Railway rail side operation safety protection system
Through the railway trackside operation safety protection system, using walkie-talkies, joint control triggers, joint control prompts, evacuation prompts and laser ranging alarms, the problems of untimely information transmission and short sensing distance of train approach alarms in railway trackside operations have been solved. Real-time joint control between on-site protection officers and station protection officers and the safe evacuation of workers have been achieved, improving the safety and efficiency of railway trackside operations.
Patent Information
- Application Number
- CN202423096438.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-16
- Publication Date
- 2025-10-10
- Estimated Expiration
- 2034-12-16
AI Technical Summary
The existing railway trackside operations lack an effective joint control and protection system, resulting in untimely information transmission between station guards and on-site guards, which may cause safety accidents. In addition, the sensing distance of the train approach alarm is short, and it is impossible to remind the operating personnel to evacuate in time.
A railway trackside operation safety protection system was designed, including an intercom, a joint control trigger, a joint control prompter, an evacuation prompter, and a laser ranging alarm. Through joint control signals and alarm prompts, real-time communication between on-site and stationed security personnel and train distance measurement can be achieved to ensure timely evacuation of workers.
It achieves timely joint control between station guards and on-site guards, ensures the safe evacuation of workers, reduces the occurrence of safety accidents, and improves the safety and efficiency of railway trackside operations.
Smart Images

Figure CN223420729U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of railway trackside operation safety protection, in particular to a railway trackside operation safety protection system. Background Art
[0002] Construction and maintenance of trackside equipment must be performed within designated timeframes. This can lead to the following safety hazards: 1. Station security personnel must maintain clear communication with on-site security personnel based on the train schedule and constantly confirm the blocking and release of trains. Failure to maintain coordinated control at the prescribed intervals between station security personnel and on-site security personnel can hinder both parties' timely understanding of train operations, potentially leading to safety incidents. 2. Station duty personnel may illegally release trains, drivers may illegally unlock and overtake, or other personnel may misinterpret dispatching orders, leading to trains entering blocked areas. While various safety devices are currently available for trackside operations, there is still no coordinated control and protection system. While time reminders can remind on-site security personnel to check in with station security personnel at the designated time, these reminders are not synchronized with intercom time. While train approach alarms can sense trains, their short range means that personnel often have no time to evacuate immediately when the alarm sounds. To ensure safety during trackside operations, it is necessary to design a safety and protection system for trackside operations. Summary of the Invention
[0003] In view of the deficiencies in the prior art, the utility model provides a railway trackside operation safety protection system.
[0004] The technical solution of the utility model to solve the above problems is:
[0005] Railway trackside operation safety protection system, including:
[0006] Walkie-talkies, carried by on-site security personnel, used to communicate with station security personnel;
[0007] The joint control trigger is installed on the intercom and is used to send joint control signals to the joint control prompter and evacuation prompter. The joint control signals include joint control trigger signals and joint control interruption signals;
[0008] A joint control reminder device, carried by the on-site security personnel, is used to receive joint control signals. When a joint control interruption signal is received, the timing starts. When the joint control interruption signal exceeds a first predetermined time, a joint control reminder alarm is issued. When a joint control trigger signal is received, the timing stops and returns to zero.
[0009] An evacuation reminder device, carried by on-site workers, is used to receive joint control signals and evacuation alarm signals. When a joint control interruption signal is received, the timer starts counting. When the joint control interruption signal exceeds a second predetermined time or an evacuation alarm signal is received, the evacuation alarm is issued. When a joint control trigger signal is received, the timer stops counting and returns to zero.
[0010] Laser ranging alarms are installed at both ends of the trackside working track to measure the distance to the train, trigger danger alarms according to the preset alarm distance, and trigger evacuation alarm signals.
[0011] Furthermore, the second predetermined time is greater than the first predetermined time.
[0012] Furthermore, the joint control trigger includes a TXS12 transmitter module, the intercom key of the intercom is connected to the IN pin and the GND pin of the TXS12 transmitter module, and the intercom provides power for the TXS12 transmitter module.
[0013] Furthermore, the laser ranging alarm is also provided with a no-entry signal light.
[0014] Furthermore, the alarm distance is 800 to 2000 meters.
