Working platform for bridge side edge construction

By designing a work platform for bridge side construction, and utilizing a drive structure and a foldable enclosure structure, the problem of poor safety of traditional scaffolding and ladders was solved, achieving continuity, safety and efficiency in bridge side construction operations.

CN223633798UActive Publication Date: 2025-12-05TIANYUAN CONSTR GROUP +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422716911.6
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-08
Publication Date
2025-12-05
Estimated Expiration
2034-11-08

AI Technical Summary

Technical Problem

In existing bridge side construction operations, traditional scaffolding and ladders are unsafe and difficult to move, resulting in limited construction areas and low efficiency.

Method used

Design a work platform that includes a mobile platform, a construction platform, and a drive structure. The drive structure drives the movement and lifting of the connecting plate and the construction platform, enabling flexible adjustment of the platform. Combined with a foldable enclosure structure, it can meet the construction operation needs of different locations.

Benefits of technology

This ensured the continuity and safety of bridge side construction operations, improved the efficiency and flexibility of construction operations, and reduced the difficulty of construction operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223633798U_ABST
    Figure CN223633798U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of buildings, and discloses a working platform for bridge side construction, which comprises a moving platform, a construction platform and a driving structure. A mounting bracket is arranged on the moving platform, and a connecting plate is movably and horizontally arranged on the mounting bracket; the construction platform comprises a construction bedplate and a fence, the construction bedplate is provided with a mounting stand column, the mounting stand column is movably connected with the connecting plate, the fence is arranged on the construction bedplate, the side wall, facing the moving platform, of the fence is of a foldable structure, and under the condition that the fence is overturned to the first position, the side wall is perpendicular to the construction bedplate; under the condition that the side wall is overturned to the second position, the side wall is parallel to the construction bedplate; the driving structure comprises a first driving part and a second driving part. According to the bridge side edge construction method, construction operation on the bridge side edge can be efficiently and rapidly completed, the difficulty of construction operation is reduced, and the safety of construction operation is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The present application relates to the field of building technology, for example to a working platform for bridge side construction. BACKGROUND

[0002] To adapt to the modern high-speed development of the transportation industry, the bridge is also extended to the building erected to cross the ravine, poor geology or meet other traffic needs to make the traffic more convenient, erected on rivers, lakes and seas, so that vehicles and pedestrians can pass smoothly, and with the increasing functional requirements of the bridge and the construction technology of the bridge, the existing bridge is generally composed of superstructure, substructure and auxiliary structure.

[0003] At present, after the completion of the bridge superstructure, there are still many structure outside engineering projects such as bridge side construction work, such as installation and maintenance of lighting lamps, installation of sewer pipes, etc. The traditional method uses scaffolding or ladder to make the construction personnel work, but the safety of scaffolding and ladder is poor, and it is difficult to move, which leads to the limitation of the construction work area, and also reduces the construction work efficiency.

[0004] Therefore, how to safely and efficiently complete the construction work on the side of the bridge, and improve the flexibility of the construction work, and meet the needs of various construction requirements become the technical problems to be solved by the technical personnel in the field.

[0005] It should be noted that the information disclosed in the above background section is only used to strengthen the understanding of the background of the present application, and therefore can include information that does not constitute prior art known to those of ordinary skill in the art. CONTENT OF THE UTILITY MODEL

[0006] In order to have a basic understanding of some aspects of the disclosed embodiments, the following is a simple summary. The summary is not a general review, nor is it intended to determine the key / important components or to delineate the scope of protection of these embodiments, but as a prelude to the detailed description below.

[0007] The working platform for bridge side construction provided by the embodiments of the present application can not only move on the bridge to ensure the continuity of the construction work on the side of the bridge, but also help to efficiently and quickly complete the construction work on the side of the bridge, and can also adjust the position of the construction platform to facilitate safe and efficient construction work on different positions of the side of the bridge, reduce the difficulty of construction work, and ensure the safety of construction work.

[0008] In some embodiments, a working platform for bridge side construction comprises a moving platform, a construction platform and a driving structure. The moving platform is provided with mounting brackets, and the mounting brackets are movably provided with connecting plates horizontally. The construction platform comprises a construction deck and a fence. The construction deck is provided with mounting columns, and the mounting columns are movably connected with the connecting plates. The fence is arranged on the construction deck, and a side wall of the fence facing the moving platform is a foldable structure. When the side wall is folded to a first position, the side wall is perpendicular to the construction deck. When the side wall is folded to a second position, the side wall is parallel to the construction deck. The driving structure comprises a first driving part and a second driving part. The first driving part is arranged on the first mounting bracket and connected with the connecting plates, and is used to drive the connecting plates to move horizontally and reciprocally. The second driving part is arranged on the construction deck and connected with the connecting plates, and is used to drive the construction deck to move longitudinally and vertically.

