Water conservancy pipeline butt joint device for house construction
By introducing a perforated mounting plate and adjustment mechanism into the water conservancy pipeline docking device, and utilizing the synchronous belt drive of the clamp assembly and threaded sleeve rod, the problems of simple structure and poor connection stability of the existing device are solved, and a stable connection and flexible adjustment of the water conservancy pipeline are realized.
Patent Information
- Application Number
- CN202422784309.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-15
- Publication Date
- 2025-11-11
- Estimated Expiration
- 2034-11-15
AI Technical Summary
Existing water conservancy pipeline connection devices have simple structures and limited functions. They are difficult to adjust according to the installation situation, have poor connection stability, and affect the use effect.
The system employs a perforated mounting plate and adjustment mechanism, which are engaged with the connecting flange via clamp components. Combined with the synchronous belt drive of the threaded sleeve and timing pulley, it achieves a stable connection to the water conservancy pipeline, enhances the connection strength, and is fixed to the wall with expansion bolts.
It improves the stability and strength of water pipeline connections, facilitates adjustments according to installation requirements, and enhances the flexibility and stability of the connections.
Smart Images

Figure CN223537153U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of pipeline connection technology, specifically to a water conservancy pipeline connection device for building construction. Background Technology
[0002] In building construction, the design and installation of water pipes are of paramount importance to ensure the effective use and safe discharge of water resources. Water pipes bring tap water into buildings to supply domestic water, fire-fighting water, and other water needs. Water pipes are often made of materials such as PVC, PE, PPR, and copper. In water conservancy projects, pipe laying is often required, which often necessitates connecting and installing multiple pipe sections together. Auxiliary docking devices are usually used to align the pipes and facilitate connection and installation operations.
[0003] Existing water conservancy project pipeline connection devices have a relatively simple overall structure and a relatively single function. They are not easy to adjust according to the installation situation and needs. At the same time, their stability is relatively poor during connection and installation work, which can easily affect the working effect.
[0004] Therefore, a water pipe connection device for building construction is proposed. Utility Model Content
[0005] The purpose of this utility model is to provide a water pipe connection device for building construction in order to solve the problems mentioned in the background art.
[0006] To achieve the above objectives, this utility model specifically adopts the following technical solution:
[0007] A water pipe connection device for building construction includes a water pipe body and a perforated mounting plate. The perforated mounting plate is installed with the wall of the building. A connecting flange is fixedly installed at the end of the water pipe body. The surface of the connecting flange is provided with a groove. The perforated mounting plate is provided with an adjustment mechanism, and the bottom end of the adjustment mechanism is provided with a clamp assembly for clamping and limiting the two sets of connecting flanges.
[0008] Furthermore, the adjustment mechanism includes two sets of threaded sleeves rotatably mounted on a perforated mounting plate. Threaded rods are inserted into the internal threads of the two sets of threaded sleeves. Timing pulleys are fixedly sleeved on the surfaces of the two sets of threaded sleeves, and timing belts are meshed on the surfaces of the two sets of timing pulleys.
[0009] Furthermore, the clamp assembly includes two sets of semi-circular clamps, one set of which is fixedly installed to the bottom ends of the two sets of threaded rods. The surfaces of the two sets of semi-circular clamps are provided with connecting holes, and second bolts are inserted into the connecting holes on the surfaces of the two sets of semi-circular clamps to form a ring. The surfaces of the two sets of semi-circular clamps are provided with semi-circular retaining rings, and the semi-circular retaining rings and retaining grooves are inserted into each other.
[0010] Furthermore, the connecting flanges at the ends of the two sets of water conservancy pipeline bodies correspond to each other, and a first threaded bolt is inserted inside them for connecting the two sets of water conservancy pipeline bodies.
[0011] Furthermore, both sets of threaded sleeves are fixedly fitted with anti-slip sleeves, and the surfaces of the anti-slip sleeves are provided with anti-slip patterns.
[0012] Furthermore, the semicircular retaining rings are provided with two sets on the surface of the semicircular clamp, and the two sets of semicircular retaining rings and the groove are arranged in a trapezoidal shape. When the two sets of water conservancy pipeline bodies and connecting flanges are installed, the semicircular retaining rings are engaged with the groove.
