Water permeable brick for landscaping
By incorporating a combination design of permeable blocks, top cover, water-absorbing sponge layer, and filter screen into the permeable bricks for landscaping, the problem of easy clogging of permeable holes is solved, achieving efficient water permeability and soil moisture regulation under different weather conditions, and simplifying cleaning and maintenance.
Patent Information
- Application Number
- CN202423032853.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-12-10
- Publication Date
- 2025-11-21
- Estimated Expiration
- 2034-12-10
AI Technical Summary
During use, the permeable bricks used in landscaping are prone to having their permeable holes clogged by dust, soil, and impurities, leading to reduced permeability and difficulty in cleaning, which in turn affects the soil moisture regulation effect.
The design incorporates a combination of a permeable brick body, permeable blocks, a top cover, an absorbent sponge layer, a filter layer, and a filter screen. The combination of permeable holes, water channels, and drainage holes prevents large impurities from entering. The removable permeable blocks and filter screen facilitate the cleaning of impurities and the removal of moss, ensuring the permeable holes remain clear.
It effectively prevents the seepage holes from becoming clogged, maintains soil moisture, and ensures that the permeable bricks can quickly absorb water under both heavy rain and drought conditions, which is beneficial to the growth of garden plants and simplifies the maintenance and cleaning process.
Smart Images

Figure CN223576872U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to the technical field of water permeable bricks, in particular to a water permeable brick for landscaping. BACKGROUND
[0002] The water permeable brick for landscaping is used for paving the ground, has good water permeability and air permeability, can make rainwater quickly permeate into the ground, so as to keep the soil humidity, improve the living conditions of the ground plants and soil microorganisms, and prevent the ground from storing a large amount of rainwater.
[0003] A water permeable brick for landscaping is provided in Chinese patent CN215925500U, which comprises a first brick body, a water permeation hole is formed in the first brick body, a cavity is arranged in the first brick body, a first through hole is formed in the upper wall of the cavity, a second through hole is formed in the lower wall of the cavity, and a sponge pad is fixedly arranged in the cavity.
[0004] The water permeable brick has a cavity and a sponge pad. When rainwater flows from the first brick body to the ground, the sponge pad can intercept part of the rainwater, so that the water is stored in the sponge pad. When there is no rainwater for a long time, the water in the sponge pad can play a moisturizing role on the temperature of the outside environment through the water permeation hole. When the rainwater is large, the water can flow into the gap between the first brick body and the third brick body through the drainage groove, quickly enter the ground, and there is no water accumulation.
[0005] However, in the process of use, dust and soil are easy to block the water permeation hole. Although most of the soil can be washed away by the water flow, the large-sized impurities are easy to enter the water permeation hole, affecting the normal water permeation. In addition, after long-term use, the inner wall of the water permeation hole is easy to stick moss and silt, which is difficult to clean. At this time, although the water flow can still seep downward, the water permeation efficiency is low. UTILITY MODEL CONTENT
[0006] The utility model aims at providing a water permeable brick for landscaping, which can effectively solve the problems in the background art.
[0007] To achieve the above-mentioned purpose, the utility model provides the following technical scheme.
[0008] A water permeable brick for landscaping comprises a water permeable brick body, one side of the water permeable brick body is provided with a mounting groove, and the other side of the water permeable brick body is fixedly connected with a positioning block which is adaptively matched with the mounting groove.
[0009] The top end of the water permeable brick body is provided with two clamping grooves, and water permeable blocks are clamped in the two clamping grooves; water permeable holes are formed through the upper and lower ends of the water permeable blocks; a top cover is mounted above the water permeable holes; a water permeable opening that is adaptively matched with the clamping grooves is formed at an upper inner position of the water permeable brick body; and a plurality of water leakage holes are formed through the bottom end of the water permeable brick body.
[0010] Preferably, a water absorption sponge layer is arranged at an inner position of the water permeable brick body and below the water permeable opening, and a filter screen layer is mounted below the water absorption sponge layer.
[0011] Preferably, a sliding groove is formed below the water permeable block, and a filter screen plate is mounted below the water permeable block through a sliding block.
[0012] Preferably, a plurality of anti-skid protrusions are arranged at a central position of the top end of the water permeable brick body, and a plurality of water guide grooves are arranged on the top surface of the water permeable brick body and the water permeable block.
[0013] Preferably, the anti-skid protrusions are arranged in a circular arc shape, and the water guide grooves are arranged in a "V" shape.
[0014] Preferably, the water permeable block is detachably connected with the water permeable brick body through the clamping grooves, and the top surface of the water permeable block and the water permeable brick body are at the same horizontal plane; the filter screen plate is detachably connected with the water permeable block through the sliding block, and the bottom surface of the filter screen plate and the bottom surface of the water permeable block are at the same horizontal plane.
