Environment-friendly enclosure for building construction
By installing cement connector components and support connection components on the fence, the problem of inconvenient installation of fences on asphalt cement pavement in the existing technology is solved, realizing rapid installation, stable connection and environmentally friendly construction, and reducing costs.
Patent Information
- Application Number
- CN202423152456.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-20
- Publication Date
- 2025-11-18
- Estimated Expiration
- 2034-12-20
AI Technical Summary
The existing construction site fences are inconvenient to install on asphalt and cement roads, and require filling holes, which increases costs and is not environmentally friendly.
By employing a first cement connector assembly, a second cement connector assembly, a third cement connector assembly, and a fourth cement connector assembly, combined with supporting connectors, inserts, support rods, and connecting hinges, the fence can be installed quickly and securely, avoiding the need for pre-buried pits in the ground.
It enables rapid installation of fencing, saves costs, reduces environmental damage, and improves installation stability and material reuse rate.
Smart Images

Figure CN223562609U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to building construction technical field especially relates to a building construction environmental protection fender. BACKGROUND
[0002] According to the construction site, the condition is different. The building engineering must be fully closed, and the main road or the heavy people flow in the city area must be not less than 2.5 meters, and the rest must be not less than 1.8 meters, and the general semi-closed is often seen in municipal engineering, and the so-called semi-closed refers to the fender set up on two sides or three sides, and one side or two sides are open, which is convenient for the entry and exit of construction machines and materials. The fully closed fender: the whole construction range is surrounded by hard material to form a fully closed fence.
[0003] The existing engineering fender needs to dig the installation hole in the installation position in advance when installing, so that the installation of the engineering fender is stable, but this method is extremely inconvenient on the asphalt cement pavement, and needs to be filled with asphalt or cement, which is not conducive to environmental protection and increases a large amount of cost.
[0004] Therefore, we propose a building construction environmental protection fender. CONTENT OF UTILITY MODEL
[0005] The utility model mainly solves the technical problem of the prior art, and provides a building construction environmental protection fender.
[0006] In order to realize the above-mentioned purpose, the utility model adopts the following technical scheme, a building construction environmental protection fender, including first fender, the inner wall of first fender is provided with support connecting component, the outer wall right side of support connecting component is provided with second fender, and the structure of second fender is consistent with first fender, the outer wall lower end right side of first fender is provided with first cement connecting seat component, and the inner wall right side of first cement connecting seat component is movably connected with the outer wall lower end left side of second fender, the outer wall lower end left side of first fender is provided with second cement connecting seat component, and the structure of second cement connecting seat component is consistent with first cement connecting seat component, the outer wall lower end right side of second fender is provided with third cement connecting seat component, and the structure of third cement connecting seat component is consistent with first cement connecting seat component, the inner wall lower end of support connecting component is provided with fourth cement connecting seat component, and the structure of fourth cement connecting seat component is consistent with first cement connecting seat component, first fender includes installation frame, fender plate is fixedly installed on the back of installation frame, support connecting component includes plug post, and the outer wall right side of plug post is movably connected with the inner wall left side upper end of second fender, first cement connecting seat component includes cement block, the top rear end of cement block is provided with slot, and the inner wall of cement block is movably connected with the outer wall lower end of first fender and second fender at the slot.
[0007] As preferred, a jack is arranged on the inner wall of the mounting frame, and a first insertion rod is arranged on the bottom right of the mounting frame.
[0008] As preferred, a support rod is movably arranged on the outer wall of the middle end of the insertion column, and a split pin is arranged on the left side of the inner wall of the insertion column.
[0009] As preferred, the outer wall of the first insertion rod is movably connected with the inner wall of the first cement connecting seat assembly.
[0010] As preferred, a second insertion rod is fixedly arranged on the bottom left of the mounting frame.
[0011] As preferred, the outer wall of the second insertion rod is movably connected with the inner wall of the second cement connecting seat assembly.
[0012] As preferred, a connecting hinge is arranged on the bottom of the support rod, and the inner wall of the connecting hinge is movably connected with the outer wall of the fourth cement connecting seat assembly.
[0013] As preferred, a threaded rod is fixedly arranged on the top middle end of the cement block.
[0014] As preferred, a nut is threadedly connected with the outer wall of the threaded rod.
