Building scaffold steel pipe collecting and transporting device

By designing an adjustable base and side fixing frame, and utilizing a rotatable plate and snap-fit ​​structure, the problems of laborious steel pipe handling and unstable fixing in existing devices have been solved, achieving efficient and stable steel pipe transportation.

CN223521314UActive Publication Date: 2025-11-07DOUBLE BLUE CONSTRUCTION CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423145797.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-19
Publication Date
2025-11-07
Estimated Expiration
2034-12-19

AI Technical Summary

Technical Problem

Existing steel pipe collection and transportation devices for construction scaffolding require manual lifting of the steel pipes onto the truck bed during transport, which is time-consuming, labor-intensive, and unstable.

Method used

A device was designed that includes an adjustable base, a side fixing bracket, and supplementary reinforcing rods. The rotatable rotating plate and snap-fit ​​structure reduce the difficulty of loading and unloading, and the triangular side fixing ensures the stability of the steel pipe during transportation.

Benefits of technology

It improved the efficiency of steel pipe loading and unloading, reduced the intensity of manual labor, and ensured the stability of the pipes during transportation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223521314U_ABST
    Figure CN223521314U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of constructional engineering, and discloses a building scaffold steel pipe collecting and transporting device which comprises an adjusting base, side edge fixing frames and a supplementary reinforcing rod, the side edge fixing frames are arranged on the two sides of the adjusting base, and the supplementary reinforcing rod is installed at one end of the adjusting base. The adjusting base comprises a fixed bottom plate, a drawing bottom plate, a mounting frame and fixing bolts, and the drawing bottom plate is slidably connected to the interior of the fixed bottom plate. According to the building scaffold steel pipe collecting and transporting device, through the rotatable first rotating plate and the second rotating plate, steel pipes can be loaded and unloaded on the side face of the device, the steel pipe loading and unloading difficulty is lowered, the loading and unloading efficiency is improved, clamping rods are used for being matched with clamping frames for clamping, and stability of the first rotating plate and the second rotating plate in the transporting process is guaranteed; and a limiting plate is arranged for ensuring that the fastening bolt and the second rotating plate can only rotate towards the outer side, and the situation that the side face is fixed unstably due to rotation in the same direction is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the technical field of building engineering, concretely is a kind of building scaffold steel pipe collection and transportation device. BACKGROUND

[0002] The scaffold steel pipe for building is a tool needed in building construction, provides stable work platform for construction personnel to work at high place, relatively uniform specification, is convenient for the general use and interchange between different construction projects, in the process of erection, it can be flexibly combined by various connecting pieces, to adapt to different building shapes and heights.

[0003] According to the authorized announcement No.CN212289921U discloses a kind of building scaffold steel pipe collection and transportation device, including carriage, the first carriage and the second carriage are included to the carriage, bottom plate of the first carriage is opened with bottom cavity, and the front and rear side plates of first carriage are all opened with side cavity, the bottom plate of the second carriage is inserted into the inside of bottom cavity, and the side plate of the second carriage is inserted into the inside of side cavity, the inside middle of bottom cavity is rotatably installed with screw rod, the circumferential outer thread of screw rod is connected with nut, the upper surface of nut is fixed with the bottom plate end of second carriage, the carriage of the utility model is divided into first carriage and second carriage, first carriage and second carriage can be close to each other and be far away from each other, the distance between them can be adjusted by screw rod nut, so as to adapt to steel pipe of different lengths, and when the distance of first carriage and second carriage quality inspection part is shortest, the volume of the carriage can be reduced, and the occupied space can be reduced when storing.

[0004] But the above-mentioned device still has the following problems: the design of first carriage and second carriage is used to realize position adjustment, but the height limit of carriage makes manual lifting above the carriage during the process of carrying scaffold steel pipe, so as to place it inside the carriage, which is time-consuming and laborious, and very inconvenient. UTILITY MODEL CONTENTS

[0005] The utility model aims at providing a kind of building scaffold steel pipe collection and transportation device to solve the problems in the above background.

