Winding device and coating equipment
By setting traction rollers and rubber rollers in the winding device, combined with multiple guide rollers and main drum units, the problem of unstable tension during substrate conveying is solved, achieving stable substrate conveying and efficient coating.
Patent Information
- Application Number
- CN202423246008.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-27
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2034-12-27
AI Technical Summary
Existing winding devices have poor tension control during substrate transport, leading to substrate breakage and affecting the normal operation of coating equipment.
Traction rollers and rubber rollers are installed in the winding device. The traction rollers actively pull the substrate forward, and the friction between the rubber rollers and the substrate prevents slippage. Multiple guide rollers and a main drum unit are combined to guide and control the tension of the substrate, ensuring the stability of the substrate during the conveying process.
It improves the tension stability during substrate transportation, avoids substrate breakage, ensures coating quality and efficiency, and reduces waste of materials to be coated.
Smart Images

Figure CN223576588U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a coating equipment technical field especially relates to a winding device and coating equipment. BACKGROUND
[0002] The winding device as important component part of coating equipment, its plays the vital role, winding device through its inside unwinding roll and over roll etc. with certain speed and tension to the coating area of the substrate to be plated, after plating, the winding roll is rewound into cylindrical film with the substrate after plating, and the subsequent collection, storage and processing are convenient.
[0003] However, the existing winding device has poor tension control effect in the substrate conveying process, which may cause the substrate to break and affect the normal operation of the coating equipment.
[0004] Therefore, the prior art needs to be improved and improved. UTILITY MODEL CONTENT
[0005] In view of the above shortcomings of the prior art, the utility model aims at providing a winding device and coating equipment, which aims to solve the problem of poor substrate conveying effect in the coating process in the prior art.
[0006] In order to achieve the above purpose, the utility model adopts the following technical scheme:
[0007] A winding device, comprising an unwinding unit for releasing uncoated substrate, a winding unit for winding the substrate after coating, a main drum unit, a traction roller for actively pulling the substrate forward, a rubber roller for preventing the substrate from slipping during conveying, the main drum unit, the traction roller and the rubber roller are sequentially arranged on the substrate conveying path between the unwinding unit and the winding unit, and the main drum unit comprises a first front main drum unit and a second front main drum unit.
[0008] A first tension roller and a first bending roller are arranged on the substrate conveying path between the unwinding unit and the main drum unit.
[0009] The main drum unit further comprises a first reverse main drum unit and a second reverse main drum unit, the first reverse main drum unit is located on the substrate conveying path between the first front main drum unit and the second front main drum unit, and the second reverse main drum unit is located on the substrate conveying path between the second front main drum unit and the traction roller.
[0010] The first front main drum unit comprises a first main drum, a second tension roller and a second bending roller are arranged on the substrate conveying path between the first main drum and the first reverse main drum unit.
[0011] The first backside main drum unit comprises a second main drum, and a third tension roller and a third bending roller are arranged on the substrate conveying path between the second main drum and the second frontside main drum unit.
[0012] The second frontside main drum unit comprises a third main drum, and a fourth tension roller and a fourth bending roller are arranged on the substrate conveying path between the third main drum and the second backside main drum unit.
[0013] The second backside main drum unit comprises a fourth main drum, and a fifth tension roller and a fifth bending roller are arranged on the substrate conveying path between the fourth main drum and the traction roller.
[0014] A sixth bending roller, a sixth tension roller and a seventh bending roller are arranged on the substrate conveying path between the rubber roller and the unwinding unit.
[0015] A coating equipment comprises the winding device, the first frontside main drum unit and the second frontside main drum unit are each provided with a coating device for coating one side of the substrate, and an adjusting assembly for adjusting the size of the coating area is arranged between the first frontside main drum unit and the coating device and between the second frontside main drum unit and the coating device.