[0015] The utility model provides a kind of building construction environmental protection enclosure, with the following beneficial effects:
[0016] 1, the environmental protection enclosure of this building construction, by being provided with first cement connecting seat assembly, second cement connecting seat assembly, third cement connecting seat assembly and fourth cement connecting seat assembly, first cement connecting seat assembly, second cement connecting seat assembly, third cement connecting seat assembly and fourth cement connecting seat assembly can be respectively fixed to first enclosure, second enclosure and support connecting component, not only facilitate the quick installation of first enclosure and second enclosure, while avoiding the operation of pit pre-burying in ground, save a lot of cost while being conducive to environmental protection.
[0017] 2, the environmental protection enclosure of this building construction, by being provided with support connecting component, insertion column and split pin on support connecting component can be connected to first enclosure and second enclosure simultaneously, and also can be connected to support rod, so that support rod can simultaneously support first enclosure and second enclosure.
[0018] 3, the environmental protection enclosure of this building construction, by being provided with connecting hinge, threaded rod and nut, by connecting hinge, support connecting component can be quickly connected on threaded rod and nut on fourth cement connecting seat assembly, to ensure the support stability of entire support connecting component to first enclosure and second enclosure. BRIEF DESCRIPTION OF DRAWINGS
[0019] Figure 1It is the front overall structure schematic view of the utility model;
[0020] Figure 2 It is the first fence front structure schematic view of the utility model;
[0021] Figure 3 It is the support connecting assembly front structure schematic view of the utility model;
[0022] Figure 4 It is the first cement connecting seat assembly front structure schematic view of the utility model.
[0023] Legend: 10, first fence;11, support connecting assembly;12, second fence;13, first cement connecting seat assembly;14, second cement connecting seat assembly;15, third cement connecting seat assembly;16, fourth cement connecting seat assembly;17, mounting frame;18, fence plate;19, jack;20, first plug rod;21, second plug rod;22, plug column;23, support rod;24, split pin;25, connecting hinge;26, cement block;27, plug groove;28, threaded rod;29, nut. DETAILED DESCRIPTION
[0024] In order to more clearly illustrate the embodiment of the utility model or the technical scheme in the prior art, the following will briefly introduce the drawings needed to be used in the embodiment or the prior art description. Obviously, the drawings in the following description are only exemplary, and for those skilled in the art, other implementation drawings can be derived from the provided drawings without creative labor.
[0025] The structure, proportion, size and the like shown in the specification are only used to cooperate with the content disclosed in the specification, for understanding and reading by those skilled in the art, and are not used to limit the limiting conditions of the utility model that can be implemented, so they do not have technical substantive significance, any modification of structure, change of proportion relationship or adjustment of size, without affecting the effect and purpose that the utility model can produce, should still fall within the scope of the technical content disclosed by the utility model.
[0026] It should be noted that: similar signs and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.
[0027] In the description of the embodiments of the utility model, it needs to be explained that the terms "center", "upper", "lower", "inner", "outer", "side" and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship of the utility model product when it is usually placed, and is only for the convenience of describing the utility model and simplifying the description, and does not indicate or imply that the indicated device or element must have a particular orientation, be constructed and operated in a particular orientation, and therefore cannot be understood as a limitation on the utility model. In addition, the terms "first", "second" and the like are only used for differentiation in description, and cannot be understood as indicating or implying relative importance.
[0028] In the description of the embodiments of the utility model, it also needs to be explained that, unless otherwise explicitly specified and limited, the terms "set", "installed", "connected", "connected" should be understood broadly, for example, it can be fixedly connected, or it can be detachably connected, or integrally connected; it can be mechanically connected, or it can be electrically connected; it can be directly connected, or it can be indirectly connected through an intermediate medium, or it can be the communication inside two elements. For ordinary skilled persons in the art, the specific meaning of the above terms in the embodiments of the utility model can be understood according to the specific circumstances.
[0029] The technical scheme in the embodiments of the utility model will be described clearly and completely in combination with the drawings in the embodiments of the utility model, obviously, the described embodiments are only part of the embodiments of the utility model, rather than all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary skilled persons in the art without creative labor belong to the scope of protection of the utility model.
