Pay-off device for building foundation pit measurement

By designing a wire-laying device with a transmission rope and spring, the problems of uneven baffle movement and lime powder waste in the existing technology are solved, realizing fast and accurate wire-laying operation and saving lime powder consumption.

CN223536073UActive Publication Date: 2025-11-11HUILONG ENG CONSULTING CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202423131015.X
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-18
Publication Date
2025-11-11
Estimated Expiration
2034-12-18

AI Technical Summary

Technical Problem

When the existing construction pit layout device moves the sliding block, the position of the funnel changes, which requires adjustment of the baffle position, affecting the smoothness and accuracy of movement. In addition, time is spent sealing the funnel when stopping, resulting in waste of lime powder.

Method used

A line-laying device was designed, comprising a base, a control lever, a sliding plate assembly, a transmission rope, and a baffle assembly. The transmission rope, in conjunction with the sliding baffle, enables the rapid opening and sealing of the lime funnel. The threaded rod and rocker arm are used to adjust the line-laying position, and the spring rebound is used to achieve automatic sealing, preventing lime powder from spilling.

Benefits of technology

It enables quick start and stop of lime powder application, reducing lime powder waste, improving the accuracy and efficiency of line laying, and making it more convenient and faster to use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223536073U_ABST
    Figure CN223536073U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of foundation pit paying-off devices, in particular to a building foundation pit measurement paying-off device which comprises a base, a control rod is welded to one end of the base, a sliding plate assembly is installed on the outer side of the control rod in a sliding mode, and second supporting frames are welded to the two sides of the top of the base respectively. An adjusting assembly is fixed to the tops of the two second supporting frames, a lime funnel is slidably installed below the adjusting assembly, a rocker is rotatably installed on one side of the adjusting assembly, a leakage groove is formed in the base, the bottom end of the lime funnel extends into the leakage groove, and a baffle assembly is installed at the bottom of the base. The two sides of the top of the base are each provided with a first supporting frame in a welded mode, and a winding roller is rotationally installed between the two first supporting frames. According to the lime powder spraying device, the operation of quickly starting and stopping lime powder spraying can be realized, the lime powder spraying device is more convenient and quicker to use, and meanwhile, the lime powder consumption can be reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the technical field of foundation pit layout devices, specifically a layout device for measuring building foundation pits. Background Technology

[0002] Foundation pit layout refers to a series of surveying and marking work carried out in construction engineering to determine the specific location of foundation pit excavation and control the excavation depth. After the layout is completed, lime powder is sprinkled to make a clear mark according to the position of the line. It is an important preparatory work before earthwork excavation to ensure that subsequent construction can be carried out in accordance with design requirements.

[0003] A search revealed a Chinese utility model patent, CN 216109807 U, published on March 22, 2022, which proposed a foundation pit layout device for building construction. The patent states that "during the layout work, workers can manually push a first sliding sleeve, which moves a driving rod. A second sliding sleeve, a third sliding sleeve, and a sliding rod further stabilize the driving rod, causing it to move a baffle fixedly connected to its front end. This baffle then moves away from the side of the funnel, allowing lime powder inside the funnel to fall out. This allows for simultaneous layout and lime powder application, solving the problem that existing foundation pit layout devices for building construction mostly require manual layout, followed by marking with lime powder based on the line's position. This is physically demanding, and the lime powder application may be inaccurate, affecting the quality and efficiency of the layout work."

[0004] However, when the sliding block 9 is moved to change the line-laying position, the position of the funnel 14 will also change. At this time, the position of the baffle 20 also needs to be changed to seal the bottom of the funnel 14 to meet the requirements of subsequent use. Furthermore, controlling the movement of the baffle 20 by multiple sliding rods and sleeves will result in insufficient smoothness of the movement of the baffle 20, resulting in insufficient accuracy of the movement of the baffle 20 and inability to quickly seal the bottom of the funnel 14. When the device stops moving, it takes time to move the baffle 20 to seal the bottom of the funnel 14. During the time it takes to adjust the position of the baffle 20, the lime powder stored inside the funnel will be spilled and wasted.