[0009] Optionally, the mounting bracket is in an inverted U-shaped structure, and a top side wall of the mounting bracket defines a movable cavity. One end of the connecting plate movably penetrates into the movable cavity. The first driving part is connected with the connecting plate in the movable cavity, and is used to drive the connecting plate to move horizontally and reciprocally along the movable cavity.

[0010] Optionally, a notch is formed in the top side wall of the mounting bracket and communicates with the movable cavity. The connecting plate is provided with a sawtooth on a side surface corresponding to the notch. The first driving part comprises a driving motor, a driving shaft and a first driving gear. The driving motor is arranged on the mounting bracket. One end of the driving shaft is connected with the driving motor. The first driving gear is arranged on the driving shaft, and the first driving gear is meshingly connected with the side surface of the connecting plate having the sawtooth in the movable cavity.

[0011] Optionally, the mounting brackets are arranged in pairs and correspondingly arranged on opposite sides of the moving platform. Each mounting bracket is correspondingly provided with a connecting plate, and the two connecting plates are driven by the first driving part.

[0012] Optionally, the connecting plate movably sleeves the mounting column, and the second driving part is arranged parallel to one side of the mounting column.

[0013] Optionally, a limiting block is arranged on the top of the mounting column.

[0014] Optionally, the fence comprises a protective baffle and a construction expansion platform. The protective baffle is in a U-shaped structure with an opening. The protective baffle is arranged on the construction deck, and the opening of the protective baffle faces the moving platform. The construction expansion platform is correspondingly arranged at the opening position of the protective baffle, and the bottom side of the construction expansion platform is rotatably connected with the construction deck.

[0015] Optionally, the side wall of the construction expansion platform is connected with the protective baffle through a reinforcing connecting piece.

[0016] Optionally, the mounting column and the second driving part are located outside the fence.

[0017] Optionally, the moving platform is provided with a storage groove.

[0018] The work platform for bridge side construction provided by the embodiments of the present disclosure can achieve the following technical effects:

[0019] When the side of the bridge is subjected to construction work, the moving platform is placed on the bridge, the second driving part is used to drive the construction platform to rise, and the first driving part is used to drive the connecting plate to move the construction platform to the outside of the bridge, when the construction platform moves out of the bridge, the second driving part is controlled again to drive the construction platform to descend, so that the construction platform is located on one side of the side of the bridge, and when the bottom of the side of the bridge needs to be subjected to work, the side wall of the fence towards the moving platform is only turned to the second position, so that the work platform can be used for mobile work on the bridge, ensuring the continuity of the work on the side of the bridge, which is helpful for efficiently and quickly completing the work on the side of the bridge, and the position of the construction platform can be adjusted to facilitate safe and efficient work on different positions of the side of the bridge, reducing the difficulty of the work and ensuring the safety of the work.

[0020] The foregoing general description and the following description are only exemplary and explanatory, and are not used to limit the present application. BRIEF DESCRIPTION OF DRAWINGS

[0021] One or more embodiments are exemplarily illustrated by corresponding drawings, which do not constitute limitation on the embodiments, elements with the same reference numerals in the drawings are shown as similar elements, the drawings do not constitute proportional limitation, and wherein:

[0022] Figure 1 is a structural schematic diagram of the work platform for bridge side construction provided by the embodiments of the present disclosure;

[0023] Figure 2 is a structural schematic diagram of the driving structure provided by the embodiments of the present disclosure;

[0024] Figure 3 is Figure 2 is an enlarged view of A part in

[0025] Figure 4 is a structural schematic diagram of the first driving part provided by the embodiments of the present disclosure;

[0026] Figure 5 is a structural schematic diagram of the fence provided by the embodiments of the present disclosure;

[0027] Figure 6 is Figure 5 is an enlarged view of B part in

[0028] Figure 7 FIG. 1 is a structural schematic diagram of a mobile platform provided by the embodiments of the present disclosure.

