block of the present invention;

[0021] Figure 3 This is a schematic diagram of the third motor structure of the present utility model;

[0022] Figure 4 This is a schematic diagram of the top view of the hard water pipe of the present utility model;

[0023] Figure 5 This is a schematic diagram of the three-dimensional structure of the second gear of the present invention.

[0024] In the figure: 1. Body; 2. Fixed block; 3. Push rod; 4. Moving block; 5. Spring; 6. Support rod; 7. Fixed arm; 8. First motor; 9. Screw rod; 10. Slider; 11. Rotating tube; 12. Second motor; 13. Rotating rod; 14. First gear; 15. Second gear; 16. Heater; 17. Third motor; 18. Third gear; 19. Fourth gear; 20. Rotating shaft; 21. Fan; 22. Hard water pipe. DETAILED DESCRIPTION

[0025] The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0026] See also Figure 1-5 The utility model provides a technical solution: a PE plastic pipe hot pulling device with adjustable positioning, including a body 1, the interior of the body 1 is fixedly connected to a first motor 8, and the front end of the first motor 8 is connected to a screw rod 9, and the screw rod 9 is connected to a slider 10 through a threaded connection, the top of the slider 10 is fixedly connected to the bottom of a fixed block 2, the fixed block 2 is symmetrically arranged about the center of the body 1, and a hard water pipe 22 is provided inside the body 1, and the hard water pipe 22 is provided with a water inlet and a water outlet, and the interior of the fixed block 2 is fixedly connected to the tail of the push rod 3 , and the front end of the push rod 3 is connected to the fixing mechanism, the fixing mechanism includes a moving block 4, a spring 5, a support rod 6, and a fixed arm 7. The tail of the moving block 4 is fixedly connected to the front end of the push rod 3, and the internal slide groove of the moving block 4 is fixedly connected to the tail end of the spring 5, and the front end of the spring 5 is connected to the tail end of the support rod 6 through a hinge axis, and the front end of the support rod 6 is connected to the middle position of the fixed arm 7 through a hinge axis. The fixed arm 7 is symmetrically arranged about the center of the moving block 4, and the tail end of the fixed arm 7 is connected to the moving block 4 through a hinge axis, and a protective layer is provided on the surface of the fixed arm 7;

[0027] First, when using, insert the PE plastic tube into the rotating tube 11, and at this time, start the push rods 3 on both sides of the fixed blocks 2 at both ends to drive the moving block 4 to move toward the middle at the same time, so that the fixed arm 7 in front of the moving block 4 contacts the surface of the PE plastic tube, and at the same time, the fixed arm 7 drives the support rod 6 to adjust through the hinge shaft, so that the tail of the support rod 6 drives the spring 5 to move through the hinge shaft, so that PE plastic tubes of different sizes can be fixed. At this time, start the heater 16 in the rotating tube 11 to heat the PE plastic tube, and at the same time start the second motor 12 to drive the rotating rod 13 to rotate, so that the first The gear 14 rotates, and due to the meshing of the first gear 14 and the second gear 15, the second gear 15 drives the rotating tube 11 to rotate inside the body 1, causing the heater 16 inside the rotating tube 11 to rotate. The heat generated by the heater 16 heats the PE plastic tube through the filter holes on the surface of the rotating tube 11, which can better heat the PE plastic tube in all directions. At this time, the first motor 8 is started to drive the screw rod 9 to rotate, so that the slider 10 above the screw rod 9 moves in the slide groove inside the body 1. At the same time, the slider 10 drives the fixed block 2 on the left side of the body 1 to move, thereby stretching the PE plastic tube;

