Novel riverway root stone rapid repairing device
The new rapid repair device for riverbed foundation stones uses components such as square tubes and insertion rods to quickly fix the foundation stones, solving the problems of high foundation stone consumption and difficulty in repair during flood season, and improving the stability of river embankments.
Patent Information
- Application Number
- CN202423132498.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-18
- Publication Date
- 2025-11-07
- Estimated Expiration
- 2034-12-18
AI Technical Summary
Existing technologies for riverbed foundation repair suffer from high stone consumption and poor results, and are difficult to repair quickly during flood season, potentially leading to dike breaches.
A novel rapid repair device for riverbed root stones is designed. The device repairs the root stones by filling the area where the root stones have been lost and then fixing them using a fixing component, which includes a square tube and an insertion rod. The device combines a reinforcement component and a drive component to achieve rapid fixation.
It enabled rapid repair in areas where foundation stones were lost, reduced stone consumption, prevented foundation stone collapse, and improved the stability of the riverbank.
Smart Images

Figure CN223523052U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to river root stone repair technical field, concretely is a new type river root stone quick repair device. BACKGROUND
[0002] When the rainy season comes, the river level rises, and the river embankment needs to be patrolled and maintained, especially the stability of the root stone foundation of the river embankment needs to be paid attention to, and the bank of the river bend is the key position, the root stone is the pedestal of the embankment in popular terms, the root stone will appear loose and displacement under the impact of flood, even be washed away and lost directly, with the continuous impact of river water, it will further cause the further large-scale collapse of the stone block above the root stone, and then make the soil of the river embankment directly face the scouring of river water, easy to cause the danger of embankment breach, therefore, the collapsed root stone needs to be detected and repaired as soon as possible.
[0003] The conventional repair method at present is to dump the prepared stone blocks for emergency rescue on the bank in the position of root stone collapse, so as to realize quick supplementary repair, but the problems are: the consumption of stone blocks is large, and if the river is turbulent, the dumped stone blocks may not be effectively filled in the position of root stone loss, so that the effect of root stone loss repair cannot be achieved; in addition, another repair method is to enclose the root stone loss position when the flood recedes, then the river water in the enclosed position is pumped out to form a "river island basin", and then artificial repair is carried out, the problem is that it needs to wait for a period of time, but whether the further greater danger will occur during the flood period is unpredictable, so the method is only suitable for repair in dry season. Therefore, a new type river root stone quick repair device is designed. UTILITY MODEL CONTENT
[0004] The utility model aims at providing a new type river root stone quick repair device, which fills the repair root stone in the root stone loss area and fixes it through the fixing assembly, thereby repairing the river root stone.
[0005] To solve the above technical problems, according to one aspect of the utility model, the utility model provides the following technical scheme:
[0006] A new type river root stone quick repair device, which comprises a river embankment soil, the surface of the river embankment soil is piled with a plurality of root stones, and further comprises:
[0007] Repair root stones for filling the root stone loss area when the root stone loss area exists in the plurality of root stones, and the repair root stones are connected in the root stone loss area through a fixing assembly;
[0008] The fixing assembly comprises:
[0009] Square tube, a plurality of square tubes are fixedly installed on the side of the repaired root stone facing the river embankment soil nest, and the square tubes are inserted into the river embankment soil nest;
[0010] Insertion rod, an insertion rod is fixedly installed on the end of the square tube away from the repaired root stone, and the shape of the insertion rod is conical.
[0011] Preferably, the fixing assembly further comprises:
[0012] The reinforcing assembly for increasing the contact area of the square tube and the repaired root stone is arranged on the square tube.
[0013] Preferably, the reinforcing assembly comprises:
[0014] Groove, a groove is arranged on each of the upper and lower sides of one end of the square tube;
[0015] Rotary shaft, a rotary shaft is rotatably connected to the square tube through bearings on the inner walls of the grooves on both sides of the square tube.
[0016] Preferably, the reinforcing assembly further comprises:
[0017] Limiting plate, the limiting plate is fixedly installed between the two groups of rotary shafts;
[0018] Torsion spring, the torsion spring is sleeved on the rotary shaft, and the two ends of the torsion spring are fixedly connected with the limiting plate and the groove, respectively.
[0019] Preferably, the reinforcing assembly further comprises:
[0020] Driving assembly for simultaneously lifting the two groups of limiting plates, and the driving assembly is arranged in the square tube.
[0021] Preferably, the driving assembly comprises:
[0022] Square plate, the square plate is fixedly installed in the square tube;
[0023] Circular ring, a circular ring is fixedly installed on the opposite end of each of the two groups of limiting plates;
[0024] Rope, one end of the rope is fixedly installed on the circular ring, and the other end of the rope sequentially passes through the circular ring and the repaired root stone.
