Anti-seepage plugging structure of dewatering well

By employing a sealed flange structure and a water pipe drainage system in the dewatering wells, the problem of groundwater leakage during construction was solved, achieving effective sealing of the dewatering well openings and ensuring construction stability.

CN223647076UActive Publication Date: 2025-12-09GUANGDONG HUALIANG CONSTR CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202423244292.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-12-26
Publication Date
2025-12-09
Estimated Expiration
2034-12-26

AI Technical Summary

Technical Problem

In existing technologies, groundwater is allowed to rise freely during the construction of dewatering wells, which require temporary sealing to avoid affecting the construction process. However, the lack of effective sealing measures leads to water seepage problems.

Method used

The system employs a sealed flange structure, which is welded to a steel sleeve via a steel ring. A sealing rubber gasket and screws are installed on the flange ring for fixation. Combined with water supply pipes and valves for drainage, the sealing structure is ensured to be airtight. Air pressure is controlled during the filling of the impermeable material to prevent leakage.

Benefits of technology

This achieved effective sealing of the wellhead of the dewatering well, preventing water seepage, improving the structural sealing during construction, and ensuring smooth construction.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN223647076U_ABST
    Figure CN223647076U_ABST
Patent Text Reader

Abstract

The utility model discloses an anti-seepage plugging structure of a dewatering well, and relates to the technical field of building construction. The dewatering sleeve comprises a dewatering sleeve body, two fixing blocks are fixedly connected to the bottom of the dewatering sleeve body, the two fixing blocks are arranged on the annular face of the dewatering sleeve body in an annular array mode, threaded steel bars are fixedly connected to the inner walls of the two dewatering sleeve bodies, a steel ring is fixedly connected to the outer surface of the dewatering sleeve body, and a steel sleeve is arranged at the top of the steel ring. The steel sleeve is slidably connected with the outer surface of the dewatering sleeve, and the top of the steel sleeve is fixedly connected with a first flange ring. The sealing flange is arranged, specifically, the dewatering sleeve on the top of the steel ring is sleeved with the steel sleeve and then connected with the steel ring in a welding mode, then a worker assembles the sealing rubber pad in the assembling groove in the top of the first flange ring, and the sealing flange is fixed to the first flange ring through the screws. Therefore, the function of sealing the flange is achieved, water seepage at the joint is prevented, and the sealing performance of the structure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

TECHNICAL FIELD

[0001] The utility model belongs to the field of building construction technology, especially, relate to a dewatering well anti -infiltration plugging structure. BACKGROUND

[0002] Dewatering well is a kind of facility used in the process of earth excavation to lower groundwater level or drain underground water, plays an important role in keeping dry foundation pit and increasing slope stability, when excavating foundation pit, dewatering well can prevent the seepage of foundation pit slope and base due to underground water infiltration, keep the dry foundation pit bottom to facilitate construction, and increase the stability of slope and slope bottom, prevent soil particle loss, improve soil consolidation degree and foundation shear strength.

[0003] In the construction project with the water level of groundwater higher than the elevation of foundation raft and sump, the opening at the top of dewatering well needs to be finally plugged after the final construction is completed to avoid the upward return of underground water.Before the final plugging of the opening of dewatering well, underground water is usually allowed to freely return upward and be discharged by drainage equipment (through pressure relief of dewatering well), but temporary plugging of the wellhead of dewatering well is sometimes needed to avoid the influence of underground water on current construction process. UTILITARY MODEL

[0004] The utility model aims at providing a dewatering well anti-infiltration plugging structure, by setting sealing flange, specifically steel ring top dewatering sleeve is sleeved with steel sleeve, and is connected together with steel ring by welding mode, then staff again installs sealing rubber pad in flange ring one top assembling groove, and sealing flange is fixed on flange ring one by screw, thus reach the function of sealing flange, prevent the seepage of connecting portion, improve the sealing property of structure, solve the problem that current underground water is usually allowed to freely return upward and be discharged by drainage equipment (through pressure relief of dewatering well), but temporary plugging of the wellhead of dewatering well is sometimes needed to avoid the influence of underground water on current construction process.

