Pipe gallery prefabricated part mounting structure
By setting a top protection mechanism and a limiting mechanism in the prefabricated pipe gallery installation structure, the problem of inconvenient installation in the existing technology is solved, and efficient isolation protection and cable laying are achieved.
Patent Information
- Application Number
- CN202422733708.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-11
- Publication Date
- 2025-11-07
- Estimated Expiration
- 2034-11-11
AI Technical Summary
The existing prefabricated pipe gallery installation structure is inconvenient for pipe gallery line installation and isolation protection during use, resulting in low installation efficiency.
By setting up a top protection mechanism and a limiting mechanism, including an isolating limiting protection frame and a protective isolation frame, which are respectively composed of a first isolation frame, a plug strip, a sealing ring, a limiting frame, a protective top frame, a protective cavity, and a second isolation frame, the isolation and protection of prefabricated pipe gallery components and cables can be achieved.
This improved the installation efficiency of prefabricated pipe gallery components and the cable protection effect, ensuring isolation and protection during installation and the convenience of cable laying.
Smart Images

Figure CN223523153U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model belongs to pipe gallery installation technical field especially relates to a pipe gallery prefabricated part mounting structure. BACKGROUND
[0002] The underground comprehensive pipe gallery assembly is a construction method that the pipe gallery components are prefabricated in the prefabricating factory and then transported to the construction site to form a whole through assembling, which not only greatly reduces material consumption, but also has excellent overall quality, strong corrosion resistance, long service life and standardization. SUMMARY
[0003] In order to solve the above technical problems, the utility model provides a pipe gallery prefabricated part mounting structure, which is convenient for protection after pipe gallery line installation and isolation protection during use by setting a top protection mechanism and improving the limiting mechanism.
[0004] A pipe gallery prefabricated part mounting structure, which comprises a pre-buried base, the left and right ends of the pre-buried base are integrally poured with an extension frame, the upper end of the pre-buried base is provided with a pipe gallery prefabricated part in the middle, the left and right sides of the pipe gallery prefabricated part are integrally poured with positioning strips in the middle, characterized in that the upper end of the extension frame is provided with an isolable limiting protection frame structure, and the upper end of the pipe gallery prefabricated part is provided with a protectable isolation frame structure.
[0005] Preferably, the isolable limiting protection frame structure comprises a first isolation frame, the bottom end of the first isolation frame is integrally provided with a splicing strip in the middle, the outer wall of the splicing strip is sleeved with a sealing ring at the upper part, and the left lower part of the first isolation frame is integrally provided with a limiting frame.
[0006] Preferably, the protectable isolation frame structure comprises a protection top frame, the inside of the protection top frame is provided with a protection cavity, the bottom end of the protection top frame is integrally poured with limiting plates in the middle of the left and right sides, and the upper end of the protection top frame is provided with a second isolation frame.
[0007] Compared with the prior art, the utility model has the beneficial effects that:
[0008] In the utility model, the pre-buried base, the extension frame, the pipe gallery prefabricated part, the first isolation frame, the splicing strip, the sealing ring and the limiting frame are cooperatively arranged, which is conducive to the purpose of isolation protection of the pipe gallery prefabricated part after cooperation of the pre-buried base, the extension frame and the first isolation frame during use.
[0009] The pipe gallery prefabricated part, the protective top frame, the protective cavity, the limiting plate and the second isolation frame are arranged in cooperation, which is beneficial to arranging the cable used in the process of laying and installation in the interior of the protective cavity, and facilitates the purpose of cable protection laying in the process of installation. BRIEF DESCRIPTION OF DRAWINGS
[0010] Figure 1 is a structural schematic view of the utility model;
[0011] Figure 2 is a structural schematic view of the isolable limiting protection frame structure of the utility model;
[0012] Figure 3 is a structural schematic view of the protectable isolation frame structure of the utility model.
[0013] In the drawings:
[0014] 1, pre-buried base; 2, extension frame; 3, pipe gallery prefabricated part; 4, positioning strip; 5, isolable limiting protection frame structure; 51, first isolation frame; 52, plug-in strip; 53, sealing ring; 54, limiting frame; 6, protectable isolation frame structure; 61, protective top frame; 62, protective cavity; 63, limiting plate; 64, second isolation frame. DETAILED DESCRIPTION
[0015] The utility model will be specifically described in combination with the drawings, such as the drawings Figure 1 and Figure 2 As shown in the drawings, a pipe gallery prefabricated part installation structure, including pre-buried base 1, extension frame 2, pipe gallery prefabricated part 3, positioning strip 4, isolable limiting protection frame structure 5 and protectable isolation frame structure 6, the pre-buried base 1 both ends of integration cast extension frame 2, the pre-buried base 1 upper end middle position is provided with pipe gallery prefabricated part 3, the pipe gallery prefabricated part 3 both sides middle position of integration cast positioning strip 4, the extension frame 2 upper end is provided with isolable limiting protection frame structure 5, the pipe gallery prefabricated part 3 upper end is provided with protectable isolation frame structure 6, the isolable limiting protection frame structure 5 includes first isolation frame 51, plug-in strip 52, sealing ring 53 and limiting frame 54, the first isolation frame 51 bottom middle position is integrally provided with plug-in strip 52, the outer wall upper portion of plug-in strip 52 is sleeved with sealing ring 53, the left lower portion of first isolation frame 51 is integrally provided with limiting frame 54, when using, pre-buried base 1 and extension frame 2 are laid in the appropriate position, then through plug-in strip 52 is inserted in the interior of extension frame 2, first isolation frame 51 is arranged in the upper end left and right sides of pre-buried base 1 respectively, which is convenient for isolating and protecting pipe gallery prefabricated part 3 through first isolation frame 51 in the process of use.
