Spraying dust falling device for building construction

By designing a mobile dust suppression spraying device, the problem of simultaneous spraying across the entire range caused by fixed pipes was solved, thereby improving cost-effectiveness and achieving an adaptable spraying effect for the construction area.

CN223628326UActive Publication Date: 2025-12-05LING HONGFENG (TIANJIN) BUILDING DECORATION CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423210558.0
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-24
Publication Date
2025-12-05
Estimated Expiration
2034-12-24

AI Technical Summary

Technical Problem

Most existing construction dust suppression spraying systems are continuous fixed pipes, resulting in simultaneous and uniform spraying across the entire construction area, which increases operating costs.

Method used

A spray dust suppression device was designed, comprising a storage tank, a protective panel, a moving component, and a base assembly. The moving component drives the spray head to move, adapting to the construction area, and the base assembly collects wastewater, thereby reducing costs.

Benefits of technology

By controlling the spraying position, the spraying effect is improved, the operating cost is reduced, the system can adapt to changes in the construction location, and resource waste is reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223628326U_ABST
    Figure CN223628326U_ABST
Patent Text Reader

Abstract

The utility model relates to the field of spraying dust fall, in particular to a building construction spraying dust fall device which comprises a storage tank, an enclosure plate, a mounting table, a moving assembly and a bottom table assembly. The moving assembly comprises a moving table; mounting seats are fixedly connected to the end parts of the two sides of the moving table; the outer side of the mounting seat is rotationally connected with a supporting wheel; a first motor is mounted on the inner side of the moving table; a gear is mounted on a rotating shaft of the first motor through a coupling; a connecting pipe is mounted on the inner side of the mounting seat; the movable table is matched with the mounting table to drive the storage tank and the spraying head to move, so that the spraying position is controlled to adapt to the construction position, the spraying effect is improved, the cost is reduced, and the problem that in the spraying and dust falling process, the spraying effect is affected is solved. The problem that the use cost of the spraying and dust-settling device for building construction is easily increased due to the fact that most of existing spraying and dust-settling devices for building construction are continuous fixed pipes and are installed on a construction fence, and during construction, the spraying and dust-settling devices for building construction always conduct synchronous and equal-quantity spraying in the whole range in a construction area is solved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model relates to the field of spraying dust fall, especially relates to building construction spraying dust fall device. BACKGROUND

[0002] In the present building construction engineering, need to guarantee the civilized construction, reduce the dust influence that the construction produces is one of the requirements of civilized construction, can effectively guarantee the health of construction personnel and the neatness of surrounding environment, therefore, often utilize building construction spraying dust fall device to spray water and reduce dust.

[0003] Therefore, the existing building construction spraying dust fall device is mostly continuous fixed pipe and is installed on the construction fence, during construction, the construction position mostly advances with progress, makes the requirement change of core dust fall position, and the continuous fixed pipe mostly sprays in full range, causes the use cost of building construction spraying dust fall device to improve.

[0004] Therefore, in view of the above-mentioned existing building construction spraying dust fall device is mostly continuous fixed pipe and is installed on the construction fence, the spraying amount of full construction range is often same, easy to cause waste, building construction spraying dust fall device can be designed to facilitate control the main spraying position, improve the effect of spraying and reduce the cost. INNOVATION CONTENT

[0005] In order to overcome in the process of spraying dust fall, because the existing building construction spraying dust fall device is mostly continuous fixed pipe and is installed on the construction fence, during construction, often in the construction area in full range synchronous same amount spraying, easy to cause the use cost of building construction spraying dust fall device to improve.

[0006] The technical scheme of the utility model is: building construction spraying dust fall device, including storage tank, enclosure board, installation platform, mobile assembly, bottom platform assembly, mobile assembly including the mobile platform for driving the spraying device, both sides of mobile platform end portion are fixedly connected with mounting seat, the outer side of mounting seat is rotatably connected with support wheel, the inner side of mobile platform is installed with first motor, the shaft of first motor is installed with gear through coupling, the inner side of mounting seat is installed with the connecting pipe for communicating equipment, the outer side of connecting pipe is installed with the limiting sheet for positioning and preventing falling.

[0007] Preferably, the storage tank, spray head and enclosure board are provided to support the remaining components for convenient spraying dust fall, the mobile assembly is provided to drive the spray head to move for adapting to the construction range and reducing waste, and the bottom platform assembly is provided to support the enclosure board and facilitate centralized recovery of dust fall wastewater.

[0008] As preferred, the lower end of the limiting sheet is provided with a liquid pump, the lower end of the liquid pump is provided with a storage tank, the outer side of the storage tank is provided with a support frame, and the upper end of the connecting pipe is provided with a spray head.

[0009] Preferably, the rear end of the support frame is provided with a surrounding plate; the lower end of the surrounding plate is fixedly connected with a limiting plate; the support frame and the limiting plate are in sliding connection.

[0010] Preferably, the inner side of the surrounding plate is fixedly connected with a support plate; the support plate is provided with an accommodating groove; the connecting pipe and the support plate are in sliding connection through the limiting piece and the accommodating groove.