[0029] Reference signs:

[0030] 100, mobile platform; 101, storage groove; 200, mounting bracket; 201, notch; 300, connecting plate; 301, limiting baffle; 400, construction platform; 401, construction platform plate; 402, fence; 403, mounting column; 404, limiting block; 405, protective baffle; 406, construction expansion platform; 407, accommodating groove; 500, driving structure; 501, first driving part; 502, second driving part; 503, driving motor; 504, driving shaft; 505, first driving gear; 506, second driving gear; 600, reinforcing connecting piece. DETAILED DESCRIPTION

[0031] In order to enable a more detailed understanding of the features and technical content of the embodiments of the present disclosure, the implementation of the embodiments of the present disclosure will be described in detail below with reference to the accompanying drawings, which are only used for reference and do not limit the embodiments of the present disclosure. In the following technical description, in order to facilitate explanation, a plurality of details are provided to provide a full understanding of the disclosed embodiments. However, one or more embodiments can still be implemented without these details. In other cases, well-known structures and devices can be simplified to facilitate the drawings.

[0032] The terms "first", "second", and the like in the specification and claims of the embodiments of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and do not necessarily describe a specific order or sequence. It should be understood that the data thus used can be interchanged under appropriate circumstances, so that the embodiments of the present disclosure described herein can be implemented. In addition, the terms "include" and "have" and any variations thereof are intended to cover non-exclusive inclusion.

[0033] In the embodiments of the present disclosure, the terms "upper", "lower", "inner", "middle", "outer", "front", "back", and the like indicate the orientation or positional relationship based on the orientation or positional relationship shown in the drawings. These terms are mainly used to better describe the embodiments of the present disclosure and its embodiments, and are not used to limit the indicated devices, elements or components must have a specific orientation, or be constructed and operated in a specific orientation. And, in addition to indicating the orientation or positional relationship, the above-mentioned terms can also be used to represent other meanings, for example, the term "upper" can also be used to represent a certain attachment relationship or connection relationship in some cases. For those skilled in the art, the specific meaning of these terms in the embodiments of the present disclosure can be understood according to the specific circumstances.

[0034] In addition, the terms "set", "connected", and "fixed" should be understood broadly. For example, "connected" can be fixed connection, detachable connection, or integral configuration; can be mechanical connection, or electrical connection; can be direct connection, or indirect connection through an intermediate medium, or internal communication between two devices, elements or components. The specific meaning of the above terms in the embodiments of the disclosure can be understood according to the specific circumstances by those of ordinary skill in the art.

[0035] Unless otherwise specified, the term "plurality" means two or more.

[0036] In the embodiments of the disclosure, the character " / " represents an "or" relationship between the objects before and after it. For example, A / B means A or B.

[0037] The term "and / or" is a description of the association between objects, which means that there can be three relationships. For example, A and / or B means that there are three relationships of A or B, or A and B.

[0038] It should be noted that the embodiments in the embodiments of the disclosure and the features in the embodiments can be combined with each other without conflict.

[0039] In combination with Figure 1 As shown in the drawings, the embodiments of the disclosure provide a working platform for bridge side construction, which comprises a mobile platform 100, a construction platform 400 and a driving structure 500. The mobile platform 100 is provided with a mounting bracket 200, and the mounting bracket 200 is movably provided with a connecting plate 300 horizontally; the construction platform 400 comprises a construction deck 401 and a fence 402, the construction deck 401 is provided with a mounting column 403, and the mounting column 403 is movably connected with the connecting plate 300, the fence 402 is arranged on the construction deck 401, and a side wall of the fence 402 facing the mobile platform 100 is a foldable structure, which is perpendicular to the construction deck 401 when it is folded to a first position, and which is parallel to the construction deck 401 when it is folded to a second position; the driving structure 500 comprises a first driving part 501 and a second driving part 502, the first driving part 501 is arranged on the first mounting bracket 200 and connected with the connecting plate 300, and is used to drive the connecting plate 300 to move horizontally and reciprocally, the second driving part 502 is arranged on the construction deck 401 and connected with the connecting plate 300, and is used to drive the construction deck 401 to move vertically and reciprocally.

[0040] The work platform for bridge side construction provided by the embodiment of the present disclosure is used when the side of the bridge is constructed. The mobile platform 100 is placed on the bridge, the second driving part 502 is used to drive the construction platform 401 to rise, the first driving part 501 is used to drive the connecting plate 300 to drive the construction platform 401 to move to the outside of the bridge, when the construction platform 401 moves out of the bridge, the second driving part 502 is controlled to drive the construction platform 401 to descend, so that the construction platform 401 is located on one side of the side of the bridge, and when the bottom of the side of the bridge needs to be constructed, the fence 402 is controlled to be flipped to the second position towards the side wall of the mobile platform 100. Thus, the work platform can be used to move on the bridge, ensure the continuity of the construction of the side of the bridge, help to efficiently and quickly complete the construction of the side of the bridge, and adjust the position of the construction platform 400, facilitate safe and efficient construction of different positions of the side of the bridge, reduce the difficulty of construction, and ensure the safety of construction.