[0013] The beneficial effects of this utility model are as follows:
[0014] The two sets of connecting flanges at the ends of the water pipe bodies are correspondingly set, so that the two sets of connecting flanges are fixedly connected. At the same time, the perforated mounting plate is fixed to the wall of the house by expansion bolts. The clamp assembly at the bottom of the adjustment mechanism is engaged with the two sets of connecting flanges, thereby limiting and fixing the two sets of connecting flanges, increasing the connection strength between the two sets of connecting flanges, and improving the connection strength between the two sets of water pipe bodies. The clamp assembly can be moved vertically by the adjustment mechanism, and the clamp assembly can support the two sets of water pipe bodies and connecting flanges, thus fixing them to the wall of the house. Attached Figure Description
[0015] Figure 1 This is a three-dimensional structural diagram of the present invention;
[0016] Figure 2 This is a front view of the present invention;
[0017] Figure 3 This is a front sectional view of the present invention;
[0018] Figure 4 This is an exploded view of this utility model;
[0019] Reference numerals in the attached drawings: 1. Water conservancy pipeline body; 2. Connecting flange; 21. Groove; 3. First threaded bolt; 4. Clamp assembly; 401. Semi-circular clamp; 402. Connecting hole; 403. Semi-circular retaining ring; 404. Second bolt; 5. Adjusting mechanism; 501. Threaded sleeve; 502. Threaded rod; 503. Anti-slip sleeve; 504. Timing pulley; 505. Timing belt; 6. Mounting plate with holes. Detailed Implementation
[0020] To make the objectives, technical solutions, and advantages of the embodiments of this utility model clearer, the technical solutions of the embodiments of this utility model will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of this utility model, and not all embodiments. The components of the embodiments of this utility model described and shown in the accompanying drawings can generally be arranged and designed in various different configurations.
[0021] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the claimed invention, but merely to illustrate selected embodiments of the invention. All other embodiments obtained by those skilled in the art based on the embodiments of the present invention without inventive effort are within the scope of protection of the present invention.
[0022] It should be noted that similar reference numerals and letters in the following figures indicate similar items; therefore, once an item is defined in one figure, it does not need to be further defined and explained in subsequent figures. Furthermore, the terms "first," "second," etc., are used only to distinguish descriptions and should not be construed as indicating or implying relative importance.
[0023] In the description of the embodiments of this utility model, it should be noted that the terms "inner", "outer", "upper", etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the utility model product is usually placed when in use. They are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation. Therefore, they should not be construed as limitations on this utility model.
[0024] like Figures 1 to 4As shown, a water pipe connection device for building construction includes a water pipe body 1 and a perforated mounting plate 6. The perforated mounting plate 6 is installed with the wall of the building. A connecting flange 2 is fixedly installed at the end of the water pipe body 1. The surface of the connecting flange 2 is provided with a groove 21. An adjustment mechanism 5 is provided on the perforated mounting plate 6. The bottom end of the adjustment mechanism 5 is provided with a clamp assembly 4 for clamping and limiting the two sets of connecting flanges 2. The connecting flanges 2 at the ends of the two sets of water pipe bodies 1 correspond to each other, and a first threaded bolt 3 is inserted inside to connect the two sets of water pipe bodies 1. More specifically, the connecting flanges 2 at the ends of the two sets of water pipe bodies 1 are correspondingly arranged, and the connecting flanges 2 at the ends of the two sets of water pipe bodies 1 are connected by the first threaded bolt 3, so that the two sets of connecting flanges 2 are fixedly connected. At the same time, the perforated mounting plate 6 is fixedly installed to the wall of the house by the expansion bolt. The clamp assembly 4 at the bottom of the adjusting mechanism 5 is engaged with the two sets of connecting flanges 2, so as to limit and fix the two sets of connecting flanges 2, increase the connection strength between the two sets of connecting flanges 2, and improve the connection strength between the two sets of water pipe bodies 1. The clamp assembly 4 can be moved vertically by the adjusting mechanism 5, and the clamp assembly 4 can support the two sets of water pipe bodies 1 and connecting flanges 2 through the adjusting mechanism 5, so as to fix them to the wall of the house.
[0025] The adjusting mechanism 5 includes two sets of threaded sleeves 501 rotatably mounted on a perforated mounting plate 6. Threaded rods 502 are threadedly inserted into the two sets of threaded sleeves 501. Timing pulleys 504 are fixedly fitted onto the surfaces of both sets of threaded sleeves 501, and timing belts 505 are meshed onto the surfaces of the two sets of timing pulleys 504. More specifically, rotating the threaded sleeves 501 causes the timing pulleys 504 on their surfaces to rotate, which in turn causes the other set of threaded sleeves 501 and the timing pulleys 504 to rotate synchronously. The threaded insertion of the threaded rods 502 into the threaded sleeves 501 further adjusts the vertical position of the clamp assembly 4.
[0026] The clamp assembly 4 includes two sets of semi-circular clamps 401. One set of semi-circular clamps 401 is fixedly installed at the bottom end of the two sets of threaded rods 502. The surfaces of the two sets of semi-circular clamps 401 are provided with connecting holes 402, and second bolts 404 are inserted into the connecting holes 402 on the surfaces of the two sets of semi-circular clamps 401 to form a ring. The surfaces of the two sets of semi-circular clamps 401 are provided with semi-circular retaining rings 403, and the semi-circular retaining rings 403 are inserted into the retaining grooves 21. More specifically, the two sets of connecting flanges 2 at the ends of the two sets of water pipe bodies 1 are fitted together, and the two sets of semi-circular clamps 401 are fitted together and attached to the surface of the connecting flanges 2. The two sets of semi-circular clamps 401 are fixed together by the second bolt 404. The semi-circular retaining ring 403 on the inner wall of the semi-circular clamp 401 is engaged with the groove 21 on the surface of the connecting flange 2, thereby fixing the two sets of connecting flanges 2 and increasing the connection strength between the two sets of connecting flanges 2.