[0005] Therefore, a line-laying device for measuring building foundation pits is proposed. Utility Model Content

[0006] The purpose of this utility model is to provide a setting-out device for measuring building foundation pits, so as to solve the problems mentioned in the background art. To achieve the above objective, this utility model provides the following technical solution: A setting-out device for measuring building foundation pits includes a base, a control rod welded to one end of the base, a sliding plate assembly slidably mounted on the outer side of the control rod, a second support frame welded to each of the two sides of the top of the base, an adjustment assembly fixed to the top of the two second support frames, a lime funnel slidably mounted below the adjustment assembly, a rocker arm rotatably mounted on one side of the adjustment assembly, a trough opened inside the base, the bottom end of the lime funnel extending into the trough, a baffle assembly mounted at the bottom of the base, a transmission rope connected to one end of the baffle assembly, a limiting installation of one end of the transmission rope inside the sliding plate assembly, two guide wheels mounted on one side of the bottom of the base, a first support frame welded to each of the two sides of the top of the base, and a winding roller rotatably mounted between the two first support frames.

[0007] Preferably, the adjusting component includes a mounting groove, and a threaded rod is mounted inside the mounting groove via a bearing. A threaded sliding plate is welded to each side of the top of the lime funnel. The top ends of the two threaded sliding plates slide into the inner wall of the mounting groove, and the two threaded sliding plates are sleeved on the outside of the threaded rod through threaded engagement. A threading plate is fixed between the two threaded sliding plates, and the bottom of the lime funnel is funnel-shaped.

[0008] Preferably, the base is fixed with four casters at its bottom, and the four casters are located at the four corners of the base bottom.

[0009] Preferably, the skateboard assembly includes a skateboard body, and a second slider is welded to each of the two sides of the skateboard body. The second slider is slidably sleeved on the outside of the control rod, and a limiting block is fixedly sleeved on the outside of the control rod. A pull rod is welded to the top of the skateboard body.

[0010] Preferably, the baffle assembly includes a baffle body, a fixing block, and a limiting plate, and there are two fixing blocks, which are respectively fixed on both sides of the bottom of the base, and the limiting plate is welded to the bottom of the base.

[0011] Preferably, a support slide rod is welded between the fixing block and the limiting plate, and a spring is sleeved on the outer side of the support slide rod.

[0012] Preferably, a first slider is welded to each of the two sides of the baffle body, and the first slider is slidably sleeved on the outside of the support slider. A connecting plate is welded to one side of the baffle body, and one end of the connecting plate is slidably sleeved and extends out of the limiting plate.

[0013] Preferably, two limiting rings are welded to one end of the connecting plate, and the inside of the limiting rings is limited and installed with one end of the transmission rope.

[0014] Compared with the prior art, the present invention provides a setting-out device for measuring building foundation pits, which has the following advantages:

[0015] The operator can hold the control lever and hook the pull rod with their finger to slide the slide plate upwards along the installation direction of the control lever. Through the linkage of the transmission rope, the baffle body can slide along the installation direction of the support slide rod towards one side of the control lever, allowing the baffle body to slide out from the bottom of the trough. At this time, the lime powder stored inside the lime funnel will be spilled out for marking. When the operator stops moving the trolley, they release their finger from the pull rod, and the compressed spring will rebound, pushing the baffle body to the bottom of the trough to seal the bottom of the trough and the lime funnel, preventing lime powder from continuing to spill when the device stops, thus saving lime powder. This device can quickly start and stop the lime powder spreading operation, making it more convenient and faster to use, while also saving lime powder. Attached Figure Description

[0016] Figure 1 This is a side view of the main body of the present utility model.

[0017] Figure 2 This utility model Figure 1 A schematic diagram of the right-side view structure;

[0018] Figure 3 This is a partial structural schematic diagram of the present invention;

[0019] Figure 4 This is a bottom view of the base of this utility model.

[0020] Figure 5 This utility model Figure 1 A magnified structural diagram of point A in the middle.