[0006] To achieve the above object, the utility model provides the following technical scheme: a kind of building scaffold steel pipe collection and transportation device, including adjusting base, side fixed frame and supplementary reinforcing rod, the side fixed frame is arranged in the two sides of adjusting base, the supplementary reinforcing rod is installed in one end of adjusting base.

[0007] The adjusting base comprises a fixed bottom plate, a pull-out bottom plate, a mounting frame and a fixing bolt, the pull-out bottom plate is slidably connected to the inside of the fixed bottom plate, the mounting frame is fixedly connected to one end of the fixed bottom plate, and the fixing bolt is connected to the pull-out bottom plate through the fixed bottom plate, the position between the fixed bottom plate and the pull-out bottom plate is adjusted, so that the device can be adjusted according to the length of the steel pipe, and the application range of collecting and transporting the steel pipe is increased.

[0008] The side fixing frame comprises a limiting plate, a first rotating plate, a fastening bolt, a clamping rod, a second rotating plate, a clamping frame and a screw, the limiting plate is fixedly connected to one side of the fixed bottom plate, the first rotating plate is installed on one side of the limiting plate, the fastening bolt is threadedly connected to the fixed bottom plate through the first rotating plate, the clamping rod is fixedly connected to one end of the first rotating plate, the second rotating plate is installed on the other side of the limiting plate, the clamping frame is fixedly connected to one side of the clamping frame, and the screw is connected to the clamping rod through the clamping frame, the first rotating plate and the second rotating plate can be rotated, so that the side of the device can be loaded and unloaded with the steel pipe, the difficulty of loading and unloading the steel pipe is reduced, the loading and unloading efficiency is improved, the clamping rod cooperates with the clamping frame to ensure the stability of the first rotating plate and the second rotating plate during transportation, and the limiting plate is arranged to ensure that the fastening bolt and the second rotating plate can only rotate outward, so that the side fixing is stable.

[0009] Preferably, the two sides of the adjusting base are provided with side plates, the number of the side plates is two, and the side plates are fixedly connected to one end of the pull-out bottom plate and one end of the fixed bottom plate respectively, so as to fix the steel pipe.

[0010] Preferably, the supplementary reinforcing rod comprises a rotating rod, an extension rod and a mounting hole, the rotating rod is rotatably connected to one side of the side plate, the extension rod is slidably connected to the inside of the rotating rod, and the mounting hole is formed in one end of the extension rod.

[0011] Preferably, the size of the extension rod is consistent with the size of the inside of the mounting frame, the extension rod is clamped and mounted in the inside of the mounting frame, and is fixed through the fixing bolt, so that the supplementary reinforcing rod cooperates with the adjustable pull-out bottom plate to move, thereby forming a triangular side fixing, the extended part is side-reinforced, and the fixed and stable transportation of the steel pipe is ensured.

[0012] Preferably, the length of the first rotating plate and the second rotating plate is consistent with the height of the side plate, so as to ensure the steel pipe fixing height of the side.

[0013] Preferably, the number of the fastening bolts is two, and the two fastening bolts fasten the first rotating plate and the second rotating plate.

[0014] Preferably, the two sides of the clamping rod are provided with reinforcing plates for increasing the structural strength between the clamping rod and the first rotating plate, and ensuring the stability of the side fixing frame for the steel pipe.

[0015] Compared with the prior art, the building scaffold steel pipe collecting and transporting device has the following beneficial effects:

[0016] 1. The building scaffold steel pipe collecting and transporting device, through the first rotating plate and the second rotating plate, can load and unload the steel pipe on the side of the device, reduce the difficulty of loading and unloading the steel pipe, improve the loading and unloading efficiency, use the clamping rod to cooperate with the clamping frame to clamp, ensure the stability of the first rotating plate and the second rotating plate during transportation, and the limiting plate is arranged to ensure that the fastening bolt and the second rotating plate can only rotate outward, thereby avoiding the situation that the side is unstable due to the same direction rotation.