[0016] The coating device is a magnetron sputtering device or an evaporation device; the adjusting assembly comprises a guide piece which defines a coating space between the first frontside main drum unit and the coating device and between the second frontside main drum unit and the coating device, and at least one adjusting plate is arranged on the guide piece, the adjusting plate adjusts the size of the coating area by adjusting the opening size of the coating space; the first backside main drum unit and the second backside main drum unit are each provided with a magnetron sputtering device for coating the other side of the substrate.
[0017] Compared with the prior art, the winding device and the coating equipment provided by the application have the following advantages: the winding device comprises an unwinding unit for releasing the uncoated substrate, a winding unit for winding the coated substrate, a main drum unit, a traction roller for actively pulling the substrate forward, and a rubber roller for preventing the substrate from slipping during the conveying process; the main drum unit, the traction roller and the rubber roller are sequentially arranged on the substrate conveying path between the unwinding unit and the winding unit; the main drum unit comprises a first frontside main drum unit and a second frontside main drum unit. BRIEF DESCRIPTION OF DRAWINGS
[0018] Figure 1 The structure diagram of the coating equipment is provided. DETAILED DESCRIPTION
[0019] To make the purpose, technical scheme and effect of the present application more clear and definite, the present application will be further described in detail below with reference to the drawings and examples. It should be understood that the specific examples described herein are only used to explain the present application and should not be used to limit the present application.
[0020] It should be noted that when a component is referred to as being "mounted on", "fixed on" or "disposed on" another component, it can be directly on the other component or there can be a middle component. When a component is referred to as being "connected to" another component, it can be directly connected to the other component or there can be a middle component.
[0021] It should also be noted that the terms of left, right, up, down and the like in the embodiments of the present application are only relative concepts or are referenced to the normal use state of the product, and should not be considered as being limited.
[0022] The winding device, as an important component of the coating equipment, plays a crucial role. The winding device transports the base material (such as pet film, metal strip, plastic film and other flexible materials) to be coated to the coating area at a certain speed and tension through the unwinding roller and the over roller in the winding device. After the coating is completed, the winding roller rewinds the coated base material into a cylindrical film, which is convenient for subsequent collection, storage and processing.
[0023] However, the existing winding device has poor tension control effect during the base material conveying process, which can cause the base material to break and affect the normal work of the coating equipment.
[0024] In view of the above shortcomings, the present application provides a winding device, please refer to Figure 1The coating equipment comprises a unwinding unit 100 for releasing the uncoated substrate, a winding unit 200 for winding the coated substrate, a main drum unit, a traction roller 21 for actively pulling the substrate to advance, and a rubber roller 22 for preventing the substrate from slipping during the conveying process. The main drum unit, the traction roller 21 and the rubber roller 22 are sequentially arranged on the substrate conveying path between the unwinding unit 100 and the winding unit 200. The main drum unit comprises a first front main drum unit and a second front main drum unit. In the present application, the traction roller 21 and the rubber roller 22 are arranged on the substrate conveying path between the main drum unit and the winding unit 200. The substrate is actively pulled by the traction roller 21, and the friction between the rubber roller 22 and the substrate is used to prevent the substrate from slipping during the conveying process, thereby avoiding the problem of unstable tension and substrate breakage. In the present application, the traction roller 21 is a driving roller for pulling the substrate to advance. The traction roller 21 is filled with cooling liquid to cool the substrate. After the cooling liquid is filled, the temperature of the traction roller 21 is controlled to avoid high-temperature winding. The coated substrate is easily oxidized by external impurities, which ensures that the quality and performance of the coated substrate are not affected. In the prior art, the traction roller 21 is usually a steel roller with a chromium surface. The friction between chromium and the substrate is small, and the substrate is easy to slip during the conveying process of the traction roller 21, which affects the tension of the substrate during the conveying process and the efficiency and quality of the coating. By arranging the rubber roller 22 downstream of the traction roller 21, the adhesion of the substrate to the roller is adjusted to ensure the stability of the conveying process.