[0025] Preferably, the driving assembly further comprises:
[0026] Connecting assembly for fixing the other end of the rope, and the connecting assembly is arranged on the side of the repaired root stone away from the river embankment soil nest.
[0027] Preferably, the connecting assembly comprises:
[0028] Long rod, a plurality of long rods are fixedly installed on the side of the repaired root stone away from the river embankment soil nest;
[0029] A circular plate is fixedly installed on one end of the long rod, and the other end of the rope can be fixedly installed on the long rod.
[0030] Compared with the prior art, the beneficial effects of the utility model are:
[0031] The utility model discloses a fixing assembly is used for fixing the repair root stone in the root stone loss area, and the fixing assembly comprises a square tube, a square plate, a long rod, a circular plate and a rope. BRIEF DESCRIPTION OF DRAWINGS
[0032] Figure 1 It is the structure state schematic view when the repair root stone of the utility model is inserted.
[0033] Figure 2 It is the structure state schematic view when the repair root stone of the utility model is inserted.
[0034] Figure 3 It is the structure state schematic view when the repair root stone of the utility model is inserted. Figure 2 It is the structure state schematic view when the repair root stone of the utility model is inserted.
[0035] Figure 4 It is the structure state schematic view when the repair root stone of the utility model is inserted. Figure 3 It is the structure state schematic view when the repair root stone of the utility model is inserted.
[0036] Figure 5 It is the structure state schematic view when the repair root stone of the utility model is inserted.
[0037] Figure 6 It is the structure state schematic view when the repair root stone of the utility model is inserted.
[0038] In the drawing: river embankment soil 10, root stone 11, root stone loss area 12, repair root stone 30, square tube 40, insertion rod 41, recess 42, pivot 43, torsion spring 431, limiting plate 44, square plate 45, rope 46, semicircular ring 461, long rod 47, circular plate 48. DETAILED DESCRIPTION
[0039] The preferred embodiments of the utility model are described below in combination with the drawings, and it should be understood that the preferred embodiments described here are only used for explaining and illustrating the utility model, and are not used for limiting the utility model.
[0040] The utility model provides a novel riverway root stone quick repair device, please refer to Figures 1-6 , including river embankment soil 10, and the surface of river embankment soil 10 is piled with several root stones 11.
[0041] Further comprising: a repair root stone 30 capable of filling the root stone loss area 12 when the root stone loss area 12 exists in the several root stones 11, and the repair root stone 30 is connected in the root stone loss area 12 through a fixing assembly, wherein the shape of the repair root stone 30 matches the shape of the root stone loss area 12.
[0042] The fixing assembly comprises: a square tube 40, an insertion rod 41;
[0043] The repair root stone 30 is fixedly installed with several square tubes 40 towards one side of the river embankment soil 10, and the square tubes 40 are inserted in the river embankment soil 10, one end of the square tube 40 away from the repair root stone 30 is fixedly installed with the insertion rod 41, and the shape of the insertion rod 41 is conical.
[0044] The fixing assembly further comprises: a reinforcing assembly for increasing the contact area of the square tube 40 and the repair root stone 30, and the reinforcing assembly is arranged on the square tube 40.
[0045] The reinforcing assembly comprises: a groove 42, a rotating shaft 43, a torsion spring 431, a limiting plate 44;
[0046] The square tube 40 is provided with the groove 42 on both upper and lower sides of one end, the rotating shaft 43 is rotatably connected to the square tube 40 on both sides of the inner wall of the groove 42 through a bearing, the limiting plate 44 is fixedly installed between the two rotating shafts 43, and the torsion spring 431 is sleeved on the rotating shaft 43, and both ends of the torsion spring 431 are fixedly connected with the limiting plate 44 and the groove 42 respectively.
[0047] The reinforcing assembly further comprises: a driving assembly for simultaneously lifting the two limiting plates 44, and the driving assembly is located in the square tube 40.
[0048] The driving assembly comprises: a square plate 45, a rope 46, a semicircular ring 461;
[0049] The square plate 45 is fixedly installed in the square tube 40, the opposite ends of the two limiting plates 44 are fixedly installed with the circular ring 461, one end of the rope 46 is fixedly installed on the circular ring 461, and the other end of the rope 46 passes through the circular ring 461 and the repair root stone 30 in sequence; wherein the rope 46 includes but is not limited to a polyester rope.
[0050] The driving assembly further comprises: a connecting assembly for fixing the other end of the rope 46, and the connecting assembly is arranged on the side of the repair root stone 30 away from the river embankment soil 10.