[0017] 2. The building scaffold steel pipe collecting and transporting device, through the fixing bolt, can move the adjustable pull-out bottom plate to form a triangular side fixing, thereby forming side reinforcement for the extended part, and ensuring the stability of the steel pipe transportation. BRIEF DESCRIPTION OF DRAWINGS

[0018] Figure 1 It is a structural schematic view of the whole utility model;

[0019] Figure 2 It is a structural schematic view of the adjusting base of the utility model;

[0020] Figure 3 It is a structural schematic view of the side fixing frame of the utility model;

[0021] Figure 4 It is a structural schematic view of the supplementary reinforcement of the utility model.

[0022] In the drawings: 1, adjusting base; 2, side fixing frame; 3, supplementary reinforcement rod; 101, fixed bottom plate; 102, pull-out bottom plate; 103, mounting frame; 104, fixing bolt; 105, side plate; 201, limiting plate; 202, first rotating plate; 203, fastening bolt; 204, clamping rod; 205, second rotating plate; 206, clamping frame; 207, screw; 301, rotating rod; 302, telescopic rod; 303, mounting hole. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of protection of the utility model.

[0024] Referring to Figures 1-4 The utility model provides a technical scheme: a building scaffold steel pipe collection and transportation device, including adjusting baseplate 1, side fixed frame 2 and supplementary reinforcing rod 3, side fixed frame 2 sets up in the both sides of adjusting baseplate 1, supplementary reinforcing rod 3 installs in the one end of adjusting baseplate 1.

[0025] Adjusting baseplate 1 includes fixed bottom plate 101, pull -out bottom plate 102, mounting frame 103 and fixed bolt 104, pull -out bottom plate 102 is slidably connected in the inside of fixed bottom plate 101, mounting frame 103 is fixedly connected in one end of fixed bottom plate 101, fixed bolt 104 is connected with pull -out bottom plate 102 through the fixed bottom plate 101, by the position adjustment between fixed bottom plate 101 and pull -out bottom plate 102, so that the device can be adjusted according to the length of steel pipe, increase the applicable range of collection and transportation steel pipe.

[0026] Side fixed frame 2 includes limiting plate 201, first rotating plate 202, fastening bolt 203, clamping rod 204, second rotating plate 205, clamping frame 206 and screw 207, limiting plate 201 is fixedly connected in one side of fixed bottom plate 101, first rotating plate 202 is installed in one side of limiting plate 201, fastening bolt 203 is screw connected with fixed bottom plate 101 through first rotating plate 202, clamping rod 204 is fixedly connected in one end of first rotating plate 202, second rotating plate 205 is installed in the other side of limiting plate 201, clamping frame 206 is fixedly connected in one side of clamping frame 206, screw 207 is connected with clamping rod 204 through clamping frame 206, by rotatable first rotating plate 202 and second rotating plate 205, so that the side of the device can be loaded and unloaded with steel pipe, reduce the difficulty of loading and unloading steel pipe, improve the loading and unloading efficiency, use clamping rod 204 to cooperate with clamping frame 206 clamping, ensure the stability of first rotating plate 202 and second rotating plate 205 in the transportation, the setting of limiting plate 201 is used to ensure that fastening bolt 203 and second rotating plate 205 can only rotate outward, avoid the situation that the side is not fixed due to same direction rotation, the length of first rotating plate 202 and second rotating plate 205 is consistent with the height of side plate 105, guarantee the steel pipe fixing height of side, the number of fastening bolt 203 is two, two fastening bolts 203 play the fastening role to first rotating plate 202 and second rotating plate 205, the both sides of clamping rod 204 are provided with reinforcing plate, for increasing the structural strength between clamping rod 204 and first rotating plate 202, guarantee the fixed stability of side fixed frame 2 to steel pipe.

[0027] The both sides of adjusting baseplate 1 are provided with side plate 105, the number of side plate 105 is two, and is fixedly connected with one end of pull -out bottom plate 102 and one end of fixed bottom plate 101 respectively, for playing the fixed role to steel pipe.

[0028] The supplementary reinforcing rod 3 comprises a rotating rod 301, a telescopic rod 302 and a mounting hole 303, the rotating rod 301 is rotatably connected to one side of the side plate 105, the telescopic rod 302 is slidably connected to the inside of the rotating rod 301, the mounting hole 303 is arranged at one end of the telescopic rod 302, the size of the telescopic rod 302 is consistent with the size of the inside of the mounting frame 103, the telescopic rod 302 is clamped and mounted in the inside of the mounting frame 103, and the telescopic rod 302 is fixed through the fixing bolt 104, so that the supplementary reinforcing rod 3 can be moved in cooperation with the adjustable pull-out bottom plate 102, thereby forming a triangular side surface fixation, and the side surface reinforcement of the extended part is formed, and the stable fixation of the steel pipe transportation is ensured.