[0025] The present application also provides a coating equipment comprising the winding device, the first front main drum unit and the second front main drum unit are each provided with a coating device 70 for coating one side of the substrate. An adjusting assembly for adjusting the size of the coating area is arranged between the first front main drum unit and the coating device 70 and between the second front main drum unit and the coating device 70. The coating equipment with the winding device of the present application can ensure the stability of the tension of the substrate during the conveying process, and adjust the size of the coating area according to different sizes of the substrate, thereby improving the efficiency of the coating and reducing the waste of the material to be coated.
[0026] Further, a first tension roller 31 and a first bending roller 32 are arranged on the substrate conveying path between the unwinding unit 100 and the main drum unit. In the present application, a first guide roller 51, a second guide roller 52 and a third guide roller 53 are arranged on the substrate conveying path between the unwinding unit 100 and the first tension roller 31. A fourth guide roller 54 is arranged on the substrate conveying path between the first tension roller 31 and the first bending roller 32. A fifth guide roller 55 is arranged on the substrate conveying path between the first bending roller 32 and the first front main drum unit. The bending roller in the present application is a flattening roller.
[0027] Further, the main drum units further include a first back main drum unit and a second back main drum unit, the first back main drum unit is located on the substrate conveying path between the first front main drum unit and the second front main drum unit, and the second back main drum unit is located on the substrate conveying path between the second front main drum unit and the traction roller 21. In this application, the substrate is coated by the coating device when passing through the first front main drum unit, the first back main drum unit, the second front main drum unit and the second back main drum unit, so as to quickly realize the process of double-sided coating of double-layer film on the substrate, and improve the coating efficiency.
[0028] Further, the first front main drum unit includes a first main drum 11, and a second tension roller 33 and a second bending roller 34 are arranged on the substrate conveying path between the first main drum 11 and the second main drum 12 unit. A sixth guide roller 56 is arranged on the substrate conveying path between the second tension roller 33 and the second bending roller 34. The first back main drum unit includes a second main drum 12, and a third tension roller 35 and a third bending roller 36 are arranged on the substrate conveying path between the second main drum 12 and the third main drum 13 unit. A seventh guide roller 57 is arranged on the substrate conveying path between the third tension roller 35 and the third bending roller 36. The second front main drum unit includes a third main drum 13, and a fourth tension roller 37 and a fourth bending roller 38 are arranged on the substrate conveying path between the third main drum 13 and the fourth main drum 14 unit. An eighth guide roller 58 is arranged on the substrate conveying path between the fourth tension roller 37 and the fourth bending roller 38. The second back main drum unit includes a fourth main drum 14, and a fifth tension roller 39 and a fifth bending roller 41 are arranged on the substrate conveying path between the fourth main drum 14 and the traction roller 21. A ninth guide roller 59 is arranged on the substrate conveying path between the fifth tension roller 39 and the fifth bending roller 41. A sixth bending roller 42, a sixth tension roller 43 and a seventh bending roller 44 are arranged on the substrate conveying path between the rubber roller 22 and the unwinding unit 100. A tenth guide roller 60 is arranged between the sixth tension roller 43 and the seventh bending roller 44, and an eleventh guide roller 61 is arranged between the seventh bending roller 44 and the unwinding unit 100.