[0028] The lower part of the body 1 is fixedly connected to the second motor 12, and the front end of the second motor 12 is connected to the rotating rod 13, and the front end of the rotating rod 13 is connected to the first gear 14, the first gear 14 and the second gear 15 are meshed, and the second gear 15 is fixedly connected to the rotating tube 11, and the rotating tube 11 is connected to the inside of the body 1 through a rotating connection, a heater 16 is provided inside the rotating tube 11, and the heater 16 is arranged in an array on the upper part of the rotating tube 11, and a filter hole is provided on the surface of the rotating tube 11, and the filter hole is arranged in an array on the surface of the rotating tube 11, the body 1 is connected to the fan 21 through a rotating mechanism. The rotating mechanism includes a third motor 17, a third gear 18, a fourth gear 19, and a rotating shaft 20. The third motor 17 is fixedly connected to the interior of the body 1, and the front end of the third motor 17 is connected to the third gear 18, and the third gear 18 and the fourth gear 19 are meshed. The fourth gear 19 is connected to the rotating shaft 20, and the lower part of the rotating shaft 20 is fixedly connected to the fan 21. The rotating shaft 20 is connected to the interior of the body 1 through a bearing, and the bearings are arranged in an array on the surface of the rotating shaft 20, and the bearing material is metal;

[0029] When the stretching is completed, the heater 16 in the rotating tube 11 is turned off, and the third motor 17 is started to drive the third gear 18 to rotate. Since the third gear 18 and the fourth gear 19 are engaged, the fourth gear 19 drives the rotating shaft 20 to rotate, so that the rotating shaft 20 rotates inside the body 1 through the bearing, and at the same time drives the fan 21 below to rotate, and then drives the rotating tube 11 to rotate, and rotates the bottom of the rotating tube 11 to the top, and at the same time connects the water inlet and outlet of the hard water pipe 22 to the external cold water. At this time, the wind fanned out by the fan 21 enters the rotating tube 11 to cool the PE plastic pipe.

[0030] Working principle: When using the PE plastic pipe hot pulling device with adjustable positioning, first insert the PE plastic pipe into the rotating tube 11. At this time, start the push rods 3 on both sides of the fixed blocks 2 at both ends to drive the moving block 4 to move toward the middle at the same time, so that the fixed arm 7 in front of the moving block 4 contacts the surface of the PE plastic pipe. At the same time, the fixed arm 7 drives the support rod 6 to adjust through the hinge shaft, so that the tail of the support rod 6 drives the spring 5 to move through the hinge shaft, so that PE plastic pipes of different sizes can be fixed. At this time, start the heater 16 in the rotating tube 11 to heat the PE plastic pipe, and at the same time start the second motor 12 to drive the rotating rod 13 to rotate, so that the first gear 14 at the front end of the rotating rod 13 rotates. Since the first gear 14 and the second gear 15 are engaged, the second gear 15 drives the rotating tube 11 to rotate inside the body 1, so that the heater 16 inside the rotating tube 11 rotates, and the heat generated by the heater 16 passes through the surface of the rotating tube 11 The filter holes on the surface heat the PE plastic pipe, which can better heat the PE plastic pipe in all directions. At this time, the first motor 8 is started to drive the screw rod 9 to rotate, so that the slider 10 above the screw rod 9 moves in the slide groove inside the body 1. At the same time, the slider 10 drives the fixed block 2 on the left side of the body 1 to move, stretching the PE plastic pipe. When the stretching is completed, the heater 16 in the rotating tube 11 is turned off. At this time, the third motor 17 is started to drive the third gear 18 to rotate. Since the third gear 18 and the fourth gear 19 are engaged, the fourth gear 19 drives the rotating shaft 20 to rotate, so that the rotating shaft 20 rotates inside the body 1 through the bearing, and at the same time drives the fan 21 below to rotate. At this time, it drives the rotating tube 11 to rotate, and rotates the bottom of the rotating tube 11 to the top. At the same time, the water inlet and outlet of the hard water pipe 22 are connected to the external cold water. At this time, the wind fanned out by the fan 21 enters the inside of the rotating tube 11 to cool the PE plastic pipe.

[0031] Thereby completing a series of tasks, the contents not described in detail in this specification belong to the prior art known to professional and technical personnel in this field.

