Reference pier
By using a design that combines corrugated pipes and concrete with an anti-frost heave layer in the benchmark pier, the problems of complex structure and high cost of the benchmark pier were solved, achieving efficient and low-cost settlement monitoring, which is applicable to various geological conditions.
Patent Information
- Application Number
- CN202422127423.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-30
- Publication Date
- 2025-11-14
- Estimated Expiration
- 2034-08-30
AI Technical Summary
Existing benchmark piers are complex and costly, making it difficult to meet the needs of efficient and low-cost settlement monitoring in large-scale projects.
The settlement monitoring device is placed by embedding a corrugated pipe into the foundation pit and filling it with concrete. Optionally, an anti-frost heave layer is set between the foundation pit and the corrugated pipe. Polyvinyl chloride corrugated pipe and fine stone concrete are used to improve structural stability and construction efficiency.
It achieves the engineering design requirements for settlement observation under various geological conditions, and has the advantages of simple structure, low cost and high construction efficiency. It is suitable for settlement observation under different geological conditions.