[0005] To solve the above technical problem, the utility model is realized by the following technical scheme:

[0006] The utility model relates to a dewatering well anti-infiltration plugging structure, including dewatering sleeve, dewatering sleeve bottom fixedly connected with two fixed blocks, two fixed blocks are arranged in the form of annular array around the surface of dewatering sleeve, and the inner wall of dewatering sleeve is fixedly connected with screw thread steel strip, the outer surface of dewatering sleeve is fixedly connected with steel ring, the top of steel ring is provided with steel sleeve, the outer surface of dewatering sleeve is connected with steel sleeve in sliding mode, and the top of steel sleeve is connected with flange ring one.

[0007] Further, the flange ring one top is provided with an assembly groove, the inner wall of the assembly groove is in contact with a sealing rubber pad, the top of the sealing rubber pad is fixedly connected with a sealing flange through screws, and the top of the sealing flange is provided with a water delivery pipe.

[0008] Further, the outer surface of the water delivery pipe is fixedly connected with a valve, the top of the valve is fixedly connected with a valve handle, the right side of the water delivery pipe is provided with a filling pipe, and the bottom of the filling pipe penetrates through the sealing rubber pad and extends to the bottom.

[0009] Further, the top of the filling pipe is fixedly connected with a fixed flange, the top of the fixed flange is fixedly connected with a flange ring pipe through screws, the top of the flange ring pipe is fixedly connected with a flange ring two, and the outer surface of the flange ring pipe is in contact with the inner wall of the filling pipe.

[0010] The utility model has the following beneficial effects:

[0011] 1, the utility model discloses a sealing flange is set up, specifically is the precipitation sleeve of steel ring top and is set up steel cover, and then is connected together with steel ring through the welding mode, and then the staff again installs the sealing rubber pad in the assembly groove of flange ring one top, and the sealing flange is fixed on the flange ring one through screw, thereby reaches the function of sealing flange, prevents the water seepage of connecting portion, and improves the sealing property of structure.

[0012] 2, the utility model discloses a water delivery pipe is set up, specifically is then injects the material that prevents the water counterpermeation in the precipitation sleeve inside, when filling material, first opens the valve through the valve handle, thereby discharges water through the water delivery pipe, avoids the unnecessary leakage caused by the internal pressure increase of precipitation sleeve when filling the anti -infiltration material, then inserts the flange ring pipe into the filling pipe inside, and extends into the precipitation sleeve inside downwards, and fixed flange and flange ring pipe are fixedly connected through screw, avoid the flange ring pipe shaking when filling, causes the problem in the filling process, finally, the filling equipment is connected through the flange ring two, thereby completes the filling work.

[0013] Of course, any product implementing the utility model does not necessarily need to achieve all the advantages mentioned above. DRAWINGS

[0014] In order to more clearly illustrate the technical scheme of the embodiments of the utility model, the following will be to the embodiment description needed to use the drawing briefly introduced, obviously, the following description in the drawing is only some embodiments of the utility model, for those skilled in the art, under the premise of not paying the creative labor, still can obtain other drawings according to these drawings.

[0015] Figure 1The utility model discloses a whole structure schematic diagram.

[0016] Figure 2 The utility model discloses a sealing rubber pad structure schematic diagram.

[0017] Figure 3 The utility model discloses an assembly groove structure schematic diagram.

[0018] Figure 4 The utility model discloses a valve handle structure schematic diagram.

[0019] Figure 5 The utility model discloses a fixed flange pipe structure schematic diagram.

[0020] In the drawing, the component list that each sign represents is as follows:

[0021] 1, precipitation sleeve;11, fixed block;12, screw strip;2, steel ring;21, steel cover;22, flange ring one;221, assembly groove;23, sealing rubber pad;24, sealing flange;25, water delivery pipe;251, valve handle;252, valve;3, flange ring two;31, filling pipe;311, fixed flange;32, flange ring pipe. Specific implementation

[0022] The technical scheme in the embodiments of the utility model will be described clearly and completely below in combination with the drawings in the embodiments of the utility model, and obviously, the described embodiments only are a part of the embodiments of the utility model, not all the embodiments. Based on the embodiments in the utility model, all other embodiments that the ordinary skilled in the art obtains without making creative labor all belong to the range of protection of the utility model.