[0011] Preferably, the upper end of the support plate is provided with a mounting table; the inner side of the mounting table is provided with a tooth groove; the mounting table and the gear are in meshing through the tooth groove; the upper end of the mounting table is provided with a protective top plate; the lower end of the limiting plate is provided with a bottom table assembly.

[0012] Preferably, the bottom table assembly comprises a support base; the upper end of the support base is provided with a mounting groove; the inner side of the support base is provided with a water flow pipe.

[0013] Preferably, the intersection of the two water flow pipes is provided with a flow port; one side end of the support base is provided with a second motor; the rotating shaft of the second motor is provided with a spiral disc through a shaft coupling.

[0014] The building construction spraying dust-settling device has the advantages that:

[0015] 1. The mobile table is arranged to drive the storage tank and the spraying head to move in cooperation with the mounting table, so that the spraying position is controlled, the construction position is adapted, the spraying effect is improved, and the cost is reduced, so that in the process of spraying dust-settling, the existing building construction spraying dust-settling device is mostly a continuous fixed pipe and is installed on a construction fence, during construction, the building construction spraying dust-settling device is often used for synchronous and same-amount spraying in the whole range of the construction area, which easily leads to the increase of the use cost of the building construction spraying dust-settling device, and thus the use effect of the whole building construction spraying dust-settling device can be improved. BRIEF DESCRIPTION OF DRAWINGS

[0016] Figure 1 The building construction spraying dust-settling device structure schematic view is shown.

[0017] Figure 2 The building construction spraying dust-settling device mobile assembly structure schematic view is shown.

[0018] Figure 3 The building construction spraying dust-settling device surrounding plate structure schematic view is shown.

[0019] Figure 4 The building construction spraying dust-settling device bottom table assembly structure schematic view is shown.

[0020] Explanation of reference signs: 2, liquid pump; 3, storage tank; 4, support frame; 5, spray head; 6, enclosure plate; 7, limiting plate; 8, support plate; 9, containing groove; 10, mounting table; 11, tooth groove; 12, protective top plate; 101, moving table; 102, mounting seat; 103, supporting wheel; 104, first motor; 105, gear; 106, connecting pipe; 107, limiting sheet; 1301, supporting base; 1302, mounting groove; 1303, water flow pipe; 1304, flow port; 1305, second motor; 1306, spiral disc. DETAILED DESCRIPTION

[0021] The utility model is further explained below in combination with the drawings and examples.

[0022] Please refer to Figures 1-4 The utility model provides a kind of embodiment: building construction spray dust-settling device, including storage tank 3, enclosure plate 6, mounting table 10, moving assembly, bottom base assembly;Moving assembly includes the moving table 101 for driving spray device;The both sides end of moving table 101 is fixedly connected with mounting seat 102;The outside of mounting seat 102 is rotatably connected with supporting wheel 103;The inside of moving table 101 is equipped with first motor 104;The shaft of first motor 104 is equipped with gear 105 by coupling;The inside of mounting seat 102 is equipped with the connecting pipe 106 for intercommunication equipment;Connecting pipe 106 outside is equipped with the limiting sheet 107 for positioning and preventing from falling off;By first motor 104 driving gear 105 rotation, to facilitate the cooperation tooth groove 11 and supporting wheel 103 to drive moving table 101 movement, to drive connecting pipe 106, storage tank 3 and spray head 5 movement.

[0023] Please refer to Figure 4 In the embodiment, bottom base assembly includes supporting base 1301;The upper end of supporting base 1301 is equipped with mounting groove 1302;The inside of supporting base 1301 is equipped with water flow pipe 1303;The intersection of two water flow pipes 1303 is equipped with flow port 1304;The side end of supporting base 1301 is equipped with second motor 1305;The shaft of second motor 1305 is equipped with spiral disc 1306 by coupling;By mounting groove 1302 to install enclosure plate 6, and by water flow pipe 1303 to collect the wastewater generated by spray dust-settling, start second motor 1305 to drive spiral disc 1306 rotation, to drive wastewater to flow port 1304, to facilitate subsequent recycling processing, improve the neatness of construction area.

[0024] Please refer to Figures 2-3In the embodiment, the lower end of the limiting sheet 107 is provided with a liquid pump 2; the lower end of the liquid pump 2 is installed with a storage tank 3; the outer side of the storage tank 3 is provided with a support frame 4; the upper end of the connecting pipe 106 is installed with a spray head 5; the rear end of the support frame 4 is provided with an enclosure plate 6; the lower end of the enclosure plate 6 is fixedly connected with a limiting plate 7; the support frame 4 and the limiting plate 7 are provided in sliding connection; the inner side of the enclosure plate 6 is fixedly connected with a support plate 8; the support plate 8 is provided with an accommodating groove 9; the connecting pipe 106 and the support plate 8 are provided in sliding connection through the limiting sheet 107 and the accommodating groove 9; the upper end of the support plate 8 is provided with a mounting table 10; the inner side of the mounting table 10 is provided with a gear slot 11; the mounting table 10 and the gear 105 are provided in engagement through the gear slot 11; the upper end of the mounting table 10 is installed with a protective top plate 12; the lower end of the limiting plate 7 is provided with a bottom table assembly; the water in the storage tank 3 is pumped into the connecting pipe 106 through the liquid pump 2, so as to spray and dust through the spray head 5, and the construction range is demarcated through the enclosure plate 6 and the mounting table 10, and the remaining assemblies are moved through the limiting plate 7 and the support plate 8.