[0032] It will be apparent to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above and that the present invention can be implemented in other specific forms without departing from the spirit or essential characteristics of the present invention. Therefore, the embodiments should be considered in all respects as illustrative and non-restrictive, and the scope of the present invention is defined by the appended claims, not the foregoing description, and all variations within the meaning and range of equivalents of the claims are intended to be encompassed within the present invention. Any reference sign in a claim should not be construed as limiting the claim to which it relates.

Claims

1. A PE plastic pipe hot-drawing device with adjustable positioning, comprising a body (1); Its characteristics are: The interior of the machine body (1) is fixedly connected to the first motor (8), and the front end of the first motor (8) is connected to the screw rod (9), and the screw rod (9) is connected to the slider (10) through a threaded connection, the top of the slider (10) is fixedly connected to the bottom of the fixed block (2), and the interior of the fixed block (2) is fixedly connected to the tail of the push rod (3), and the front end of the push rod (3) is connected to the fixing mechanism; The lower portion of the machine body (1) is fixedly connected to the second motor (12), and the front end of the second motor (12) is connected to the rotating rod (13), and the front end of the rotating rod (13) is connected to the first gear (14), the first gear (14) and the second gear (15) are meshed, and the second gear (15) is fixedly connected to the rotating tube (11), and the rotating tube (11) is connected to the interior of the machine body (1) through a rotating connection, a heater (16) is provided inside the rotating tube (11), and the interior of the machine body (1) is connected to the fan (21) through a rotating mechanism.

2. The PE plastic pipe hot-pulling device with adjustable positioning according to claim 1 is characterized in that: The fixed block (2) is symmetrically arranged about the center of the machine body (1), and a hard water pipe (22) is arranged inside the machine body (1), and the hard water pipe (22) is provided with a water inlet and a water outlet.

3. The PE plastic pipe hot-pulling device with adjustable positioning according to claim 1, characterized in that: The fixing mechanism comprises a moving block (4), a spring (5), a support rod (6), and a fixed arm (7); the tail of the moving block (4) is fixedly connected to the front end of the push rod (3); the internal sliding groove of the moving block (4) is fixedly connected to the tail end of the spring (5); the front end of the spring (5) is connected to the tail of the support rod (6) through a hinge shaft; and the front end of the support rod (6) is connected to the middle position of the fixed arm (7) through the hinge shaft.

4. The PE plastic pipe hot-pulling device with adjustable positioning according to claim 3 is characterized in that: The fixed arm (7) is symmetrically arranged about the center of the moving block (4), and the tail of the fixed arm (7) is connected to the moving block (4) through a hinge shaft, and a protective layer is provided on the surface of the fixed arm (7).

5. The PE plastic pipe hot-pulling device with adjustable positioning according to claim 1, characterized in that: The rotating mechanism comprises a third motor (17), a third gear (18), a fourth gear (19), and a rotating shaft (20); the third motor (17) is fixedly connected to the interior of the machine body (1); the front end of the third motor (17) is connected to the third gear (18); the third gear (18) and the fourth gear (19) are meshed; the fourth gear (19) is connected to the rotating shaft (20); and the lower portion of the rotating shaft (20) is fixedly connected to the fan (21).

6. The PE plastic pipe hot-pulling device with adjustable positioning according to claim 5, characterized in that: The rotating shaft (20) is connected to the interior of the machine body (1) via bearings, and the bearings are arranged in an array on the surface of the rotating shaft (20), and the bearing material is metal.

7. The PE plastic pipe hot-pulling device with adjustable positioning according to claim 1, characterized in that: The heaters (16) are arranged in an array on the interior of the rotating tube (11), and filter holes are arranged on the surface of the rotating tube (11), and the filter holes are arranged in an array on the surface of the rotating tube (11).

Citation Information

Patent Citations

  • Plastic pipe hot drawing device

    CN219466993U