[0029] In the present application, the unwinding unit 100 releases the uncoated substrate, which passes through the first guide roller 51, the second guide roller 52, the third guide roller 53, the first tension roller 31, the fourth guide roller 54, the first bending roller 32 and the fifth guide roller 55 to the first main drum 11 in sequence; the substrate is coated for the first time at the first main drum 11; the function of the first tension roller 31 is to maintain the tension of the substrate when passing through the first main drum 11, so that the uniformity of the coating is improved when the substrate is coated for the first time, and the interruption of the substrate is avoided; the first bending roller 32 is arranged upstream of the first main drum 11, which flattens the substrate through the unique structure and function of the first bending roller 32, eliminates wrinkles and creases in the substrate conveying process, improves the flatness and quality of the substrate, and makes the substrate better adhere to the first main drum 11, ensuring the stability of the coating. After one side of the substrate is coated for the first time by the first main drum 11, it passes through the second tension roller 33, the sixth guide roller 56 and the second bending roller 34 to the second main drum 12 in sequence; the arrangement of the second tension roller 33 can maintain the tension of the substrate after passing through the first main drum 11, ensuring the stability of the tension when the substrate enters the second main drum 12; the arrangement of the second bending roller 34 flattens the substrate after the first coating, ensuring the adhesion of the substrate when passing through the second main drum 12, and avoiding the substrate being burned through by high temperature while being coated by the second main drum 12. After the other side of the substrate is coated for the first time by the second main drum 12, it passes through the third tension roller 35, the seventh guide roller 57 and the third bending roller 36 to the third main drum 13 in sequence; the third tension roller 35 is used to stabilize the tension of the substrate after passing through the second main drum 12; the third bending roller 36 is used to improve the adhesion of the substrate to the third main drum 13. After one side of the substrate is coated for the second time by the third main drum 13, it passes through the fourth tension roller 37, the eighth guide roller 58 and the fourth bending roller 38 to the fourth main drum 14 in sequence; the fourth tension roller 37 is used to control the stability of the tension of the substrate after passing through the third main drum 13; the fourth bending roller 38 is used to adhere closely to the fourth main drum 14 when the substrate passes through the fourth main drum 14. After the other side of the substrate is coated for the second time by the fourth main drum 14, it passes through the fifth tension roller 39, the ninth guide roller 59 and the fifth bending roller 41 to the traction roller 21 in sequence; the fifth tension roller 39 is used to control the stability of the tension of the substrate after passing through the fourth main drum 14; the function of the fifth bending roller 41 is to make the substrate better adhere to the traction roller 21, since the traction roller 21 is supplied with cooling liquid, the substrate can be cooled better after coating is completed. After the substrate passes through the traction roller 21, it passes through the tenth guide roller 60, the rubber roller 22, the sixth bending roller 42, the sixth tension roller 43, the eleventh guide roller 61, the seventh bending roller 44 and the twelfth guide roller 62 in sequence to the winding unit 200, which winds the coated substrate, and thus the double-sided double-layer coating of the substrate is completed.
[0030] In the present application, a plurality of guide rollers are arranged to guide the conveying of the substrate, ensure that the substrate maintains the correct path and position during coating, improve the stability of the substrate conveying, and reduce friction and wear during the conveying of the substrate.
[0031] Further, the coating device 70 is a magnetron sputtering device or an evaporation device; the adjusting assembly comprises a guide 71, the guide 71 defines a coating space 72 between the first front main drum unit and the coating device 70 and between the second front main drum unit and the coating device 70, at least one adjusting plate 73 is arranged on the guide 71, the adjusting plate 73 adjusts the size of the coating area by adjusting the opening size of the coating space 72; the to-be-coated material is guided to deposit on the substrate through the coating space 72, the coating efficiency is improved, and the waste of the to-be-coated material is reduced; the opening size of the coating space 72 is adjusted according to the size of the substrate by arranging the adjusting plate 73, and the stability of the coating effect is ensured. In the embodiment of the application, one fixing plate 74 and one adjusting plate 73 are mounted on the guide 71, the fixing plate 74 and the adjusting plate 73 are oppositely arranged, the opening size of the coating space 72 is changed by adjusting the distance between the adjusting plate 73 and the fixing plate 74, and then the size of the coating area of the coating device 70 is adjusted. Preferably, the coating device arranged around the second front main drum unit is a magnetron sputtering device; after the first coating on one side of the substrate, a first film layer is formed on one side of the substrate, at this time, the first film layer is still at a high temperature, a second film layer is deposited on the first film layer through the magnetron sputtering device, and the first film layer and the second film layer are firmly fixed on the substrate by using the high-energy characteristics of the magnetron sputtering, so that the adhesion between the film layer and the substrate is improved.