[0015] The utility model allows on-site security personnel to communicate smoothly with station security personnel through intercoms, and to transmit information in a timely manner; the joint control trigger, joint control prompter, and evacuation prompter realize alarm prompts through joint control signals, and promptly remind on-site workers to pay attention to safety and evacuate in time; the laser ranging alarm can measure the distance between trains in real time, and issue a danger alarm when the train approaches the operation area, prompting the driver to take emergency braking measures to avoid safety accidents; the evacuation prompter issues an evacuation alarm when it receives the evacuation alarm signal or the joint control interruption signal for more than a predetermined time, prompting on-site workers to evacuate urgently. The system as a whole improves the safety and efficiency of railway trackside operations and can effectively reduce the occurrence of accidents. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 This is a principle block diagram of a preferred embodiment of this utility;
[0017] Figure 2 This is a circuit diagram of a joint control trigger in a preferred embodiment of this utility model;
[0018] Figure 3 This is a circuit diagram of the joint control prompter in the preferred embodiment of this utility;
[0019] Figure 4 This is a circuit diagram of the evacuation reminder in the preferred embodiment of this utility model;
[0020] Figure 5 This is a circuit diagram of a laser ranging alarm in a preferred embodiment of this utility model;
[0021] In the figure: intercom 1, joint control trigger 2, joint control prompter 3, evacuation prompter 4, laser ranging alarm 5. DETAILED DESCRIPTION
[0022] In order to make the technical means, creative features, objectives and effects achieved by the present invention easier to understand, the present invention is further described below with reference to specific illustrations.
[0023] For example, see Figures 1 to 5 As shown in the figure, the railway trackside operation safety protection system includes:
[0024] Walkie-talkie 1, carried by the on-site security officer and used to communicate with the station security officer;
[0025] The joint control trigger 2 is installed on the intercom 1 and is used to send a joint control signal to the joint control prompter 3 and the evacuation prompter 4. The joint control signal includes a joint control trigger signal and a joint control interrupt signal;
[0026] The joint control prompter 3 is carried by the on-site security personnel and is used to receive the joint control signal. When the joint control interruption signal is received, the timing is started. When the joint control interruption signal exceeds a first predetermined time, the joint control prompt alarm is issued. When the joint control trigger signal is received, the timing is stopped and reset to zero.
[0027] An evacuation reminder 4 is carried by on-site workers and is used to receive the joint control signal and the evacuation alarm signal. When the joint control interruption signal is received, the timer starts counting. When the joint control interruption signal exceeds the second predetermined time or the evacuation alarm signal is received, the evacuation alarm is issued. When the joint control trigger signal is received, the timer stops counting and returns to zero.
[0028] The laser ranging alarm 5 is set at both ends of the trackside operation track to measure the distance of the train, trigger a danger alarm according to the preset alarm distance, and trigger an evacuation alarm signal.
[0029] In this embodiment, the second predetermined time is greater than the first predetermined time.
[0030] like Figure 2 As shown, the joint control trigger 2 includes a TXS12 transmitter module, the intercom button of the intercom 1 is connected to the IN pin and GND pin of the TXS12 transmitter module, the intercom 1 is powered by the TXS12 transmitter module, and DC9V is the battery on the intercom.
[0031] In this embodiment, the laser ranging alarm 5 is also provided with a no-entry signal light.
[0032] During use, the intercom 1, the joint control trigger 2, and the joint control prompter 3 are all carried by the on-site protection officer, and the protection distance of the protection officer is implemented in accordance with regulations; the evacuation prompter 4 is carried by the on-site operating personnel; the laser ranging alarm 5 is set at both ends of the trackside operation track, and is set by the on-site operating personnel in accordance with regulations when working on the track. The no-entry signal light is always in working state (red) during work; the on-site protection officer and on-site operating personnel must keep the equipment they carry in the power-on state during work. When the evacuation prompter 4 issues an evacuation alarm (the alarm method is sound and light alarm), the on-site operating personnel must evacuate the work site to a safe area. If it is a false alarm and the false alarm is eliminated and safety is confirmed, they can enter the work site to perform operations.