[0041] As shown in Figures 2-4 Optionally, the mounting bracket 200 is in an inverted U-shaped structure, and the top side wall of the mounting bracket 200 defines a movable cavity, one end of the connecting plate 300 is movably arranged in the movable cavity, and the first driving part 501 is connected with the connecting plate 300 in the movable cavity and is used to drive the connecting plate 300 to move horizontally and reciprocally in the movable cavity. In this way, by arranging the connecting plate 300 in the movable cavity, the movement of the connecting plate 300 can be effectively limited by the movable cavity, so that the connecting plate 300 will only move horizontally and reciprocally in the movable cavity under the action of the first driving part 501, and will not shake or move obliquely, thereby ensuring the stability of the movement of the connecting plate 300, so that the construction platform 400 can move stably and the safety of construction is improved.

[0042] Optionally, the length of the top side wall of the mounting bracket 200 is greater than or equal to one third of the length of the connecting plate 300 and less than or equal to two thirds of the length of the connecting plate 300. In this way, the length of the top side wall of the mounting bracket 200 is within a reasonable range, so that the contact area of the movable cavity and the connecting plate 300 is more reasonable, the movement of the connecting plate 300 can be stably limited by the movable cavity, and the stability of the movement of the connecting plate 300 is further improved.

[0043] Optionally, a notch 201 is formed in the top side wall of the mounting bracket 200 and communicates with the movable chamber, the connecting plate 300 is provided with a sawtooth on the side corresponding to the notch 201, the first driving part 501 comprises a driving motor 503, a driving shaft 504 and a first driving gear 505, the driving motor 503 is arranged on the mounting bracket 200, one end of the driving shaft 504 is connected with the driving motor 503, and the first driving gear 505 is arranged on the driving shaft 504 and is in meshing connection with the side of the connecting plate 300 provided with the sawtooth in the movable chamber. In this way, the first driving gear 505 is always in meshing connection with the connecting plate 300 in the movable chamber through the notch 201, and when the driving motor 503 is started to drive the driving shaft 504 to rotate, the first driving gear 505 can smoothly drive the connecting plate 300 to move, thereby ensuring the stability of the driving process, and the driving mode and structure are relatively simple, facilitating control and saving cost.

[0044] Optionally, the notch 201 is arc-shaped, and part of the first driving gear 505 can be adapted to pass through the notch 201 and be in meshing connection with the side of the connecting plate 300 provided with the sawtooth. In this way, the first driving gear 505 can always be in meshing connection with the side of the connecting plate 300 provided with the sawtooth, so that the first driving gear 505 can smoothly and continuously drive the connecting plate 300 to move.

[0045] Optionally, the connecting plate 300 is provided with a limiting baffle 301 at the end away from the construction platform 400, and the area of the limiting baffle 301 is greater than the area of the movable chamber. In this way, the movement of the connecting plate 300 can be limited by the limiting baffle 301, so as to avoid the situation that the connecting plate 300 is separated from the movable chamber during the movement of the connecting plate 300, thereby ensuring that the connecting plate 300 is always in the movable chamber and improving the safety of the movement of the connecting plate 300.

[0046] Optionally, the mounting brackets 200 are arranged in pairs and correspondingly arranged on the opposite sides of the moving platform 100, wherein each mounting bracket 200 is correspondingly provided with a connecting plate 300, and the two connecting plates 300 are driven by the first driving part 501. In this way, the two connecting plates 300 are synchronously driven to move by the first driving part 501, so as to make the driving process of the construction platform 400 more stable, always keep the stable horizontal movement of the construction platform 400, avoid the inclination of the construction platform 400 during the movement, orderly and stably move the construction platform 400 to the construction position, ensure the stability of the movement of the construction platform 400 and improve the safety of the construction operation.

[0047] Optionally, the first driving part 501 further comprises a second driving gear 506, which is installed on the driving shaft 504 and engaged with the other connecting plate 300. In this way, the two connecting plates 300 can be driven to move synchronously by the first driving part 501, and no additional driving structure 500 is needed, thus reducing the space occupation and saving the cost.

