Assembly type pipeline connecting set for machine room

By using the design of connecting blocks, grooves, clamping rings and sealing rubber rings in the assembled pipe connection group for the computer room, the problem of insufficient sealing of the assembled pipes in the computer room is solved, and efficient sealing and convenient installation of the pipe connection are achieved.

CN223360175UActive Publication Date: 2025-09-19CHINA RAILWAY CONSTR GRP ELECTROMECHANICAL INSTALLATION CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423045776.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-11
Publication Date
2025-09-19
Estimated Expiration
2034-12-11

AI Technical Summary

Technical Problem

The existing assembled pipes used in the equipment room lack sealing and insulation measures during docking installation, which affects safety in use.

Method used

The connection mechanism between the first and second pipes includes first and second connection blocks, a clamping groove and a clamping ring, an embedded sealing rubber ring, and the pipes are connected through threaded holes and tightening bolts, and the sealing effect is improved in combination with a sealing gasket layer.

Benefits of technology

It realizes double sealing ring and preliminary sealing layer of pipe docking, avoids leakage risk, and improves safety of use and convenience of operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223360175U_ABST
    Figure CN223360175U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of assembly type pipelines, in particular to an assembly type pipeline connecting set for a machine room, which comprises a first pipeline and a second pipeline, a connecting mechanism is arranged between the first pipeline and the second pipeline, and the connecting mechanism comprises a first connecting block and a second connecting block. The first connecting blocks are fixedly arranged on the two sides of the right end of the first pipeline and are one centimeter away from the right end face of the first pipeline, the second connecting blocks are fixedly arranged on the two sides of the left end face of the second pipeline and are flush with the left end face of the second pipeline, and a first clamping groove and a second clamping groove are formed in the right end face of the first pipeline. A first clamping ring and a second clamping ring are arranged on the left end face of the second pipeline, and a first sealing rubber ring and a second sealing rubber ring are embedded in the first sealing groove and the second sealing groove. The connecting device is simple in structure, ingenious in design and convenient and fast to install, the leakage risk can be better avoided in the using process of the device through three sealing measures, and therefore the using safety is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of assembled pipes, in particular to an assembled pipe connection group for a machine room. Background Art

[0002] The computer room is the hub of all types of information. Computer room construction must ensure a working environment that allows for the long-term and reliable operation of advanced equipment such as networks and computers. The construction of military computer rooms is a crucial component of electronic infrastructure development. Computer room construction integrates multiple specialized skills, including construction, electrical engineering, electromechanical installation, interior design, and network configuration, and requires extensive experience in project implementation and management. The quality of the computer room's design and construction directly impacts the stable and reliable operation of the entire information system within the room and the unimpeded flow of information and communication. The computer room environment must meet the temperature, humidity, cleanliness, electromagnetic field strength, noise interference, safety, leak prevention, power quality, vibration, lightning protection, and grounding requirements of various microcomputer-based electronic equipment and personnel.

[0003] During computer room construction, specialized prefabricated conduits are often used to route cables to improve efficiency and ensure operational safety. However, these commonly used prefabricated conduits often lack adequate sealing and insulation during installation, compromising safety. Therefore, prefabricated conduits with excellent sealing properties are essential components for computer room construction.

[0004] The invention discloses an assembled energy station pipe connection group, which belongs to the field of energy technology, and includes a first pipe and a second pipe, wherein the front and back sides of the right side of the surface of the first pipe are bolted to a first mounting seat, and the left side of the surface of the second pipe is bolted to a second mounting seat used in conjunction with the first mounting seat, and the inner cavity of the first mounting seat is provided with a fixing mechanism, and the right side of the fixing mechanism passes through the first mounting seat and the second mounting seat in sequence and is bolted to the inner cavity of the second mounting seat. The utility model makes the fixing of the fixing rod more secure through the cooperation of the screw rod, thereby preventing the fixation between the first mounting seat and the second mounting seat from loosening. The secondary tightening of the fixing rod can effectively prevent the first pipe and the second pipe from leaking when transporting energy, which is beneficial to the transportation of energy and can effectively ensure the economic benefits of energy enterprises, solving the problem of poor fixed connection effect of traditional assembled energy station pipes. However, the utility model lacks effective sealing measures, which is not convenient for ensuring the airtightness of the utility model during use. To this end, we propose an assembled pipe connection group for a machine room, which solves the problem of insufficient sealing measures of the utility model and improves the sealing effect and safety of use of the utility model. Utility Model Content

[0005] The purpose of the utility model is to provide an assembled pipe connection group for a machine room to solve the problems raised in the above background technology.