[0025] In the installation, first, the embedding groove is opened and the slope is determined, and the support base 1301 is installed into the opened groove, then the enclosure plate 6 is installed through the installation groove 1302, and the construction range is demarcated through the enclosure plate 6, the mounting table 10 and the protective top plate 12, then the moving table 101 is placed on the support plate 8, at the same time, the connecting pipe 106 is passed through the accommodating groove 9, and the connecting pipe 106 is positioned on the support plate 8 by the limiting sheet 107, finally, the liquid pump 2, the storage tank 3 and the spray head 5 are installed on the connecting pipe 106.

[0026] In the use, first, the gear 105 is driven to rotate by the first motor 104, so as to drive the moving table 101 to move in cooperation with the gear slot 11 and the support wheel 103, so as to drive the connecting pipe 106, the storage tank 3 and the spray head 5 to move, then the water in the storage tank 3 is pumped into the connecting pipe 106 through the liquid pump 2, so as to spray and dust through the spray head 5, then the waste water generated by the spray and dust is collected through the flowing water pipe 1303, finally, the second motor 1305 is started to drive the spiral disc 1306 to rotate, so as to drive the waste water to the flowing port 1304, so as to facilitate subsequent recycling and improve the neatness of the construction area.

[0027] Through the above steps, by setting the storage tank 3, the spray head 5 and the enclosure plate 6, the remaining components are conveniently supported to facilitate the spray dust fall; by setting the moving table 101, the supporting wheel 103 and the connecting pipe 106, the spray head 5 is driven to move, so as to adapt to the construction range and reduce waste; by setting the bottom table assembly, the enclosure plate 6 is supported and the dust fall wastewater is conveniently collected, so as to solve the problem that in the process of spray dust fall, the existing building construction spray dust fall device is mostly continuous fixed pipe and is installed on the construction fence, during construction, the spray is often carried out in the full range of the construction area at the same time and the same amount, which is easy to cause the use cost of the building construction spray dust fall device to be increased, and then the use effect of the whole building construction spray dust fall device can be improved.

Claims

1. A dust-settling device for construction, comprising a storage tank (3), a surrounding plate (6) and a mounting table (10); characterized in that: Also include mobile components, base station components; mobile components including for driving the spray device mobile station (101); both sides of the mobile station (101) end fixedly connected with the mounting seat (102); the outer side of the mounting seat (102) is rotatably connected with the support wheel (103); the inner side of the mobile station (101) is provided with a first motor (104); the shaft of the first motor (104) is provided with a gear (105) through the shaft coupling; the inner side of the mounting seat (102) is provided with a connecting pipe (106) for communicating equipment; the outer side of the connecting pipe (106) is provided with a limiting piece (107) for positioning and preventing falling off.

2. The construction spraying dust-settling device, as claimed in claim 1, wherein: The lower end of the limiting piece (107) is provided with a liquid pump (2); the lower end of the liquid pump (2) is provided with a storage tank (3); the outer side of the storage tank (3) is provided with a support frame (4); the upper end of the connecting pipe (106) is provided with a spray head (5).

3. The construction spraying dust settling device, as claimed in claim 2, wherein: The rear end of the support frame (4) is provided with a surrounding plate (6); the lower end of the surrounding plate (6) is fixedly connected with a limiting plate (7); the support frame (4) and the limiting plate (7) are provided as sliding connection.

4. The construction spraying dust settling device, as claimed in claim 3, wherein: The inner side of the surrounding plate (6) is fixedly connected with a support plate (8); the support plate (8) is provided with a containing groove (9); the connecting pipe (106) and the support plate (8) are provided as sliding connection through the limiting piece (107) and the containing groove (9).

5. The construction spraying dust settling device, as claimed in claim 4, wherein: The upper end of the support plate (8) is provided with a mounting table (10); the inner side of the mounting table (10) is provided with a gear slot (11); the mounting table (10) and the gear (105) are provided as meshing through the gear slot (11); the upper end of the mounting table (10) is provided with a protective top plate (12); the lower end of the limiting plate (7) is provided with a base station component.

6. The construction spraying dust settling device, as claimed in claim 5, wherein: The base station component includes a support base (1301); the upper end of the support base (1301) is provided with a mounting groove (1302); the inner side of the support base (1301) is provided with a water pipe (1303).

7. The construction spraying dust settling device, as claimed in claim 6, wherein: The intersection of the two water pipes (1303) is provided with a flow port (1304); one side end of the support base (1301) is provided with a second motor (1305); the shaft of the second motor (1305) is provided with a spiral disc (1306) through the shaft coupling.