[0030] Embodiment one: a kind of building construction environmental protection enclosure, such as Figures 1-2As shown, it comprises a first enclosure 10, the inner wall of the first enclosure 10 is provided with a support connecting assembly 11, the outer wall right side of the support connecting assembly 11 is provided with a second enclosure 12, and the structure of the second enclosure 12 is consistent with the first enclosure 10, the outer wall lower end right side of the first enclosure 10 is provided with a first cement connecting seat assembly 13, and the inner wall right side of the first cement connecting seat assembly 13 is movably connected with the outer wall lower end left side of the second enclosure 12, the outer wall lower end left side of the first enclosure 10 is provided with a second cement connecting seat assembly 14, and the structure of the second cement connecting seat assembly 14 is consistent with the first cement connecting seat assembly 13, the outer wall lower end right side of the second enclosure 12 is provided with a third cement connecting seat assembly 15, and the structure of the third cement connecting seat assembly 15 is consistent with the first cement connecting seat assembly 13, the inner wall lower end of the support connecting assembly 11 is provided with a fourth cement connecting seat assembly 16, and the structure of the fourth cement connecting seat assembly 16 is consistent with the first cement connecting seat assembly 13, the first enclosure 10 comprises a mounting frame 17, the back of the mounting frame 17 is fixedly installed with an enclosure plate 18, the inner wall upper end of the mounting frame 17 is provided with a jack 19, the bottom right side of the mounting frame 17 is fixedly installed with a first plug rod 20, and the outer wall of the first plug rod 20 is movably connected with the inner wall of the first cement connecting seat assembly 13, the bottom left side of the mounting frame 17 is fixedly installed with a second plug rod 21, and the outer wall of the second plug rod 21 is movably connected with the inner wall of the second cement connecting seat assembly 14, by setting the first cement connecting seat assembly 13, the second cement connecting seat assembly 14, the third cement connecting seat assembly 15 and the fourth cement connecting seat assembly 16, the first cement connecting seat assembly 13, the second cement connecting seat assembly 14, the third cement connecting seat assembly 15 and the fourth cement connecting seat assembly 16 can be fixed respectively to the first enclosure 10, the second enclosure 12 and the support connecting assembly 11, which not only facilitates the quick installation of the first enclosure 10 and the second enclosure 12, but also avoids the operation of digging a pit for pre-burying on the ground, saves a lot of cost and is conducive to environmental protection.
[0031] Example two: on the basis of example one, as shown, Figure 3 the support connecting assembly 11 comprises a plug column 22, and the outer wall right side of the plug column 22 is movably connected with the inner wall left side upper end of the second enclosure 12, the outer wall middle end of the plug column 22 is movably installed with a support rod 23, the inner wall left side of the plug column 22 is provided with a split pin 24, the bottom of the support rod 23 is provided with a connecting hinge 25, and the inner wall of the connecting hinge 25 is movably connected with the outer wall of the fourth cement connecting seat assembly 16, by setting the support connecting assembly 11, the plug column 22 and the split pin 24 on the support connecting assembly 11 can connect the first enclosure 10 and the second enclosure 12, and also can connect the support rod 23, so that the support rod 23 can support the first enclosure 10 and the second enclosure 12 at the same time.
[0032] Example three: on the basis of example one and example two, as shown,Figure 4 As shown, the first cement connecting seat assembly 13 comprises a cement block 26, a slot 27 is formed at the top rear end of the cement block 26, and the inner wall of the cement block 26 is movably connected with the lower end of the outer wall of the first fence 10 and the second fence 12 at the slot 27, a threaded rod 28 is fixedly installed at the top middle end of the cement block 26, and a nut 29 is threadedly connected with the outer wall of the threaded rod 28, and by arranging the connecting hinge 25, the threaded rod 28 and the nut 29, the support connecting assembly 11 can be quickly connected with the threaded rod 28 and the nut 29 on the fourth cement connecting seat assembly 16 through the connecting hinge 25, thereby ensuring the support stability of the entire support connecting assembly 11 to the first fence 10 and the second fence 12.