[0033] For example, the on-site security officer conducts a safety joint control with the station security officer via intercom every 5 minutes, with the first scheduled time being 4 minutes and 15 seconds and the second scheduled time being 4 minutes and 45 seconds: when the joint control prompter 3 receives the joint control interruption signal, it starts timing. When the joint control interruption time reaches 4 minutes and 15 seconds, the joint control prompter 3 issues a joint control prompt alarm. The joint control time is synchronized with the call time of the intercom 1. When the intercom key is pressed, that is, the joint control trigger 2 sends a joint control trigger signal, the joint control prompter 3 receives the joint control trigger signal, and then no alarm is given. The joint control prompter 3 stops timing and returns to zero.
[0034] When the evacuation reminder 4 receives the joint control interruption signal, it starts timing. When the joint control interruption time reaches 4 minutes and 45 seconds and the on-site protection officer still has not conducted joint control with the on-site protection officer, the evacuation reminder 4 issues an evacuation alarm, prompting the on-site workers to evacuate the work site urgently and move to a safe area urgently. When the intercom button is pressed, the joint control trigger 2 sends a joint control trigger signal, and the evacuation reminder 4 receives the joint control trigger signal, then no alarm is issued, and the evacuation reminder 4 stops timing and returns to zero.
[0035] When a train illegally enters the on-site operation track, the danger alarm 5 measures the distance to the train through the laser ranging alarm 5. When the train enters the alarm distance (the alarm distance is set according to needs, and the general alarm distance is 800 to 2000 meters within the operation safety range), a danger alarm is issued (the alarm mode is a sound alarm and a flashing indicator light alarm) to prompt the driver to take emergency braking measures, thereby avoiding the occurrence of safety accidents. At the same time, the evacuation reminder 4 is triggered to issue an evacuation alarm, prompting on-site workers to evacuate the operation site urgently and move to a safe area.
[0036] The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and that the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive. The scope of the present invention is defined by the appended claims rather than the above description. Therefore, it is intended that all changes that fall within the meaning and range of equivalents of the claims are included in the present invention. Any reference signs in the claims should not be construed as limiting the claim to which they relate.
[0037] In addition, it should be understood that although this specification is described in terms of implementation methods, not every implementation method contains only one independent technical solution. This narrative method of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment can also be appropriately combined to form other implementation methods that can be understood by those skilled in the art.
Claims
1. Railway trackside operation safety protection system, characterized by: include: Walkie-talkie (1), carried by the on-site security officer and used to communicate with the station security officer; A joint control trigger (2) is installed on the intercom (1) and is used to send a joint control signal to the joint control prompter (3) and the evacuation prompter (4), wherein the joint control signal includes a joint control trigger signal and a joint control interruption signal; A joint control prompter (3) is carried by a site security officer and is used to receive a joint control signal. When a joint control interruption signal is received, timing is started. When the joint control interruption signal exceeds a first predetermined time, a joint control prompt alarm is issued. When a joint control trigger signal is received, timing is stopped and reset to zero. An evacuation reminder (4) is carried by on-site workers and is used to receive joint control signals and evacuation alarm signals. When a joint control interruption signal is received, timing is started. When the joint control interruption signal exceeds a second predetermined time or an evacuation alarm signal is received, an evacuation alarm is issued. When a joint control trigger signal is received, timing is stopped and reset to zero. A laser distance measuring alarm (5) is provided at both ends of a trackside operation track and is used to measure the distance to a train, trigger a danger alarm according to a preset alarm distance, and trigger an evacuation alarm signal.
2. The railway trackside operation safety protection system according to claim 1, characterized in that: The second predetermined time is greater than the first predetermined time.
3. The railway trackside operation safety protection system according to claim 1, characterized in that: The joint control trigger (2) includes a TXS12 transmitter module, the intercom key of the intercom (1) is connected to the IN pin and the GND pin of the TXS12 transmitter module, and the intercom (1) supplies power to the TXS12 transmitter module.
4. The railway trackside operation safety protection system according to claim 1, characterized in that: The laser distance measuring alarm (5) is also provided with a no-go signal light.
5. The railway trackside operation safety protection system according to claim 1, characterized in that: The alarm distance is 800 to 2000 meters.