[0051] The connecting assembly comprises: a long rod 47, a circular plate 48;
[0052] The repair root stone 30 is fixedly installed with several long rods 47 away from the river embankment soil 10, the circular plate 48 is fixedly installed on one end of the long rod 47, and the other end of the rope 46 can be fixedly installed on the long rod 47.
[0053] In specific use, the specific steps are as follows:
[0054] Step one: detect the position of the root stone loss area 12, and clean the cavity in the root stone loss area 12;
[0055] Step two: select the corresponding repair root stone 30 according to the shape of the root stone loss area 12, and set the fixing assembly on the repair root stone 30;
[0056] Step three: use external tools (including but not limited to a hammer) to hit the repair root stone 30, so that the repair root stone 30 can be inserted into the root stone loss area 12, and in the process, the square tube 40 is inserted into the river embankment soil 10 through the insertion rod 41;
[0057] Step four: pull the rope 46 to make the limiting plate 44 rotate around the pivot 43, at this time the limiting plate 44 will be raised until the limiting plate 44 is in contact with the square plate 45, then tie the rope 46 to the long rod 47 to fix the position of the limiting plate 44, thereby enabling the river root stone to be quickly repaired.
[0058] Although the utility model has been described above with reference to the embodiments, various improvements can be made to it and equivalent parts can be substituted for the parts therein without departing from the scope of the utility model. In particular, as long as there is no structural conflict, each feature in the embodiments disclosed by the utility model can be combined with each other in any way, and the combinations are not exhaustively described in the specification only for the consideration of saving space and resources. Therefore, the utility model is not limited to the specific embodiments disclosed herein, but includes all technical solutions falling within the scope of the claims.
Claims
1. A novel riverway root stone rapid repair device, comprising a river embankment soil body (10), the surface of the river embankment soil body (10) is piled with a plurality of root stones (11), characterized in that, Also include: For the presence of root stone loss area (12) in several root stones (11), the repair root stone (30) can fill the root stone loss area (12), and the repair root stone (30) is connected in the root stone loss area (12) by a fixing assembly; The fixing assembly comprises: Square tube (40), the repair root stone (30) is fixedly installed on one side of several square tubes (40) of the river embankment soil (10), and the square tube (40) is inserted into the river embankment soil (10); Insertion rod (41), the square tube (40) is fixedly installed on one end of the insertion rod (41) away from the repair root stone (30), and the shape of the insertion rod (41) is conical.
2. The new type of riverway root stone quick repairing device according to claim 1, characterized in that, The fixing assembly further comprises: A reinforcing assembly for increasing the contact area of the square tube (40) and the repair root stone (30), and the reinforcing assembly is arranged on the square tube (40).
3. The new type of riverway root stone quick repairing device according to claim 2, characterized in that, The reinforcing assembly comprises: Groove (42), the square tube (40) is provided with a groove (42) on both sides of one end; The shaft (43) is rotatably connected to the shaft (43) on the square tube (40) through the bearing on the inner wall of the groove (42).
4. The new type of riverway root stone quick repairing device according to claim 3, characterized in that, The reinforcing assembly further comprises: Limiting plate (44), the limiting plate (44) is fixedly installed between the two groups of shafts (43); Torsion spring (431), the torsion spring (431) is sleeved on the shaft (43), and the two ends of the torsion spring (431) are fixedly connected with the limiting plate (44) and the groove (42) respectively.
5. The novel device for quick repair of river bed stone according to claim 4, characterized in that, The reinforcing assembly further comprises: Driving assembly for lifting the two groups of limiting plates (44) at the same time, and the driving assembly is located in the square tube (40).
6. The novel device for quick repair of river bed stone according to claim 5, characterized in that, The driving assembly comprises: Square plate (45), the square plate (45) is fixedly installed in the square tube (40); Circular ring (461), the opposite ends of the two groups of limiting plates (44) are fixedly installed with circular rings (461); Rope (46), one end of the rope (46) is fixedly installed on the circular ring (461), and the other end of the rope (46) passes through the circular ring (461) and the repair root stone (30) in sequence.
7. The novel device for quick repair of river bed stone according to claim 6, characterized in that, The driving assembly further comprises: Connecting assembly for fixing the other end of the rope (46), and the connecting assembly is arranged on the side of the repair root stone (30) away from the river embankment soil (10).
8. The novel river root stone quick repair device according to claim 7, characterized in that, The connecting assembly comprises: Long rod (47), the repair root stone (30) is fixedly installed with several long rods (47) on one side away from the river embankment soil (10); Circular plate (48), the circular plate (48) is fixedly installed on one end of the long rod (47), and the other end of the rope (46) can be fixedly installed on the long rod (47).