[0027] Both sets of threaded sleeves 501 are fixedly fitted with anti-slip sleeves 503, and the surface of the anti-slip sleeves 503 is provided with anti-slip patterns. More specifically, the anti-slip sleeves 503 on the surface of the threaded sleeves 501 facilitate the rotation of the threaded sleeves 501 when adjusting the position of the clamp assembly 4.
[0028] Two sets of semicircular retaining rings 403 are provided on the surface of the semicircular clamp 401, and the two sets of semicircular retaining rings 403 are arranged in a trapezoidal shape with the groove 21. When installing the two sets of water pipe bodies 1 and connecting flanges 2, the semicircular retaining rings 403 are engaged with the grooves 21. More specifically, the two sets of semicircular retaining rings 403 are fixedly installed as a whole through the inner wall of the semicircular clamp 401, and during installation, the two sets of semicircular retaining rings 403 are engaged with the grooves 21 on the surface of the connecting flanges 2, increasing the axial connection strength between the two sets of connecting flanges 2.
[0029] In summary: By having the connecting flanges 2 at the ends of the two sets of water pipe bodies 1 arranged in a corresponding manner, the two sets of connecting flanges 2 are fixedly connected. At the same time, the perforated mounting plate 6 is fixedly installed to the wall of the house by expansion bolts. The clamp assembly 4 at the bottom of the adjusting mechanism 5 is engaged with the two sets of connecting flanges 2, thereby limiting and fixing the two sets of connecting flanges 2, increasing the connection strength between the two sets of connecting flanges 2, and improving the connection strength between the two sets of water pipe bodies 1. The adjusting mechanism 5 can move the clamp assembly 4 vertically, and the adjusting mechanism 5 can support the two sets of water pipe bodies 1 and connecting flanges 2 through the clamp assembly 4, so as to fix them to the wall of the house.
[0030] The foregoing has shown and described the basic principles, main features, and advantages of this utility model. Those skilled in the art should understand that this utility model is not limited to the above embodiments. The embodiments and descriptions in the specification are merely principles of this utility model. Various changes and modifications can be made to this utility model without departing from its spirit and scope, and all such changes and modifications fall within the scope of the claimed utility model. The scope of protection of this utility model is defined by the appended claims and their equivalents.
Claims
1. A water pipe connection device for building construction, characterized in that, The system includes a water pipe body (1) and a perforated mounting plate (6). The perforated mounting plate (6) is installed on the wall of the building. A connecting flange (2) is fixedly installed at the end of the water pipe body (1). A slot (21) is opened on the surface of the connecting flange (2). An adjustment mechanism (5) is provided on the perforated mounting plate (6), and a clamp assembly (4) for clamping and limiting the two sets of connecting flanges (2) is provided at the bottom of the adjustment mechanism (5).
2. The water pipe connection device for building construction according to claim 1, characterized in that, The adjustment mechanism (5) includes two sets of threaded sleeves (501) rotatably mounted on a perforated mounting plate (6). Threaded rods (502) are threaded into the two sets of threaded sleeves (501). Timing pulleys (504) are fixedly sleeved on the surfaces of the two sets of threaded sleeves (501). Timing belts (505) are meshed on the surfaces of the two sets of timing pulleys (504).
3. A water pipe connection device for house construction according to claim 1, characterized in that, The clamp assembly (4) includes two sets of semi-circular clamps (401), one set of semi-circular clamps (401) is fixedly installed with the bottom ends of two sets of threaded rods (502), the surfaces of the two sets of semi-circular clamps (401) are provided with connecting holes (402), and a second bolt (404) is inserted into the connecting holes (402) on the surfaces of the two sets of semi-circular clamps (401) to form a ring. The surfaces of the two sets of semi-circular clamps (401) are provided with semi-circular retaining rings (403), and the semi-circular retaining rings (403) and the retaining grooves (21) are inserted into each other.
4. A water pipe connection device for house construction according to claim 1, characterized in that, The connecting flanges (2) at the ends of the two sets of water conservancy pipeline bodies (1) correspond to each other, and the first threaded bolts (3) are inserted inside them for connecting the two sets of water conservancy pipeline bodies (1).
5. A water pipe connection device for house construction according to claim 2, characterized in that, Both sets of threaded sleeves (501) are fixedly fitted with anti-slip sleeves (503), and the surface of the anti-slip sleeves (503) is provided with anti-slip patterns.
6. A water pipe connection device for house construction according to claim 3, characterized in that, The semicircular retaining ring (403) is provided in two sets on the surface of the semicircular clamp (401), and the two sets of semicircular retaining rings (403) and the groove (21) are arranged in a trapezoidal shape. When the two sets of water conservancy pipeline bodies (1) and connecting flanges (2) are installed, the semicircular retaining rings (403) and the groove (21) are engaged.