[0021] In the diagram: 1. Base; 2. Fixed casters; 3. Baffle assembly; 301. Baffle body; 302. Fixing block; 303. First slider; 304. Spring; 305. Supporting slide rod; 306. Limiting plate; 307. Connecting plate; 308. Limiting ring; 4. Guide wheel; 5. Transmission rope; 6. Slide assembly; 601. Slide body; 602. Second slider; 603. Pull rod; 604. Limiting stop; 7. Winding roller; 8. First support frame; 9. Threaded slide; 10. Rocker arm; 11. Adjustment assembly; 1101. Mounting slot; 1102. Threading plate; 1103. Threaded rod; 12. Second support frame; 13. Lime funnel; 14. Control rod; 15. Slot. Detailed Implementation

[0022] The technical solutions of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of the present utility model, and not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the protection scope of the present utility model.

[0023] Example 1: A control rod 14 is welded to one end of the base 1. A slide plate assembly 6 is slidably installed on the outside of the control rod 14. A second support frame 12 is welded to each of the two sides of the top of the base 1. An adjustment assembly 11 is fixed to the top of the two second support frames 12. A lime funnel 13 is slidably installed below the adjustment assembly 11. A rocker arm 10 is rotatably installed on one side of the adjustment assembly 11. A trough 15 is opened inside the base 1. The bottom end of the lime funnel 13 extends into the trough 15. A baffle assembly 3 is installed at the bottom of the base 1. A transmission rope 5 is connected to one end of the baffle assembly 3. One end of the transmission rope 5 is limited and installed inside the slide plate assembly 6. Two guide wheels 4 are installed on one side of the bottom of the base 1. A first support frame 8 is welded to each of the two sides of the top of the base 1. A winding roller 7 is rotatably installed between the two first support frames 8.

[0024] The skateboard assembly 6 includes a skateboard body 601, and a second slider 602 is welded to each side of the skateboard body 601. The second slider 602 is slidably sleeved on the outside of the control rod 14, and a limit stop 604 is fixedly sleeved on the outside of the control rod 14. A pull rod 603 is welded to the top of the skateboard body 601.

[0025] The baffle assembly 3 includes a baffle body 301, a fixing block 302 and a limiting plate 306. There are two fixing blocks 302, which are fixed on both sides of the bottom of the base 1 respectively. The limiting plate 306 is welded to the bottom of the base 1.

[0026] A support slide rod 305 is welded between the fixing block 302 and the limiting plate 306, and a spring 304 is sleeved on the outside of the support slide rod 305.

[0027] A first slider 303 is welded to each side of the baffle body 301, and the first slider 303 is slidably sleeved on the outside of the support slider 305. A connecting plate 307 is welded to one side of the baffle body 301, and one end of the connecting plate 307 is slidably sleeved and extends out of the interior of the limiting plate 306.

[0028] Two limiting rings 308 are welded to one end of the connecting plate 307, and the inside of the limiting rings 308 is limited and installed with one end of the transmission rope 5.

[0029] Specifically, such as Figure 1 , Figure 2 , Figure 4 and Figure 5 As shown, since the base 1 has a trough 15 inside, and the bottom of the lime funnel 13 slides into the trough 15, after lime powder is injected into the lime funnel 13, the lime powder will leak out from the bottom of the lime funnel 13 and be scattered on the ground through the trough 15. The trough 15 allows the bottom of the lime funnel 13 to slide inside, thus ensuring that the lime powder is leaked and scattered simultaneously when the line laying position is changed. Since the bottom of the base 1 is equipped with a baffle assembly 3, and the baffle assembly 3 includes a baffle body 301 The baffle body 301 can seal the bottom of the trough 15, thereby preventing the lime powder from spilling. When lime powder needs to be sprinkled, the operator can hold the control lever 14 and hook the pull rod 603 with their fingers to drive the slide body 601 to slide upward along the installation direction of the control lever 14. Since there are two transmission ropes 5 fixed inside the slide body 601, and the two transmission ropes 5 pass through the inside of the guide wheel 4 and are fixed inside the limiting ring 308, when the slide body 601 slides upward along the installation direction of the control lever 14... During sliding, the linkage of the transmission rope 5 drives the baffle body 301 to slide along the installation direction of the support slide rod 305 towards the control rod 14. Simultaneously, the first sliders 303 welded to both sides of the baffle body 301 compress the springs 304 sleeved on the outside of the support slide rod 305, controlling the baffle body 301 to slide out from the bottom of the trough 15. At this point, the bottom of the trough 15 is not blocked, and the blockage of the bottom of the lime funnel 13 is also removed. At this time, the lime stored inside the lime funnel 13... The lime powder is then sprinkled out for marking. When the operator stops moving the trolley, they release the hook on the lever 603. At this time, the compressed spring 304 will rebound, pushing the baffle body 301 to the bottom of the trough 15 to seal the bottom of the trough 15 and the lime funnel 13, preventing the lime powder from continuing to spill when the device stops, thus saving the amount of lime powder used. This device can quickly start and stop the lime powder sprinkling operation, making it more convenient and faster to use, and saving the amount of lime powder used.