[0016] In the embodiment, the combination of the drawings Figure 3 As shown in the drawings, the protective isolation frame structure 6 comprises a protective top frame 61, a protective cavity 62, a limiting plate 63 and a second isolation frame 64, the protective cavity 62 is arranged in the protective top frame 61, the limiting plate 63 is integrally cast at the middle positions of the bottom ends of the protective top frame 61, and the second isolation frame 64 is arranged at the upper end of the protective top frame 61; after placing the pipe gallery prefabricated part 3, the protective top frame 61 is placed at the upper end of the pipe gallery prefabricated part 3, and the limiting plate 63 is respectively sleeved on the upper parts of the left and right sides of the pipe gallery prefabricated part 3, and after installation, the wiring work is carried out in the protective cavity 62, so that the wiring and line protection purposes in the use process are facilitated, and the pipe gallery prefabricated part 3 installation work is completed.
[0017] In the embodiment, specifically, the sealing ring 53 is made of a rubber ring and has a thickness of 5-10 cm, and the sealing ring 53 is arranged at the bottom end of the first isolation frame 51 and in contact.
[0018] In the embodiment, specifically, the insertion strips 52 are respectively inserted into the extension frames 2, the first isolation frames 51 are respectively arranged at the upper ends of the extension frames 2, and the positioning strips 4 are respectively arranged at the upper ends of the limiting frames 54.
[0019] In the embodiment, specifically, the second isolation frame 64 is arranged in an inverted U shape and integrally cast with the protective top frame 61.
[0020] In the embodiment, specifically, the limiting plates 63 are respectively arranged at the upper ends of the positioning strips 4, and the limiting plates 63 are respectively arranged on the upper parts of the inner walls of the first isolation frames 51, the upper end of the pipe gallery prefabricated part 3 is arranged at the middle position of the bottom end of the protective top frame 61, and the upper ends of the first isolation frames 51 are respectively arranged at the left and right sides of the bottom end of the protective top frame 61.
[0021] Working principle
[0022] In the embodiment, during use, the embedded base 1 and the extension frame 2 are laid at a suitable position, the insertion strips 52 are inserted into the extension frames 2, the first isolation frames 51 are respectively arranged at the left and right sides of the upper end of the embedded base 1, the pipe gallery prefabricated part 3 is isolated and protected by the first isolation frames 51 during use, after placing the pipe gallery prefabricated part 3, the protective top frame 61 is placed at the upper end of the pipe gallery prefabricated part 3, and the limiting plate 63 is respectively sleeved on the upper parts of the left and right sides of the pipe gallery prefabricated part 3, and after installation, the wiring work is carried out in the protective cavity 62, so that the wiring and line protection purposes in the use process are facilitated, and the pipe gallery prefabricated part 3 installation work is completed.
[0023] The technical scheme of the utility model, or the technical scheme inspired by the technical scheme of the utility model, designs similar technical scheme, and achieves the above technical effect, and all falls into the protection range of the utility model.
Claims
1. A pipe gallery prefabricated part mounting structure, comprising a pre-embedded base (1), both left and right ends of which are integrally cast with extension frames (2); the middle position of the upper end of the pre-embedded base (1) is provided with a pipe gallery prefabricated part (3); the middle positions of both left and right sides of the pipe gallery prefabricated part (3) are integrally cast with positioning strips (4) respectively; characterized in that, The upper end of the extension frame (2) in the pipe gallery prefabricated part mounting structure is provided with an isolable limiting protection frame structure (5); the upper end of the pipe gallery prefabricated part (3) is provided with a protectable isolation frame structure (6).
2. The pipe rack pre-fabrication installation structure according to claim 1, wherein The isolable limiting protection frame structure (5) comprises a first isolation frame (51), and an insertion strip (52) is integrally arranged at the middle position of the bottom end of the first isolation frame (51); a sealing ring (53) is sleeved on the outer wall of the upper portion of the insertion strip (52); and a limiting frame (54) is integrally arranged at the lower left side of the first isolation frame (51).
3. The pipe rack pre-fabrication installation structure according to claim 1, wherein, The protectable isolation frame structure (6) comprises a protection top frame (61), and a protection cavity (62) is arranged in the protection top frame (61); limiting plates (63) are integrally cast at the middle positions of the bottom ends of the left and right sides of the protection top frame (61); and a second isolation frame (64) is arranged at the upper end of the protection top frame (61).
4. The pipe rack pre-fabrication installation structure according to claim 2, wherein, The insertion strips (52) are respectively inserted into the extension frames (2); the first isolation frames (51) are respectively arranged at the upper ends of the extension frames (2); and the positioning strips (4) are respectively arranged at the upper ends of the limiting frames (54).
5. The pipe rack preform mounting structure according to claim 3, wherein The limiting plates (63) are respectively arranged at the upper ends of the positioning strips (4) and on the inner wall upper portions of the first isolation frames (51); the upper end of the pipe gallery prefabricated part (3) is arranged at the middle position of the bottom end of the protection top frame (61); and the upper ends of the first isolation frames (51) are respectively arranged at the bottom end of the left and right sides of the protection top frame (61).