[0015] Compared with the prior art, the water permeable brick has the following beneficial effects:
[0016] The top cover, the filter screen layer, the water absorption sponge layer, the water permeable holes and the filter screen plate are arranged in cooperation, so that when it rains, the water flow can be guided and filtered through the cooperation of the water permeable holes, the filter screen plate, the water absorption sponge layer and the filter screen layer, thereby preventing large-size impurities from directly entering the lower part of the water permeable brick body, avoiding the blockage of the water leakage holes at the lower part of the water permeable brick body, preventing large interference to water permeation, and avoiding large interference to soil water replenishment, so as to keep the soil in a wet state and facilitate the growth of garden trees and plants.
[0017] The clamping grooves cooperate with the water permeable blocks, so that after long-term use, the water permeable blocks can be pulled out upward for cleaning, the impurities in the water permeable holes can be cleaned, and the moss growing in the water permeable holes can be removed, thereby preventing the water permeable holes from being blocked by too many impurities and preventing large interference to water permeation. BRIEF DESCRIPTION OF DRAWINGS
[0018] Figure 1 It is a whole structure schematic view of the water permeable brick for landscaping in the embodiment of the utility model;
[0019] Figure 2 It is the structure split view of the filter screen plate and the water permeable block in the embodiment of the utility model;
[0020] Figure 3 It is the inside sectional view of the water permeable brick body in the embodiment of the utility model;
[0021] Figure 4 It is the structure plan view of the water permeable block in the embodiment of the utility model.
[0022] In the drawing: 1, water permeable brick body; 2, installation groove; 3, positioning block; 4, clamping groove; 5, water permeable block; 6, water permeable hole; 7, filter screen plate; 8, sliding block; 9, top cover; 10, water permeable mouth; 11, filter screen layer; 12, water absorption sponge layer; 13, water leakage hole; 14, anti-skid protrusion; 15, water guide groove. DETAILED DESCRIPTION
[0023] The technical scheme in the embodiments of the utility model will be described clearly and completely below with reference to the drawings in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by those skilled in the art without creative labor fall within the scope of the utility model.
[0024] Embodiment one
[0025] Combined Figures 1-4 A water permeable brick for landscaping, comprising a water permeable brick body 1, one side of the water permeable brick body 1 is provided with an installation groove 2, and the other side of the water permeable brick body 1 is fixedly connected with a positioning block 3 adaptively matched with the installation groove 2.
[0026] Referring to Figure 2 , Figure 3 and Figure 4 , it is further obtained that two clamping grooves 4 are formed at the top end of the water permeable brick body 1, and a water permeable block 5 is clamped in the two clamping grooves 4, a water permeable hole 6 is formed through the upper and lower ends of the water permeable block 5, a top cover 9 is installed above the water permeable hole 6, a water permeable mouth 10 adaptively matched with the clamping groove 4 is formed at the upper position in the water permeable brick body 1, a plurality of water leakage holes 13 are formed through the bottom end of the water permeable brick body 1, a plurality of anti-skid protrusions 14 are arranged at the central position of the top end of the water permeable brick body 1, a plurality of water guide grooves 15 are arranged on the top surface of the water permeable brick body 1 and the water permeable block 5, the anti-skid protrusions 14 are arranged in an arc shape, and the water guide grooves 15 are arranged in a "V" shape.
[0027] Specifically, when the plurality of water permeable brick bodies 1 are assembled, the installation groove 2 and the positioning block 3 are matched to facilitate positioning by personnel, prevent the water permeable brick body 1 from being skewed during construction, when it rains, the water permeable hole 6 and the water guide groove 15 guide the rainwater, the rainwater is guided to the connecting gap of each water permeable brick body 1 through the water guide groove 15 and discharged, the rainwater is guided to the water permeation opening 10 through the water permeable hole 6 and falls into the water absorbing sponge layer 12 from the water permeation opening 10, after the water absorbing sponge layer 12 absorbs water, it continues to penetrate downward to the water leakage hole 13 and is discharged to the lower part of the water permeable brick body 1, thereby completing the water permeation process, quickly guiding the rainwater accumulated on the water permeable brick body 1 into the ground, so that the water permeable brick body 1 can still quickly permeate water in heavy rain.
[0028] Embodiment two
[0029] Referring to Figure 2 and Figure 3 , and on the basis of embodiment one, it is further obtained that the water absorbing sponge layer 12 is arranged inside the water permeable brick body 1 and below the water permeation opening 10, the filter screen layer 11 is arranged below the water absorbing sponge layer 12, the sliding groove is arranged below the water permeable block 5, the filter screen plate 7 is arranged below the water permeable block 5 through the sliding block 8, the water permeable block 5 is detachably connected with the water permeable brick body 1 through the clamping groove 4, the top surface of the water permeable block 5 is at the same horizontal plane as the top surface of the water permeable brick body 1, the filter screen plate 7 is detachably connected with the water permeable block 5 through the sliding block 8, and the bottom surface of the filter screen plate 7 is at the same horizontal plane as the bottom surface of the water permeable block 5.
