Steel structure plant with pitched roof
By designing a pitched roof and introducing diversion plates and a filter canopy structure on the roof of the steel structure factory, the drainage problem of the steel structure factory under strong winds and rain is solved, realizing the smooth discharge of rainwater and the effective filtration of garbage, and improving the waterproof performance of the factory.
Patent Information
- Application Number
- CN202422928061.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-29
- Publication Date
- 2025-11-07
- Estimated Expiration
- 2034-11-29
AI Technical Summary
The flat roof design of existing steel structure factory buildings is prone to rainwater retention and leakage during strong winds and rain, and the drainage channels are easily blocked by garbage, affecting the drainage effect.
Design a steel structure factory building with a pitched roof, using a diversion plate and a filter canopy structure. The diversion plate guides rainwater to the outlet trough, and the filter canopy filters garbage to prevent clogging.
It effectively prevents rainwater retention and leakage, ensures smooth rainwater drainage, avoids blockage of drainage channels, and improves the stability and reliability of the factory's drainage system.
Smart Images

Figure CN223523484U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to factory building structure design field, especially a kind of steel structure factory building with slope roof. BACKGROUND
[0002] The skeleton of the factory building currently built is built by steel, and the top of the skeleton is provided with a steel support beam for support. The support beam is fixed between multiple support beams by multiple support rods to form a stable support structure. Meanwhile, the roof of the factory building is designed in the form of a flat slope. When encountering strong wind and rain weather, rainwater falling on the top of the roof will cause some rainwater to stay on the top of the roof, which may cause a rain leakage phenomenon. Meanwhile, garbage and leaves carried by the wind will fall on the factory building through the rainwater, and the rainwater will flow the garbage to the water leakage grooves on both sides of the factory building, causing the water leakage grooves to be blocked by garbage and resulting in drainage blockage. Therefore, a steel structure factory building with a slope roof is needed. SUMMARY
[0003] The utility model aims at providing a steel structure factory building with a slope roof to solve the problems raised in the background.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical scheme: a steel structure factory building with a slope roof, comprising a skeleton, further comprising:
[0005] A support assembly is provided at the top of the skeleton, comprising multiple connecting rods, and a roof board is provided at the top of the connecting rods. The support assembly comprises a support part provided on the outer wall of the skeleton, and is used for supporting the roof.
[0006] A waterproof mechanism is provided at the top of the roof board, comprising multiple drainage plates designed by the designer. Multiple connecting parts are provided between the connecting parts of the multiple drainage plates. Multiple water outlets are provided at the top of the roof board and located close to one end of the drainage plate. A filter shed roof is provided at the top of the drainage plate for filtering garbage.
[0007] Preferably, the support part comprises a support beam and a support rod, and multiple support rods are provided at the top of multiple support beams.
[0008] Preferably, multiple support beams are fixedly connected with multiple columns at the bottom end, and the top end of the multiple columns is fixedly connected with the top end of the roof board. Multiple walls are fixedly connected with the outer wall of the multiple skeletons.
[0009] Preferably, multiple connecting plates are fixedly connected between multiple connecting rods, and the top end of the multiple connecting plates is fixedly connected with the bottom end of the roof board. The top end of the roof board is fixedly connected with the bottom end of the drainage plate.
[0010] Preferably, the connecting part comprises a first connecting structure and a second connecting structure, the first connecting structure is arranged at the top end edge of the drainage plate, and the second connecting structure is arranged at the top end of the drainage plate and located away from the first connecting structure.
[0011] Preferably, the inner walls of the plurality of first connecting structures are sleeved with the outer walls of the plurality of second connecting structures, and a connecting frame is fixedly connected at the connecting position of the first connecting structure and the second connecting structure.
[0012] Preferably, the top end of the plurality of drainage plates is provided with a support frame, the top end of the support frame is fixedly connected with the bottom end of the filter shed roof, the top end of the filter shed roof is provided with a plurality of filter holes, and the top end of the roof board is provided with a water flow groove.
[0013] The technical effects and advantages of the utility model are as follows:
[0014] The utility model discloses a roof board drainage device, which comprises a roof board, a plurality of drainage plates and a connecting part, wherein the connecting part is arranged at the top end of the roof board, and the plurality of drainage plates are arranged on the connecting part. DRAWINGS
[0015] Figure 1 It is the schematic diagram of the main structure of the utility model.
[0016] Figure 2 It is the side view of the main structure of the utility model.
[0017] Figure 3 It is the front sectional view of the main structure of the utility model.
[0018] Figure 4 It is the side sectional view of the main structure of the utility model.
[0019] Figure 5 It is the schematic diagram of the drainage plate structure of the utility model.
[0020] Figure 6 It is the schematic diagram of the first connecting structure and the second connecting structure of the utility model.
[0021] Figure 7 It is the plan view of the main structure of the utility model.