[0029] When in use, according to the length of the steel pipe, the position of the pull-out bottom plate 102 is adjusted, then the steel pipe is stacked on the fixed bottom plate 101 and the pull-out bottom plate 102, the both ends of the steel pipe are fixed through the side plate 105, then the telescopic rod 302 is inserted into the mounting frame 103, the pull-out bottom plate 102 and the telescopic rod 302 are fixed through the fixing bolt 104, the clamping rod 204 is clamped in the clamping frame 206 through the rotation of the first rotating plate 202 and the second rotating plate 205, the screw 207 is used for fixation, then the first rotating plate 202 and the second rotating plate 205 are fixed through the fastening bolt 203, and the collection and transportation of the steel pipe are completed.

[0030] Although the embodiments of the utility model have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and variations can be made to the embodiments without departing from the principles and spirits of the utility model, and the scope of the utility model is defined by the appended claims and their equivalents.

Claims

1. A building scaffold steel pipe collecting and transporting device, comprising an adjusting base (1), a side fixing frame (2) and a supplementary reinforcing rod (3), characterized in that: The side fixing frame (2) is arranged on both sides of the adjusting base (1), and the supplemental reinforcing rod (3) is installed on one end of the adjusting base (1). The adjusting base (1) comprises a fixed bottom plate (101), a pull-out bottom plate (102), an installation frame (103) and a fixed bolt (104), the pull-out bottom plate (102) is slidably connected to the inside of the fixed bottom plate (101), the installation frame (103) is fixedly connected to one end of the fixed bottom plate (101), and the fixed bolt (104) penetrates the fixed bottom plate (101) and is connected with the pull-out bottom plate (102). The side fixing frame (2) comprises a limiting plate (201), a first rotating plate (202), a fastening bolt (203), a clamping rod (204), a second rotating plate (205), a clamping frame (206) and a screw (207), the limiting plate (201) is fixedly connected to one side of the fixed bottom plate (101), the first rotating plate (202) is installed on one side of the limiting plate (201), the fastening bolt (203) penetrates the first rotating plate (202) and is threadedly connected with the fixed bottom plate (101), the clamping rod (204) is fixedly connected to one end of the first rotating plate (202), the second rotating plate (205) is installed on the other side of the limiting plate (201), the clamping frame (206) is fixedly connected to one side of the clamping frame (206), and the screw (207) penetrates the clamping frame (206) and is connected with the clamping rod (204).

2. The steel pipe collecting and transporting device for building scaffold according to claim 1, characterized in that: Both sides of the adjusting base (1) are provided with side plates (105), the number of the side plates (105) is two, and one end of the pull-out bottom plate (102) and one end of the fixed bottom plate (101) are fixedly connected.

3. The steel pipe collecting and transporting device for building scaffold according to claim 1, characterized in that: The supplemental reinforcing rod (3) comprises a rotating rod (301), an extension rod (302) and an installation hole (303), the rotating rod (301) is rotatably connected to one side of the side plate (105), the extension rod (302) is slidably connected to the inside of the rotating rod (301), and the installation hole (303) is formed in one end of the extension rod (302).

4. The steel pipe collecting and transporting device for building scaffold according to claim 3, characterized in that: The size of the extension rod (302) is consistent with the size of the inside of the installation frame (103).

5. The construction scaffold steel pipe collecting and transporting device according to claim 1, characterized in that: The lengths of the first rotating plate (202) and the second rotating plate (205) are consistent with the height of the side plate (105).

6. The construction scaffold steel pipe collecting and transporting device according to claim 1, characterized in that: The number of the fastening bolts (203) is two.

7. The steel pipe collecting and transporting device for building scaffold according to claim 1, characterized in that: Both sides of the clamping rod (204) are provided with reinforcing plates.