[0033] The working principle of the utility model is as follows: the first cement connecting seat assembly 13, the second cement connecting seat assembly 14, the third cement connecting seat assembly 15 and the fourth cement connecting seat assembly 16 are placed at the construction site, the first fence 10 and the second fence 12 are sequentially inserted into the first cement connecting seat assembly 13, the second cement connecting seat assembly 14 and the third cement connecting seat assembly 15, the first fence 10 and the second fence 12 are connected together through the insertion column 22 and the split pin 24 on the support connecting assembly 11, and then the first fence 10 and the second fence 12 are supported on the fourth cement connecting seat assembly 16 through the support rod 23 and the connecting hinge 25 on the support connecting assembly 11, so that the stability of the device engineering fence can be ensured, and after the construction is completed, the first fence 10, the support connecting assembly 11, the second fence 12, the first cement connecting seat assembly 13, the second cement connecting seat assembly 14, the third cement connecting seat assembly 15 and the fourth cement connecting seat assembly 16 are removed, so that the repeated use in the future is facilitated, and material waste is avoided, which is not conducive to environmental protection.
[0034] The basic principle and main features of the utility model and the advantages of the utility model are shown and described above. It should be understood by those skilled in the art that the utility model is not limited by the above examples, and the above examples and descriptions in the specification are only to illustrate the principle of the utility model, and various changes and improvements can be made to the utility model without departing from the spirit and scope of the utility model, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection of the utility model is defined by the appended claims and their equivalents.
Claims
1. An environmentally friendly construction site enclosure, comprising a first enclosure (10), characterized in that: The inner wall of the first enclosure (10) is provided with a support connection assembly (11). The right side of the outer wall of the support connection assembly (11) is provided with a second enclosure (12), and the structure of the second enclosure (12) is the same as that of the first enclosure (10). The lower right side of the outer wall of the first enclosure (10) is provided with a first cement connector assembly (13), and the right side of the inner wall of the first cement connector assembly (13) is movably connected to the lower left side of the outer wall of the second enclosure (12). The lower left side of the outer wall of the first enclosure (10) is provided with a second cement connector assembly (14), and the structure of the second cement connector assembly (14) is the same as that of the first cement connector assembly (13). The lower right side of the outer wall of the second enclosure (12) is provided with a third cement connector assembly (15), and the structure of the third cement connector assembly (15) is the same as that of the first cement connector assembly (13). The connecting seat assembly (13) is identical to the first cement connecting seat assembly (13). The lower end of the inner wall of the supporting connecting assembly (11) is provided with a fourth cement connecting seat assembly (16), and the structure of the fourth cement connecting seat assembly (16) is identical to that of the first cement connecting seat assembly (13). The first enclosure (10) includes an installation frame (17), and an enclosure plate (18) is fixedly installed on the back of the installation frame (17). The supporting connecting assembly (11) includes a plug (22), and the right side of the outer wall of the plug (22) is movably connected to the upper left side of the inner wall of the second enclosure (12). The first cement connecting seat assembly (13) includes a cement block (26), and a slot (27) is opened at the top rear end of the cement block (26). The inner wall of the cement block (26) is located at the slot (27) and is movably connected to the lower end of the outer wall of the first enclosure (10) and the second enclosure (12).
2. The environmentally friendly construction site enclosure according to claim 1, characterized in that: The upper end of the inner wall of the mounting frame (17) is provided with an insertion hole (19), and the first insertion rod (20) is fixedly installed on the bottom right side of the mounting frame (17).
3. The environmentally friendly construction site enclosure according to claim 1, characterized in that: A support rod (23) is movably installed at the middle of the outer wall of the insert (22), and a cotter pin (24) is provided on the left side of the inner wall of the insert (22).
4. The environmentally friendly construction site enclosure according to claim 2, characterized in that: The outer wall of the first insertion rod (20) is movably connected to the inner wall of the first cement connector assembly (13).
5. The environmentally friendly construction site enclosure according to claim 1, characterized in that: The second insert rod (21) is fixedly installed on the bottom left side of the mounting frame (17).
6. The environmentally friendly construction site enclosure according to claim 5, characterized in that: The outer wall of the second insertion rod (21) is movably connected to the inner wall of the second cement connector assembly (14).
7. The environmentally friendly construction site enclosure according to claim 3, characterized in that: The bottom of the support rod (23) is provided with a connecting hinge (25), and the inner wall of the connecting hinge (25) is movably connected to the outer wall of the fourth cement connecting seat assembly (16).
8. The environmentally friendly construction site enclosure according to claim 1, characterized in that: A threaded rod (28) is fixedly installed at the top center of the cement block (26).
9. The environmentally friendly construction site enclosure according to claim 8, characterized in that: The outer wall of the threaded rod (28) is threaded with a nut (29).