[0022] In the figure: 1, skeleton; 101, wall body; 102, stand column; 2, support part; 201, support beam; 202, support rod; 3, roof board; 301, connecting rod; 302, connecting plate; 4, connecting part; 401, drainage plate; 402, first connecting structure; 403, second connecting structure; 404, water outlet groove; 405, connecting frame; 5, filter shed roof; 501, filter hole; 502, water flow groove; 503, support frame. DETAILED DESCRIPTION
[0023] The technical solutions in the embodiments of the utility model will be clearly and completely described below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the protection scope of the utility model.
[0024] The utility model provides a kind of steel structure factory building with slope roof as shown in Figures 1-7 It further includes:
[0025] Supporting assembly, the top of skeleton 1 is provided with a plurality of connecting rods 301, the top of connecting rod 301 is provided with roof board 3, supporting assembly includes the support part 2 of the outer wall of skeleton 1, and supporting assembly is used to support roof;
[0026] Waterproof mechanism, waterproof mechanism includes the drainage plate 401 of designer at the top of roof board 3, a plurality of connecting parts 4 are provided between the connecting place of a plurality of drainage plates 401, the top of roof board 3 and the end close to drainage plate 401 is provided with a plurality of water outlet grooves 404, the top of drainage plate 401 is provided with filter shed roof 5 for filtering garbage;
[0027] It should be noted that skeleton 1 is made of steel structure plate splicing, a plurality of skeletons 1 need to be fixed around the top of ground, roof board 3 is firmly supported at the top of skeleton 1 by support part 2, the bottom of roof board 3 is fixed by a plurality of connecting rods 301, operator needs to splice drainage plate 401 at the top of roof board 3 by connecting part 4, drainage plate 401 and roof board 3 are combined into slope roof, the top of drainage plate 401 and roof board 3 presents inclination angle, it is convenient for drainage plate 401 to drain rainwater, filter shed roof 5 will filter rainwater and garbage to the top of drainage plate 401.
[0028] Specifically, the support part 2 comprises support beams 201 and support rods 202, a plurality of support rods 202 are arranged at the top ends of the plurality of support beams 201, the bottom ends of the plurality of support beams 201 are fixedly connected with a plurality of columns 102, the top ends of the plurality of columns 102 are fixedly connected with the top end of the roof plate 3, and the outer walls of the plurality of frameworks 1 are fixedly connected with a plurality of walls 101.
[0029] It should be noted that the support beams 201 and the support rods 202 are made of steel plates, and the plurality of support beams 201 realize a stable support structure under the fixation of the plurality of support rods 202, and the roof plate 3 is stably supported through the support structure, in order to strengthen the support of the support beams 201 and the middle position of the bottom end of the roof plate 3, the columns 102 are arranged at the bottom end of the support beams 201 and the roof plate 3, and the columns 102 are also made of steel, and the walls 101 are spliced around the outer walls of the plurality of frameworks 1 to realize fixation and protection.
[0030] Specifically, a plurality of connecting plates 302 are fixedly connected between the plurality of connecting rods 301, the top ends of the plurality of connecting plates 302 are fixedly connected with the bottom end of the roof plate 3, and the top end of the roof plate 3 is fixedly connected with the bottom end of the drainage plate 401.
[0031] It should be noted that when installing the roof plate 3, the plurality of connecting rods 301 need to be erected at the top position of the factory building, the plurality of connecting rods 301 are arranged at a bevel angle, then the connecting plates 302 are erected at the top ends of the plurality of connecting rods 301, so as to strengthen the connection and stability of the plurality of connecting rods 301, the two ends of the connecting plates 302 are designed to be provided with grooves, the connecting plates 302 can be quickly installed by being sleeved on the outer walls of the connecting rods 301, and after the installation is completed, the roof plate 3 can be fixed at the top of the connecting plates 302.
[0032] Specifically, the connecting part 4 comprises first connecting structures 402 and second connecting structures 403, the first connecting structures 402 are arranged at the top end edges of the drainage plate 401, the second connecting structures 403 are arranged at the top end of the drainage plate 401 and located away from one end of the first connecting structures 402, the inner walls of the plurality of first connecting structures 402 are sleeved with the outer walls of the plurality of second connecting structures 403, and the connecting frames 405 are fixedly connected at the connections between the first connecting structures 402 and the second connecting structures 403.
[0033] It should be noted that when the drainage plate 401 is built, the first connecting structure 402 of the plurality of drainage plates 401 needs to be spliced with the second connecting structure 403 of the next drainage plate 401, and the first connecting structure 402 and the second connecting structure 403 of the plurality of drainage plates 401 are spliced and fixed in the same way. After the fixing is completed, the drainage plate 401 is fixed and connected with the roof plate 3 through bolts, and finally the connecting frame 405 is sleeved on the connecting place of the first connecting structure 402 and the second connecting structure 403, and the connecting place of the first connecting structure 402 and the second connecting structure 403 is sealed through the connecting frame 405 to realize the effect of isolating rainwater.
[0034] Specifically, the top end of the plurality of drainage plates 401 is provided with a support frame 503, the top end of the support frame 503 is fixedly connected with the bottom end of the filter shed roof 5, the top end of the filter shed roof 5 is provided with a plurality of filter holes 501, and the top end of the roof plate 3 is provided with a water flow groove 502.