[0048] Optionally, the connecting plate 300 is movably sleeved on the mounting column 403, and the second driving part 502 is arranged parallel to one side of the mounting column 403. In this way, the second driving part 502 can drive the construction platform 401 to move vertically, and the connecting plate 300 can guide the movement of the mounting column 403 during the vertical movement of the construction platform 401, so that the mounting column 403 can always move vertically, thereby making the movement of the construction platform 401 more stable and avoiding the inclination of the construction platform 401, ensuring the stability of the movement of the construction platform 401 and improving the safety of the construction work.

[0049] It can be understood that the second driving part 502 is an electric telescopic rod, which is a prior art and its specific structure is not described here.

[0050] As shown in Figures 5-6 Optionally, the top of the mounting column 403 is provided with a limiting stopper 404. In this way, the movement of the connecting plate 300 can be limited by the limiting stopper 404, so as to avoid the disengagement of the connecting plate 300 from the mounting column 403 during the movement, thereby making the vertical movement of the construction platform 401 more secure.

[0051] Optionally, the mounting column 403 has a plurality of mounting columns 403, and each corner of the construction platform 401 is provided with a mounting column 403. Among them, two mounting columns 403 on the same side are movably arranged on one connecting plate 300, and the other two mounting columns 403 are movably arranged on the other connecting plate 300. In this way, the connecting plate 300 can more stably push the mounting column 403 to drive the construction platform 401 to adjust the position, and the mounting column 403 can guide the vertical movement of the construction platform 401, so that it can always keep synchronous rising or falling, thereby making the construction platform 401 always in a horizontal state during the movement, avoiding the inclination of the construction platform 401, and improving the safety of the driving process.

[0052] Optionally, the second driving part 502 is arranged in pairs, one of which is arranged between two mounting columns 403 on the same side, and the other is arranged between the other two mounting columns 403 on the same side. In this way, the construction platform plate 401 can be more stably driven to ascend and descend longitudinally, avoiding tilting of the construction platform plate 401, ensuring that the two ends of the construction platform plate 401 can always ascend or descend synchronously, and keeping the construction platform plate 401 always in a horizontal state, thereby improving the safety of construction operation.

[0053] Optionally, the fence 402 comprises a protective baffle 405 and a construction expansion platform 406. The protective baffle 405 is in a U-shaped structure with an opening, and is arranged on the construction platform plate 401 with the opening facing the moving platform 100. The construction expansion platform 406 is arranged at the opening position of the protective baffle 405, and the bottom side of the construction expansion platform 406 is rotatably connected with the construction platform plate 401. In this way, when the space of the construction platform plate 401 cannot meet the construction requirements or the bottom of the bridge needs to be operated, the construction expansion platform 406 can be rotated to the second position, thereby expanding the space of the construction platform plate 401, facilitating efficient construction operation of the construction personnel, and enabling the bottom of the bridge to be operated, thereby meeting various construction requirements and improving the use performance.

[0054] Optionally, the side wall of the construction expansion platform 406 and the protective baffle 405 are connected through a reinforcing connecting piece 600. In this way, when the construction expansion platform 406 is rotated to the second position, the construction expansion platform 406 is reinforced by the reinforcing connecting piece 600, which can effectively prevent the construction expansion platform 406 from being separated from the construction platform plate 401, improve the stability of the construction expansion platform 406, and also prevent the construction personnel working on the construction expansion platform 406 from falling, thereby ensuring the safety of construction operation.

[0055] Optionally, the reinforcing connecting piece 600 is a connecting chain, the protective baffle 405 is provided with a receiving groove 407, a contraction disc is arranged in the receiving groove 407, one end of the connecting chain is wound on the contraction disc, and the other end is connected with the construction expansion platform 406. In this way, when the construction expansion platform 406 needs to be rotated and opened, the contraction disc releases the connecting chain, and the protective baffle 405 and the construction expansion platform 406 are always in a connected state by the connecting chain, which can effectively reinforce the construction expansion platform 406 and ensure the stability and safety of the construction expansion platform 406 after rotation.

[0056] It can be understood that the reinforcing connecting piece 600 can also be a telescopic rod structure, which will not be described here.

[0057] As Figure 7As shown, the mounting column 403 and the second driving part 502 are both located outside the fence 402. In this way, the mounting column 403 and the second driving part 502 are both spaced apart from the internal space of the fence 402, which can not only reduce the influence of the construction operation on the position adjustment process of the construction platform 400, but also avoid the situation that the second driving part 502 and the connecting plate 300 hurt the construction workers during the movement, thereby ensuring the stability of the position adjustment process of the construction platform 400 and the safety of the construction workers.