[0023] Please refer to Figures 1-5As shown, the utility model is a kind of precipitation well anti-seepage plugging structure, including precipitation sleeve 1, two fixed blocks 11 are fixedly connected to the bottom of precipitation sleeve 1, two fixed blocks 11 are arranged in annular array with the ring surface of precipitation sleeve 1, the inner wall of two precipitation sleeve 1 is fixedly connected with screw thread steel strip 12, the outer surface of precipitation sleeve 1 is fixedly connected with steel ring 2, steel ring 2 top is provided with steel sleeve 21, steel sleeve 21 is slidably connected with the outer surface of precipitation sleeve 1, flange ring one 22 is connected to the top of steel sleeve 21, by the structure of flange ring one 22, increase the effect of anti-seepage, flange ring one 22 top is provided with assembly groove 221, sealing rubber pad 23 is contacted in the inner wall of assembly groove 221, sealing flange 24 is fixedly connected with sealing rubber pad 23 top by screw, by setting sealing flange 24, specifically, the precipitation sleeve 1 of steel ring 2 top is covered steel sleeve 21, and then by welding mode and steel ring 2 are connected together, then staff again sealing rubber pad 23 is assembled in the assembly groove 221 of flange ring one 22 top inside, and sealing flange 24 is fixed on flange ring one 22 by screw, thereby reach the function of sealing flange 24, prevent the seepage of connecting portion, improve the sealing property of structure, sealing flange 24 top is provided with water delivery pipe 25, water delivery pipe 25 bottom penetrates sealing rubber pad 23 and extends to inside, by setting water delivery pipe 25, specifically, then inject the material for preventing the reverse osmosis of water in the inside of precipitation sleeve 1 in the inside of precipitation sleeve 1, when filling material, first, valve handle 251 is opened to valve 252, so as to discharge water through water delivery pipe 25, avoid the unnecessary leakage caused by the increase of internal pressure of precipitation sleeve 1 when filling anti-seepage material, then, flange ring pipe 32 is inserted into filling pipe 31 inside, and extends into the inside of precipitation sleeve 1 downwards, sealing flange 311 is fixedly connected with flange ring pipe 32 by screw simultaneously, avoid flange ring pipe 32 to shake when filling, cause problem in filling process, finally, flange ring two 3 is connected to filling equipment, so as to complete filling operation, the outer surface of water delivery pipe 25 is fixedly connected with valve 252, valve handle 251 is fixedly connected with the top of valve 252, filling pipe 31 is arranged on the right side of water delivery pipe 25, filling pipe 31 bottom penetrates sealing rubber pad 23 and extends to bottom, water in the inside of precipitation sleeve 1 is discharged outward through water delivery pipe 25, so as to adjust the internal pressure of precipitation sleeve 1 and then fill anti-seepage material, fixed flange 311 is fixedly connected at the top of filling pipe 31, flange ring pipe 32 is fixedly connected with fixed flange 311 top by screw, flange ring pipe 32 top is fixedly connected with flange ring two 3 by cooperating filling equipment to fill anti-seepage material in the inside of precipitation sleeve 1, the outer surface of flange ring pipe 32 is connected with the inner wall of filling pipe 31, and filling equipment is connected through flange ring two 3.