[0006] To achieve the above objectives, the present invention provides the following technical solutions:

[0007] A prefabricated pipe connection group for a computer room includes a first pipe and a second pipe, with a connecting mechanism provided between the first pipe and the second pipe; the connecting mechanism includes a first connecting block and a second connecting block, the first connecting block is fixedly arranged on both sides of the right end of the first pipe and is one centimeter away from the right end face of the first pipe, and the second connecting block is fixedly arranged on both sides of the left end face of the second pipe and is flush with the left end face of the second pipe; the right end face of the first pipe is provided with a first clamping groove and a second clamping ring, and the first clamping groove and the second clamping groove are embedded with a first sealing rubber ring and a second sealing rubber ring.

[0008] Preferably, the first connecting block and the second connecting block are arranged in a one-to-one correspondence, and both the first connecting block and the second connecting block are provided with threaded holes, and the threaded holes are equipped with tightening bolts.

[0009] Preferably, a sealing gasket layer is pasted on the left end surface of the second pipe, and the thickness of the sealing gasket layer is 3 mm.

[0010] Preferably, the first clamping ring and the second clamping ring are arranged in one-to-one correspondence with the first clamping groove and the second clamping groove.

[0011] Preferably, there are two first connecting blocks, which are symmetrically arranged with respect to the center line of the first pipeline; and there are two second connecting blocks, which are symmetrically arranged with respect to the center line of the second pipeline.

[0012] Preferably, the sealing pad layer is made of insulating rubber material, and the first sealing rubber ring and the second sealing rubber ring are made of silicone material.

[0013] Compared with the prior art, the beneficial effects of the present invention are:

[0014] 1. This assembled pipe connection group for a computer room forms two closed rings by squeezing the first and second sealing rubber rings against the first and second clamping rings. A preliminary sealing layer is formed by pressing the sealing gasket layer provided on the left end face of the second pipe against the right end face of the first pipe. This effectively ensures the sealing effect of the pipe joint gap during installation, thereby avoiding leakage risks.

[0015] 2. This assembled pipe connection group for a computer room provides a larger tightness operating space for pipe docking installation by fixing the first connecting block on the right end side of the first pipe and making it 1 cm away from the right end face of the first pipe. When the first connecting block and the second connecting block are tightened by tensioning bolts, the contact surface of the pipe can be tightened to the greatest extent, thereby improving the sealing effect. The structural design is ingenious, the operation is simple, and it is also convenient for later disassembly and maintenance, and is suitable for wide promotion and use. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0017] Figure 2 This is a schematic diagram of the internal structure of the utility model;

[0018] Figure 3 This is a schematic structural diagram of the right end face of the first pipeline of the present invention;

[0019] Figure 4 For this utility model Figure 2 Enlarged schematic diagram of point A in the middle.

[0020] In the figure: 100, first pipe; 101, second pipe; 102, sealing gasket; 200, first connecting block; 201, second connecting block; 202, first slot; 203, second slot; 204, first retaining ring; 205, second retaining ring; 206, first sealing rubber ring; 207, second sealing rubber ring; 208, threaded hole; 209, tightening bolt. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the embodiments described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative efforts are within the scope of protection of the present invention.

[0022] See also Figures 1-4 As shown, the utility model provides a technical solution:

[0023] A prefabricated pipe connection group for a computer room includes a first pipe 100 and a second pipe 101. A connecting mechanism is provided between the first pipe 100 and the second pipe 101. The connecting mechanism includes a first connecting block 200 and a second connecting block 201. The first connecting block 200 is fixedly arranged on both sides of the right end of the first pipe 100 and is one centimeter away from the right end face of the first pipe 100. The second connecting block 201 is fixedly arranged on both sides of the left end face of the second pipe 101 and is flush with the left end face of the second pipe 101. A first clamping groove 202 and a second clamping groove 203 are provided on the right end face of the first pipe 100. A first clamping ring 204 and a second clamping ring 205 are provided on the left end face of the second pipe 101. A first sealing rubber ring 206 and a second sealing rubber ring 207 are embedded in the first and second clamping grooves.

[0024] In this embodiment, preferably, the first connecting block 200 and the second connecting block 201 are provided in a one-to-one correspondence, and the first connecting block 200 and the second connecting block 201 are both provided with threaded holes 208 , and the threaded holes 208 are equipped with tensioning bolts 209 .

[0025] In this embodiment, preferably, a sealing gasket layer 102 is adhered to the left end surface of the second pipe 101, and the thickness of the sealing gasket layer 102 is 3 mm.