[0030] The limiting block 604 fixedly sleeved on the outside of the control lever 14 can limit the sliding distance of the skateboard body 601, preventing the skateboard body 601 from sliding to the bottom of the control lever 14, and further facilitating the operator's use.

[0031] Example 2: The adjusting component 11 includes a mounting groove 1101, and a threaded rod 1103 is mounted inside the mounting groove 1101 via a bearing. A threaded sliding plate 9 is welded to each side of the top of the lime funnel 13. The top ends of the two threaded sliding plates 9 slide into the inner wall of the mounting groove 1101, and the two threaded sliding plates 9 are threaded and fitted onto the outside of the threaded rod 1103. A threading plate 1102 is fixed between the two threaded sliding plates 9. The bottom of the lime funnel 13 is funnel-shaped. Four fixed casters 2 are fixed to the bottom of the base 1, and the four fixed casters 2 are located at the four corners of the bottom of the base 1.

[0032] Specifically, such as Figure 1 , Figure 2 and Figure 3 As shown, rotating the rocker arm 10 can drive the threaded rod 1103 to rotate. The rotation of the threaded rod 1103 can simultaneously drive the two threaded slide plates 9 to slide along the installation direction of the threaded rod 1103, thereby causing the lime funnel 13 to slide below the mounting groove 1101. Since a threading plate 1102 is fixed between the two threaded slide plates 9, one end of the marking line can be passed through the inside of the threaded rod 1103 and released as the entire device moves. The movement of the lime funnel 13 can simultaneously change the position of the released line and the position of the lime powder, and ensure that the position of the lime powder and the position of the marking line coincide. The marking line can be wound and stored by the winding roller 7. Since a fixed caster 2 is fixed at each of the four corners of the bottom of the base 1, the entire device can be moved easily by the fixed caster 2.

[0033] Working principle: In use, lime powder is injected into the lime funnel 13. Then, one end of the marking line wound on the outside of the winding roller 7 is passed through the inside of the threading plate 1102. Then, by rotating the rocker arm 10, the lime funnel 13 is moved inside the trough 15, changing the position of the marking line and the position of the lime powder. Then, the entire base 1 is moved by the control rod 14 to place the marking line. At the same time, by hooking the pull rod 603 with a finger, the slide body 601 is moved upward along the installation direction of the control rod 14. Since there are two transmission ropes 5 fixed inside the slide body 601, and the two transmission ropes 5 pass through the inside of the guide wheel 4 and are fixed inside the limiting ring 308, when the slide body 601 slides upward along the installation direction of the control rod 14, the linkage of the transmission ropes 5 can drive the baffle body 301 along the support. The sliding rod 305 slides towards the control rod 14. Simultaneously, the first slider 303 welded to both sides of the baffle body 301 compresses the spring 304 sleeved on the outside of the sliding rod 305, controlling the baffle body 301 to slide out from the bottom of the trough 15. At this time, the bottom of the trough 15 will not be blocked, and the bottom of the lime funnel 13 will also be unblocked. At this time, the lime powder stored inside the lime funnel 13 will be spilled out for marking. When the operator stops moving the trolley, the finger releases the hook of the pull rod 603. At this time, the compressed spring 304 will rebound, pushing the baffle body 301 to the bottom of the trough 15 to block the bottom of the trough 15 and the bottom of the lime funnel 13, preventing the lime powder from continuing to spill when the device stops, thus saving the amount of lime powder used.