[0024] One specific application of the embodiment is: in specific use, first, the two fixed blocks 11 at the bottom of the precipitation sleeve 1 are installed on the two threaded steel strips 12, then the precipitation sleeve 1 is buried underground and cement is poured around the precipitation sleeve 1, so that the precipitation sleeve 1 is kept stable and the precipitation sleeve 1 is prevented from being inclined and causing leakage at the bottom of the precipitation sleeve 1, then the steel ring 2 is welded on the outer surface of the precipitation sleeve 1, the steel sleeve 21 is sleeved on the precipitation sleeve 1 at the top of the steel ring 2 and is connected with the steel ring 2 by welding, then the sealing rubber pad 23 is assembled in the assembly groove 221 at the top of the flange ring one 22, and the sealing flange 24 is fixed on the flange ring one 22 by screws, so that the function of the sealing flange 24 is achieved, the connection is prevented from leaking, the sealing property of the structure is improved, then the material for preventing the back seepage of water in the precipitation sleeve 1 is injected into the precipitation sleeve 1, when the material is filled, the valve 252 is opened by the valve handle 251, so that the water is discharged through the water pipe 25, the unnecessary leakage caused by the increase of the air pressure in the precipitation sleeve 1 during the filling of the anti-seepage material is avoided, then the flange ring pipe 32 is inserted into the filling pipe 31 and extends into the precipitation sleeve 1, and the fixed flange 311 is fixedly connected with the flange ring pipe 32 by screws, so that the flange ring pipe 32 is prevented from shaking during the filling and causing problems in the filling process, finally, the filling equipment is connected through the flange ring two 3, so that the filling work is completed.

[0025] In the description of the present specification, the description of the terms "one embodiment", "example", "specific example" and the like means that the specific features, structures, materials or characteristics described in conjunction with the embodiments or examples are contained in at least one embodiment or example of the present application. In the present specification, the illustrative description of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0026] The preferred embodiments of the application disclosed above are only used to help explain the application. The preferred embodiments do not describe all the details and limit the application to the specific embodiments described. Obviously, according to the content of the specification, many modifications and changes can be made. The embodiments are selected and described in the specification in order to better explain the principles and practical applications of the application, so that the persons skilled in the art can well understand and utilize the application. The application is limited by the claims and their entire scope and equivalents.

Claims

1. A seepage prevention and sealing structure for a dewatering well, comprising a dewatering sleeve (1), wherein two fixing blocks (11) are fixedly connected to the bottom of the dewatering sleeve (1), characterized in that: The two fixed blocks (11) are arranged in a ring array on the annular surface of the rainwater sleeve (1). The inner walls of the two rainwater sleeves (1) are fixedly connected with threaded steel bars (12). The outer surface of the rainwater sleeve (1) is fixedly connected with a steel ring (2). A steel sleeve (21) is provided on the top of the steel ring (2). The steel sleeve (21) is slidably connected to the outer surface of the rainwater sleeve (1). A flange ring (22) is fixedly connected to the top of the steel sleeve (21).

2. The seepage prevention and plugging structure for a dewatering well according to claim 1, characterized in that, The flange ring (22) has an assembly groove (221) at the top. The inner wall of the assembly groove (221) is in contact with a sealing rubber gasket (23). The top of the sealing rubber gasket (23) is fixedly connected to a sealing flange (24) by screws.

3. The seepage prevention and plugging structure for a dewatering well according to claim 2, characterized in that, The sealing flange (24) is provided with a water supply pipe (25) at the top, and the bottom of the water supply pipe (25) passes through the sealing rubber gasket (23) and extends into the interior.

4. The seepage prevention and plugging structure for a dewatering well according to claim 3, characterized in that, A valve (252) is fixedly connected to the outer surface of the water pipe (25), and a valve handle (251) is fixedly connected to the top of the valve (252).

5. The seepage prevention and plugging structure for a dewatering well according to claim 4, characterized in that, A filling tube (31) is provided on the right side of the water supply pipe (25), and the bottom of the filling tube (31) passes through the sealing rubber gasket (23) and extends to the bottom.

6. The seepage prevention and plugging structure for a dewatering well according to claim 5, characterized in that, The top of the filling tube (31) is fixedly connected to a fixed flange (311), and the top of the fixed flange (311) is fixedly connected to a flange ring tube (32) by screws.

7. The seepage prevention and plugging structure for a dewatering well according to claim 6, characterized in that, The flange ring tube (32) is fixedly connected to the top of the flange ring tube (32), and the outer surface of the flange ring tube (32) is in contact with the inner wall of the filling tube (31).