[0026] In this embodiment, preferably, the first snap ring 204 and the second snap ring 205 are arranged in a one-to-one correspondence with the first clamping groove 202 and the second clamping groove 203 .

[0027] In this embodiment, preferably, there are two first connection blocks 200 , which are symmetrically arranged about the center line of the first pipeline 100 , and there are two second connection blocks 201 , which are symmetrically arranged about the center line of the second pipeline 101 .

[0028] In this embodiment, preferably, the sealing pad layer 102 is made of insulating rubber, and the first sealing rubber ring 206 and the second sealing rubber ring 207 are made of silicone.

[0029] When using the assembled pipe connection group for a computer room of this embodiment, the first sealing rubber ring 206 and the second sealing rubber ring 207 are first embedded and installed into the first card groove 202 and the second card groove 203, and then the first card groove 202 and the second card groove 203 set at the right end of the first pipe 100 are matched with the first clamping ring 204 and the second clamping ring 205 set on the left end face of the second pipe 101 to dock the two pipes, and make the first connecting block 200 and the second connecting block 201 correspond one to one, and then the first connecting block 200 and the second connecting block 201 are pulled and tightened by passing the tightening bolt 209 through the threaded hole 208, thereby achieving the docking effect of the first pipe 100 and the second pipe 101. The gap between the first pipe 100 and the second pipe 101 can be adjusted by turning the loosening bolt 209 until the first clamping ring 204 and the second clamping ring 205 provided on the left end face of the second pipe 101 press against the first sealing rubber ring 206 and the second sealing rubber ring 207 to form two barrier sealing rings. At the same time, the sealing gasket layer 102 provided on the left end face of the second pipe 101 is squeezed, so that the contact surface of the two pipes achieves a preliminary sealing effect. The connecting device has a simple structure, ingenious design, and easy installation. Through three sealing measures, the device can better avoid leakage risks during use, thereby improving safety in use.

[0030] The above shows and describes the basic principles, main features, and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions are merely preferred examples of the present invention and are not intended to limit the present invention. Various changes and improvements may be made to the present invention without departing from the spirit and scope of the present invention, and such changes and improvements fall within the scope of the present invention. The scope of protection claimed in the present invention is defined by the appended claims and their equivalents.

Claims

1. An assembled pipe connection group for a machine room, comprising a first pipe (100) and a second pipe (101), characterized in that: A connecting mechanism is provided between the first pipe (100) and the second pipe (101); The connecting mechanism comprises a first connecting block (200) and a second connecting block (201), wherein the first connecting block (200) is fixedly arranged on both sides of the right end of the first pipe (100) and is one centimeter away from the right end face of the first pipe (100), and the second connecting block (201) is fixedly arranged on both sides of the left end face of the second pipe (101) and is flush with the left end face of the second pipe (101); The right end surface of the first pipe (100) is provided with a first clamping groove (202) and a second clamping groove (203), the left end surface of the second pipe (101) is provided with a first clamping ring (204) and a second clamping ring (205), and the first clamping groove and the second clamping groove are embedded with a first sealing rubber ring (206) and a second sealing rubber ring (207).

2. The assembled pipe connection group for a machine room according to claim 1, characterized in that: The first connecting block (200) and the second connecting block (201) are arranged in a one-to-one correspondence. The first connecting block (200) and the second connecting block (201) are both provided with threaded holes (208), and the threaded holes (208) are matched with loose bolts (209).

3. The assembled pipe connection group for a machine room according to claim 1, characterized in that: A sealing gasket layer (102) is pasted on the left end surface of the second pipe (101), and the thickness of the sealing gasket layer (102) is 3 mm.

4. The assembled pipe connection group for a machine room according to claim 1, characterized in that: The first snap ring (204) and the second snap ring (205) are arranged in one-to-one correspondence with the first clamping groove (202) and the second clamping groove (203).

5. The assembled pipe connection group for a machine room according to claim 2, characterized in that: There are two first connection blocks (200) and they are symmetrically arranged with respect to the center line of the first pipeline (100); there are two second connection blocks (201) and they are symmetrically arranged with respect to the center line of the second pipeline (101).

6. The assembled pipe connection group for a machine room according to claim 3, characterized in that: The sealing pad layer (102) is made of insulating rubber material, and the first sealing rubber ring (206) and the second sealing rubber ring (207) are made of silicone material.

Citation Information

Patent Citations

  • Assembly type energy station pipeline connecting set

    CN215568709U