[0034] It will be apparent to those skilled in the art that this invention is not limited to the details of the exemplary embodiments described above, and that it can be implemented in other specific forms without departing from the spirit or essential characteristics of this invention. Therefore, the embodiments should be considered illustrative and non-limiting in all respects, and the scope of this invention is defined by the appended claims rather than the foregoing description. Thus, it is intended that all variations falling within the meaning and scope of equivalents of the claims be included within this invention. No reference numerals in the claims should be construed as limiting the scope of the claims.

Claims

1. A surveying and setting-out device for building foundation pits, comprising a base (1), characterized in that: A control rod (14) is welded to one end of the base (1). A slide plate assembly (6) is slidably installed on the outside of the control rod (14). A second support frame (12) is welded to each side of the top of the base (1). An adjustment assembly (11) is fixed to the top of the two second support frames (12). A lime funnel (13) is slidably installed below the adjustment assembly (11). A rocker arm (10) is rotatably installed on one side of the adjustment assembly (11). A trough (15) is opened inside the base (1). The bottom end of the lime funnel (13) extends into the trough (15). A baffle assembly (3) is installed at the bottom of the base (1). A transmission rope (5) is connected to one end of the baffle assembly (3). One end of the transmission rope (5) is limited and installed inside the slide plate assembly (6). Two guide wheels (4) are installed on one side of the bottom of the base (1). A first support frame (8) is welded to each side of the top of the base (1). A winding roller (7) is rotatably installed between the two first support frames (8).

2. The setting-out device for measuring building foundation pits according to claim 1, characterized in that: The adjusting component (11) includes a mounting groove (1101), and a threaded rod (1103) is mounted inside the mounting groove (1101) via a bearing. A threaded sliding plate (9) is welded to each side of the top of the lime funnel (13). The top ends of the two threaded sliding plates (9) slide into the inner wall of the mounting groove (1101), and the two threaded sliding plates (9) are sleeved on the outside of the threaded rod (1103) by thread engagement. A threading plate (1102) is fixed between the two threaded sliding plates (9). The bottom of the lime funnel (13) is funnel-shaped.

3. The setting-out device for measuring building foundation pits according to claim 1, characterized in that: The base (1) is fixed with four casters (2) at its bottom, and the four casters (2) are located at the four corners of the bottom of the base (1).

4. The setting-out device for measuring building foundation pits according to claim 1, characterized in that: The skateboard assembly (6) includes a skateboard body (601), and a second slider (602) is welded to each side of the skateboard body (601). The second slider (602) is slidably sleeved on the outside of the control rod (14), and a limiting block (604) is fixedly sleeved on the outside of the control rod (14). A pull rod (603) is welded to the top of the skateboard body (601).

5. The setting-out device for measuring building foundation pits according to claim 1, characterized in that: The baffle assembly (3) includes a baffle body (301), a fixing block (302) and a limiting plate (306), and there are two fixing blocks (302). The two fixing blocks (302) are respectively fixed on both sides of the bottom of the base (1), and the limiting plate (306) is welded to the bottom of the base (1).

6. The setting-out device for measuring building foundation pits according to claim 5, characterized in that: A support slide rod (305) is welded between the fixing block (302) and the limiting plate (306), and a spring (304) is sleeved on the outside of the support slide rod (305).

7. The setting-out device for measuring building foundation pits according to claim 5, characterized in that: A first slider (303) is welded to each side of the baffle body (301), and the first slider (303) is slidably sleeved on the outside of the support slider (305). A connecting plate (307) is welded to one side of the baffle body (301), and one end of the connecting plate (307) is slidably sleeved and extends out of the interior of the limiting plate (306).

8. The setting-out device for measuring building foundation pits according to claim 7, characterized in that: Two limiting rings (308) are welded to one end of the connecting plate (307), and the limiting rings (308) are installed inside the transmission rope (5) for limiting.