[0030] Specifically, in a relatively dry environment, after the ground is watered by the water pipe, the water absorbing sponge layer 12 can still absorb a large amount of water, and then the water in the water absorbing sponge layer 12 will evaporate and leak to supplement the water of the ground and the air, adjust the air humidity of the garden, and the water absorbing sponge layer 12 will not be exposed to sunlight to avoid rapid drying, and during the water permeation process, most of the impurities flowing down from the water permeable hole 6 can be blocked by the filter screen plate 7 to prevent them from directly entering the water permeable brick body 1, then the water permeable block 5 can be taken off by being buckled upward, then the filter screen plate 7 can be pulled out to expose the water permeable hole 6, so that personnel can clean and dredge it, and then by means of intermittent maintenance and dredging, the water permeable hole 6 can be prevented from being affected by too many impurities.
[0031] In actual operation, when the plurality of water permeable brick bodies 1 are assembled and constructed, the installation groove 2 and the positioning block 3 are matched to facilitate positioning by personnel, prevent the water permeable brick body 1 from being skewed during construction, when it rains, the water permeable hole 6 and the water guide groove 15 guide the rainwater, the rainwater is guided to the connecting gap of each water permeable brick body 1 through the water guide groove 15 and discharged;
[0032] Rainwater can be guided to the water seepage hole 10 through the water seepage hole 6 and fall into the water absorption sponge layer 12, and after water absorption of the water absorption sponge layer 12, continue to penetrate to the water leakage hole 13, thereby discharging to the lower of the water seepage brick body 1, completing the water seepage process, so as to quickly guide the rainwater accumulated on the water seepage brick body 1 into the ground, so that the water seepage brick body 1 can still quickly permeate in heavy rain weather;
[0033] In a relatively dry occasion, after watering the land through the water pipe, the water absorption sponge layer 12 can still absorb a lot of water, and then the water in the water absorption sponge layer 12 will volatilize and leak, so as to supplement the ground and air with water and adjust the air humidity of the garden, and the water absorption sponge layer 12 will not be irradiated by sunlight, so as to avoid rapid drying;
[0034] And in the water seepage process, most of the impurities flowing down from the water seepage hole 6 can be blocked by the filter screen plate 7 to prevent them from directly entering the water seepage brick body 1, and then the water seepage block 5 can be taken off from the water seepage brick body 1 by being buckled upward, and then the filter screen plate 7 can be pulled out to expose the lower part of the water seepage hole 6, so that personnel can clean it, and then the water seepage hole 6 can be prevented from being affected by too much impurities by intermittent maintenance and cleaning.
[0035] Although the embodiments of the present application have been shown and described, it can be understood by those skilled in the art that various changes, modifications, replacements and modifications can be made to the embodiments without departing from the principles and spirits of the present application, and the scope of the present application is defined by the appended claims and their equivalents.
Claims
1. A permeable brick for landscaping, comprising a permeable brick body (1), characterized in that: One side of the water seepage brick body (1) is provided with a mounting groove (2), and the other side of the water seepage brick body (1) is fixedly connected with a positioning block (3) adaptively matched with the mounting groove (2); Two clamping grooves (4) are formed in the top end of the water seepage brick body (1), and a water seepage block (5) is clamped in the two clamping grooves (4); water seepage holes (6) are formed through the upper and lower ends of the water seepage block (5); a top cover (9) is mounted above the water seepage holes (6); a water seepage opening (10) adaptively matched with the clamping groove (4) is formed in the upper portion of the water seepage brick body (1); and a plurality of water leakage holes (13) are formed through the bottom end of the water seepage brick body (1).
2. The water permeable brick for landscaping according to claim 1, wherein: A water-absorbing sponge layer (12) is arranged in the water seepage brick body (1) below the water seepage opening (10), and a filter screen layer (11) is mounted below the water-absorbing sponge layer (12).
3. The water permeable brick for landscaping according to claim 1, wherein: A sliding groove is formed below the water seepage block (5), and a filter screen plate (7) is mounted below the water seepage block (5) through a sliding block (8).
4. The water permeable brick for landscaping according to claim 1, wherein: A plurality of anti-skid protrusions (14) are arranged at the central position of the top end of the water seepage brick body (1), and a plurality of water guide grooves (15) are arranged on the top surface of the water seepage brick body (1) and the water seepage block (5).
5. The water permeable brick for landscaping according to claim 4, wherein: The anti-skid protrusions (14) are arranged in a circular arc shape, and the water guide grooves (15) are arranged in a "V" shape.
6. The water permeable brick for landscaping according to claim 3, wherein: The water seepage block (5) is detachably connected with the water seepage brick body (1) through the clamping groove (4), and the top surface of the water seepage block (5) is at the same level as the top surface of the water seepage brick body (1); the filter screen plate (7) is detachably connected with the water seepage block (5) through the sliding block (8), and the bottom surface of the filter screen plate (7) is at the same level as the bottom surface of the water seepage block (5).
Citation Information
Patent Citations
Landscaping environment-friendly water permeable brick
CN215925500U