[0058] Optionally, the moving platform 100 is provided with a storage groove 101. In this way, the weight of the moving platform 100 and the construction platform 400 can be balanced by placing articles in the storage groove 101, which can avoid the situation that the moving platform 100 is tilted due to the over-heavy construction platform 400, thereby ensuring the safety of the construction operation, and the storage groove 101 can place the tools used for the construction operation, thereby providing greater convenience for the construction operation.

[0059] The above description and drawings sufficiently show the embodiments of the present disclosure to enable one skilled in the art to practice them. Other embodiments can include structural and other changes. The embodiments represent only the possible variations. Individual components and functions are optional unless explicitly required, and the order of operations can be changed. Parts and features of some embodiments can be included or replaced by parts and features of other embodiments. The embodiments of the present disclosure are not limited to the structures described above and shown in the drawings, and various modifications and changes can be made without departing from the scope thereof. The scope of the present disclosure is limited only by the appended claims.

Claims

1. A work platform for bridge side construction, characterized by, The utility model relates to a movable platform (100) is provided with the mounting support (200) on, and the mounting support (200) is movably provided with the connecting plate (300) on the horizontal, and the construction platform (400) is provided with the mounting stand (403) on the construction platform (401), and the mounting stand (403) is movably connected with the connecting plate (300), and the fence (402) is arranged on the construction platform (401), and the fence (402) one side wall towards the movable platform (100) is the structure that can be folded, and in the case where it is turned to the first position, the side wall is perpendicular to the construction platform (401), in the case where it is turned to the second position, the side wall is parallel to the construction platform (401), and the drive structure (500) includes the first drive part (501) and the second drive part (502), and the first drive part (501) is arranged on the first mounting support (200) and is connected with the connecting plate (300), is used for driving the horizontal reciprocating movement of connecting plate (300), and the second drive part (502) is arranged on the construction platform (401) and is connected with the connecting plate (300), and is used for driving the vertical lifting movement of construction platform (401). The mounting support (200) is inverted U-shaped structure, and the top side wall of mounting support (200) defines a movable chamber, one end of connecting plate (300) movably penetrates into the movable chamber, the first drive part (501) is connected with the connecting plate (300) in the movable chamber, for driving the horizontal reciprocating movement of connecting plate (300) along the movable chamber. The top side wall of mounting support (200) is provided with a notch (201) in communication with the movable chamber, the side of connecting plate (300) corresponding to the notch (201) is provided with a sawtooth, the first drive part (501) includes a drive motor (503), a drive shaft (504) and a first drive gear (505), the drive motor (503) is arranged on the mounting support (200), one end of the drive shaft (504) is connected with the drive motor (503), the first drive gear (505) is installed on the drive shaft (504), and the first drive gear (505) is meshed with the side of connecting plate (300) in the movable chamber with a sawtooth. The mounting support (200) is arranged in pairs, and the pair of mounting supports (200) are correspondingly arranged on the opposite sides of the movable platform (100), wherein each mounting support (200) is correspondingly provided with a connecting plate (300), and the two connecting plates (300) are driven by the first drive part (501).

2. The work platform for bridge side construction according to claim 1, wherein The connecting plate (300) is movably sleeved on the mounting stand (403), and the second drive part (502) is parallelly arranged on one side of the mounting stand (403).

3. The work platform for bridge side construction according to claim 2, wherein The top of the mounting stand (403) is provided with a limiting stopper (404).

4. The work platform for bridge side construction according to claim 2, wherein The fence (402) includes:

5. The work platform for bridge side construction according to claim 1, wherein The protective baffle (405) is a U-shaped structure with an opening, the protective baffle (405) is arranged on the construction platform (401), and the opening thereof faces the movable platform (100).

6. The work platform for bridge side construction according to claim 5, wherein ​ 7. A work platform for bridge side construction according to any one of claims 1 to 6, characterized in that ​ ​ The construction extension platform (406) is arranged at the open position of the protective baffle (405), and the bottom side of the construction extension platform (406) is rotatably connected with the construction platform (401).

8. The work platform for bridge side construction according to claim 7, wherein The side wall of the construction extension platform (406) is connected with the protective baffle (405) through the reinforcing connecting piece (600).

9. A work platform for bridge side construction according to any one of claims 1 to 6, characterized in that The mounting column (403) and the second driving part (502) are located outside the fence (402).

10. The work platform for bridge side construction according to any one of claims 1 to 6, characterized in that, The moving platform (100) is provided with a storage groove (101).