Auxiliary rope arrangement side wall baffle structure of multi-layer winding drum
By installing side wall baffles on the multi-layer winding drum and using double-folded rope grooves, the problem of uneven arrangement at the layer change of the wire rope is solved, and neat winding of the wire rope is achieved.
Patent Information
- Application Number
- CN202422897589.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2025-11-25
- Estimated Expiration
- 2034-11-26
AI Technical Summary
Existing multi-layer winding drums are prone to uneven arrangement when changing layers of wire rope, especially in the middle and outer layers where the wire rope is easily trapped in the gaps, resulting in tangled rope.
The system employs a multi-layer winding drum auxiliary rope-laying sidewall baffle structure, combined with a double-folded drum rope groove. The sidewall baffle is installed at the secondary climbing section of the wire rope, covering from the third layer to the outermost layer. It is welded to the drum side plate through fillet welds. The size design is adjusted according to the winding parameters to ensure that the wire rope is neatly arranged.
It effectively reduces the gap between wire ropes, ensures that the wire ropes are properly arranged at the layer change point, prevents rope tangling, and achieves neat winding.
Smart Images

Figure CN223592302U_ABST
Abstract
Description
TECHNICAL FIELD
[0001] The utility model relates to a kind of multi-layer winding reel, especially a kind of multi-layer winding reel auxiliary rope arranging side wall baffle structure. BACKGROUND
[0002] Reel is one of important components of winch, and steel wire rope is arranged neatly on reel, which is the basis for ensuring normal operation of winch. For multi-layer winding reel, arranging rope is one of the key problems to be solved. Commonly used measures for assisting in arranging rope mainly include using double-fold line type rope groove and winch increasing rope arranging device to assist in arranging rope. For reel using double-fold line type rope groove, in the process of changing layer in middle layer and outer layer, gap exists between steel wire rope and reel side baffle, which may cause steel wire rope to sink into gap in some cases, resulting in uneven arrangement of steel wire rope at changing layer, and thus causing disorder of steel wire rope in middle layer and outer layer. In view of the above problems, it is necessary to develop a reel side baffle to assist in arranging steel wire rope at changing layer of reel, so as to realize neat arrangement of steel wire rope. SUMMARY
[0003] The utility model provides a kind of multi-layer winding reel auxiliary rope arranging side wall baffle structure, mainly applied to multi-layer winding winch reel, cooperates double-fold line reel rope groove, and assists in arranging steel wire rope to correct position at changing layer of middle layer or outer side steel wire rope.
[0004] To achieve the above object, the utility model adopts the technical scheme of a kind of multi-layer winding reel auxiliary rope arranging side wall baffle structure, including reel side plate, reel double-fold line rope groove, side wall baffle, side wall baffle is installed at the second time climbing section of steel wire rope at both sides of reel side plate, and side wall baffle cooperates with reel double-fold line type rope groove.
[0005] Further, the height of side wall baffle covers the 3rd layer to the outermost layer of steel wire rope of reel, to ensure that the arrangement of steel wire rope is neat in each layer.
[0006] Further, side wall baffle is arranged symmetrically on reel side plate, and is welded on reel side plate by using fillet weld.
[0007] Further, the maximum thickness H of side wall baffle is determined by the maximum gap at the intersection when two layers of steel wire rope change, and is adjusted according to the actual gap between steel wire rope and side wall.
[0008] Further, the edge fillet r of side wall baffle is made a fillet according to the size of side wall baffle.
[0009] Further, the outer diameter Ra of side wall baffle is 1 to 1.5 times the diameter of the outermost layer of steel wire rope; the inner diameter Rb of side wall baffle is 0.5 times the diameter of the 3rd layer of steel wire rope; and the width B of side wall baffle is the linear length of the innermost layer of steel wire rope at the climbing section angle of double-fold line rope groove on one side.