[0032] The magnetron sputtering device is arranged around the first back main drum unit and the second back main drum unit, and is used for coating the other side of the substrate. Similarly, the first film layer and the second film layer are deposited on the other side of the substrate through the magnetron sputtering device, so that the coating of the other side of the substrate is completed.
[0033] In summary, the winding device and the coating equipment provided by the application, wherein the winding device comprises a unwinding unit for releasing the uncoated substrate; a winding unit for winding the coated substrate; a main drum unit; a traction roller for actively pulling the substrate forward; a rubber roller for preventing the substrate from slipping during conveying; the main drum unit, the traction roller and the rubber roller are sequentially arranged on the substrate conveying path between the unwinding unit and the winding unit; the main drum unit comprises a first front main drum unit and a second front main drum unit. The application sets the traction roller and the rubber roller on the substrate conveying path between the main drum unit and the winding unit, actively pulls the substrate through the traction roller, and uses the friction force between the rubber roller and the substrate to prevent the substrate from slipping during conveying, so as to avoid the problem of unstable tension and substrate breakage.
[0034] It can be understood that, for those skilled in the art, equivalent replacement or change can be made according to the technical scheme and the utility model concept of the utility model, and all these changes or replacements shall belong to the protection scope of the claims attached to the utility model.
Claims
1. A winding device, characterized by The coating device comprises a releasing unit for releasing an uncoated substrate, a winding unit for winding the coated substrate, a main drum unit, a traction roller for driving the substrate to advance, and a rubber roller for preventing the substrate from slipping during the conveying process. The main drum unit, the traction roller and the rubber roller are sequentially arranged on the substrate conveying path between the releasing unit and the winding unit. The main drum unit comprises a first front main drum unit and a second front main drum unit.
2. The winding device according to claim 1, characterized in that A first tension roller and a first bending roller are arranged on the substrate conveying path between the releasing unit and the main drum unit.
3. The winding device according to claim 2, characterized in that The main drum unit further comprises a first back main drum unit and a second back main drum unit. The first back main drum unit is arranged on the substrate conveying path between the first front main drum unit and the second front main drum unit, and the second back main drum unit is arranged on the substrate conveying path between the second front main drum unit and the traction roller.
4. The winding device according to claim 3, characterized in that The first front main drum unit comprises a first main drum. A second tension roller and a second bending roller are arranged on the substrate conveying path between the first main drum and the first back main drum unit.
5. The winding device according to claim 4, characterized in that The first back main drum unit comprises a second main drum. A third tension roller and a third bending roller are arranged on the substrate conveying path between the second main drum and the second front main drum unit.
6. The winding device according to claim 5, characterized in that The second front main drum unit comprises a third main drum. A fourth tension roller and a fourth bending roller are arranged on the substrate conveying path between the third main drum and the second back main drum unit.
7. The winding device according to claim 6, characterized in that The second back main drum unit comprises a fourth main drum. A fifth tension roller and a fifth bending roller are arranged on the substrate conveying path between the fourth main drum and the traction roller.
8. The winding device according to claim 3, characterized in that A sixth bending roller, a sixth tension roller and a seventh bending roller are arranged on the substrate conveying path between the rubber roller and the releasing unit.
9. A coating apparatus, characterized by, The coating device comprises the winding device according to any one of claims 3-8. The first front main drum unit and the second front main drum unit are each provided with a coating device for coating one side of the substrate. An adjusting assembly for adjusting the size of the coating area is arranged between the first front main drum unit and the coating device and between the second front main drum unit and the coating device.
10. The coating apparatus of claim 9, wherein, The coating device is a magnetron sputtering device or an evaporation device. The adjusting assembly comprises a guide member defining a coating space between the first front main drum unit and the coating device and between the second front main drum unit and the coating device. At least one adjusting plate is arranged on the guide member. The adjusting plate adjusts the size of the coating area by adjusting the opening size of the coating space. The first back main drum unit and the second back main drum unit are each provided with a magnetron sputtering device for coating the other side of the substrate.