[0035] It should be noted that the support frame 503 is arranged at the top end of the middle part of the drainage plate 401 and the roof plate 3, the filter shed roof 5 is fixed on the top end of the support frame 503 by bolts, and in strong wind and rain weather, rainwater and garbage fall on the filter shed roof 5. The filter shed roof 5 can separate the garbage from the rainwater, and the rainwater can flow to the top end of the drainage plate 401 through the filter holes 501, and the rainwater can flow out of the water groove 404 through the drainage plate 401. The rainwater flows to the inner wall of the water flow groove 502 through the water outlet groove 404, and finally flows out of the factory from the water flow groove 502.
[0036] Principle of the utility model:
[0037] Specific operation is, roof board 3 and framework 1 are connected and supported by multiple support parts 2, support part 2 includes support beam 201 and support rod 202, multiple support rods 202 are fixed between support beam 201 and cross, multiple support beams 201 are connected by multiple support rods 202 and the support of roof board 3 is strengthened, support beam 201 and the middle part of the bottom end of roof board 3 are also provided with stand column 102 to realize the support of the whole body, operator needs to splice and fix multiple drainage plates 401 on the top end of roof board 3 by connecting part 4, connecting part 4 includes first connecting structure 402 and second connecting structure 403, first connecting structure 402 of drainage plate 401 needs to be sleeved with second connecting structure 403 of other drainage plate 401, first connecting structure 402 and second connecting structure 403 of multiple drainage plates 401 are spliced, finally, drainage plate 401 that splicing is completed is fixedly connected with the top end of roof board 3, connecting frame 405 is sleeved and fixed at the connecting place of multiple first connecting structure 402 and second connecting structure 403, when encountering strong wind and rain weather, filter shed roof 5 will separate rainwater and garbage through filter hole 501, leaves and other garbage will be isolated at the top end of filter shed roof 5, rainwater will flow along filter hole 501 to the top end of drainage plate 401, drainage plate 401 guides rainwater to water outlet groove 404 by the aid of the angle of inclination and flows to the inner wall of water flow groove 502 and then flows to the outside, drainage plate 401 is blocked in the outer wall under the cooperation of connecting part 4 and connecting frame 405 and flows.
[0038] Finally, it should be noted that the above only for the preferred embodiments of the present application, and not for limiting the present application, although the present application is described in detail with reference to the foregoing embodiments, for those skilled in the art, it still can modify the technical solutions recorded in the foregoing embodiments, or make equivalent replacement to part of the technical features, any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present application, should be included in the protection scope of the present application.
Claims
1. A steel structure factory building with a sloping roof, comprising a skeleton (1), characterized in that, Also include: Support assembly, the top end of the skeleton (1) is provided with a plurality of connecting rods (301), the top end of the connecting rod (301) is provided with a roof board (3), the support assembly includes a support part (2) provided on the outer wall of the skeleton (1), the support assembly is used for supporting the roof; Waterproof mechanism, the waterproof mechanism includes a drainage plate (401) designed by the designer at the top end of the roof board (3), a plurality of connecting parts (4) are arranged between the connecting parts of a plurality of drainage plates (401), a plurality of water outlets (404) are arranged at the top end of the roof board (3) and close to one end of the drainage plate (401), and a filter shed (5) is arranged at the top end of the drainage plate (401) for filtering garbage.
2. A steel-framed plant building with a pitched roof according to claim 1, characterized in that The support part (2) includes a support beam (201) and a support rod (202), and a plurality of support rods (202) are arranged at the top end of a plurality of support beams (201).
3. A steel-framed building with a pitched roof according to claim 2, characterized in that, The bottom end of a plurality of support beams (201) is fixedly connected with a plurality of columns (102), the top end of a plurality of columns (102) is fixedly connected with the top end of the roof board (3), and a plurality of wall bodies (101) are fixedly connected with the outer wall of a plurality of skeletons (1).
4. A steel building with a pitched roof as defined in claim 1, characterized in that A plurality of connecting plates (302) are fixedly connected between a plurality of connecting rods (301), the top end of a plurality of connecting plates (302) is fixedly connected with the bottom end of the roof board (3), and the top end of the roof board (3) is fixedly connected with the bottom end of the drainage plate (401).
5. A steel building with a pitched roof as defined in claim 1, wherein The connecting part (4) includes a first connecting structure (402) and a second connecting structure (403), the first connecting structure (402) is arranged at the top end edge of the drainage plate (401), and the second connecting structure (403) is arranged at the top end of the drainage plate (401) and away from the first connecting structure (402).
6. A steel-framed building with a pitched roof according to claim 5, characterized in that, The inner wall of a plurality of first connecting structures (402) is sleeved with the outer wall of a plurality of second connecting structures (403), and the connecting part of the first connecting structure (402) and the second connecting structure (403) is fixedly connected with a connecting frame (405).
7. A steel building with a pitched roof as defined in claim 1, wherein The top end of a plurality of drainage plates (401) is provided with a support frame (503), the top end of the support frame (503) is fixedly connected with the bottom end of the filter shed (5), the top end of the filter shed (5) is provided with a plurality of filter holes (501), and the top end of the roof board (3) is provided with a water flow groove (502).