[0010] The beneficial effects brought by the technical scheme of the utility model are as follows:
[0011] 1. The triangular area at the two-layer steel wire rope climbing position of the double-fold line type winding drum is effectively filled, so that the gap of each layer of steel wire rope arrangement is reduced, and the steel wire rope is effectively prevented from being embedded without support;
[0012] 2. When the steel wire rope is not closely arranged in the middle layer and the outer layer on the winding drum, the auxiliary rope arrangement can assist the steel wire rope to be wound to the correct position at the layer changing position;
[0013] 3. The side wall baffle can prevent the steel wire rope from being changed to the next layer in advance, and ensure the steel wire rope arrangement to be regular from the bottom layer, so that the steel wire rope arrangement on the whole winding drum is neat. BRIEF DESCRIPTION OF DRAWINGS
[0014] Figure 1 is a position schematic view of the auxiliary rope arrangement side wall baffle of the winding drum in a winding drum unfolding view;
[0015] Figure 2 is an installation position schematic view of the auxiliary rope arrangement side wall baffle of the winding drum;
[0016] Figure 3 is an A-A sectional view of Figure 2 ;
[0017] Figure 4 is a schematic view of the auxiliary rope arrangement side wall baffle of the winding drum;
[0018] Figure 5 is a left view of Figure 4 ;
[0019] In the figure: 1-winding drum side plate, 2-winding drum double-fold line rope groove, 3-side wall baffle, 4-nth layer of steel wire rope, 5-n-1 layer of steel wire rope, 6-innermost layer of steel wire rope, 7-outermost layer of steel wire rope, 8-rope entering position, G-secondary climbing section, H-maximum thickness, r-edge fillet, Ra-outer circle diameter, Rb-inner circle diameter, B-width. DETAILED DESCRIPTION
[0020] The utility model will be further described below in combination with the drawings and examples.
[0021] As shown in Figures 1 to 5 , the utility model embodiment provides a kind of multi-layer winding drum auxiliary rope arrangement side wall baffle structure, including winding drum side plate 1, winding drum double-fold line rope groove 2, side wall baffle 3, side wall baffle 3 is installed at the secondary climbing section G of winding drum side plate 1 two sides steel wire rope, side wall baffle 3 cooperates with winding drum double-fold line type rope groove 2 and is used.
[0022] The height of side wall baffle 3 covers the third layer of winding drum to the outermost layer of steel wire rope, to ensure that the steel wire rope is arranged neatly in each layer.
[0023] The side wall baffle 3 is symmetrically arranged on the reel side wall and is welded on the reel side wall by fillet welding.
[0024] The side wall baffle 3 is symmetrically arranged on the reel side wall and is welded on the reel side wall by fillet welding. Figure 4 The maximum thickness H of the side wall baffle 3 is determined by the maximum gap at the intersection in the top view when the two layers of wire ropes are exchanged, and can be adjusted according to the actual gap between the wire rope and the side wall; the edge radius r is a transition fillet according to the size of the side wall baffle; the outer circle diameter Ra is 1 to 1.5 times the diameter of the outermost layer of wire rope; the inner circle diameter Rb is 0.5 times the diameter of the third layer of wire rope; and the width B is the linear length at the innermost layer of wire rope. Figure 1
[0025] The technical key points of the application are as follows:
[0026] 1. The side wall baffle is used in cooperation with the double-folded line rope groove, and the size should be determined according to the parameters of the double-folded line rope groove of the reel to ensure that the side wall baffle plays the maximum role;
[0027] 2. The side wall baffle is installed at the second climbing section of the wire rope on both sides of the reel;
[0028] 3. The height of the side wall baffle covers the third layer to the outermost layer of wire rope on the reel as much as possible to ensure that the wire rope is arranged neatly in each layer;
[0029] 4. The side wall baffle is welded to the side wall of the reel through fillet welding around.
Claims
1. A multi-layered spool assist rope lay side wall baffle structure, characterized by: The winding drum side plate, the winding drum double-fold line rope groove, the side wall baffle, the side wall baffle installation at the two steel wire ropes secondary climbing section of the winding drum side plate, the side wall baffle cooperates with the winding drum double-fold line rope groove; the maximum thickness H of the side wall baffle is determined by the maximum gap at the cross section when the two layers of steel wire ropes are exchanged, and is adjusted according to the actual gap between the steel wire rope and the side wall; the outer diameter Ra of the side wall baffle is 1 to 1.5 times the rope diameter larger than the winding diameter of the outermost layer of steel wire rope; the inner diameter Rb of the side wall baffle is 0.5 times the rope diameter larger than the winding diameter of the third layer; the width B of the side wall baffle is the linear length at the innermost layer of steel wire rope at the single-side climbing section angle of the double-fold line rope groove.
2. The multi-ply spool assisted rope lay side wall baffle structure of claim 1, wherein: The height of the side wall baffle covers the third layer to the outermost layer of the steel wire rope of the winding drum, so as to ensure that the steel wire rope is arranged in order.
3. The multi-ply spool assisted rope lay side wall baffle structure of claim 1, wherein: The side wall baffles are symmetrically arranged on the winding drum side plate and are welded on the winding drum side plate by using fillet welds.
4. The multi-ply spool assisted rope lay side wall baffle structure of claim 1, wherein: The edge roundness r of the side wall baffle is a transition roundness according to the size of the side wall baffle.